CN106381817A - Self-balancing type horizontal correcting device for correcting and resetting old bridge and construction method thereof - Google Patents

Self-balancing type horizontal correcting device for correcting and resetting old bridge and construction method thereof Download PDF

Info

Publication number
CN106381817A
CN106381817A CN201610968399.1A CN201610968399A CN106381817A CN 106381817 A CN106381817 A CN 106381817A CN 201610968399 A CN201610968399 A CN 201610968399A CN 106381817 A CN106381817 A CN 106381817A
Authority
CN
China
Prior art keywords
bracket
base plate
plate
slip
deviation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610968399.1A
Other languages
Chinese (zh)
Inventor
张志红
窦勇芝
韦福堂
孙长军
李建立
欧志莲
梁冰
罗迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIUZHOU OVM ENGINEERING Co Ltd
Original Assignee
LIUZHOU OVM ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIUZHOU OVM ENGINEERING Co Ltd filed Critical LIUZHOU OVM ENGINEERING Co Ltd
Priority to CN201610968399.1A priority Critical patent/CN106381817A/en
Publication of CN106381817A publication Critical patent/CN106381817A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Abstract

The invention relates to a self-balancing type horizontal correcting device for correcting and resetting an old bridge. The self-balancing type horizontal correcting device comprises a fixed bracket, a sliding bracket, a pushing jack, a vertical jack, a sliding plate and wedge blocks, wherein the fixed bracket comprises a base plate and a baffle, wherein the base plate is arranged at the bottom end, and the baffle is arranged at any end of the base plate; the sliding bracket comprises a base plate arranged at the bottom end and a baffle arranged on the base plate; the base plate of the fixed bracket is paved under the sliding plate; the base plate of the sliding bracket is paved above the sliding plate; the front end of the pushing jack is jacked on the baffle of the sliding bracket, and the rear end of the pushing jack is jacked on the baffle of the fixed bracket; the vertical jack is arranged on the base plate of the sliding bracket; and the wedge blocks are respectively arranged at the upper end and lower end of the vertical jack. The self-balancing type horizontal correcting device has a simple structure, is reasonable in design, can fully utilize the available space of a beam bottom and the top of a pier column cover beam, requires no additional construction support basis and is reusable. The invention also provides a construction method for the horizontal correcting device for correcting and resetting the old bridge.

Description

The horizontal deviation correcting device of self-balancing type for old bridge deviation rectification and its construction method
Technical field
The invention belongs to technical field of bridge construction, especially relate to a kind of self-balancing type water for old bridge deviation rectification Flat deviation correcting device and its construction method.
Background technology
As the important component part of bridge structure, it is bridge top major bearing structures it is ensured that vehicle smoothes out to beam body Travel, the active force of vehicular load is reliably passed through bearing power transmission to Bridge Pier.Due to design, construction, operation and bearing The improper problem existing, often sliding off normal disease, leads to beam body can not work according to normal stress in beam body, or even The operation security of impact bridge structure, therefore must reset in time for girder slippage off normal disease.Using beam body lateral pushing When method carries out deviation rectification to beam body, not only do not interfere with the normal of spanning and use and stress, and reduce investment outlay, energy Effectively shorten the construction period.
At present, using setting deviation correcting device, standard practice arranges basis around pier stud to bridge on highway deviation rectification With large-scale correction bracing frame, shortcoming is need to excavate and do basis, and bracing frame must firmly, reliably and can bear the anti-of pushing tow beam body Active force, so that carry out as bracing frame basis after reforming processing to existing bridge foundation, basis after the completion of incremental launching construction Just ineffective, Meteorological is high, and especially under the conditions of soft foundation, the disposal costs on basis are higher, be unfavorable for recycling and Extremely uneconomical.Do not make full use of the construction featuress beam bottom of bridge itself and the useful space on pier stud bent cap top, arrangement is entangled Resetting means partially.
Content of the invention
The technical problem to be solved is for above-mentioned deficiency of the prior art, provides one kind to be used for old bridge The horizontal deviation correcting device of self-balancing type of deviation rectification and its construction method, its structure is simple, reasonable in design, input cost is relatively low and Handling are easy, using effect is good, can be the strong point using the former bearing pad stone in bridge coping top, and energy is easy, be rapidly completed beam body Correction process, the advantage making full use of beam bottom and the useful space on pier stud bent cap top, without Construction Support basis, and can repeatedly weigh Multiple use.
The present invention takes technical scheme below to realize above-mentioned purpose:
A kind of horizontal deviation correcting device of self-balancing type for old bridge deviation rectification, including fixing bracket(1), slip bracket(2), top Push away jack(3), vertical jack(4), slide plate(5), wedge(6), described fixing bracket(1)Including the bottom being arranged on bottom Plate(12)Be arranged on base plate(12)The baffle plate of two ends either end(13), described slip bracket(2)Including the bottom being arranged on bottom Plate(14)Be arranged on base plate(14)On baffle plate(15), described fixing bracket(1)Base plate(12)It is laid in slide plate(5)Under Side, slip bracket(2)Base plate(14)It is laid in slide plate(5)Top, described pushing tow jack(3)Front end is propped up and is withstood on slip bracket (2)Baffle plate(15)Upper and its rear end is propped up and is withstood on fixing bracket(1)Baffle plate(13)On, described vertical jack(4)It is arranged on Slip bracket(2)Base plate(14)On, described vertical jack(4)Top and bottom be respectively arranged with wedge(6).
Preferably, described fixing bracket(1)Base plate(12)And baffle plate(13)L-shaped structure.
Preferably, described slip bracket(2)Base plate(14)And baffle plate(15)T-shaped structure.
Preferably, described slip bracket(2)Baffle plate(15)There is stiffener front end(16), stiffener(16)Play fixing pushing tow Jack(3).
Preferably, described slide plate(5)Bottom surface is polyethylene face, and upper surface is rubber face, using upper and lower rubbing surface friction Difference of coefficients realizes sliding.
Preferably, described fixing bracket(1)Baffle plate(13)Before be installed with rubber blanket(7), described rubber blanket(7)Make supporting Power is uniformly distributed.
Preferably, described fixing bracket(1), pushing tow jack(3)With slip bracket(2)Enter from outside to inside in the horizontal direction Row is laid and three and vertical jack(4)All it is laid on same straight line.
The present invention also provides the construction method of the horizontal deviation correcting device using above-mentioned old bridge deviation rectification, walks including following Suddenly:
Step one:Fix bracket first(1)Baffle plate(13)Overhead is in bent cap top pinner(8)Side, rubber blanket(7)It is installed with gear Plate(13)Front end, by slide plate(5), slip bracket(2)It is placed sequentially in fixing bracket(1)Base plate(12)On;Secondly, pushing tow thousand Jin top(3)It is arranged on slip bracket(2)Stiffener(16)Between and its front end pushing tow fixes bracket(1)Baffle plate(13), described Vertical jack(4)Top and bottom are respectively provided with wedge(6);
Step 2:Start oil pump, drive vertical jack(4)Carry out jacking, until vertical jack(4)The wedge of upper end (6)With beam body to be rectified a deviation(11)Completely attach to and beam body to be rectified a deviation(11)Depart from rubber support(10);
Step 3:Start pushing tow jack(3)Pushing tow fixes bracket(1), promote slip bracket(2)Thus driving slide plate(5)? Fixing bracket(1)Base plate(14)Upper slip, makes vertical jack(4)With beam body to be rectified a deviation(11)With slip bracket(2)Together Horizontal sliding completes to rectify a deviation.
The present invention compared with prior art has advantages below:
1st, structure is simple, reasonable in design and processing and fabricating is easy, and input cost is relatively low.
2nd, pushing tow process is simple and easy construction, and the construction period is short.
3rd, using effect is good and practical value is high, directly make use of the useful space at beam bottom and pier stud bent cap top, is not required to apply Work brace foundation, handling are easy and can repeatedly use, remarkable in economical benefits.
Brief description
Fig. 1 is:The structural representation of the horizontal deviation correcting device of self-balancing type for old bridge deviation rectification of the present invention.
Fig. 2 is:The structural representation of fixing bracket of the present invention.
Fig. 3 is:The structural representation of slip bracket of the present invention.
Fig. 4 is:The scheme of installation of the horizontal deviation correcting device of self-balancing type for old bridge deviation rectification of the present invention.
In figure:
1 is fixing bracket;2 is slip bracket;3 is pushing tow jack;4 is vertical jack;5 is slide plate;6 is wedge;7 are Rubber blanket;8 is bent cap top pinner;9 is bridge coping;10 is rubber support;11 is beam body to be rectified a deviation;12 is fixing bracket bottom Plate;13 is fixing bracket baffle plate;14 is slip bracket base plate;15 is slip bracket baffle plate;16 is slip bracket stiffener.
Specific embodiment
1~4 the present invention will be described below in conjunction with the accompanying drawings
As shown in figure 1, for the horizontal deviation correcting device of self-balancing type of old bridge deviation rectification, including fixing bracket(1), slip bracket (2), pushing tow jack(3), vertical jack(4), slide plate(5), wedge(6), described fixing bracket(1)Including being arranged on bottom The base plate at end(12)Be arranged on base plate(12)The baffle plate of two ends either end(13), described slip bracket(2)Including being arranged on bottom The base plate at end(14)Be arranged on base plate(14)On baffle plate(15), described fixing bracket(1)Base plate(12)It is laid in slide plate (5)Lower section, slip bracket(2)Base plate(14)It is laid in slide plate(5)Top, described pushing tow jack(3)Front end is propped up and is withstood on cunning Dynamic bracket(2)Baffle plate(15)Upper and its rear end is propped up and is withstood on fixing bracket(1)Baffle plate(13)On, described vertical jack(4) It is arranged on slip bracket(2)Base plate(14)On, described vertical jack(4)Top and bottom be respectively arranged with wedge (6).
As shown in Fig. 2 fixing bracket(1)Including base plate(12)And baffle plate(13).
As shown in figure 3, slip bracket(2)Including base plate(14)And baffle plate(15).
As shown in figure 4, when actually used, first by vertical jack(4)Carry out jacking, until vertical jack(4)Upper end Wedge(6)With beam body to be rectified a deviation(11)Bottom surface completely attach to and beam body to be rectified a deviation(11)Depart from the rubber support of bridge pier (10), fixing bracket(1)Baffle plate(13)Pushing tow is in bridge coping(9)Original structure bent cap top pinner(8), as correction Hold application point, baffle plate(13)Before the rubber blanket that is installed with(7)Play and so that supporting force is uniformly distributed, then start pushing tow jack(3) Pushing tow fixes bracket(1), promote slip bracket(2)Thus driving slide plate(5)In fixing bracket(1)Base plate(14)Upper slip, Make vertical jack(4)With beam body to be rectified a deviation(11)With slip bracket(2)Together horizontal sliding completes to rectify a deviation.Correction operation completes Afterwards, by vertical jack(4)Slowly fall up to vertical jack(4)The wedge of top(6)With beam body to be rectified a deviation(11)Bottom Till portion departs from, it is finally completed bridge main beam horizontal sliding and realizes bridge deviation rectification.Effectively utilizes beam bottom of the present invention and pier stud Space between bent cap top, is the counter-force strong point using former support seat cover back pinner, in correction slipping, remains pushing tow The horizontal friction force that the top lift of the jacking force of jack and vertical jack produces equal it is ensured that bottom pillarwork level to The self-balancing of power.
A kind of construction method of the horizontal deviation correcting device of self-balancing type using above-mentioned old bridge deviation rectification, concrete steps are such as Under:
Step one:Fix bracket first(1)Baffle plate(13)Overhead is in bent cap top pinner(8)Side, rubber blanket(7)It is installed with gear Plate(13)Front end, by slide plate(5), slip bracket(2)It is placed sequentially in fixing bracket(1)Base plate(12)On;Secondly, pushing tow thousand Jin top(3)It is arranged on slip bracket(2)Stiffener(16)Between and its front end pushing tow fixes bracket(1)Baffle plate(13), described Vertical jack(4)Top and bottom are respectively provided with wedge(6);
Step 2:Start oil pump, drive vertical jack(4)Carry out jacking, until vertical jack(4)The wedge of upper end (6)With beam body to be rectified a deviation(11)Completely attach to and beam body to be rectified a deviation(11)Depart from rubber support(10);
Step 3:Start pushing tow jack(3)Pushing tow fixes bracket(1), promote slip bracket(2)Thus driving slide plate(5)? Fixing bracket(1)Base plate(14)Upper slip, makes vertical jack(4)With beam body to be rectified a deviation(11)With slip bracket(2)Together Horizontal sliding completes to rectify a deviation.

Claims (5)

1. be used for old bridge deviation rectification the horizontal deviation correcting device of self-balancing type it is characterised in that:Including fixing bracket(1), slide Bracket(2), pushing tow jack(3), vertical jack(4), slide plate(5), wedge(6), described fixing bracket(1)Including setting Base plate in bottom(12)Be arranged on base plate(12)The baffle plate of two ends either end(13), described slip bracket(2)Including setting Base plate in bottom(14)Be arranged on base plate(14)On baffle plate(15), described fixing bracket(1)Base plate(12)It is laid in Slide plate(5)Lower section, slip bracket(2)Base plate(14)It is laid in slide plate(5)Top, described pushing tow jack(3)Front end prop up Withstand on slip bracket(2)Baffle plate(15)Upper and its rear end is propped up and is withstood on fixing bracket(1)Baffle plate(13)On, described vertically very heavy Top(4)It is arranged on slip bracket(2)Base plate(14)On, described vertical jack(4)Top and bottom be respectively arranged with wedge Shape block(6).
2. the horizontal deviation correcting device of self-balancing type for old bridge deviation rectification according to claim 1 it is characterised in that:Institute State fixing bracket(1)Base plate(12)And baffle plate(13)L-shaped structure.
3. the horizontal deviation correcting device of self-balancing type for old bridge deviation rectification according to claim 1 or 2 any one, it is special Levy and be:Described slip bracket(2)Base plate(14)And baffle plate(15)T-shaped structure.
4. the horizontal deviation correcting device of self-balancing type for old bridge deviation rectification according to claim 1 it is characterised in that:Institute State slip bracket(2)Baffle plate(15)There is stiffener front end(16).
5. a kind of usage right requires the construction party of the horizontal deviation correcting device of self-balancing type for old bridge deviation rectification described in 1 Method it is characterised in that:Comprise the following steps:
Step one:Fix bracket first(1)Baffle plate(13)Overhead is in bent cap top pinner(8)Side, rubber blanket(7)It is installed with gear Plate(13)Front end, by slide plate(5), slip bracket(2)It is placed sequentially in fixing bracket(1)Base plate(12)On;Secondly, pushing tow thousand Jin top(3)It is arranged on slip bracket(2)Stiffener(16)Between and its front end pushing tow fixes bracket(1)Baffle plate(13), described Vertical jack(4)Top and bottom are respectively provided with wedge(6);
Step 2:Start oil pump, drive vertical jack(4)Carry out jacking, until vertical jack(4)The wedge of upper end (6)With beam body to be rectified a deviation(11)Completely attach to and beam body to be rectified a deviation(11)Depart from rubber support(10);
Step 3:Start pushing tow jack(3)Pushing tow fixes bracket(1), promote slip bracket(2)Thus driving slide plate(5)? Fixing bracket(1)Base plate(14)Upper slip, makes vertical jack(4)With beam body to be rectified a deviation(11)With slip bracket(2)Together Horizontal sliding completes to rectify a deviation.
CN201610968399.1A 2016-10-28 2016-10-28 Self-balancing type horizontal correcting device for correcting and resetting old bridge and construction method thereof Pending CN106381817A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610968399.1A CN106381817A (en) 2016-10-28 2016-10-28 Self-balancing type horizontal correcting device for correcting and resetting old bridge and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610968399.1A CN106381817A (en) 2016-10-28 2016-10-28 Self-balancing type horizontal correcting device for correcting and resetting old bridge and construction method thereof

Publications (1)

Publication Number Publication Date
CN106381817A true CN106381817A (en) 2017-02-08

Family

ID=57956693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610968399.1A Pending CN106381817A (en) 2016-10-28 2016-10-28 Self-balancing type horizontal correcting device for correcting and resetting old bridge and construction method thereof

Country Status (1)

Country Link
CN (1) CN106381817A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589560A (en) * 2018-04-04 2018-09-28 武汉二航路桥特种工程有限责任公司 Bridge cast steel list roller support correction restorative procedure
CN109138483A (en) * 2018-09-14 2019-01-04 武大巨成结构股份有限公司 A kind of device and its construction method replacing jacking increasing layer building with steel slideway using high-strength concrete column
CN111395206A (en) * 2020-03-20 2020-07-10 中铁大桥(南京)桥隧诊治有限公司 On-site deviation rectifying method for spherical support seat emptying
CN111926685A (en) * 2020-08-19 2020-11-13 中铁二院工程集团有限责任公司 Shear force conversion component for transversely moving high-speed railway continuous beam and conversion method
CN112627065A (en) * 2020-12-31 2021-04-09 陕西铁路工程职业技术学院 Bridge pier stud resetting means that rectifies
CN114703764A (en) * 2022-06-07 2022-07-05 中铁三局集团有限公司 Construction method for leveling and shifting high-speed rail inclined box girder

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953348A (en) * 2012-12-12 2013-03-06 重庆桥都桥梁技术有限公司 Correcting and resetting method for pier stud of bridge
CN103821091A (en) * 2014-02-27 2014-05-28 武汉中交试验检测加固工程有限责任公司 Deviation correcting and resetting method for longitudinal deviation of beam bodies of beam bridge
CN205188840U (en) * 2015-10-31 2016-04-27 西安公路研究院 Horizontal top of bridge pushes away deviation correcting device
KR101641583B1 (en) * 2013-11-08 2016-07-22 주식회사 티아이에스 Apparatus for reinforcing a girder section force for bridge and method manufacturing the same
CN206204807U (en) * 2016-10-28 2017-05-31 柳州欧维姆工程有限公司 A kind of horizontal deviation correcting device of self-balancing type for old bridge deviation rectification

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953348A (en) * 2012-12-12 2013-03-06 重庆桥都桥梁技术有限公司 Correcting and resetting method for pier stud of bridge
KR101641583B1 (en) * 2013-11-08 2016-07-22 주식회사 티아이에스 Apparatus for reinforcing a girder section force for bridge and method manufacturing the same
CN103821091A (en) * 2014-02-27 2014-05-28 武汉中交试验检测加固工程有限责任公司 Deviation correcting and resetting method for longitudinal deviation of beam bodies of beam bridge
CN205188840U (en) * 2015-10-31 2016-04-27 西安公路研究院 Horizontal top of bridge pushes away deviation correcting device
CN206204807U (en) * 2016-10-28 2017-05-31 柳州欧维姆工程有限公司 A kind of horizontal deviation correcting device of self-balancing type for old bridge deviation rectification

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589560A (en) * 2018-04-04 2018-09-28 武汉二航路桥特种工程有限责任公司 Bridge cast steel list roller support correction restorative procedure
CN109138483A (en) * 2018-09-14 2019-01-04 武大巨成结构股份有限公司 A kind of device and its construction method replacing jacking increasing layer building with steel slideway using high-strength concrete column
WO2020052637A1 (en) * 2018-09-14 2020-03-19 武大巨成结构股份有限公司 Device for alternately jacking added storey of building with high-strength concrete columns and steel slideways and construction method therefor
CN111395206A (en) * 2020-03-20 2020-07-10 中铁大桥(南京)桥隧诊治有限公司 On-site deviation rectifying method for spherical support seat emptying
CN111395206B (en) * 2020-03-20 2021-05-25 中铁桥隧技术有限公司 On-site deviation rectifying method for spherical support seat emptying
CN111926685A (en) * 2020-08-19 2020-11-13 中铁二院工程集团有限责任公司 Shear force conversion component for transversely moving high-speed railway continuous beam and conversion method
CN111926685B (en) * 2020-08-19 2022-02-22 中铁二院工程集团有限责任公司 Shear force conversion component for transversely moving high-speed railway continuous beam and conversion method
CN112627065A (en) * 2020-12-31 2021-04-09 陕西铁路工程职业技术学院 Bridge pier stud resetting means that rectifies
CN114703764A (en) * 2022-06-07 2022-07-05 中铁三局集团有限公司 Construction method for leveling and shifting high-speed rail inclined box girder

Similar Documents

Publication Publication Date Title
CN106381817A (en) Self-balancing type horizontal correcting device for correcting and resetting old bridge and construction method thereof
CN105735141A (en) Gliding device with box beam side template and construction method thereof
CN205636496U (en) A interim strutting arrangement that is used for support frame bridge crane and whole hole case roof beam
CN104929148B (en) The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN105603877A (en) Large-span cable-stayed bridge steel beam locking and adjusting method
CN103015330A (en) Steel hoop support system of jacking bridge
CN105887590A (en) Height direction adjusting system and method after railway foundation subsidence
CN205188840U (en) Horizontal top of bridge pushes away deviation correcting device
CN206204807U (en) A kind of horizontal deviation correcting device of self-balancing type for old bridge deviation rectification
CN203160142U (en) Jacking bridge steel hoop support system
CN208594486U (en) A kind of anchor ear system of automatic lifting
CN210263111U (en) Hollow pile body for civil engineering construction
CN102116094B (en) Displacement limit force transmission device for jacking up building
CN107806015B (en) A kind of unit construction bridge beam flange plate formwork for placing concrete system and construction method
CN106677557B (en) A kind of support protection structure and construction technology rising top replacement large-scale air spring
CN103669957B (en) V-arrangement framework construction method for hanging
CN103185682A (en) Loading method for axial forces of pre-stressed pipe pile
CN103411758A (en) Bailey truss static load test reaction frame device
CN109441118B (en) Distributing machine pouring system and method for assembled building construction concrete
KR101586376B1 (en) Structure lifting method using steel pipe member with lifting jack
CN204530479U (en) The interim counter-force bracing or strutting arrangement of a kind of bridge jacking
CN107034788B (en) A kind of suspender tension device and its construction method
CN218090551U (en) Stand type temporary telescopic device
CN203113334U (en) Holding device of static pressure pile hammer
CN105421246A (en) Installation method of towing cable hanging baskets

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170208

RJ01 Rejection of invention patent application after publication