CN109441118B - Distributing machine pouring system and method for assembled building construction concrete - Google Patents

Distributing machine pouring system and method for assembled building construction concrete Download PDF

Info

Publication number
CN109441118B
CN109441118B CN201811422310.7A CN201811422310A CN109441118B CN 109441118 B CN109441118 B CN 109441118B CN 201811422310 A CN201811422310 A CN 201811422310A CN 109441118 B CN109441118 B CN 109441118B
Authority
CN
China
Prior art keywords
floor
machine
pouring
mounting frame
installation base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811422310.7A
Other languages
Chinese (zh)
Other versions
CN109441118A (en
Inventor
吕哲
贺勇
周发兵
万鑫
曾大勇
姚曌曌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201811422310.7A priority Critical patent/CN109441118B/en
Publication of CN109441118A publication Critical patent/CN109441118A/en
Application granted granted Critical
Publication of CN109441118B publication Critical patent/CN109441118B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明属于建筑施工领域,主要涉及一种装配式建筑施工混凝土的布料机浇筑系统及浇筑方法。本发明的布料机浇筑系统包括布料机及安装底座。应用于装配式建筑的混凝土布料机系统,将布料机浇筑系统和浇筑作业层支撑系统脱离置于作业层的下层楼板面上,浇筑混凝土的泵送冲击力由下一层楼板承载,确保了作业层的叠合板不会位移或破损而发生质量安全问题;改变了以前的直接挪动泵管布料的方式,提高了施工效率;利用快速固定的安装底座,实现布料机与安装底座的快速稳定地安装,并且增加加固系统对安装底座进行加固减振支撑,确保了施工的安全可靠;本发明将模板加于安装底座中,方便后续对预留洞口封堵。

The invention belongs to the field of building construction, and mainly relates to a placing machine pouring system and a pouring method for concrete in prefabricated building construction. The placing machine pouring system of the present invention includes a placing machine and a mounting base. The concrete placing machine system used in prefabricated buildings separates the placing system of the placing machine from the supporting system of the pouring operation layer and places it on the lower floor of the operation layer. The pumping impact of the poured concrete is carried by the next floor, ensuring that the operation is guaranteed. The laminated boards of the first layer will not be displaced or damaged, causing quality and safety problems; the previous method of directly moving the pump pipe to distribute cloth has been changed, which improves the construction efficiency; the quick-fixing installation base is used to achieve quick and stable installation of the distribution machine and the installation base. , and a reinforcement system is added to strengthen and dampen the support of the installation base, ensuring the safety and reliability of the construction; in the present invention, the template is added to the installation base to facilitate the subsequent sealing of the reserved holes.

Description

一种装配式建筑施工混凝土的布料机浇筑系统及浇筑方法A placing machine pouring system and pouring method for concrete in prefabricated building construction

技术领域Technical field

本发明属于建筑施工领域,主要涉及一种装配式建筑施工混凝土的布料机浇筑系统及浇筑方法。The invention belongs to the field of building construction, and mainly relates to a placing machine pouring system and a pouring method for concrete in prefabricated building construction.

背景技术Background technique

近年来装配式建筑工程得到了逐步的发展,而PC叠合板构件是装配式建筑的最主要构件,其安装面积大,而单块叠合板本身具有平面尺寸大而厚度小的特点,在施工中对叠合板做好保护措施防止板开裂尤为重要。In recent years, prefabricated construction projects have gradually developed, and PC composite board components are the most important components of prefabricated buildings. They have a large installation area, and a single composite board itself has the characteristics of large plane size and small thickness. During construction It is especially important to take protective measures to prevent laminates from cracking.

传统的非装配式建筑施工布料机直接放置在现浇楼板的梁或板面钢筋上,对应位置的模板底面做加固措施,而装配式建筑工程在安装叠合板后浇筑混凝作业时,叠合板板面不能直接承受布料机支腿的荷载,故浇筑混凝土时未采用布料机,直接使用在板面上挪动混凝土泵送的甭管浇筑,存在施工效率底下,对叠合板的安装质量也有影响。Traditional non-fabricated construction construction placing machines are placed directly on the beams or slab steel bars of the cast-in-place floor slabs, and reinforcement measures are taken on the bottom of the formwork at the corresponding positions. However, in prefabricated construction projects, when the laminated panels are installed and the concrete is poured after the laminated panels are poured, the laminated panels The slab cannot directly bear the load of the placing machine's legs. Therefore, the placing machine was not used when pouring concrete. Instead, pipes were used to move concrete pumps on the slab. This resulted in low construction efficiency and also affected the installation quality of the laminated slabs.

因此,急需发明一种新的装配式建筑混凝土浇筑施工的布料机系统及浇筑方法,解决叠合板板面浇筑混凝土的布料难题,并且使得布料机的底座安装和固定操作简便,安全可靠。Therefore, there is an urgent need to invent a new placing machine system and pouring method for prefabricated building concrete pouring construction, which can solve the problem of placing concrete on laminated slabs and make the installation and fixing of the base of the placing machine simple, safe and reliable.

发明内容Contents of the invention

本发明目的在于:针对上述存在的问题,提供一种装配式建筑施工混凝土的浇筑方法,减少布料机在布料过程中由于产生振动而对叠合板产生破坏,防止叠合板由于振动出现安装位置的错位从而影响后续工程质量,防止布料机的移动跑位。The object of the present invention is to provide a concrete pouring method for prefabricated building construction in view of the above-mentioned problems, to reduce the damage to the laminated plates caused by the vibration of the distribution machine during the spreading process, and to prevent the laminated plates from being dislocated in the installation position due to vibrations. This will affect the quality of subsequent projects and prevent the moving position of the cloth machine.

本发明的技术方案是这样的:The technical solution of the present invention is as follows:

一种装配式建筑施工混凝土的布料机浇筑方法,包括以下步骤:A method for pouring concrete in prefabricated buildings using a placing machine, including the following steps:

S1、在装配式建筑楼面由下至上进行浇筑逐层施工,在需要浇筑的作业层楼面及下层楼板面的同一位置开孔留设施工洞口,洞口四面钢筋留茬作施工缝,将传统布料机的立架加高接长,利用起吊机将布料机通过作业层楼面的预留洞口放置于下层楼板面上;S1. On the floor of the prefabricated building, pouring is carried out layer by layer from bottom to top. Construction openings are opened at the same position of the working floor and the lower floor that need to be poured. The steel bars on the four sides of the opening are left as construction joints. The traditional The stand of the spreading machine is increased and extended, and a crane is used to place the spreading machine on the lower floor through the reserved hole on the working floor;

S2、在下层楼板面16的预留洞口处设置带有模板的安装底座,将模板贴合在预留洞口下方设置,利用安装底座对布料机1及模板进行安装固定;S2. Set an installation base with a template at the reserved hole on the lower floor floor 16, fit the template under the reserved hole, and use the installation base to install and fix the distributor 1 and the template;

S3、布料机在浇筑楼层浇筑混凝土完成;S3. The placing machine completes pouring concrete on the pouring floor;

S4、浇筑完成后,布料机立架和安装底座拆除分离,塔吊将布料机吊离作业点,同时下层楼板面预留洞口的模板和钢筋恢复绑扎,利用作业层的混凝土来浇筑下层楼板面的预留洞口进行封堵。S4. After the pouring is completed, the distribution machine stand and installation base are dismantled and separated. The tower crane lifts the distribution machine away from the working point. At the same time, the formwork and steel bars of the reserved holes on the lower floor slab are restored and tied, and the concrete on the working layer is used to pour the lower floor slab. Reserve holes for sealing.

以此方法向上逐层施工,同样在施工下一层板面混凝土时,对本层的预留洞口浇筑封堵。由于采用向上逐层施工,因此不会对下层楼板面产生破坏。In this way, construction is carried out layer by layer. When constructing the next layer of slab concrete, the reserved openings of this layer are poured and sealed. Since the construction is carried out layer by layer upward, there will be no damage to the floor below.

所述步骤S1中,所述楼面开孔与布料机的立架尺寸相匹配,楼面开孔尺寸与布料机相比不宜过大,可对布料机进行限位防止移动,另一方面降低后续封堵洞口的成本。In step S1, the floor opening matches the size of the distribution machine's stand. The size of the floor opening should not be too large compared with the distribution machine. The distribution machine can be limited to prevent movement. On the other hand, the distribution machine can be reduced in size. The subsequent cost of sealing the hole.

进一步地,当作业层为第二层楼面时,在第一层楼的地面无需开孔及封堵,直接利用不包含模板的安装底座固定布料机。当从第三层往上时,则需要在下一层开孔,并在后续施工中对孔洞进行封堵。Furthermore, when the working floor is the second floor, there is no need to open holes and seal the ground on the first floor, and the installation base without formwork is directly used to fix the distribution machine. When going up from the third layer, it is necessary to open holes in the next layer and seal the holes in subsequent construction.

本发明还包括实现上述布料机浇筑方法的布料机浇筑系统,包括布料机、安装底座;所述安装底座包括设置在楼板面上的横向安装架、竖向安装架、贴合设置在楼板面下方的模板,设置在模板下表面的固定架;所述竖向安装架压合在横向安装架上,从上至下利用连接杆依次穿过竖向安装架、横向安装架、楼板面预留洞口、模板、固定架连接,竖向安装架上表面和固定架下表面采用紧固件紧固;所述连接杆外侧套装有圆筒安装在模板表面,所述圆筒高度高于楼板面的高度;所述布料机与安装底座可拆卸连接。在下层楼面开孔下方贴合模板,有利于后续的封堵施工,同时在开孔在下方设置固定架与楼面的安装架固定,利用反拉支撑进一步增加布料机工作的稳定性,减少浇筑施工中动荷载对作业层及下层预留洞口产生震动。在下层楼板开孔处的连接杆外部套装圆筒,使得该开孔在后续的浇筑封堵过程中不会对连接杆产生影响,方便连接杆拆卸。The invention also includes a distribution machine pouring system that implements the above distribution machine pouring method, including a distribution machine and a mounting base; the mounting base includes a transverse mounting frame and a vertical mounting frame disposed on the floor surface, which are fitted and disposed below the floor surface. The formwork is provided with a fixed frame on the lower surface of the formwork; the vertical mounting frame is pressed onto the lateral mounting frame, and connecting rods are used from top to bottom to pass through the vertical mounting frame, the lateral mounting frame, and the reserved holes on the floor surface. , the formwork and the fixed frame are connected, and the upper surface of the vertical mounting frame and the lower surface of the fixed frame are fastened with fasteners; a cylinder is set on the outside of the connecting rod and installed on the surface of the formwork, and the height of the cylinder is higher than the height of the floor surface ; The cloth machine and the installation base are detachably connected. Fitting the formwork below the opening on the lower floor is beneficial to subsequent sealing construction. At the same time, a fixing frame is set below the opening to be fixed with the installation frame on the floor. The back-pull support is used to further increase the stability of the cloth machine and reduce the During the pouring construction, the dynamic load will cause vibrations to the working layer and the reserved openings in the lower layer. A cylinder is installed on the outside of the connecting rod at the opening of the lower floor so that the opening will not affect the connecting rod during the subsequent pouring and sealing process and facilitates the disassembly of the connecting rod.

进一步地,所述横向安装架为工字钢,所述竖向安装架为槽钢,所述固定架为槽钢,所述连接杆为上下两端设置有螺纹的圆钢,从上至下利用连接杆依次穿过竖向安装架、横向安装架、楼板面预留洞口、模板、固定架连接,竖向安装架上表面和固定架下表面采用螺帽紧固。利用竖向安装架对横向安装架进行压合,可提高安装底座的稳定性;利用圆钢贯穿可拆卸连接,能够实现布料装置的快速组装与拆卸,以提高工程效率。Further, the horizontal mounting frame is I-beam, the vertical mounting frame is channel steel, the fixing frame is channel steel, and the connecting rod is round steel with threads at the upper and lower ends, from top to bottom. Use the connecting rod to pass through the vertical mounting frame, the horizontal mounting frame, the reserved hole in the floor surface, the template, and the fixed frame in sequence. The upper surface of the vertical mounting frame and the lower surface of the fixed frame are fastened with nuts. Using the vertical mounting frame to press the horizontal mounting frame can improve the stability of the installation base; using round steel to penetrate the detachable connection can achieve rapid assembly and disassembly of the cloth device to improve engineering efficiency.

进一步地,所述安装底座的横向安装架的四角分别开设有插销座,所述布料机的立架底部的四角安装有插销套,与插销座位置相对应,将柱销插入到插销座与插销套中将安装底座与布料机连接固定。利用插销的方式可快速实现布料机与安装底座的固定。相较于横向固定,插销固定能够有效避免布料机在安装底座上的横向位移。Further, the four corners of the transverse mounting frame of the installation base are respectively provided with latch seats, and the four corners of the bottom of the stand of the cloth machine are equipped with latch sleeves corresponding to the positions of the latch blocks. The pins are inserted into the latch blocks and the latch blocks. The installation base is connected and fixed with the cloth machine in the set. The latching method can be used to quickly fix the cloth machine and the installation base. Compared with lateral fixation, latch fixation can effectively avoid lateral displacement of the cloth machine on the installation base.

进一步地,所述横向安装架的两端底部设置有吸振装置,所述吸振装置为弹性底座,进一步对布料机进行减振。Further, vibration-absorbing devices are provided at the bottoms of both ends of the transverse mounting frame. The vibration-absorbing devices are elastic bases to further dampen the vibration of the cloth machine.

进一步地,所述布料机的立架的架身四周设置有支架座,所述支架座上固定安装有支架。Further, a bracket seat is provided around the frame body of the upright frame of the distribution machine, and a bracket is fixedly installed on the bracket seat.

进一步地,所述支架座和支架上开设有螺孔,通过螺栓固定。Further, screw holes are provided on the bracket base and the bracket and are fixed by bolts.

进一步地,所述支架底部包覆防滑套,进一步提高支撑的稳固效果。Furthermore, the bottom of the bracket is covered with an anti-slip cover to further improve the stability of the support.

进一步地,所述布料机的立架高度为单层楼高的1.5倍到2倍之间,有利于施工人员作业。Furthermore, the stand height of the distributor is between 1.5 and 2 times the height of a single floor, which is conducive to the work of construction workers.

综上所述,由于采用了上述技术方案,本发明的有益效果是:本发明的应用于装配式建筑的混凝土布料机系统,将布料机浇筑系统和浇筑作业层支撑系统脱离置于作业层的下层楼板面上,浇筑混凝土的泵送冲击力由下一层楼板承载,确保了作业层的叠合板不会位移或破损而发生质量安全问题;改变了以前的直接挪动泵管布料的方式,提高了施工效率;利用快速固定的安装底座,实现布料机与安装底座的快速稳定地安装,并且增加加固系统对安装底座进行加固减振支撑,确保了施工的安全可靠;本发明的将模板加于安装底座中,方便后续对预留洞口封堵。In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are: the concrete placing machine system used in prefabricated buildings of the present invention separates the placing system of the placing machine from the pouring operation layer support system and places it on the operation layer. On the lower floor slab, the pumping impact of pouring concrete is carried by the next floor slab, ensuring that the laminated plates on the working floor will not be displaced or damaged, causing quality and safety problems; the previous method of directly moving the pump pipes to distribute materials has been changed, improving The construction efficiency is improved; the quickly fixed installation base is used to realize the rapid and stable installation of the cloth machine and the installation base, and a reinforcement system is added to reinforce and dampen the installation base to ensure safe and reliable construction; in the present invention, the formwork is added to Install it in the base to facilitate subsequent sealing of the reserved holes.

附图说明Description of the drawings

图1是本发明的示意图;Figure 1 is a schematic diagram of the present invention;

图中标记:1-布料机、2-横向安装架、3-竖向安装架、4-模板、5-固定架、6-连接杆、7-圆筒、8-插销座、9-插销套、10-柱销、11-吸振装置、12-支架座、13-支架、14-防滑套、15-作业层楼面、16-下层楼板面。Marked in the picture: 1-closing machine, 2-lateral mounting frame, 3-vertical mounting frame, 4-template, 5-fixing frame, 6-connecting rod, 7-cylinder, 8-pin seat, 9-pin sleeve , 10-Pillar pin, 11-Vibration absorbing device, 12-Bracket seat, 13-Bracket, 14-Anti-slip sleeve, 15-Working floor, 16-Lower floor.

具体实施方式Detailed ways

为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention and are not intended to limit the present invention.

实施例1Example 1

如图1所示,一种布料机浇筑系统,包括布料机1、安装底座;所述安装底座包括设置在楼板面上的两根横向安装架2、两根竖向安装架3、贴合设置在楼板面下方的模板4,设置在模板下表面的两根竖向的固定架5;所述横向安装架2为工字钢,所述竖向安装架3为槽钢,所述固定架5为槽钢;所述竖向安装架3压合在横向安装架2上,从上至下利用两端带螺纹的圆钢的连接杆6依次穿过竖向安装架3、横向安装架2、楼板面预留洞口、模板4、固定架5连接,竖向安装架3上表面和固定架5下表面采用螺帽加垫片进行紧固;所述连接杆6外侧套装有圆筒7安装在模板4表面和预留洞口之间,所述圆筒7为PVC管,高度与楼板面的高度一致。As shown in Figure 1, a distribution machine pouring system includes a distribution machine 1 and an installation base; the installation base includes two transverse mounting brackets 2, two vertical mounting brackets 3, and a fitting arrangement arranged on the floor surface. The formwork 4 below the floor surface has two vertical fixing brackets 5 arranged on the lower surface of the formwork; the transverse mounting bracket 2 is an I-beam, the vertical mounting bracket 3 is a channel steel, and the fixing bracket 5 It is channel steel; the vertical mounting frame 3 is pressed on the horizontal mounting frame 2, and the connecting rod 6 of round steel with threads at both ends is used to pass through the vertical mounting frame 3, the horizontal mounting frame 2, and the horizontal mounting frame 2 from top to bottom. A hole is reserved on the floor surface, and the formwork 4 and the fixed frame 5 are connected. The upper surface of the vertical mounting frame 3 and the lower surface of the fixed frame 5 are fastened with nuts and washers; a cylinder 7 is installed on the outside of the connecting rod 6 and is installed on the Between the surface of the formwork 4 and the reserved opening, the cylinder 7 is a PVC pipe with the same height as the floor surface.

所述安装底座的横向安装架2的四角分别开设有插销座8,所述布料机1的立架底部的四角安装有插销套9,与插销座8位置相对应,将柱销10插入到插销座8与插销套9中将安装底座与布料机1连接固定。利用插销的方式可快速实现布料机1与安装底座的固定。The four corners of the transverse mounting frame 2 of the installation base are respectively provided with latch seats 8. The four corners of the bottom of the stand of the cloth machine 1 are equipped with latch sleeves 9 corresponding to the positions of the latch seats 8. Insert the pin 10 into the latch. The mounting base and the distributor 1 are connected and fixed in the base 8 and the latch sleeve 9. The distribution machine 1 and the installation base can be quickly fixed by using bolts.

进一步地,所述两根横向安装架2的两端底部设置有吸振装置11,所述吸振装置11为弹性底座。Furthermore, vibration absorbing devices 11 are provided at the bottoms of both ends of the two transverse mounting brackets 2, and the vibration absorbing devices 11 are elastic bases.

进一步地,所述布料机1的立架的架身四周焊接有支架座12,所述支架座12为两边突出,中间内凹的结构。两边突出的中部对应开设螺孔,所述支架13为圆钢,上端开设有通孔,圆钢大小与支架座的内凹尺寸相匹配,利用螺栓将支架13与支架座12固定,施工完成后拆卸。Furthermore, a support seat 12 is welded around the vertical frame of the distribution machine 1. The support seat 12 has a structure that protrudes on both sides and is concave in the middle. Screw holes are provided correspondingly in the protruding middle parts of both sides. The bracket 13 is made of round steel with a through hole at the upper end. The size of the round steel matches the concave size of the bracket seat. Use bolts to fix the bracket 13 and the bracket seat 12. After the construction is completed disassembly.

进一步地,所述支架底部包覆防滑套14,进一步提高支撑的稳固效果。Furthermore, the bottom of the bracket is covered with an anti-slip cover 14 to further improve the stabilizing effect of the support.

进一步地,所述布料机1的立架高度为单层楼高的1.8倍。Furthermore, the height of the distribution machine 1 is 1.8 times the height of a single floor.

本发明的布料机系统及浇筑方法在实施时,包括以下步骤:When implemented, the distributor system and pouring method of the present invention include the following steps:

S1、在装配式建筑楼面由下至上进行浇筑逐层施工,在需要浇筑的作业层楼面15及下层楼板面16的同一位置开孔留设施工洞口,洞口四面钢筋留茬作施工缝,将传统布料机的立架加高接长,利用起吊机将布料机1通过作业层楼面15的预留洞口放置于下层楼板面16上;S1. Carry out pouring and construction on the floor of the prefabricated building layer by layer from bottom to top. Open construction openings at the same position of the working floor 15 and the floor 16 of the lower floor that need to be poured, and leave steel bars on all sides of the openings as construction joints. Increase the height and length of the traditional spreading machine stand, and use a crane to place the spreading machine 1 on the lower floor floor 16 through the reserved hole on the working floor 15;

S2、在下层楼板面16的预留洞口处设置带有模板4的安装底座,将模板4贴合在预留洞口下方设置,利用安装底座对布料机1及模板4进行安装固定;S2. Set the installation base with the template 4 at the reserved hole of the lower floor floor 16, fit the template 4 under the reserved hole, and use the installation base to install and fix the distributor 1 and the template 4;

S3、布料机1在浇筑楼层浇筑混凝土完成;S3. The placing machine 1 completes pouring concrete on the pouring floor;

S4、浇筑完成后,布料机1的立架和安装底座拆除分离,塔吊将布料机1吊离作业点,同时下层楼板面16预留洞口的模板4和钢筋恢复绑扎,利用作业层的混凝土来浇筑下层楼板面16的预留洞口进行封堵。S4. After the pouring is completed, the stand and installation base of the spreading machine 1 are dismantled and separated. The tower crane lifts the spreading machine 1 away from the working point. At the same time, the formwork 4 and the steel bars with reserved holes in the lower floor slab 16 are restored and tied, and the concrete on the working layer is used to The reserved openings on the lower floor slab 16 are poured and sealed.

PVC管在预留洞口的封堵过程中留滞在该层楼板间,将紧固件的上下螺帽松开,则可对安装底座进行拆卸。上述方法适用于三层及以上的楼层施工,以此方法向上逐层施工,同样在施工下一层板面混凝土时,对本层的预留洞口浇筑封堵。当作业层为第二层楼面时,在第一层楼的地面无需开孔及封堵。The PVC pipe remains between the floors during the sealing process of the reserved holes. Loosen the upper and lower nuts of the fasteners, and then the installation base can be disassembled. The above method is suitable for the construction of floors three and above. This method is used to construct upward layer by layer. Similarly, when constructing the concrete of the next layer of slabs, the reserved openings of this layer are poured and sealed. When the working floor is the second floor, there is no need to open holes and seal the ground on the first floor.

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the protection of the present invention. within the range.

Claims (1)

1.一种装配式建筑施工混凝土的布料机浇筑方法,其特征在于,包括以下步骤:1. A placing machine pouring method for concrete in prefabricated building construction, which is characterized in that it includes the following steps: S1、在装配式建筑楼面由下至上进行浇筑逐层施工,在需要浇筑的作业层楼面及下层楼板面的同一位置开孔留设施工洞口,洞口四面钢筋留茬作施工缝,将传统布料机的立架加高接长,利用起吊机将布料机通过作业层楼面的预留洞口放置于下层楼板面上;S1. On the floor of the prefabricated building, pouring is carried out layer by layer from bottom to top. Construction openings are opened at the same position of the working floor and the lower floor that need to be poured. The steel bars on the four sides of the opening are left as construction joints. The traditional The stand of the spreading machine is increased and extended, and a crane is used to place the spreading machine on the lower floor through the reserved hole on the working floor; S2、在下层楼板面的预留洞口处设置带有模板的安装底座,将模板贴合在预留洞口下方设置,利用安装底座对布料机及模板进行安装固定;S2. Set the installation base with the template at the reserved hole in the lower floor floor, fit the template under the reserved hole, and use the installation base to install and fix the distributor and template; S3、布料机在浇筑楼层浇筑混凝土完成;S3. The placing machine completes pouring concrete on the pouring floor; S4、浇筑完成后,布料机立架和安装底座拆除分离,塔吊将布料机吊离作业点,同时下层楼板面预留洞口的模板和钢筋恢复绑扎,利用作业层的混凝土来浇筑下层楼板面的预留洞口进行封堵;S4. After the pouring is completed, the distribution machine stand and installation base are dismantled and separated. The tower crane lifts the distribution machine away from the working point. At the same time, the formwork and steel bars of the reserved holes on the lower floor slab are restored and tied, and the concrete on the working layer is used to pour the lower floor slab. Reserve holes for sealing; 当作业层为第二层楼面时,在第一层楼的地面无需开孔及封堵;When the working floor is the second floor, there is no need to open holes and seal the ground on the first floor; 布料机浇筑系统包括布料机、安装底座;所述安装底座包括设置在楼板面上的横向安装架、竖向安装架、贴合设置在楼板面下方的模板,设置在模板下表面的固定架;所述竖向安装架压合在横向安装架上,从上至下利用连接杆依次穿过竖向安装架、横向安装架、楼板面的预留洞口、模板、固定架连接,竖向安装架上表面和固定架下表面采用紧固件紧固;所述连接杆外侧套装有圆筒安装在模板表面,所述圆筒高度与楼板面的高度一致;所述布料机与安装底座可拆卸连接;The placing machine pouring system includes a placing machine and a mounting base; the mounting base includes a transverse mounting frame, a vertical mounting frame arranged on the floor surface, a formwork arranged under the floor surface, and a fixing frame arranged on the lower surface of the formwork; The vertical mounting frame is pressed onto the horizontal mounting frame, and connecting rods are used from top to bottom to pass through the vertical mounting frame, the horizontal mounting frame, the reserved holes on the floor surface, the formwork, and the fixed frame to connect the vertical mounting frame. The upper surface and the lower surface of the fixing frame are fastened with fasteners; a cylinder is installed on the outside of the connecting rod and installed on the surface of the formwork, and the height of the cylinder is consistent with the height of the floor surface; the distributor is detachably connected to the installation base ; 所述横向安装架为工字钢,所述竖向安装架为槽钢,所述固定架为槽钢,所述连接杆为上下两端设置有螺纹的圆钢,从上至下利用连接杆依次穿过竖向安装架、横向安装架、楼板面的预留洞口、模板、固定架连接,竖向安装架上表面和固定架下表面采用螺帽紧固;The horizontal mounting frame is I-beam, the vertical mounting frame is channel steel, the fixing frame is channel steel, the connecting rod is round steel with threads at the upper and lower ends, and the connecting rod is used from top to bottom. Pass through the reserved holes of the vertical installation frame, the horizontal installation frame, the floor surface, the template, and the fixed frame in sequence. The upper surface of the vertical installation frame and the lower surface of the fixed frame are fastened with nuts; 所述安装底座的横向安装架的四角分别安装有插销座,所述布料机的立架底部的四角设置有插销套,与插销座位置相对应,将柱销插入到插销座与插销套中将安装底座与布料机连接固定;The four corners of the transverse mounting frame of the installation base are respectively equipped with latch seats. The four corners of the bottom of the stand of the cloth machine are provided with latch sleeves corresponding to the positions of the latch blocks. Insert the pins into the latch blocks and latch sleeves. The installation base is connected and fixed with the cloth machine; 所述横向安装架的两端底部设置有吸振装置,所述吸振装置为弹性底座;Vibration absorbing devices are provided at the bottoms of both ends of the transverse mounting frame, and the vibration absorbing devices are elastic bases; 所述布料机的立架的架身四周设置有支架座,所述支架座上固定安装有支架;A bracket seat is provided around the stand of the cloth machine, and a bracket is fixedly installed on the bracket seat; 所述支架座和支架上开设有螺孔,通过螺栓固定;The bracket seat and bracket are provided with screw holes and fixed by bolts; 所述支架底部包覆防滑套;The bottom of the bracket is covered with an anti-slip cover; 所述布料机的立架高度为单层楼高的1.5倍到2倍之间。The stand height of the cloth machine is between 1.5 times and 2 times the height of a single floor.
CN201811422310.7A 2018-11-27 2018-11-27 Distributing machine pouring system and method for assembled building construction concrete Active CN109441118B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811422310.7A CN109441118B (en) 2018-11-27 2018-11-27 Distributing machine pouring system and method for assembled building construction concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811422310.7A CN109441118B (en) 2018-11-27 2018-11-27 Distributing machine pouring system and method for assembled building construction concrete

Publications (2)

Publication Number Publication Date
CN109441118A CN109441118A (en) 2019-03-08
CN109441118B true CN109441118B (en) 2023-10-13

Family

ID=65554343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811422310.7A Active CN109441118B (en) 2018-11-27 2018-11-27 Distributing machine pouring system and method for assembled building construction concrete

Country Status (1)

Country Link
CN (1) CN109441118B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794517A (en) * 2020-07-30 2020-10-20 广州市房屋开发建设有限公司 A kind of prefabricated laminated layer pouring mechanism and construction method
CN115182587B (en) * 2022-06-11 2023-07-25 北京崇建工程有限公司 Efficient construction method for post-cast concrete of assembled shear wall structure

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07259333A (en) * 1994-03-18 1995-10-09 Ohbayashi Corp Construction method of concrete structure
JP2002147027A (en) * 2000-11-13 2002-05-22 Koken Sangyo Kk Safety fence post fixing method
JP2004197520A (en) * 2002-12-20 2004-07-15 Maeda Corp Void form, concrete structure using the void form and construction method for concrete layer
KR20060055268A (en) * 2004-12-21 2006-05-23 유광철 Concrete splitter for high-rise buildings
DE102005026120A1 (en) * 2005-06-07 2006-12-14 Hudelmaier, Götz Telescopic mast with liquid concrete delivery tube has pipe separation and extension insertion station
CN202401769U (en) * 2011-12-13 2012-08-29 广东浩和建筑股份有限公司 Detachable concrete cloth machine for self-elevating creeping formwork system
CN102877649A (en) * 2012-10-27 2013-01-16 二十二冶集团第一建设有限公司 Prefabricated concrete structure interlayer pouring construction method
JP2013194383A (en) * 2012-03-16 2013-09-30 Ohbayashi Corp Plug member for sealing through-hole of concrete-filled steel tube, and sealing method
CN104727557A (en) * 2013-12-21 2015-06-24 中建四局第三建筑工程有限公司 Method and structure for constructing concrete distributer in aluminum-alloy template system
CN104975719A (en) * 2015-06-11 2015-10-14 中国建筑第二工程局有限公司 Novel material distribution device and construction method for pouring floor concrete by using same
CN106401041A (en) * 2016-08-31 2017-02-15 陕西建工第六建设集团有限公司 Cast-in-situ concrete construction method for pseudo-classic architecture slope roof
CN107313592A (en) * 2017-07-27 2017-11-03 中国建筑第五工程局有限公司 Extension type prevents different labels concrete is mixed from pouring device
CN208122325U (en) * 2018-04-03 2018-11-20 中国建筑第五工程局有限公司 A kind of assembled architecture Liftable type material distributing machine
CN209353720U (en) * 2018-11-27 2019-09-06 中国五冶集团有限公司 A distributing machine pouring system for prefabricated building construction concrete

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7685729B2 (en) * 2007-03-29 2010-03-30 Mershon Michael S Removable grade pin system

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07259333A (en) * 1994-03-18 1995-10-09 Ohbayashi Corp Construction method of concrete structure
JP2002147027A (en) * 2000-11-13 2002-05-22 Koken Sangyo Kk Safety fence post fixing method
JP2004197520A (en) * 2002-12-20 2004-07-15 Maeda Corp Void form, concrete structure using the void form and construction method for concrete layer
KR20060055268A (en) * 2004-12-21 2006-05-23 유광철 Concrete splitter for high-rise buildings
DE102005026120A1 (en) * 2005-06-07 2006-12-14 Hudelmaier, Götz Telescopic mast with liquid concrete delivery tube has pipe separation and extension insertion station
CN202401769U (en) * 2011-12-13 2012-08-29 广东浩和建筑股份有限公司 Detachable concrete cloth machine for self-elevating creeping formwork system
JP2013194383A (en) * 2012-03-16 2013-09-30 Ohbayashi Corp Plug member for sealing through-hole of concrete-filled steel tube, and sealing method
CN102877649A (en) * 2012-10-27 2013-01-16 二十二冶集团第一建设有限公司 Prefabricated concrete structure interlayer pouring construction method
CN104727557A (en) * 2013-12-21 2015-06-24 中建四局第三建筑工程有限公司 Method and structure for constructing concrete distributer in aluminum-alloy template system
CN104975719A (en) * 2015-06-11 2015-10-14 中国建筑第二工程局有限公司 Novel material distribution device and construction method for pouring floor concrete by using same
CN106401041A (en) * 2016-08-31 2017-02-15 陕西建工第六建设集团有限公司 Cast-in-situ concrete construction method for pseudo-classic architecture slope roof
CN107313592A (en) * 2017-07-27 2017-11-03 中国建筑第五工程局有限公司 Extension type prevents different labels concrete is mixed from pouring device
CN208122325U (en) * 2018-04-03 2018-11-20 中国建筑第五工程局有限公司 A kind of assembled architecture Liftable type material distributing machine
CN209353720U (en) * 2018-11-27 2019-09-06 中国五冶集团有限公司 A distributing machine pouring system for prefabricated building construction concrete

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
布料机平台基于爬模平台的一体化施工技术;杨宏;郑志辉;李臣森;李江滔;;科技创新导报(第13期);全文 *
超高层建筑楼层内混凝土布料装备研究;吴联定;;建筑机械化(第01期);全文 *

Also Published As

Publication number Publication date
CN109441118A (en) 2019-03-08

Similar Documents

Publication Publication Date Title
CN105715068B (en) Existing brick mix structure shock isolating pedestal underpinning structure and its construction method
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN104929148B (en) The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN208023710U (en) A kind of connection structure of assembly concrete shear wall
CN109441118B (en) Distributing machine pouring system and method for assembled building construction concrete
CN205314539U (en) Large -scale cantilever type combination steel form
CN104746862A (en) Temporary installation operating platform on overhead equipment foundation and erecting method thereof
CN110984398B (en) Filling type steel die block connecting node structure and construction method
CN109386050A (en) A kind of multi-layer combined type house structure
CN202577960U (en) A Suspended Outer Bearing Composite Steel Formwork Applied in Roller Compacted Concrete Construction
CN209353720U (en) A distributing machine pouring system for prefabricated building construction concrete
CN105715042B (en) Tool-type building drop panel assembly and its construction method
CN213952973U (en) Superimposed sheet bearing structure
CN212295340U (en) Elastic concrete column base node
CN206070404U (en) Oblique formwork support structure at the section haunch of box culvert top
CN107558487A (en) A kind of goaf transmission line foundation bracing means and reinforcement means
CN106812308B (en) Super High hydraulic climbing formwork seat in the plane is hampered in-plane displancement construction method
CN220035215U (en) A hang mould support that is used for bridge main tower mound top to pour
CN207551775U (en) A kind of derrick crane attached wall attachment device
CN106284402A (en) Anchor sleeve bolt mounting tool and embedded construction method of anchor sleeve bolt
CN203684694U (en) Connection device for installing distributor into elevator shaft
CN207109843U (en) A kind of goaf transmission line foundation bracing means
CN206070555U (en) Construction elevator steel structure base
CN204959790U (en) Spring vibration insulating foundation construction formwork levelling device
CN214272960U (en) A prefabricated concrete prefabricated structure and supporting structure therefor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant