CN109598483A - A kind of accurate report work method of the web front-end based on calendar - Google Patents

A kind of accurate report work method of the web front-end based on calendar Download PDF

Info

Publication number
CN109598483A
CN109598483A CN201811467345.2A CN201811467345A CN109598483A CN 109598483 A CN109598483 A CN 109598483A CN 201811467345 A CN201811467345 A CN 201811467345A CN 109598483 A CN109598483 A CN 109598483A
Authority
CN
China
Prior art keywords
report work
report
calendar
work
accurate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811467345.2A
Other languages
Chinese (zh)
Inventor
庞磊
孔帅
林�建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Changhong Electric Co Ltd
Original Assignee
Sichuan Changhong Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Changhong Electric Co Ltd filed Critical Sichuan Changhong Electric Co Ltd
Priority to CN201811467345.2A priority Critical patent/CN109598483A/en
Publication of CN109598483A publication Critical patent/CN109598483A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of accurate report work method the invention discloses web front-end based on calendar is related to web front-end technical field, including step 1: the accurate report work time component of setting and report work entrance associated there;Step 2: user enters report work time component by the report work entrance in step 1 and chooses the report work period, fills in report work content and is committed to back-end server;Step 3: server by the report work information that step 2 is submitted carry out processing is transferred to audit list for administrative staff audit, while feed back to report work time component on shown;And after user reports work, the application for cancelling or reporting again can be initiated at report work time component.User can directly select the corresponding period to carry out filling in for report work information on webpage, then be submitted to background server, and server transport to audit list is audited for administrative staff, no longer needs to fill in paper report, simplify management process, and convenient for management.

Description

A kind of accurate report work method of the web front-end based on calendar
Technical field
The present invention relates to web front-end technical fields, are a kind of accurate report work side of the web front-end based on calendar specifically Method.
Background technique
Web front end application has entered the web2.0 stage, although still web technology core is HTML, CSS, JS carriage drawn by a team of three horses. Firstly, the standardization and development of JS language itself have initially entered the new stage from ES6, secondly, front end ecology also becomes increasingly prosperous, it is excellent Elegant front end frame emerges one after another, Angular, React, Vue etc.;Modularization and packaging technique and tool also closely follow technology into Step, has adapted to the development of front-end technology.Web front-end technology in life using more and more, especially for all kinds of The application of business administration is very common also very practical.
For business administration, the management of the report work of staff is very important step, but present report work Typically employee gives special statistical department after corresponding leader and counts and audit by filling in a form to be reported to, intermediate Data volume be it is very large, manually audited also be very easy to error, there is also some employees repeat report work the problem of, The efficiency of management is poor and these situations are all inequitable for employee and enterprise.
Summary of the invention
A kind of accurate report work method the purpose of the present invention is to provide web front-end based on calendar, for solving existing skill Manually audited in art also be very easy to error, there is also some employees repeat report work the problem of, the efficiency of management difference and this A little situations are for all inequitable problem of employee and enterprise.
The present invention is solved the above problems by following technical proposals:
A kind of accurate report work method of the web front-end based on calendar, described method includes following steps:
Step 1: the accurate report work time component of setting and report work entrance associated there;
Step 2: user enters report work time component by the report work entrance in step 1 and chooses the report work period, fills in report Work content is simultaneously committed to back-end server;
Step 3: the report work information that step 2 is submitted is carried out processing and is transferred to audit list examining for administrative staff by server Core, while being shown in feedback to report work time component;And after user reports work, revocation can be initiated at report work time component Or the application reported again.
By this method, user can directly select the corresponding period to carry out filling in for report work information on webpage, then It is submitted to background server, server transport to audit list is audited for administrative staff, no longer needs to fill in paper report, letter Management process is changed, and convenient for management;It submits and is fed back after server process after reporting work information onto report work time component It is shown, user can see report work information on report work time component, cannot directly change, if the vicious ground of discovery can The request initiating revocation or reporting again can be very good the complicated processes for applying for manual amendment after avoiding false alarm work, pass through net The mode of page report work, can use manpower and material resources sparingly, while the efficiency of management is substantially improved, improve the fairness of business administration.
Preferably, the report work time component includes calendar and the adjustable time shaft of span, is provided with 2 on time shaft and drags Dynamic button, time shaft can be set to 24 hours or working time section across clothes, can be any on a timeline by actuating button The selection report work period, it is easy to use high-efficient.
Preferably, when being shown in feedback to report work time component after the completion of step 3 administrative staff audit, in calendar and There is display on time shaft, calendar can show whether there is report work in the corresponding date, and time shaft can show the detailed interior of same day report work Hold, clear and intuitive the recognizing of user is allowed to report work situation.
Preferably, after the step 3 audit completion server feedback is shown to report work time component, calendar and time shaft Upper corresponding date and time Duan Douhui has different colors to distinguish, and the period that existing color is distinguished can not be selected again It takes, different report work states is indicated with different colors, can intuitively find out that there is report work on which on calendar on date, which on date Do not report work;Time shaft reports the period of work to have color mark, and report work situation has intuitive display, and existing color mark Period cannot repeat choose, perfectly avoid employee repeat report work the problem of.
Preferably, the report work time component will pop up information when mouse pointer points to corresponding date and time section Frame shows corresponding report work information, reports the display mode of work information simple, shows without the form of list, the page area of occupancy Smaller more succinct, service efficiency is higher.
Preferably, it is shorthand information that the message box, which corresponds to the report work information shown when calendar, including the report in the date Work period and report work content Description;When corresponding to the period on time shaft, the content that message box is shown includes reporting worker, report work Content and whether audit, classification display report work content, reduces the information content shown in shorthand information, reduce the face of its message box Product, can be such that the page more coordinates, and user's reading content when is more efficient.
Preferably, the state after the report work content is submitted includes pending and has audited, state before administrative staff audit To be pending, state is changed to audit after audit, and server can count the data that audit passes through after the approval, It can will not be accomplished well the case where preventing employee from reporting work privately by server statistics by the data of audit.
Compared with prior art, the present invention have the following advantages that and the utility model has the advantages that
(1) in the present invention, user can directly select the corresponding period to carry out filling in for report work information on webpage, then It is submitted to background server, server transport to audit list is audited for administrative staff, no longer needs to fill in paper report, letter Management process is changed, and convenient for management;It submits and is fed back after server process after reporting work information onto report work time component It is shown, user can see report work information on report work time component, cannot directly change, if the vicious ground of discovery can The request initiating revocation or reporting again can be very good the complicated processes for applying for manual amendment after avoiding false alarm work, pass through net The mode of page report work, can use manpower and material resources sparingly, while the efficiency of management is substantially improved, improve the fairness of business administration.
(2) the report work information shown when the present invention corresponds to calendar with message box is shorthand information, including the report in the date Work period and report work content Description;When corresponding to the period on time shaft, the content that message box is shown includes reporting worker, report work Content and whether audit, classification display report work content, reduces the information content shown in shorthand information, reduce the face of its message box Product, can be such that the page more coordinates, and user's reading content when is more efficient.
(3) state after report work content is submitted in the present invention includes pending and has audited, state before administrative staff audit To be pending, state is changed to audit after audit, and server can count the data that audit passes through after the approval, It can will not be accomplished well the case where preventing employee from reporting work privately by server statistics by the data of audit.
(4) the report work in the present invention is revocable or reports again, can be reported or be recalled again after discovery false alarm work, removed It returns and then deletes the data, report then instead preceding data again, it is efficient and convenient efficient.
Detailed description of the invention
Fig. 1 is the accurate report work method flow schematic diagram of web front-end of the invention based on calendar.
Specific embodiment
The present invention is described in further detail below with reference to embodiment, embodiments of the present invention are not limited thereto.
Embodiment 1:
In conjunction with shown in attached drawing 1, a kind of web front-end is based on a kind of accurate web front-end of report work method of calendar based on calendar Accurate report work method, described method includes following steps:
Step 1: the accurate report work time component of setting and report work entrance associated there;
Step 2: user enters report work time component by the report work entrance in step 1 and chooses the report work period, fills in report Work content is simultaneously committed to back-end server;
Step 3: the report work information that step 2 is submitted is carried out processing and is transferred to audit list examining for administrative staff by server Core, while being shown in feedback to report work time component;And after user reports work, revocation can be initiated at report work time component Or the application reported again.
By the method, user can directly select the corresponding period to carry out filling in for report work information on webpage, then It is submitted to background server, server transport to audit list is audited for administrative staff, no longer needs to fill in paper report, letter Management process is changed, and convenient for management;It submits and is fed back after server process after reporting work information onto report work time component It is shown, user can see report work information on report work time component, cannot directly change, if the vicious ground of discovery can The request initiating revocation or reporting again can be very good the complicated processes for applying for manual amendment after avoiding false alarm work, pass through net The mode of page report work, can use manpower and material resources sparingly, while the efficiency of management is substantially improved, improve the fairness of business administration.Report work Time component includes calendar and the adjustable time shaft of span, is provided with 2 actuating buttons on time shaft, time shaft can be with across clothes It is set as 24 hours or working time section, the report work period can arbitrarily be selected by actuating button on a timeline, using just It is prompt high-efficient.When being shown in feedback to report work time component after the completion of step 3 administrative staff audit, on calendar and time shaft There is display, calendar can show whether there is report work in the corresponding date, and time shaft can show the detailed content of same day report work, make user clear It is clear to get information about report work situation.
After step 3 audit completion server feedback is shown to report work time component, corresponding day on calendar and time shaft Phase and period all can have different colors to distinguish, and the period that existing color is distinguished can not be chosen again, with different Color indicates different report work states, can intuitively find out that there is report work on which on date on calendar, which does not report work on the date;When Between axis report the period of work to have a color mark, report work situation has intuitive display, and the period of existing color mark cannot It repeats to choose, perfectly avoids the problem of employee repeats report work.Work time component is reported to point to the corresponding date in mouse pointer When with the period, it will pop up message box and show corresponding report work information, report the display mode of work information simple, without the shape of list Formula shows that the page area of occupancy is smaller more succinct, and service efficiency is higher.Message box corresponds to the report work information shown when calendar Shorthand information including the report work period in the date and reports work content Description;When corresponding to the period on time shaft, message box Whether the content of display includes reporting worker, report work content and auditing, classification display report work content, is shown in reduction shorthand information Information content reduces the area of its message box, the page can be made more to coordinate, and user's reading content when is more efficient.It reports in work Hold the state after submitting to include pending and audited, state is pending before administrative staff audit, and state is changed after audit To have audited, server can count the data that audit passes through after the approval, will not bedding and clothing by the data of audit Business device statistics, can accomplish well the case where preventing employee from reporting work privately.
Although reference be made herein to invention has been described for explanatory embodiment of the invention, and above-described embodiment is only this hair Bright preferable embodiment, embodiment of the present invention are not limited by the above embodiments, it should be appreciated that those skilled in the art Member can be designed that a lot of other modification and implementations, these modifications and implementations will fall in principle disclosed in the present application Within scope and spirit.

Claims (7)

1. a kind of accurate report work method of web front-end based on calendar, which is characterized in that described method includes following steps:
Step 1: the accurate report work time component of setting and report work entrance associated there;
Step 2: user enters report work time component by the report work entrance in step 1 and chooses the report work period, fills in report work Hold and is committed to back-end server;
Step 3: server by the report work information that step 2 is submitted carry out processing be transferred to audit list for administrative staff audit, It is shown in feedback to report work time component simultaneously;And user report work after, can report work time component at initiate revocation or The application reported again.
2. accurate report work method of the web front-end according to claim 1 based on calendar, it is characterised in that: the report working hour Between component include calendar and the adjustable time shaft of span, 2 actuating buttons are provided on time shaft.
3. accurate report work method of the web front-end according to claim 1 based on calendar, it is characterised in that: step 3 pipe When showing in feedback to report work time component after the completion of reason personnel audit, there is display on calendar and time shaft.
4. accurate report work method of the web front-end according to claim 3 based on calendar, it is characterised in that: the step 3 is examined After core completion server feedback is shown to report work time component, corresponding date and time Duan Douhui has on calendar and time shaft Different colors distinguish, and the period that existing color is distinguished can not be chosen again.
5. accurate report work method of the web front-end according to claim 3 based on calendar, it is characterised in that: the report working hour Between component when mouse pointer points to corresponding date and time section, will pop up message box and show corresponding report work information.
6. accurate report work method of the web front-end according to claim 5 based on calendar, it is characterised in that: the message box The report work information shown when corresponding calendar is shorthand information, including the report work period in the date and reports work content Description;It is right When answering the period on time shaft, whether the content that message box is shown includes reporting worker, report work content and auditing.
7. accurate report work method of the web front-end according to claim 1 based on calendar, it is characterised in that: in the report work Hold the state after submitting to include pending and audited, state is pending before administrative staff audit, and state is changed after audit To have audited.
CN201811467345.2A 2018-12-03 2018-12-03 A kind of accurate report work method of the web front-end based on calendar Pending CN109598483A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811467345.2A CN109598483A (en) 2018-12-03 2018-12-03 A kind of accurate report work method of the web front-end based on calendar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811467345.2A CN109598483A (en) 2018-12-03 2018-12-03 A kind of accurate report work method of the web front-end based on calendar

Publications (1)

Publication Number Publication Date
CN109598483A true CN109598483A (en) 2019-04-09

Family

ID=65959460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811467345.2A Pending CN109598483A (en) 2018-12-03 2018-12-03 A kind of accurate report work method of the web front-end based on calendar

Country Status (1)

Country Link
CN (1) CN109598483A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113012787A (en) * 2021-03-01 2021-06-22 白杨智慧医疗信息科技(北京)有限公司 Operation process management method and system
CN113554324A (en) * 2021-07-28 2021-10-26 重庆允成互联网科技有限公司 Production process withdrawal method, system, equipment and storage medium
CN113642912A (en) * 2021-08-23 2021-11-12 重庆允成互联网科技有限公司 Method, system, equipment and storage medium for reporting labor and preventing mistake

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012150740A (en) * 2011-01-21 2012-08-09 Hitachi Ltd Program generating device and method
CN102722533A (en) * 2012-05-09 2012-10-10 浙江图讯科技有限公司 Method and system for displaying and filling report
CN106204259A (en) * 2016-07-25 2016-12-07 贝才禾兑网络科技南京有限公司 A kind of method of automatization based on browser taxation declaration
CN106384203A (en) * 2016-09-30 2017-02-08 宁波信泰机械有限公司 PRM production work confirmation system
CN206489612U (en) * 2016-09-30 2017-09-12 宁波信泰机械有限公司 One kind production report work system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012150740A (en) * 2011-01-21 2012-08-09 Hitachi Ltd Program generating device and method
CN102722533A (en) * 2012-05-09 2012-10-10 浙江图讯科技有限公司 Method and system for displaying and filling report
CN106204259A (en) * 2016-07-25 2016-12-07 贝才禾兑网络科技南京有限公司 A kind of method of automatization based on browser taxation declaration
CN106384203A (en) * 2016-09-30 2017-02-08 宁波信泰机械有限公司 PRM production work confirmation system
CN206489612U (en) * 2016-09-30 2017-09-12 宁波信泰机械有限公司 One kind production report work system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡红: "项目进度管理系统的设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113012787A (en) * 2021-03-01 2021-06-22 白杨智慧医疗信息科技(北京)有限公司 Operation process management method and system
CN113554324A (en) * 2021-07-28 2021-10-26 重庆允成互联网科技有限公司 Production process withdrawal method, system, equipment and storage medium
CN113554324B (en) * 2021-07-28 2022-02-25 重庆允成互联网科技有限公司 Production process withdrawal method, system, equipment and storage medium
CN113642912A (en) * 2021-08-23 2021-11-12 重庆允成互联网科技有限公司 Method, system, equipment and storage medium for reporting labor and preventing mistake
CN113642912B (en) * 2021-08-23 2024-05-28 重庆允丰科技有限公司 Method, system, equipment and storage medium for preventing work error

Similar Documents

Publication Publication Date Title
US8818835B2 (en) Method and system for integrating calendar, budget and cash flow of a project
CN109598483A (en) A kind of accurate report work method of the web front-end based on calendar
US8234137B2 (en) One view integrated project management system
CN107368967A (en) Engineering safety quality inspection intelligent management based on internet
US20070203778A1 (en) Workflow management
EP1649392A2 (en) Apparatuses and methods for dynamic creation of phase gantt charts
CN106548324A (en) A kind of IT system O&M service management system
CA3017609A1 (en) A system and method for ordering and manufacturing customized orthodontic appliances and products
CN109345407A (en) A kind of Discrete Manufacturing Enterprise peace lamp Andon network system realization
CN108510249A (en) A kind of management method of track problems system
Simatupang et al. Change management perspectives in an ERP module implementation: A case study in a telecommunication company
US10114622B2 (en) Method and system for customizing a graphic user interface of a manufacturing execution system screen
CN112749911A (en) MES production and manufacturing method and system
DE112012001501T5 (en) Management of licenses with usage-based payment for software applications
CN105243490B (en) A kind of statistical system and method based on git software
JP6836295B2 (en) Accounting system, accounting equipment, accounting program and accounting method
CN110503386B (en) Data processing system for marketized project
CN113362017A (en) Method for instantly sharing and analyzing standardized operation management information
Welch et al. E-government and network technologies: Does bureaucratic red tape inhibit, promote or fall victim to intranet technology implementation?
Fletcher et al. Workflow Management with SAP® WebFlow®: A Practical Manual
US8103633B2 (en) Method and system for generic display and use of an object
CN109359714A (en) Customize the manufacture generation method and its device of label of the board-like part of household
US20020178188A1 (en) Productivity recovery and improvement software
JP2005165988A (en) Method and system for displaying table to manage state of performance evaluation index item, and display program
Molina-Maturano et al. Promoting ethical and responsible data management within a toolkit for scaling Citizen Science projects

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200114

Address after: 518000 unit 01, 23 / F, Changhong science and technology building, No. 12, South Science and technology zone, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Applicant after: SHENZHEN YIJIAEN TECHNOLOGY Co.,Ltd.

Address before: 621000 Mianyang province high tech Zone, East Hing Road, No. 35 cotton

Applicant before: SICHUAN CHANGHONG ELECTRIC Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220621

Address after: 621000, No. 35 Mian Xing Dong Road, hi tech Zone, Sichuan, Mianyang

Applicant after: SICHUAN CHANGHONG ELECTRIC Co.,Ltd.

Address before: 518000 unit 01, 23rd floor, Changhong science and technology building, Keji South 12 road, high tech Zone, Yuehai street, Nanshan District, Shenzhen, Guangdong

Applicant before: SHENZHEN YIJIAEN TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20190409

RJ01 Rejection of invention patent application after publication