CN106382152B - A kind of radiator fast cooling equipment - Google Patents

A kind of radiator fast cooling equipment Download PDF

Info

Publication number
CN106382152B
CN106382152B CN201611021768.2A CN201611021768A CN106382152B CN 106382152 B CN106382152 B CN 106382152B CN 201611021768 A CN201611021768 A CN 201611021768A CN 106382152 B CN106382152 B CN 106382152B
Authority
CN
China
Prior art keywords
strut
connection
sliding block
gear
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201611021768.2A
Other languages
Chinese (zh)
Other versions
CN106382152A (en
Inventor
吴伟平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mingguang Wisdom Tianshun Technology Transfer Service Co.,Ltd.
Original Assignee
Wuxi Weifeng Printing Machinery Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Weifeng Printing Machinery Factory filed Critical Wuxi Weifeng Printing Machinery Factory
Priority to CN201611021768.2A priority Critical patent/CN106382152B/en
Publication of CN106382152A publication Critical patent/CN106382152A/en
Application granted granted Critical
Publication of CN106382152B publication Critical patent/CN106382152B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P9/00Cooling having pertinent characteristics not provided for in, or of interest apart from, groups F01P1/00 - F01P7/00
    • F01P9/02Cooling by evaporation, e.g. by spraying water on to cylinders
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P5/00Pumping cooling-air or liquid coolants
    • F01P5/02Pumping cooling-air; Arrangements of cooling-air pumps, e.g. fans or blowers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P5/00Pumping cooling-air or liquid coolants
    • F01P5/02Pumping cooling-air; Arrangements of cooling-air pumps, e.g. fans or blowers
    • F01P5/04Pump-driving arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P5/00Pumping cooling-air or liquid coolants
    • F01P5/02Pumping cooling-air; Arrangements of cooling-air pumps, e.g. fans or blowers
    • F01P5/04Pump-driving arrangements
    • F01P5/043Pump reversing arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P9/00Cooling having pertinent characteristics not provided for in, or of interest apart from, groups F01P1/00 - F01P7/00
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P9/00Cooling having pertinent characteristics not provided for in, or of interest apart from, groups F01P1/00 - F01P7/00
    • F01P2009/005Cooling with melting solids

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Special Spraying Apparatus (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)

Abstract

The present invention relates to a kind of cooling system more particularly to a kind of radiator fast cooling equipment.The technical problem to be solved in the present invention is to provide a kind of radiator that water tank cooling rate is fast fast cooling equipment.In order to solve the above-mentioned technical problem, the present invention provides such a radiator fast cooling equipment, include the first strut, the first sliding rail, the second strut, first gear, small belt pulley, disk, third strut, second gear, second connecting rod, motor, shaft etc.;It is welded with the first strut and the second strut on the left of holder inner top, first strut is located at the left of the second strut, holder inner top between first strut and the second strut is connected with the first sliding rail by bolted connection, and third strut is welded on the right side of holder inner top.Invention achieves the fast advantageous effects of water tank cooling rate;By being equipped with air inlet pipe, ice cube case, escape pipe, air pump, the second hose, the second nozzle and the 5th strut.

Description

A kind of radiator fast cooling equipment
Technical field
The present invention relates to a kind of cooling system more particularly to a kind of radiator fast cooling equipment.
Background technology
Radiator is also known as radiator, is critical part in automobile cooling system, and function is to distribute heat, and cooling water is in water Heat is absorbed in set, heat disperses after flowing to radiator, returns cycle in water jacket, reaches temperature adjustment.
Chinese patent CN203303638U for the cooling of existing water tank the problem of, disclose a kind of water tank cooling dress It sets, is connected with accumulator by solar panel, accumulator is connected with electrical component with each supplying whole device The mode of electricity, the problem of overcoming waste of resource, but since the mode of cooling is less, to which water tank cooling rate can be caused slow.
To sum up, it needs to research and develop a kind of radiator cooling system that water tank cooling rate is fast at present, to overcome the prior art The slow disadvantage of middle water tank cooling rate.
Invention content
(1)Technical problems to be solved
The present invention in order to overcome the disadvantage that water tank cooling rate is slow in the prior art, the technical problem to be solved by the present invention is to A kind of radiator that water tank cooling rate is fast fast cooling equipment is provided.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a radiator fast cooling equipment, including There are the first strut, the first sliding rail, the second strut, first gear, small belt pulley, disk, third strut, second gear, second to connect Bar, motor, shaft, the first sliding block, the first directive wheel, hinge member, first connecting rod, flat belt, big belt pulley, drawstring, first It is elevating lever, piston, bucket, the first hose, the first nozzle, the second elevating lever, guide plate, the second directive wheel, contact roller, W-shaped Slide plate, pedestal, support plate, elastic component, the second sliding block, the second sliding rail, holder, the 4th strut and air-cooler;Base top passes through spiral shell It tethers the mode connect and is connected with holder, the second sliding rail and support plate in turn from left to right, first is welded on the left of holder inner top Bar and the second strut, the first strut are located at the left of the second strut, and the holder inner top between the first strut and the second strut is logical It crosses bolted mode and is connected with the first sliding rail, be welded with third strut on the right side of holder inner top, the first strut lower end passes through Bolted mode is connected with second gear, is connect by hinge member with second connecting rod upper end on front side of second gear, hinged Component includes notch plate, connecting shaft and swivel plate, and connecting shaft is fixedly mounted on notch plate, and through-hole is equipped on swivel plate, Connecting shaft passes through the through-hole on swivel plate, and swivel plate passes through welding by being rotated around connecting shaft on front side of second gear The notch plate of hinge member on front side of mode and second gear is connect, second connecting rod upper end by welding with the second tooth The swivel plate of hinge member on wheel front side connects, and slidingtype is connected with the first sliding block, the first sliding rail and first on the first sliding rail Sliding block coordinates, and second connecting rod lower end is connect with left part on front side of the first sliding block by hinge member, and second connecting rod lower end passes through welding Mode connect with the notch plate of the hinge member of second connecting rod lower end, left part is by welding with the on front side of the first sliding block The swivel plate of the hinge member of two connecting rod lower ends connects, and the first sliding block lower end is connected with the first lifting by bolted connection Bar, the second strut lower end are connected with motor by bolted connection, and the output shaft on motor is connected by shaft coupling and shaft It connects, first gear and small belt pulley is connected with by way of flat key connection in shaft, after first gear is located at small belt pulley Side, first gear are engaged with second gear, are connect by hinge member with first connecting rod upper end on front side of first gear, first gear Front side is connect with the notch plate of the hinge member on first gear front side by welding, and first connecting rod upper end passes through welding Mode and first gear on front side of on the swivel plate of hinge member connect, first connecting rod lower end leads to right part on front side of the first sliding block Hinge member connection is crossed, first connecting rod lower end connects with the notch plate of the hinge member of first connecting rod lower end by welding It connects, right part is connect with the swivel plate of the hinge member of first connecting rod lower end by welding on front side of the first sliding block, third branch Bar lower end is connected with disk by bolted connection, and the 4th strut is welded on disk, and the 4th strut end passes through bolt The mode of connection is connected with air-cooler, is connected with big belt pulley on front side of disk by bolted connection, big belt pulley with it is small Flat belt is wound between belt pulley, the first directive wheel is welded on holder inner left wall top, holder inner left wall by head rod Lower part is connected with guide plate by bolted connection, and pilot hole is provided on guide plate, and guide plate top left side passes through bolt The mode of connection is connected with bucket, and piston is equipped in bucket, and piston coordinates with bucket, and the first elevating lever lower end is bolted Mode connect with piston, bucket right wall lower part is equipped with the first hose, and the second directive wheel is welded on holder by the second connecting rod Inner left wall lower part, the second directive wheel are located at the lower section of guide plate, and slidingtype is connected with the second sliding block, the second sliding rail on the second sliding rail Coordinate with the second sliding block, the second sliding block left end is connected with drawstring, one end of drawstring by way of hook with the second sliding block left end Connection, drawstring bypass the second directive wheel and the first directive wheel, the other end of drawstring by way of hook with the first sliding block left end Connection, the second upper end of slide block are connected with W-shaped slide plate by bolted connection, and slidingtype is equipped with contact roller on W-shaped slide plate, Contact roller is engaged with W-shaped slide plate, and contact roller rear end is connected with the second elevating lever by way of key connection, second liter Dropping bar passes through pilot hole, the second elevating lever upper end to be connected with the first nozzle by bolted connection, and the first hose end is logical The mode for crossing flanged joint is connect with the first nozzle, and the second sliding block right end is equipped with elastic component, and one end of elastic component passes through hook Mode is connect with the second sliding block right end, and the other end of elastic component is connect by way of hook with support plate.
Preferably, further include having air inlet pipe, ice cube case, escape pipe, air pump, the second hose, the second nozzle and the 5th strut, The 5th strut is welded on disk, the 5th strut end is connected with the second nozzle by bolted connection, and cradle top is right Side is connected with ice cube case and air pump by bolted connection, and ice cube case is located at the left of air pump, is set on the left of ice cube box top There is air inlet pipe, be connected with escape pipe and the second hose on air pump by way of flanged joint, outlet pipe end stretches into ice cube case Interior, the second hose end is connect by way of flanged joint with the second nozzle.
Preferably, further include having mobile bar, magnet piece and irony placing frame, the first elevating lever right side central is welded with movement Bar, mobile bar right end are connected with magnet piece by bolted connection, and magnet piece right end is equipped with irony placing frame, and irony is placed The three-dimensional shape of frame is cuboid.
Preferably, further include having catch basin, base top passes on left bolted mode and is connected with catch basin, catchments Slot is located at the right of holder, and catch basin is located at the left of support plate, and catch basin is located at the dead astern of the second sliding rail, the material of catch basin For stainless steel.
Preferably, the material of holder is stainless steel.
Preferably, the material of the first strut, the second strut, third strut and the 4th strut is Q235 steel.
Preferably, elastic component is spring.
Operation principle:When needing to be cooled down to radiator, suitable cold water is added into bucket first, then opens Dynamic motor drives first gear to rotate clockwise, to drive second gear to rotate counterclockwise, in first connecting rod and second connecting rod Under the action of, to drive the first sliding block to move downward, to drive the first elevating lever to move downward, to downward with piston Movement, to which the cold water in bucket to be squeezed into the first hose, then passes through again to be pressed down against the cold water in bucket The ejection of the first nozzle is crossed, to be sprayed onto on radiator, to cool down to radiator.At the same time the first sliding block to Lower movement, and since the original state of elastic component is tensional state, while again under the action of drawstring, to which second will be driven Sliding block moves right, to drive W-shaped slide plate to move right, to drive contact roller to move up and down, to drive second liter It drops bar to move up and down, to drive the first nozzle to move up and down, to which the spraying range of the first nozzle will be expanded, to make vapour The speed of vehicle water tank cooling is faster.At the same time first gear rotates clockwise, to drive shaft to rotate clockwise, to band Dynamic small belt pulley rotates clockwise, to drive flat belt to rotate clockwise, to drive big belt pulley to rotate clockwise, to Disk is driven to rotate clockwise, to drive the 4th strut to rotate clockwise, to drive air-cooler to rotate clockwise, to just The angle of air-cooler can be adjusted.Start air-cooler work simultaneously, then air-cooler will blow a cold wind over to radiator, to add The fast cooling rate of radiator, to improve work efficiency.When radiator no longer needs cooling, start motor band Dynamic first gear rotates counterclockwise, to drive second gear to rotate clockwise, under the action of first connecting rod and second connecting rod, To drive the first sliding block to move upwards, due to the effect of drawstring, to which the second sliding block will be driven to move downward, to drive W-shaped slide plate moves downward.At the same time first gear rotates counterclockwise, small to drive to drive shaft to rotate counterclockwise Belt pulley rotates counterclockwise, to drive flat belt to rotate counterclockwise, to drive big belt pulley to rotate counterclockwise, to drive Disc counter-clockwise rotates, to drive the 4th strut to rotate counterclockwise, to drive air-cooler to rotate counterclockwise.When W-shaped slide plate When being resetted with air-cooler, motor is stopped.When then needing to cool down to radiator every time, repeating above step is It can.
Because further including having air inlet pipe, ice cube case, escape pipe, air pump, the second hose, the second nozzle and the 5th strut, circle The 5th strut is welded on disk, the 5th strut end is connected with the second nozzle, cradle top right side by bolted connection It is connected with ice cube case and air pump by bolted connection, ice cube case is located at the left of air pump, is equipped on the left of ice cube box top Air inlet pipe is connected with escape pipe and the second hose on air pump by way of flanged joint, and outlet pipe end stretches into ice cube case, Second hose end is connect by way of flanged joint with the second nozzle, so when being cooled down to radiator, first Suitable ice cube is added into ice cube case, then extraneous gas will be entered by air inlet pipe becomes cold air in ice cube case, together When restart air pump work, then the cold air in ice cube case will be pumped into escape pipe by air pump, then be entered back into soft to second In pipe, then sprayed using the second nozzle.At the same time disk rotates clockwise to drive the second nozzle to rotate clockwise, To expand the spraying range of the second nozzle, to further accelerate the cooling rate of radiator, to improve Working efficiency.
Because further including having mobile bar, magnet piece and irony placing frame, the first elevating lever right side central is welded with mobile bar, Mobile bar right end is connected with magnet piece by bolted connection, and magnet piece right end is equipped with irony placing frame, irony placing frame Three-dimensional shape be cuboid irony placing frame is placed on magnet piece first so when being cooled down to radiator Right side, then magnet piece irony placing frame will be sucked, suitable ice cube is then added into irony placing frame again, then ice cube is just Heat can be absorbed, when the first elevating lever moves downward, to which the irony placing frame equipped with ice cube will be driven to move downward, from And the speed to cool down to radiator will be accelerated.
Because further including having catch basin, base top passes on left bolted mode and is connected with catch basin, catch basin Positioned at the right of holder, catch basin is located at the left of support plate, and catch basin is located at the dead astern of the second sliding rail, and the material of catch basin is Stainless steel, so the water that nozzle can drop down is caught, so as to reuse, to save water resource.
(3)Advantageous effect
Invention achieves the fast advantageous effects of water tank cooling rate;By being equipped with air inlet pipe, ice cube case, escape pipe, gas Pump, the second hose, the second nozzle and the 5th strut, so the cooling rate of radiator is further accelerated, to improve Working efficiency;By being equipped with catch basin, so can reuse, to save water resource.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the dimensional structure diagram of the hinge member of the present invention.
Fig. 3 is second of main structure diagram of the present invention.
Fig. 4 is the third main structure diagram of the present invention.
Fig. 5 is the 4th kind of main structure diagram of the present invention.
Label in attached drawing be:The first struts of 1-, the first sliding rails of 2-, the second struts of 3-, 4- first gears, 5- belt laces Wheel, 6- disks, 7- third struts, 8- second gears, 9- second connecting rods, 10- motors, 11- shafts, the first sliding blocks of 12-, 13- the One directive wheel, 14- hinge members, 15- first connecting rods, 16- flat belts, 17- big belt pulleys, 18- drawstrings, the first elevating levers of 19-, 20- pistons, 21- buckets, the first hoses of 22-, the first nozzles of 23-, the second elevating levers of 24-, 25- pilot holes, 26- guide plates, 27- Second directive wheel, 28- contact rollers, 29-W shape slide plates, 30- pedestals, 31- support plates, 32- elastic components, the second sliding blocks of 33-, 34- Two sliding rails, 35- holders, 36- notch plates, 37- connecting shafts, 38- swivel plates, 39- air inlet pipe, 40- ice cube casees, 41- escape pipes, 42- air pumps, the second hoses of 43-, the second nozzles of 44-, the 5th struts of 45-, 46- mobile bars, 47- magnet pieces, 48- ironys are placed Frame, 49- catch basins, the 4th struts of 50-, 51- air-coolers.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of radiator fast cooling equipment includes as shown in Figs. 1-5 the first strut 1, the first sliding rail 2, second Strut 3, first gear 4, small belt pulley 5, disk 6, third strut 7, second gear 8, second connecting rod 9, motor 10, shaft 11, First sliding block 12, the first directive wheel 13, hinge member 14, first connecting rod 15, flat belt 16, big belt pulley 17, drawstring 18, first Elevating lever 19, piston 20, bucket 21, the first hose 22, the first nozzle 23, the second elevating lever 24, guide plate 26, the second directive wheel 27, contact roller 28, W-shaped slide plate 29, pedestal 30, support plate 31, elastic component 32, the second sliding block 33, the second sliding rail 34, holder 35, 4th strut 50 and air-cooler 51;The top of pedestal 30 is connected with holder 35, the in turn from left to right by bolted connection Two sliding rails 34 and support plate 31,35 inner top of holder left side are welded with the first strut 1 and the second strut 3, and the first strut 1 is located at second The left of strut 3,35 inner top of holder between the first strut 1 and the second strut 3 are connected with by bolted connection One sliding rail 2,35 inner top of holder right side are welded with third strut 7, and 1 lower end of the first strut is connected with by bolted connection Second gear 8,8 front side of second gear are connect with 9 upper end of second connecting rod by hinge member 14, and hinge member 14 includes spill Plate 36, connecting shaft 37 and swivel plate 38, connecting shaft 37 are fixedly mounted on notch plate 36, through-hole are equipped on swivel plate 38, even Spindle 37 passes through the through-hole on swivel plate 38, and swivel plate 38, by being rotated around connecting shaft 37,8 front side of second gear passes through The mode of welding is connect with the notch plate 36 of the hinge member 14 on 8 front side of second gear, and 9 upper end of second connecting rod passes through welding Mode is connect with the swivel plate 38 of the hinge member 14 on 8 front side of second gear, and slidingtype is connected with the first cunning on the first sliding rail 2 Block 12, the first sliding rail 2 and the first sliding block 12 coordinate, and 9 lower end of second connecting rod passes through hinge member with 12 front side left part of the first sliding block 14 connections, 9 lower end of second connecting rod are connect with the notch plate 36 of the hinge member 14 of 9 lower end of second connecting rod by welding, First sliding block, 12 front side left part is connect with the swivel plate 38 of the hinge member 14 of 9 lower end of second connecting rod by welding, the One sliding block, 12 lower end is connected with the first elevating lever 19 by bolted connection, and 3 lower end of the second strut is bolted Mode is connected with motor 10, and the output shaft on motor 10 is connect by shaft coupling with shaft 11, is connected by flat key in shaft 11 Mode be connected with first gear 4 and small belt pulley 5, first gear 4 is located at the rear side of small belt pulley 5, first gear 4 and second Gear 8 engages, and 4 front side of first gear is connect with 15 upper end of first connecting rod by hinge member 14, and 4 front side of first gear passes through weldering The mode connect is connect with the notch plate 36 of the hinge member 14 on 4 front side of first gear, and 15 upper end of first connecting rod passes through welding Mode is connect with the swivel plate 38 of the hinge member 14 on 4 front side of first gear, before 15 lower end of first connecting rod and the first sliding block 12 Side right part is connected by hinge member 14,15 lower end of the first connecting rod articulated section with 15 lower end of first connecting rod by welding The notch plate 36 of part 14 connects, 12 front side right part of the first sliding block hinge member with 15 lower end of first connecting rod by welding 14 swivel plate 38 connects, and 7 lower end of third strut is connected with disk 6, the 4th is welded on disk 6 by bolted connection Strut 50,50 end of the 4th strut are connected with air-cooler 51 by bolted connection, and 6 front side of disk is bolted Mode is connected with big belt pulley 17, and flat belt 16 is wound between big belt pulley 17 and small belt pulley 5, and the first directive wheel 13 passes through One connecting rod is welded on 35 inner left wall top of holder, and 35 inner left wall lower part of holder is connected with guide plate by bolted connection 26, pilot hole 25 is provided on guide plate 26, and 26 top left side of guide plate is connected with bucket 21, bucket by bolted connection Piston 20 is equipped in 21, piston 20 coordinates with bucket 21,19 lower end of the first elevating lever by bolted connection with piston 20 Connection, 21 right wall lower part of bucket are equipped with the first hose 22, and the second directive wheel 27 is welded on by the second connecting rod in holder 35 left Wall lower part, the second directive wheel 27 are located at the lower section of guide plate 26, and slidingtype is connected with the second sliding block 33 on the second sliding rail 34, and second Sliding rail 34 and the second sliding block 33 coordinate, and 33 left end of the second sliding block is connected with drawstring 18, and one end of drawstring 18 is by way of hook It is connect with 33 left end of the second sliding block, drawstring 18 passes through around the second directive wheel 27 and the first directive wheel 13, the other end of drawstring 18 The mode of hook is connect with 12 left end of the first sliding block, and 33 upper end of the second sliding block is connected with W-shaped slide plate by bolted connection 29, slidingtype is equipped with contact roller 28 on W-shaped slide plate 29, and contact roller 28 is engaged with W-shaped slide plate 29, after contact roller 28 End is connected with the second elevating lever 24 by way of key connection, and the second elevating lever 24 is on pilot hole 25, the second elevating lever 24 End is connected with the first nozzle 23 by bolted connection, and 22 end of the first hose is sprayed by way of flanged joint with first First 23 connection, 33 right end of the second sliding block are equipped with elastic component 32, one end of elastic component 32 by way of hook with the second sliding block 33 Right end connects, and the other end of elastic component 32 is connect by way of hook with support plate 31.
Further include having air inlet pipe 39, ice cube case 40, escape pipe 41, air pump 42, the second hose 43, the second nozzle 44 and the 5th Strut 45 is welded with the 5th strut 45 on disk 6, and 45 end of the 5th strut is connected with the second nozzle by bolted connection 44,35 top right side of holder is connected with ice cube case 40 and air pump 42 by bolted connection, and ice cube case 40 is located at air pump 42 Left, 40 top left side of ice cube case is equipped with air inlet pipe 39, escape pipe 41 is connected with by way of flanged joint on air pump 42 With the second hose 43,41 end of escape pipe is stretched into ice cube case 40, and 43 end of the second hose is by way of flanged joint with the Two nozzles 44 connect.
Further include having mobile bar 46, magnet piece 47 and irony placing frame 48,19 right side central of the first elevating lever is welded with shifting Lever 46,46 right end of mobile bar are connected with magnet piece 47 by bolted connection, and 47 right end of magnet piece is placed equipped with irony The three-dimensional shape of frame 48, irony placing frame 48 is cuboid.
Further include having catch basin 49,30 top left side of pedestal is connected with catch basin 49 by bolted connection, catchments Slot 49 is located at the right of holder 35, and catch basin 49 is located at the left of support plate 31, and catch basin 49 is located at the dead astern of the second sliding rail 34, The material of catch basin 49 is stainless steel.
The material of holder 35 is stainless steel.
First strut 1, the second strut 3, third strut 7 and the 4th strut 50 material be Q235 steel.
Elastic component 32 is spring.
Operation principle:When needing to be cooled down to radiator, suitable cold water is added into bucket 21 first, then Starting motor 10 drives first gear 4 to rotate clockwise, to drive second gear 8 to rotate counterclockwise, in 15 He of first connecting rod Under the action of second connecting rod 9, to drive the first sliding block 12 to move downward, to drive the first elevating lever 19 to move downward, from And moved downward with piston 20, to which the cold water in bucket 21 will be pressed down against, to which the cold water in bucket 21 be squeezed into Into the first hose 22, then using the first nozzle 23 spray, to be sprayed onto on radiator, to radiator into Row cooling.At the same time the first sliding block 12 moves downward, and since the original state of elastic component 32 is tensional state, while existing again Under the action of drawstring 18, to which the second sliding block 33 will be driven to move right, to drive W-shaped slide plate 29 to move right, to Contact roller 28 is driven to move up and down, to drive the second elevating lever 24 to move up and down, to drive the first about 23 nozzle fortune It is dynamic, to which the spraying range of the first nozzle 23 will be expanded, to make the speed of radiator cooling faster.At the same time first Gear 4 rotates clockwise, to drive shaft 11 to rotate clockwise, to drive small belt pulley 5 to rotate clockwise, to drive Flat belt 16 rotates clockwise, to drive big belt pulley 17 to rotate clockwise, to drive disk 6 to rotate clockwise, to The 4th strut 50 is driven to rotate clockwise, to drive air-cooler 51 to rotate clockwise, to which the angle of air-cooler 51 will be adjusted Degree.Start the work of air-cooler 51 simultaneously, then air-cooler 51 will blow a cold wind over to radiator, to accelerate radiator Cooling rate, to improve work efficiency.When radiator no longer needs cooling, starts motor 10 and drive first gear 4 rotate counterclockwise, to drive second gear 8 to rotate clockwise, under the action of first connecting rod 15 and second connecting rod 9, to The first sliding block 12 is driven to move upwards, due to the effect of drawstring 18, to which the second sliding block 33 will be driven to move downward, to band W-shaped slide plate 29 is moved to move downward.At the same time first gear 4 rotates counterclockwise, to drive shaft 11 to rotate counterclockwise, to Small belt pulley 5 is driven to rotate counterclockwise, to drive flat belt 16 to rotate counterclockwise, to drive big belt pulley 17 to turn counterclockwise It is dynamic, to drive disk 6 to rotate counterclockwise, to drive the 4th strut 50 to rotate counterclockwise, to drive 51 inverse time of air-cooler Needle rotates.When W-shaped slide plate 29 and air-cooler 51 reset, motor 10 is stopped.Then it needs to carry out radiator every time When cooling, above step is repeated.
Because further including having air inlet pipe 39, ice cube case 40, escape pipe 41, air pump 42, the second hose 43,44 and of the second nozzle 5th strut 45 is welded with the 5th strut 45 on disk 6, and 45 end of the 5th strut is connected with second by bolted connection Nozzle 44,35 top right side of holder are connected with ice cube case 40 and air pump 42 by bolted connection, and ice cube case 40 is located at gas The left of pump 42,40 top left side of ice cube case are equipped with air inlet pipe 39, outlet are connected with by way of flanged joint on air pump 42 Pipe 41 and the second hose 43,41 end of escape pipe are stretched into ice cube case 40, and 43 end of the second hose is by way of flanged joint It is connect with the second nozzle 44, so when being cooled down to radiator, suitable ice cube is added into ice cube case 40 first, then Extraneous gas will be entered by air inlet pipe 39 becomes cold air in ice cube case 40, while restarting the work of air pump 42, then gas Cold air in ice cube case 40 will be pumped into escape pipe 41 by pump 42, then entered back into the second hose 43, then passed through again Cross the ejection of the second nozzle 44.At the same time disk 6 rotates clockwise to drive the second nozzle 44 to rotate clockwise, to expand The spraying range of second nozzle 44, to further accelerate the cooling rate of radiator, to improve work effect Rate.
Because further including having mobile bar 46, magnet piece 47 and irony placing frame 48, the welding of 19 right side central of the first elevating lever There are mobile bar 46,46 right end of mobile bar to be connected with magnet piece 47 by bolted connection, 47 right end of magnet piece is equipped with irony The three-dimensional shape of placing frame 48, irony placing frame 48 is cuboid, so when being cooled down to radiator, first by iron Matter placing frame 48 is placed on the right side of magnet piece 47, then irony placing frame 48 will be sucked for magnet piece 47, then be put again to irony It sets and suitable ice cube is added in frame 48, then ice cube is absorbed by heat, when the first elevating lever 19 moves downward, thus will band The dynamic irony placing frame 48 equipped with ice cube moves downward, to accelerate the speed to cool down to radiator.
Because further including having catch basin 49,30 top left side of pedestal is connected with catch basin 49 by bolted connection, Catch basin 49 is located at the right of holder 35, and catch basin 49 is located at the left of support plate 31, and catch basin 49 is being located at the second sliding rail 34 just The material at rear, catch basin 49 is stainless steel, so the water that nozzle can drop down is caught, so as to reuse, To save water resource.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (7)

1. a kind of radiator fast cooling equipment, which is characterized in that include the first strut(1), the first sliding rail(2), Two struts(3), first gear(4), small belt pulley(5), disk(6), third strut(7), second gear(8), second connecting rod (9), motor(10), shaft(11), the first sliding block(12), the first directive wheel(13), hinge member(14), first connecting rod(15), Flat belt(16), big belt pulley(17), drawstring(18), the first elevating lever(19), piston(20), bucket(21), the first hose (22), the first nozzle(23), the second elevating lever(24), guide plate(26), the second directive wheel(27), contact roller(28), W-shaped cunning Plate(29), pedestal(30), support plate(31), elastic component(32), the second sliding block(33), the second sliding rail(34), holder(35), the 4th Bar(50)And air-cooler(51);Pedestal(30)Top is connected with holder in turn from left to right by bolted connection(35), Second sliding rail(34)And support plate(31), holder(35)It is welded with the first strut on the left of inner top(1)With the second strut(3), first Strut(1)Positioned at the second strut(3)Left, the first strut(1)With the second strut(3)Between holder(35)Inner top passes through Bolted mode is connected with the first sliding rail(2), holder(35)It is welded with third strut on the right side of inner top(7), the first strut (1)Lower end is connected with second gear by bolted connection(8), second gear(8)Front side and second connecting rod(9)Upper end is logical Cross hinge member(14)Connection, hinge member(14)It include notch plate(36), connecting shaft(37)And swivel plate(38), connecting shaft (37)It is fixedly mounted on notch plate(36)On, in swivel plate(38)It is equipped with through-hole, connecting shaft(37)Across swivel plate(38)On Through-hole, and swivel plate(38)By around connecting shaft(37)Rotation, second gear(8)Front side is by welding with Two gears(8)Hinge member on front side(14)Notch plate(36)Connection, second connecting rod(9)Upper end by welding with Second gear(8)Hinge member on front side(14)Swivel plate(38)Connection, the first sliding rail(2)Upper slidingtype is connected with first Sliding block(12), the first sliding rail(2)With the first sliding block(12)Cooperation, second connecting rod(9)Lower end and the first sliding block(12)Front side left part Pass through hinge member(14)Connection, second connecting rod(9)Lower end by welding with second connecting rod(9)The hinge member of lower end (14)Notch plate(36)Connection, the first sliding block(12)Front side left part by welding with second connecting rod(9)The hinge of lower end Relay part(14)Swivel plate(38)Connection, the first sliding block(12)Lower end is connected with the first elevating lever by bolted connection (19), the second strut(3)Lower end is connected with motor by bolted connection(10), motor(10)On output shaft pass through connection Axis device and shaft(11)Connection, shaft(11)On flat key connection by way of be connected with first gear(4)And small belt pulley (5), first gear(4)Positioned at small belt pulley(5)Rear side, first gear(4)With second gear(8)Engagement, first gear(4) Front side and first connecting rod(15)Upper end passes through hinge member(14)Connection, first gear(4)Front side is by welding with One gear(4)Hinge member on front side(14)Notch plate(36)Connection, first connecting rod(15)Upper end is by welding With first gear(4)Hinge member on front side(14)Swivel plate(38)Connection, first connecting rod(15)Lower end and the first sliding block (12)Front side right part passes through hinge member(14)Connection, first connecting rod(15)Lower end by welding with first connecting rod(15) The hinge member of lower end(14)Notch plate(36)Connection, the first sliding block(12)Front side right part connects with first by welding Bar(15)The hinge member of lower end(14)Swivel plate(38)Connection, third strut(7)Lower end connects by bolted connection It is connected to disk(6), disk(6)On be welded with the 4th strut(50), the 4th strut(50)End connects by bolted connection It is connected to air-cooler(51), disk(6)Front side is connected with big belt pulley by bolted connection(17), big belt pulley(17)With Small belt pulley(5)Between be wound with flat belt(16), the first directive wheel(13)It is welded on holder by head rod(35)An interior left side Wall top, holder(35)Inner left wall lower part is connected with guide plate by bolted connection(26), guide plate(26)On be provided with Pilot hole(25), guide plate(26)Top left side is connected with bucket by bolted connection(21), bucket(21)Inside it is equipped with Piston(20), piston(20)With bucket(21)Cooperation, the first elevating lever(19)Lower end by bolted connection with piston (20)Connection, bucket(21)Right wall lower part is equipped with the first hose(22), the second directive wheel(27)It is welded on by the second connecting rod Holder(35)Inner left wall lower part, the second directive wheel(27)Positioned at guide plate(26)Lower section, the second sliding rail(34)Upper slidingtype connects It is connected to the second sliding block(33), the second sliding rail(34)With the second sliding block(33)Cooperation, the second sliding block(33)Left end is connected with drawstring (18), drawstring(18)One end by way of hook with the second sliding block(33)Left end connects, drawstring(18)It is oriented to around second Wheel(27)With the first directive wheel(13), drawstring(18)The other end by way of hook with the first sliding block(12)Left end connects, Second sliding block(33)Upper end is connected with W-shaped slide plate by bolted connection(29), W-shaped slide plate(29)Upper slidingtype is equipped with and connects Touch idler wheel(28), contact roller(28)With W-shaped slide plate(29)It is engaged, contact roller(28)Rear end is by way of key connection It is connected with the second elevating lever(24), the second elevating lever(24)Across pilot hole(25), the second elevating lever(24)Upper end passes through bolt The mode of connection is connected with the first nozzle(23), the first hose(22)End by way of flanged joint with the first nozzle(23) Connection, the second sliding block(33)Right end is equipped with elastic component(32), elastic component(32)One end by way of hook with the second sliding block (33)Right end connects, elastic component(32)The other end by way of hook and support plate(31)Connection.
2. a kind of radiator fast cooling equipment according to claim 1, which is characterized in that further include having air inlet pipe (39), ice cube case(40), escape pipe(41), air pump(42), the second hose(43), the second nozzle(44)With the 5th strut(45), Disk(6)On be welded with the 5th strut(45), the 5th strut(45)End is connected with the second nozzle by bolted connection (44), holder(35)Top right side is connected with ice cube case by bolted connection(40)And air pump(42), ice cube case(40) Positioned at air pump(42)Left, ice cube case(40)Top left side is equipped with air inlet pipe(39), air pump(42)Above pass through flanged joint Mode is connected with escape pipe(41)With the second hose(43), escape pipe(41)Ice cube case is stretched into end(40)It is interior, the second hose (43)End by way of flanged joint with the second nozzle(44)Connection.
3. a kind of radiator fast cooling equipment according to claim 1, which is characterized in that further include having mobile bar (46), magnet piece(47)With irony placing frame(48), the first elevating lever(19)Right side central is welded with mobile bar(46), mobile bar (46)Right end is connected with magnet piece by bolted connection(47), magnet piece(47)Right end is equipped with irony placing frame(48), Irony placing frame(48)Three-dimensional shape be cuboid.
4. a kind of radiator fast cooling equipment according to claim 1, which is characterized in that further include having catch basin (49), pedestal(30)Top left side is connected with catch basin by bolted connection(49), catch basin(49)Positioned at holder (35)Right, catch basin(49)Positioned at support plate(31)Left, catch basin(49)Positioned at the second sliding rail(34)Dead astern, collection Sink(49)Material be stainless steel.
5. a kind of radiator fast cooling equipment according to claim 1, which is characterized in that holder(35)Material For stainless steel.
6. a kind of radiator fast cooling equipment according to claim 1, which is characterized in that the first strut(1), Two struts(3), third strut(7)With the 4th strut(50)Material be Q235 steel.
7. a kind of radiator fast cooling equipment according to claim 1, which is characterized in that elastic component(32)For bullet Spring.
CN201611021768.2A 2016-11-21 2016-11-21 A kind of radiator fast cooling equipment Expired - Fee Related CN106382152B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611021768.2A CN106382152B (en) 2016-11-21 2016-11-21 A kind of radiator fast cooling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611021768.2A CN106382152B (en) 2016-11-21 2016-11-21 A kind of radiator fast cooling equipment

Publications (2)

Publication Number Publication Date
CN106382152A CN106382152A (en) 2017-02-08
CN106382152B true CN106382152B (en) 2018-10-30

Family

ID=57959008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611021768.2A Expired - Fee Related CN106382152B (en) 2016-11-21 2016-11-21 A kind of radiator fast cooling equipment

Country Status (1)

Country Link
CN (1) CN106382152B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106839813B (en) * 2017-02-14 2018-12-11 浙江明新风机有限公司 A kind of fuel oil auxiliary cooling device
CN107262904B (en) * 2017-08-08 2019-05-10 泰州市罡杨橡塑有限公司 A kind of copper product Suppression of High-frequency Welding Devices
CN111833765A (en) * 2020-08-04 2020-10-27 吉林农业科技学院 Outdoor billboard adapting to new urbanization

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2134950Y (en) * 1992-08-21 1993-06-02 北京市通力机械工业公司 Vehicle surface cleaning apparatus
DE102010016644A1 (en) * 2010-04-26 2011-11-24 Technische Universität Darmstadt Evaporator for evaporation of liquid coolant, has housing which has inlet opening for liquid coolant and outlet opening for evaporated coolant
CN102297041A (en) * 2010-06-24 2011-12-28 福特环球技术公司 Combustion motor with cylinder cover and turbo machine and operation method thereof
CN202100319U (en) * 2011-06-16 2012-01-04 杨世雄 Automatic water supplement and spraying control device of automobile
DE102013214446A1 (en) * 2013-07-24 2015-01-29 Robert Bosch Gmbh Apparatus for utilizing condensing energy in an internal combustion engine.
CN206290319U (en) * 2016-11-21 2017-06-30 无锡市伟丰印刷机械厂 A kind of radiator fast cooling equipment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140026869A1 (en) * 2012-07-27 2014-01-30 Ford Global Technologies, Llc Fuel delivery system including a heat pipe assembly

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2134950Y (en) * 1992-08-21 1993-06-02 北京市通力机械工业公司 Vehicle surface cleaning apparatus
DE102010016644A1 (en) * 2010-04-26 2011-11-24 Technische Universität Darmstadt Evaporator for evaporation of liquid coolant, has housing which has inlet opening for liquid coolant and outlet opening for evaporated coolant
CN102297041A (en) * 2010-06-24 2011-12-28 福特环球技术公司 Combustion motor with cylinder cover and turbo machine and operation method thereof
CN202100319U (en) * 2011-06-16 2012-01-04 杨世雄 Automatic water supplement and spraying control device of automobile
DE102013214446A1 (en) * 2013-07-24 2015-01-29 Robert Bosch Gmbh Apparatus for utilizing condensing energy in an internal combustion engine.
CN206290319U (en) * 2016-11-21 2017-06-30 无锡市伟丰印刷机械厂 A kind of radiator fast cooling equipment

Also Published As

Publication number Publication date
CN106382152A (en) 2017-02-08

Similar Documents

Publication Publication Date Title
CN106382152B (en) A kind of radiator fast cooling equipment
CN206343691U (en) A kind of hot water pipe cutter device
CN207013398U (en) A kind of nonpetroleum pipe cleaning device
CN206290319U (en) A kind of radiator fast cooling equipment
CN101284272B (en) High pressure cleaning machine and uses thereof
CN206868760U (en) A kind of quartz glass straight tube cleaning device
CN206935908U (en) A kind of machine components cleaning device
CN206500291U (en) A kind of high-performance gas-liquid injection equipment
CN113857125B (en) Full-automatic efficient cleaning device for silicon wafer surface and operation method
CN107981383A (en) Bubble shower cleaning machine
CN204974549U (en) Reciprocal swing water curtain parts washer of flat link chain through type
CN211771467U (en) Equipment for heat treatment of bearing outer ring
CN209110310U (en) A kind of vertical band sawing machine
CN201223865Y (en) High pressure cleaning machine
CN207899771U (en) A kind of device for cleaning mould
CN206882311U (en) A kind of crankshaft washer
CN206854296U (en) A kind of Barrel of Hydraulic Cylinders automates cleaning device
CN212844341U (en) Angle-adjustable belt tensioning loading type tensioning wheel testing machine
CN206578075U (en) A kind of circuit board automatic cleaning apparatus
CN108545403A (en) A kind of brick transmission equipment for building
CN108636975A (en) A kind of paper product production debris removal equipment
CN209406975U (en) A kind of ultrasonic automatic cleaning machine
CN114669147A (en) Building construction site dust collector
CN208893923U (en) A kind of rotary and centrifugal type DMF gas concentration unit
CN208372540U (en) Fabric produces water circulation device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201210

Address after: 239400 4-4302, 3rd floor, science and technology enterprise incubator building, middle section of Huaihe Avenue, Mingguang City, Chuzhou City, Anhui Province

Patentee after: Mingguang Wisdom Tianshun Technology Transfer Service Co.,Ltd.

Address before: 214000 phase V of Shuofang Industrial Park, Wuxi New District, Jiangsu Province

Patentee before: WUXI JIANGSU WEIFENG PRINTING MACHINE Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181030

Termination date: 20201121

CF01 Termination of patent right due to non-payment of annual fee