CN106384203A - PRM production work confirmation system - Google Patents
PRM production work confirmation system Download PDFInfo
- Publication number
- CN106384203A CN106384203A CN201610871999.6A CN201610871999A CN106384203A CN 106384203 A CN106384203 A CN 106384203A CN 201610871999 A CN201610871999 A CN 201610871999A CN 106384203 A CN106384203 A CN 106384203A
- Authority
- CN
- China
- Prior art keywords
- report
- module
- work
- report work
- personnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 10
- 238000012790 confirmation Methods 0.000 title abstract 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 9
- 238000009795 derivation Methods 0.000 claims description 3
- 238000000354 decomposition reaction Methods 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 2
- 238000012544 monitoring process Methods 0.000 abstract 1
- 238000013468 resource allocation Methods 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K7/00—Methods or arrangements for sensing record carriers, e.g. for reading patterns
- G06K7/10—Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation
- G06K7/14—Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation using light without selection of wavelength, e.g. sensing reflected white light
- G06K7/1404—Methods for optical code recognition
- G06K7/1408—Methods for optical code recognition the method being specifically adapted for the type of code
- G06K7/1417—2D bar codes
Abstract
The invention belongs to the technical field of automobile component production statistics, and provides a PRM production work confirmation system comprising a total statistical terminal, an equipment work confirmation side, a personnel work confirmation side, a webpage work confirmation side and a barcode generation side. The advantages of the PRM production work confirmation system are that real-time statistical monitoring can be performed on equipment and personnel work confirmation through the system so that managers can check in real time and timely and efficiently process the situations and the problems of tasks, and thus efficient resource allocation can be performed; and the standard work hours of the project can be acquired, the employee performance can be assessed, the labor cost of the project can be accounted, and thus the labor cost of the project can be reduced and the work efficiency of the employees can be enhanced.
Description
Technical field
The invention belongs to auto parts and components production leadtime technical field, it is related to a kind of PRM and produces report work system.
Background technology
Report work system, its implication is exactly to express employee to make a report on or report the system that project man-hour and content are used.In state
This system outer is called (timesheet, etimesheet), and Chinese is referred to as electronics man-hour table, has again and is called timetable, main use
Way is record, the statistics and analysis employee work in every task definition in project and non-project and the time being spent, in order to
Collection project standard work force, examine Employees' achievement, Perform Project Financial Aanalysis cost of labor, thus reduce project cost of labor, improve employee
Operating efficiency, existing domestic report work systemic-function more single it is impossible to accomplish to report the effect of work comprehensively, be simultaneous for equipment meeting
Failing to report phenomenon occurs, part still rely on artificial report work, artificial report work drawback, send a duplicate to data not in time, data no verifies, passes on
The problems such as data is error-prone.
Content of the invention
The technical problem to be solved is the present situation for prior art, and provides a kind of Data Collection simple,
Clearly grasp work in every progress, the PRM improving operating efficiency produces report work system.
The present invention solves the technical scheme that adopted of above-mentioned technical problem:A kind of PRM produces report work system, and its feature exists
In, include total statistics terminal, equipment report work end, personnel's report work end, webpage report work end and bar code and generate end, described equipment
Report work end, personnel report work end and webpage report work end are all connected to always count in terminal, are connected with bar shaped on equipment report work end
Scanner, described bar code generates end and is used for producing bar code, is connected with items of equipment frock on bar shaped scanner, described
Bar code is pasted onto in items of equipment frock, and described bar shaped scanner is used for scanning bar code will be defeated for this items of equipment frock
Enter on equipment report work end and finally enter total statistics terminal to be counted, described personnel's report work end is used for entry personnel's information
After carry out reporting work statistics, described webpage report work end is used for external staff and is carried out report work after network port entry personnel's information
Statistics.
The measure taken for optimizing such scheme specifically includes:
Produce in report work system in a kind of above-mentioned PRM, described equipment report work end includes items of equipment frock and shows
Module, the module that goes into operation and shut-down module, described items of equipment frock display module is used for showing the frock of work statistics to be reported
Information, described go into operation module for record start between the report man-hour executing, described shut-down module is used for record and stops executing
Report man-hour between.
Produce in report work system in a kind of above-mentioned PRM, described personnel's report work end include personal information input module,
The module that goes into operation and shut-down module, described personal information input module is used for inputting employee's job number and password, and described goes into operation
Module is used for record and starts between the report man-hour executing, and described shut-down module was used between the report man-hour that record stops execution.
Produce in report work system in a kind of above-mentioned PRM, be connected between described webpage report work end and total statistics terminal
WEB data terminal, described webpage report work end is passed through WEB data terminal and is connected with total statistics terminal foundation, described webpage report work end
Also personal information input module, the module that goes into operation and shut-down module are included, described personal information input module is used for inputting
Employee's job number and password, described go into operation module for record start execution report man-hour between, described shut-down module is used for remembering
Record stopped between the report man-hour of execution.
Produce in report work system in a kind of above-mentioned PRM, described bar code generation end includes production work order, serial number divides
Solution, software flow derivation, flowing water information and bar code software, described production work order and serial number decompose for producing flowing water
Number, described software flow is derived for deriving serial number, and described flowing water information and bar code software are used for serial number
Become to produce bar code.
Compared with prior art, it is an advantage of the current invention that work can be reported to carry out reality equipment and personnel by this system
When Statistical monitor so that manager can with real time inspection, and to task occur situation and a difficult problem carry out timely and efficient
Process, carry out efficient resource distribution, can gather project standard work force, examine Employees' achievement, Perform Project Financial Aanalysis cost of labor, by
This reduces project cost of labor, improves staffing effectiveness.
Brief description
Fig. 1 is that this PRM produces report work system diagram.
Specific embodiment
The following is the specific embodiment of the present invention and combine accompanying drawing, technical scheme is further described,
But the present invention is not limited to these embodiments.
In figure, total statistics terminal 1;Equipment report work end 2;Personnel report work end 3;Webpage report work end 4;Bar code generates end 5;Bar shaped
Scanner 6;Items of equipment frock 7;Produce work order 8;Serial number decomposes 9;Software flow derives 10;Flowing water information 11;Bar code is soft
Part 12;Bar code 13;Personal information input module 14;The module that goes into operation 15;Shut-down module 16;WEB data terminal 17;Items of equipment work
Dress display module 18.
As shown in figure 1, this PRM produces report work system, include total statistics terminal 1, equipment report work end 2, personnel's report work end
3rd, webpage report work end 4 and bar code generate end 5, and equipment report work end 2, personnel report work end 3 and webpage report work end 4 are all connected to always
In statistics terminal 1, this newspaper work system is broadly divided into three class forms and carries out reporting work here, and the first kind is to carry out reporting work using equipment,
Bar shaped scanner 6 is connected with equipment report work end 2, bar code generates end 5 and is used for producing bar code 13, and bar code generates end 5 here
Include production work order 8, serial number decomposes 9, software flow derivation 10, flowing water information 11 and bar code software 12, produces work order 8
Decompose 9 with serial number and be used for producing serial number, software flow is derived 10 and is used for deriving serial number, flowing water information 11 and bar code
Software 12 is used for becoming to produce bar code 13 by serial number, and equipment report work end 2 includes items of equipment frock display module 18, go into operation mould
Block 14 and shut-down module 15, items of equipment frock display module 18 is used for showing the frock information of work statistics to be reported, go into operation mould
Block 14 is used for record and starts between the report man-hour executing, and shut-down module 15 was used between the report man-hour that record stops execution, swept in bar shaped
Retouch and items of equipment frock 7 is connected with rifle 6, bar code 13 is pasted onto in items of equipment frock 7, described bar shaped scanner 6 is used
It is input on equipment report work end 2 and finally enters total statistics terminal 1 to carry out in scanning bar code 13 and by this items of equipment frock 7
Statistics, corresponding items of equipment frock 7 information of each bar code 13 correspondence here, for the entirety of recording equipment project frock 7
Run time, thus calculate cost information.
Another mode is to report work end 3 to be used for after entry personnel's information carrying out reporting work statistics, personnel here using personnel
Report work end 3 includes personal information input module 14, the module that goes into operation 15 and shut-down module 16, and described personal information inputs mould
Block 14 is used for inputting employee's job number and password, and the module that goes into operation 15 is used for record and starts between the report man-hour executing, and shut-down module 16 is used
Stop between the report man-hour of execution in record, when reporting work end 3 to carry out reporting man-hour can record each personnel and work daily using personnel
Between, the form of calendar type can be produced.
Another mode is laggard by network port entry personnel's information for external staff using webpage report work end 4
Row report work statistics, is connected with WEB data terminal 17 between webpage report work end 4 and total statistics terminal 1, webpage report work end 4 is passed through here
WEB data terminal 17 is set up with total statistics terminal 1 and is connected, and webpage report work end 4 also includes personal information input module 14, go into operation mould
Block 15 and shut-down module 16, personal information input module 14 is used for inputting employee's job number and password, and the module that goes into operation 15 is used for remembering
Record starts between the report man-hour executing, and shut-down module 16 was used between the report man-hour that record stops execution.
Specific embodiment described herein is only explanation for example to present invention spirit.The affiliated technology of the present invention is led
The technical staff in domain can be made various modifications or supplement or replaced using similar mode to described specific embodiment
Generation, but without departing from scope defined in the spirit of the present invention.
Claims (5)
1. a kind of PRM produce report work system it is characterised in that include total statistics terminal, equipment report work end, personnel's report work end,
Webpage report work end and bar code generate end, and described equipment report work end, personnel report work end and webpage report work end to be all connected to always
In statistics terminal, bar shaped scanner is connected with equipment report work end, described bar code generates end and is used for producing bar code, in bar
Items of equipment frock is connected with shape scanner, described bar code is pasted onto in items of equipment frock, described bar shaped scans
Rifle is used for scanning bar code and this items of equipment frock being input on equipment report work end and finally enters total statistics terminal carrying out
Statistics, described personnel's report work end carries out reporting work statistics after being used for entry personnel's information, and described webpage report work end is used for outside
Personnel carry out reporting work statistics after network port entry personnel's information.
2. a kind of PRM according to claim 1 produces report work system it is characterised in that described equipment report work end includes
There are items of equipment frock display module, the module that goes into operation and shut-down module, described items of equipment frock display module is used for showing
Show the frock information of work to be reported statistics, described go into operation module for record start execution report man-hour between, described shut-down mould
Block was used between the report man-hour that record stops execution.
3. a kind of PRM according to claim 1 produces report work system it is characterised in that described personnel's report work end includes
There are personnel's MIM message input module, the module that goes into operation and shut-down module, described personal information input module is used for inputting employee's work
Number and password, described go into operation module for record start between the report man-hour executing, described shut-down module is used for record stopping
Between the report man-hour of execution.
4. a kind of PRM according to claim 1 produces report work system it is characterised in that described webpage report work end is with always
It is connected with WEB data terminal, described webpage report work end is passed through WEB data terminal and set up even with total statistics terminal between statistics terminal
Connect, described webpage report work end also includes personal information input module, the module that goes into operation and shut-down module, described personnel believe
Breath input module is used for inputting employee's job number and password, described go into operation module for record start execution report man-hour between, institute
The shut-down module stated was used between the report man-hour that record stops execution.
5. a kind of PRM according to claim 1 produces report work system it is characterised in that described bar code generation end includes
There are production work order, serial number decomposition, software flow derivation, flowing water information and bar code software, described production work order and flowing water
Number decompose for producing serial number, described software flow is derived for deriving serial number, described flowing water information and bar
Code software is used for becoming to produce bar code by serial number.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610871999.6A CN106384203A (en) | 2016-09-30 | 2016-09-30 | PRM production work confirmation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610871999.6A CN106384203A (en) | 2016-09-30 | 2016-09-30 | PRM production work confirmation system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106384203A true CN106384203A (en) | 2017-02-08 |
Family
ID=57936967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610871999.6A Pending CN106384203A (en) | 2016-09-30 | 2016-09-30 | PRM production work confirmation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106384203A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108171418A (en) * | 2017-12-27 | 2018-06-15 | 深圳春沐源控股有限公司 | Data processing method, device, electronic equipment and computer readable storage medium |
CN109598483A (en) * | 2018-12-03 | 2019-04-09 | 四川长虹电器股份有限公司 | A kind of accurate report work method of the web front-end based on calendar |
CN111158311A (en) * | 2020-02-12 | 2020-05-15 | 福建惠安新然石材有限公司 | Numerical control machine tool part counting management method |
CN113240301A (en) * | 2021-05-20 | 2021-08-10 | 北京创源微致软件有限公司 | Production work reporting system, production work reporting method, electronic device and readable storage medium |
CN114065794A (en) * | 2021-11-26 | 2022-02-18 | 重庆允成互联网科技有限公司 | Production and work reporting method, system and equipment based on multi-dimensional two-dimensional code |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103616853A (en) * | 2013-10-18 | 2014-03-05 | 中铁宝桥(南京)有限公司 | Turnout production plan execution system and working method |
CN206489612U (en) * | 2016-09-30 | 2017-09-12 | 宁波信泰机械有限公司 | One kind production report work system |
-
2016
- 2016-09-30 CN CN201610871999.6A patent/CN106384203A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103616853A (en) * | 2013-10-18 | 2014-03-05 | 中铁宝桥(南京)有限公司 | Turnout production plan execution system and working method |
CN206489612U (en) * | 2016-09-30 | 2017-09-12 | 宁波信泰机械有限公司 | One kind production report work system |
Non-Patent Citations (2)
Title |
---|
刘三文: "基于ERP的博威集团成本管理改进研究", no. 2, pages 40 * |
黎先才: "基于MES系统集成的车间数字化管理系统的应用研究", no. 12, pages 29 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108171418A (en) * | 2017-12-27 | 2018-06-15 | 深圳春沐源控股有限公司 | Data processing method, device, electronic equipment and computer readable storage medium |
CN109598483A (en) * | 2018-12-03 | 2019-04-09 | 四川长虹电器股份有限公司 | A kind of accurate report work method of the web front-end based on calendar |
CN111158311A (en) * | 2020-02-12 | 2020-05-15 | 福建惠安新然石材有限公司 | Numerical control machine tool part counting management method |
CN113240301A (en) * | 2021-05-20 | 2021-08-10 | 北京创源微致软件有限公司 | Production work reporting system, production work reporting method, electronic device and readable storage medium |
CN114065794A (en) * | 2021-11-26 | 2022-02-18 | 重庆允成互联网科技有限公司 | Production and work reporting method, system and equipment based on multi-dimensional two-dimensional code |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106384203A (en) | PRM production work confirmation system | |
Qing et al. | Quality risk management model for railway construction projects | |
CN206489612U (en) | One kind production report work system | |
CN104778414A (en) | Vulnerability management system and method | |
CN110189098A (en) | A kind of online reviewing method | |
CN105023117A (en) | Electrified detection standardized operation management system based on mobile and cloud computing technologies | |
CN107037794B (en) | A kind of nonlinear restriction scheduling optimization system based on electroplating assembly line | |
CN103971294B (en) | One kind assesses information display system based on power transmission and transformation equipment state | |
CN110135598A (en) | A kind of high-speed railway electricity business maintenance auxiliary system of knowledge based service | |
CN104881763A (en) | Fixed-asset information management system | |
CN105447631A (en) | Subway engineering tri-network intelligent control system and method thereof | |
CN111950846A (en) | Intelligent factory shift scheduling system | |
CN110188999A (en) | DMS digital production management system | |
CN110880090A (en) | Aviation part manufacturing digital management system | |
CN107480259A (en) | A kind of dynamic and visual enterprise management system and application process based on index system | |
Hicks | The language of collaborative engineering projects | |
CN206236144U (en) | Electronics report work system based on intelligent terminal | |
CN107423035A (en) | A kind of software development process product data management system | |
CN202210236U (en) | Textile industry on-site monitoring system | |
CN112085412B (en) | Resource optimization distribution system and distribution method | |
CN112241428A (en) | Digital decision-making method and system | |
Goel et al. | End-to-end process extraction in process unaware systems | |
CN109447464A (en) | A kind of thermal power plant's anomaly analysis evaluation system | |
CN106503875A (en) | A kind of propulsion project management method of Computer systems | |
CN108388997A (en) | Task record selective examination system and method based on Quick Response Code |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination |