CN106383294A - 一种基于两侧信息的半波长交流输电线路故障选相方法 - Google Patents
一种基于两侧信息的半波长交流输电线路故障选相方法 Download PDFInfo
- Publication number
- CN106383294A CN106383294A CN201610848125.9A CN201610848125A CN106383294A CN 106383294 A CN106383294 A CN 106383294A CN 201610848125 A CN201610848125 A CN 201610848125A CN 106383294 A CN106383294 A CN 106383294A
- Authority
- CN
- China
- Prior art keywords
- phase
- transmission line
- selection element
- phase selection
- line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/081—Locating faults in cables, transmission lines, or networks according to type of conductors
- G01R31/085—Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution lines, e.g. overhead
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/088—Aspects of digital computing
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Mathematical Physics (AREA)
- Theoretical Computer Science (AREA)
- Locating Faults (AREA)
Abstract
本发明公开了一种基于两侧信息的半波长交流输电线路故障选相方法,其特征在于,包括如下步骤:步骤1、对半波长交流输电线路本侧和对侧的电压、电流进行同步采样,并将对侧的电压、电流采样值传输到本侧;步骤2、利用半波长交流输电线路两侧的线电压和线电流构造选相元件;步骤3、比较选相元件输出值与门槛值大小,选出故障相。基于两侧信息的半波长交流输电线路故障选相方法,受半波长交流输电线路运行方式影响小,能够正确选出故障相。选相元件是根据半波长交流输电线路的特征而构造的,完全适用于半波长交流输电线路。基于两侧信息的故障选相方法在半波长交流输电线路两端的灵敏度完全一样,能够很好地配合全线速动保护。
Description
技术领域
本发明涉及一种基于两侧信息的半波长交流输电线路故障选相方法。
背景技术
半波长交流输电是指输电的电气距离接近1个工频半波,即3000km(50Hz)的超远距离的三相交流输电。随着能源互联网的建设,半波长交流输电作为一种高效的远距离洲际输电方式,具有良好的应用前景。
现有的国内高压线路保护主要采用单端相电流突变量选相和序分量选相相结合的方法来实现故障选相。但是,半波长交流输电线路距离长,零序模量波速小于正负序模量波速,非故障相电流突变量较大,相电流突变量选相失去意义。而且,当半波长交流输电线路中点附近发生短路时,保护安装处电流序分量很小,序分量选相灵敏度不足。
申请号为2016100669912的中国发明专利,公开了一种基于单侧电流的半波长线路自由波能量保护选相方法,其通过选相元件与自由波能量保护经与逻辑出口,选跳故障相,但是选相元件由于只使用单侧电流量,往往受运行方式的影响较大,特别是在半波长交流输电线路一端弱馈时,弱馈端的保护电流几乎为零,单侧量电流选相失效。
发明内容
针对上述问题,本发明提供一种基于两侧信息的半波长交流输电线路故障选相方法,受半波长交流输电线路运行方式影响小,能够正确选出故障相,提高故障选相的准确性。
为实现上述技术目的,达到上述技术效果,本发明通过以下技术方案实现:
一种基于两侧信息的半波长交流输电线路故障选相方法,其特征在于,包括如下步骤:
步骤1、对半波长交流输电线路本侧和对侧的电压、电流进行同步采样,并将对侧的电压、电流采样值传输到本侧;
步骤2、利用半波长交流输电线路两侧的线电压和线电流构造选相元件;
步骤3、比较选相元件输出值与门槛值大小,选出故障相。
其中,步骤2中,线电压和线电流可以采用工频稳态量,也可以采用工频变化量。
优选,构造选相元件的具体步骤为:
A)计算半波长交流输电线路两侧线电流之差、计算半波长交流输电线路两侧线电压之和;
B)两侧线电流之差与线路波阻抗作乘积,再加上两侧线电压之和,构成选相元件,包括AB相选相元件、BC相选相元件、CA相选相元件。
优选,步骤3中,门槛值包括固定门槛值和浮动门槛值。
优选,浮动门槛值为AB相选相元件、BC相选相元件、CA相选相元件中的最大输出值与一常系数的乘积。
优选,若某相选相元件输出值小于固定门槛值,且该相选相元件输出值小于浮动门槛值,则该相选相元件动作:
1)当仅有AB相选相元件动作时,则半波长交流输电线路发生C相接地短路;
2)当仅有BC相选相元件动作时,则半波长交流输电线路发生A相接地短路;
3)当仅有CA相选相元件动作时,则半波长交流输电线路发生B相接地短路;
4)否则,半波长交流输电线路发生多相短路。
本发明的有益效果是:
第一、基于两侧信息的半波长交流输电线路故障选相方法,受半波长交流输电线路运行方式影响小,能够正确选出故障相。
第二、选相元件是根据半波长交流输电线路的特征而构造的,完全适用于半波长交流输电线路。
第三、基于两侧信息的故障选相方法在半波长交流输电线路两端的灵敏度完全一样,能够很好地配合全线速动保护。
附图说明
图1是本发明一种基于两侧信息的半波长交流输电线路故障选相方法的流程图。
具体实施方式
下面结合附图和具体的实施例对本发明技术方案作进一步的详细描述,以使本领域的技术人员可以更好的理解本发明并能予以实施,但所举实施例不作为对本发明的限定。
一种基于两侧信息的半波长交流输电线路故障选相方法,如图1所示,包括如下步骤:
步骤1、对半波长交流输电线路本侧和对侧的电压、电流进行同步采样,并将对侧的电压、电流采样值传输到本侧;
步骤2、利用半波长交流输电线路两侧的线电压和线电流构造选相元件;
步骤3、比较选相元件输出值与门槛值大小,选出故障相。
下面进行详细介绍。
步骤2中,两侧线电流和两侧线电压可以同时选用工频稳态量或同时选用工频变化量。构造选相元件的具体步骤为:
A)计算半波长交流输电线路两侧线电流之差、计算半波长交流输电线路两侧线电压之和;
B)两侧线电流之差与线路波阻抗作乘积,再加上两侧线电压之和,构成选相元件,选相元件包括AB相选相元件、BC相选相元件、CA相选相元件。
也即,当两侧线电流、两侧线电压同时选用工频稳态量,则选相元件为:
其中,是本侧线电流工频稳态量,是对侧线电流工频稳态量,是本侧线电压工频稳态量,是对侧线电压工频稳态量,ZC1是线路波阻抗,下标表示AB、BC或CA。
当两侧线电流、两侧线电压同时选用工频变化量,则选相元件为:
其中,是本侧线电流工频变化量,是对侧线电流工频变化量,是本侧线电压工频变化量,是对侧线电压工频变化量,ZC1是线路波阻抗,下标表示AB、BC或CA。
优选,步骤3中,门槛值包括固定门槛值和浮动门槛值,比较选相元件输出值与门槛值包括:比较选相元件输出值与固定门槛值、比较选相元件输出值与浮动门槛值:若某相选相元件输出值小于固定门槛值,且该相选相元件输出值小于浮动门槛值,则该相选相元件动作。优选,浮动门槛值为AB相选相元件、BC相选相元件、CA相选相元件中的最大输出值与一常系数的乘积。比如:
若UIAB<UI_set且UIAB<k_set×UImax,则AB相选相元件动作;
若UIBC<UI_set且UIBC<k_set×UImax,则BC相选相元件动作;
若UICA<UI_set且UICA<k_set×UImax,则CA相选相元件动作;
其中,UIAB是AB相选相元件输出值,UIBC是BC相选相元件输出值,UICA是CA相选相元件输出值,UI_set是固定门槛值,UImax是AB相选相元件、BC相选相元件、CA相选相元件中的最大输出值,k_set是浮动门槛值中的常系数。
具体的,选出故障相的方法为:
1)当仅有AB相选相元件动作时,则半波长交流输电线路发生C相接地短路;
2)当仅有BC相选相元件动作时,则半波长交流输电线路发生A相接地短路;
3)当仅有CA相选相元件动作时,则半波长交流输电线路发生B相接地短路;
4)否则,半波长交流输电线路发生多相短路。
本方法简单有效,具有下述有益效果:
第一、基于两侧信息的半波长交流输电线路故障选相方法,受半波长交流输电线路运行方式影响小,能够正确选出故障相。
第二、选相元件是根据半波长交流输电线路的特征而构造的,完全适用于半波长交流输电线路。
第三、基于两侧信息的故障选相方法在半波长交流输电线路两端的灵敏度完全一样,能够很好地配合全线速动保护。
以上仅为本发明的优选实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构或者等效流程变换,或者直接或间接运用在其他相关的技术领域,均同理包括在本发明的专利保护范围内。
Claims (7)
1.一种基于两侧信息的半波长交流输电线路故障选相方法,其特征在于,包括如下步骤:
步骤1、对半波长交流输电线路本侧和对侧的电压、电流进行同步采样,并将对侧的电压、电流采样值传输到本侧;
步骤2、利用半波长交流输电线路两侧的线电压和线电流构造选相元件;
步骤3、比较选相元件输出值与门槛值大小,选出故障相。
2.根据权利要求1所述的一种基于两侧信息的半波长交流输电线路故障选相方法,其特征在于,步骤2中,线电压和线电流采用工频稳态量。
3.根据权利要求1所述的一种基于两侧信息的半波长交流输电线路故障选相方法,其特征在于,步骤2中,线电压和线电流采用工频变化量。
4.根据权利要求2或3所述的一种基于两侧信息的半波长交流输电线路故障选相方法,其特征在于,构造选相元件的具体步骤为:
A)计算半波长交流输电线路两侧线电流之差、计算半波长交流输电线路两侧线电压之和;
B)两侧线电流之差与线路波阻抗作乘积,再加上两侧线电压之和,构成选相元件,包括AB相选相元件、BC相选相元件、CA相选相元件。
5.根据权利要求1所述的一种基于两侧信息的半波长交流输电线路故障选相方法,其特征在于,步骤3中,门槛值包括固定门槛值和浮动门槛值。
6.根据权利要求5所述的一种基于两侧信息的半波长交流输电线路故障选相方法,其特征在于,浮动门槛值为AB相选相元件、BC相选相元件、CA相选相元件中的最大输出值与一常系数的乘积。
7.根据权利要求6所述的一种基于两侧信息的半波长交流输电线路故障选相方法,其特征在于,若某相选相元件输出值小于固定门槛值,且该相选相元件输出值小于浮动门槛值,则该相选相元件动作:
1)当仅有AB相选相元件动作时,则半波长交流输电线路发生C相接地短路;
2)当仅有BC相选相元件动作时,则半波长交流输电线路发生A相接地短路;
3)当仅有CA相选相元件动作时,则半波长交流输电线路发生B相接地短路;
4)否则,半波长交流输电线路发生多相短路。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610848125.9A CN106383294B (zh) | 2016-09-23 | 2016-09-23 | 一种基于两侧信息的半波长交流输电线路故障选相方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610848125.9A CN106383294B (zh) | 2016-09-23 | 2016-09-23 | 一种基于两侧信息的半波长交流输电线路故障选相方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106383294A true CN106383294A (zh) | 2017-02-08 |
CN106383294B CN106383294B (zh) | 2019-01-04 |
Family
ID=57936871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610848125.9A Expired - Fee Related CN106383294B (zh) | 2016-09-23 | 2016-09-23 | 一种基于两侧信息的半波长交流输电线路故障选相方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106383294B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107147125A (zh) * | 2017-05-25 | 2017-09-08 | 中国电力科学研究院 | 一种半波长输电线路稳态电压灵敏度的确定方法和装置 |
CN109031043A (zh) * | 2018-07-24 | 2018-12-18 | 国网山西省电力公司电力科学研究院 | 基于瞬时功率突变量半波长交流输电线路故障选相方法 |
CN109061380A (zh) * | 2018-07-24 | 2018-12-21 | 国网山西省电力公司电力科学研究院 | 特高压半波长交流输电线路的故障定位方法 |
CN109188191A (zh) * | 2018-07-24 | 2019-01-11 | 国网山西省电力公司电力科学研究院 | 基于功率突变量半波长交流输电线路快速故障选相方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004333418A (ja) * | 2003-05-12 | 2004-11-25 | Nishimu Electronics Industries Co Ltd | 送電線電流検出装置 |
CN101173975A (zh) * | 2007-11-29 | 2008-05-07 | 北京四方继保自动化股份有限公司 | 利用相间电气量实现输电线路双端测距方法 |
JP2008295144A (ja) * | 2007-05-23 | 2008-12-04 | Hitachi Ltd | 地絡距離継電器 |
CN201697994U (zh) * | 2010-06-30 | 2011-01-05 | 湖南湘能电气自动化有限公司 | 小电流接地系统单相接地故障选线装置 |
CN102735993A (zh) * | 2012-06-26 | 2012-10-17 | 国电南瑞科技股份有限公司 | 一种线路保护双端测距的方法 |
CN103245886A (zh) * | 2013-05-10 | 2013-08-14 | 国家电网公司 | 一种线路中间安装串联补偿电容装置的故障定位方法 |
CN104730410A (zh) * | 2015-03-16 | 2015-06-24 | 王金泽 | 一种基于电压电流向量的配电线路断线监测方法及装置 |
-
2016
- 2016-09-23 CN CN201610848125.9A patent/CN106383294B/zh not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004333418A (ja) * | 2003-05-12 | 2004-11-25 | Nishimu Electronics Industries Co Ltd | 送電線電流検出装置 |
JP2008295144A (ja) * | 2007-05-23 | 2008-12-04 | Hitachi Ltd | 地絡距離継電器 |
CN101173975A (zh) * | 2007-11-29 | 2008-05-07 | 北京四方继保自动化股份有限公司 | 利用相间电气量实现输电线路双端测距方法 |
CN201697994U (zh) * | 2010-06-30 | 2011-01-05 | 湖南湘能电气自动化有限公司 | 小电流接地系统单相接地故障选线装置 |
CN102735993A (zh) * | 2012-06-26 | 2012-10-17 | 国电南瑞科技股份有限公司 | 一种线路保护双端测距的方法 |
CN103245886A (zh) * | 2013-05-10 | 2013-08-14 | 国家电网公司 | 一种线路中间安装串联补偿电容装置的故障定位方法 |
CN104730410A (zh) * | 2015-03-16 | 2015-06-24 | 王金泽 | 一种基于电压电流向量的配电线路断线监测方法及装置 |
Non-Patent Citations (1)
Title |
---|
蒋雷海 等: "新型线路保护选相方案", 《电力系统自动化》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107147125A (zh) * | 2017-05-25 | 2017-09-08 | 中国电力科学研究院 | 一种半波长输电线路稳态电压灵敏度的确定方法和装置 |
CN107147125B (zh) * | 2017-05-25 | 2023-09-22 | 中国电力科学研究院 | 一种半波长输电线路稳态电压灵敏度的确定方法和装置 |
CN109031043A (zh) * | 2018-07-24 | 2018-12-18 | 国网山西省电力公司电力科学研究院 | 基于瞬时功率突变量半波长交流输电线路故障选相方法 |
CN109061380A (zh) * | 2018-07-24 | 2018-12-21 | 国网山西省电力公司电力科学研究院 | 特高压半波长交流输电线路的故障定位方法 |
CN109188191A (zh) * | 2018-07-24 | 2019-01-11 | 国网山西省电力公司电力科学研究院 | 基于功率突变量半波长交流输电线路快速故障选相方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106383294B (zh) | 2019-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106383294A (zh) | 一种基于两侧信息的半波长交流输电线路故障选相方法 | |
Song et al. | A new whole-line quick-action protection principle for HVDC transmission lines using one-end current | |
Song et al. | A fault-location method for VSC-HVDC transmission lines based on natural frequency of current | |
CN106505536B (zh) | 一种基于分布参数模型下利用电流突变特性的特高压直流线路保护方法 | |
CN103529332A (zh) | 一种基于电压相关度和小波变换暂态能量分布特性的特高压直流输电线路雷击干扰识别方法 | |
Zou et al. | Novel transient-energy-based directional pilot protection method for HVDC line | |
CN105141209B (zh) | 减少隔离ups旁路导通的变压器励磁电流的方法及装置 | |
Dias et al. | Single‐phase auto‐reclosing mitigation procedure for half‐wavelength transmission line | |
CN108318762A (zh) | 电压互感器工频铁磁谐振的判别方法 | |
Ma et al. | Novel differential protection using model recognition and unsymmetrical vector reconstruction for the transmission line with wind farms connection | |
Zhao et al. | Investigation on digital algorithm for on-line monitoring and diagnostics of metal oxide surge arrester based on an accurate model | |
Lin et al. | A novel current amplitude differential protection for active distribution network considering the source-effect of IM-type unmeasurable load branches | |
CN108107329A (zh) | 一种交流电弧频域检测方法 | |
CN106340859B (zh) | 一种半波长交流输电线路单端快速保护方法 | |
CN106300295B (zh) | 一种半波长交流输电线路的双灵敏度贝瑞隆差动保护方法 | |
CN105203903B (zh) | 基于动态数据窗输电线路相间故障方向判别方法 | |
CN108400005B (zh) | 一种变压器直流偏磁抑制系统及抑制方法 | |
Pirjola et al. | Geomagnetically induced currents in European high-voltage power systems | |
CN208078634U (zh) | 偏磁抑制装置和系统 | |
Rao et al. | Analysis of very long distance AC power transmission line | |
Wang et al. | A new criterion for single-phase adaptive automatic reclosure based on improved correlation algorithm. | |
Mohitkar et al. | Harmonic measurement and analysis of variable frequency drive (VFD) in industry | |
Sun et al. | The impact analysis of various unbalance factors on the PCC voltage imbalance | |
Jena et al. | Detection of High Impedance Fault | |
EA201001877A1 (ru) | Замыкание высокочастотного средства отключения |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190104 |