CN106378594A - Preparing method for automobile chain wheel - Google Patents

Preparing method for automobile chain wheel Download PDF

Info

Publication number
CN106378594A
CN106378594A CN201611013620.4A CN201611013620A CN106378594A CN 106378594 A CN106378594 A CN 106378594A CN 201611013620 A CN201611013620 A CN 201611013620A CN 106378594 A CN106378594 A CN 106378594A
Authority
CN
China
Prior art keywords
blank
sprocket wheel
teeth portion
stove
incubated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611013620.4A
Other languages
Chinese (zh)
Inventor
汪伟东
冯海明
张俊忠
钟鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qijing Machinery Co Ltd
Original Assignee
Qijing Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qijing Machinery Co Ltd filed Critical Qijing Machinery Co Ltd
Priority to CN201611013620.4A priority Critical patent/CN106378594A/en
Publication of CN106378594A publication Critical patent/CN106378594A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • B23P15/14Making specific metal objects by operations not covered by a single other subclass or a group in this subclass gear parts, e.g. gear wheels

Abstract

The invention relates to a preparing method for an automobile chain wheel. According to the method, round steel or a hollow pipe material is subjected to a series of treatment such as annealing, shot blasting and saponification of phosphorus, the performance of a blank can be primarily improved through annealing and shot blasting, after an inner layer protection film and an outer layer lubricating film are formed on the surface of the blank through saponification of phosphorus, cold extrusion is conducted, and the problems of blank surface cracking and the like in the cold extrusion process can be solved. After the component appearance meeting the requirement is obtained through the procedures of extrusion, inner hole turning, groove cutting, positioning structure machining and the like, a component is subjected to carburizing and quenching and tempering treatment, the hardness of a workpiece is further improved, and the metallographic structure of the workpiece can meet the QC/T262-1999 requirement. A gear part structure is directly machined in the cold extrusion process. Compared with the prior art, adopted equipment is relatively simple, and the production efficiency is effectively improved. Due to the fact that the hardness of the workpiece is improved step by step in the whole component preparing process, the abrasion of a tool is effectively avoided, and the production cost is reduced.

Description

A kind of preparation method of automobile sprocket wheel
Technical field
The present invention relates to a kind of preparation method of automobile sprocket wheel.
Background technology
Fig. 1,2,8 show a kind of automobile sprocket wheel structure, in prior art, when producing to such automobile sprocket wheel, It is usually that machining is carried out to the round steel after cure process, the positions such as the gear of needs are cut on round steel.And adopt this The mode of production of sample, needs more huge, the complicated equipment of configuration, and the abrasion to cutter is also larger, leads to the cost producing relatively High;And the mode production efficiency of cutting is extremely inefficient, a general machine can be only done 50 about finished products for one day.
Application publication number is the Chinese invention patent application of CN103659166A《A kind of blind tooth precise cold of little shape is squeezed into Type processing method》(application number:CN201210329047.3) disclose a kind of preparation technology of tooth like members, its step is as follows:
(1) blanking:Use forcing press blanking, coiled strip steel wire is cut into material-saving on forcing press, the two-sided made allowance of material-saving 0.3mm~0.5mm;
(2) shaping:Material-saving is placed in the shaping mould with cutting edge, upsetting squeeze, excess waste are carried out on forcing press It is extruded outside mould;
(3) deburring:Blank after shaping is put into unhairing machine and carries out deburring and cleaning;
(4) squeeze shape:Micro- for the blank of deburring painting is put in crowded shape mould after extruding oil, closing is carried out on forcing press and squeezes Shape, squeezes out the size of the shape of product in addition to profile of tooth;
(5) crowded teeth:To put in crowded teeth mould after micro- for the blank after crowded shape applying extruding oil, use be carried out on forcing press just crowded Pressure mode carries out crowded teeth;
(6) clean:With gasoline, product is carried out;
(7) check:Carry out size and appearance test by product figure.
Above-mentioned tooth like members priority employs shape of product in addition to profile of tooth for the fashion of extrusion shaping and teeth portion shape, very big Production efficiency is improve in degree, but, above-mentioned tooth like members structure is excessively simple, with the automobile sprocket wheel structure shown in Fig. 1,2 Belong to different applications, structural difference larger it is impossible to prepare Fig. 1, the automobile sprocket wheel structure shown in 2.
Content of the invention
The technical problem to be solved is the present situation for prior art, provides a kind of production efficiency height, produces The preparation method of the automobile sprocket wheel of low cost.
The present invention solves the technical scheme that adopted of above-mentioned technical problem:A kind of preparation method of automobile sprocket wheel, it is special Levy and be to comprise the following steps:
(1) blanking:Round steel or hollow materials in the tube are cut into needs the blank of length, the two-sided made allowance of blank;Above-mentioned round steel Refer to solid cylindrical steel, hollow materials in the tube refer to the cylindrical steel of inner hollow, but need to ensure the internal diameter of hollow materials in the tube less than with The aperture of turning gained endoporus in lower step (6), is for saving steel from hollow materials in the tube, reduces production cost;
(2) annealing and ball blast:First blank is carried out making annealing treatment and again Shot Blasting is carried out to it so as to outward appearance non-oxidation Skin, hardness is maintained at below HRB80;
(3) straight-through cylindrical:Step (2) gained blank is worn into the cylindrical-shaped structure of standard;
(4) phospholeum:First phosphorating treatment is carried out to blank, form layer protecting film in blank surface;Phosphorating treatment is laggard Row saponification process, forms one layer of lubricating film outside diaphragm;
(5) extrude:Blank after phospholeum is placed in the die of press, squeezes out teeth portion in blank periphery, and in base Material top reserves one section of no teeth portion, the blank surface mating shapes that the inner surface configuration of above-mentioned die is completed with extruding;
(6) in-car hole:In the middle part of blank, turning vertically goes out endoporus, and the periphery turning in blank no teeth portion goes out between outer land Rank, go out interior step in the inner circumferential turning of blank no teeth portion;
(7) cut groove:Cut groove in the turning of blank periphery, make blank periphery maintain a row or multi-row teeth portion;
(8) locating and machining structure:
Milling boss:The top end face of blank no teeth portion processes boss, and this convex edge of table is carried out at chamfering Reason;Or
Draw inside groove:Keyway is processed on the inner hole wall of blank;
(9) timing marks are processed:One circular hole is processed on any one teeth portion of blank bottom end face as timing marks;
(10) it is heat-treated:Carburizing and quenching and temper are carried out to step (9) gained blank, so that blank surface is hardened, that is, Obtain described automobile sprocket wheel.
The workpiece higher in order to obtain precision, carries out to gained automobile sprocket wheel refining at endoporus and cleaning after step (10) Reason, makes surface no dirt.
As improvement, the integrated disposal processing that described annealing process heats up for staged and lowers the temperature, annealing temperature Degree 200 DEG C and more than.Using such processing procedure, hardness and the Oxygen potential of blank can be effectively improved.
Specifically, described annealing process detailed process is
First it is warming up to 200~210 DEG C with stove, be incubated 1.8~2.2 hours;
It is warming up to 600~610 DEG C with stove again, be incubated 0.8~1.2 hour;
It is warming up to 780~790 DEG C with stove again, be incubated 7.8~8.2 hours;
It is cooled to 680~690 DEG C with stove, be incubated 7.8~8.2 hours;
It is cooled to 450 DEG C and less again, come out of the stove.
In order to accelerate speed of coming out of the stove, be cooled to 450 DEG C and following during, first with stove cooling, when temperature is down to 550 DEG C when, open air blast and lowered the temperature.
In above-mentioned each scheme, after described annealing process completes and workpiece is cooled to normal temperature, using Shot Blasting.
Improve further, described phosphorus saponification process includes oil removing, washing for the first time, rust cleaning, second washing, surface successively Regulation, phosphatization, third time washing and saponification.Using such process, so that blank surface is fully cleaned and smooth, then utilize Parkerizing process forms layer protecting film in blank surface, carries out saponification again after abundant washing, one layer of profit of attachment outside diaphragm Synovial membrane, can prevent blank surface from producing the defects such as cracking in subsequent extrusion and processing procedure.
Specifically, described oil removal process be containing percentage by weight being in 6% degreasing agent, temperature be 80~95 DEG C, PH be 10~12 environment in carry out, process time be 5~10 minutes;The hydrochloric acid that described descaling process is 20% in volume content Carry out in solution, process time is 5~10 minutes;Described surface modulation process is in the surface modulation being 2 ‰ containing volume content In agent solution, pH be 8~9 environment in carry out, process time be 0.5~1 minute;Described Phosphating Treatment Process is containing volume Content be 6% supply agent solution in, temperature be to carry out in 75~85 DEG C of environment, process time is 15~25 minutes, and should In supply agent solution, total acid content is 45~55%, and free acid content is 5~7%;Described saponification process is containing volume content In solution for 5~6% lubricants, temperature be 70~80 DEG C, pH be 8~9 environment in carry out, process time be 3~5 points Clock.
Improve again, described heat treatment process includes pretreatment, carburizing and quenching, cleaning and tempering successively, and wherein, carburizing is quenched Hardness >=the 90HR15N, the hardness >=89HR15N of described blank teeth portion after tempering of described blank teeth portion after fire;In metallography microscope When instrument amplifies 100 times, described blank is less than along the ferrite in teeth portion face and bainite content in 0.3mm depth bounds 10%.
Specifically, above-mentioned preprocessing process is:First spray 3min, then spray 4min, soak 2min, shake 1min, soak Standby 3min, sprays 3min, draining 2min, 20min is dried.
Described carburizing and quenching and drawing process are:
It is warming up to 920~930 DEG C, be incubated 150~160min;
It is cooled to 850~860 DEG C with stove, be incubated 30~40min;
Workpiece is moved to cooling in 60~80 DEG C of oil groove;
After being down to room temperature, workpiece is warming up to 180~190 DEG C, is incubated 150~160min;
Come out of the stove air cooling.
Compared with prior art, it is an advantage of the current invention that:The present invention has first carried out annealing, has thrown to round steel or hollow materials in the tube A series of process such as ball and phospholeum, can make the performance of blank tentatively be improved by annealing and ball blast, hardness reaches HRB80 Hereinafter, then by phospholeum carry out cold extrusion after blank surface forms internal layer diaphragm and outer layer lubricating film, cold-extruded can be avoided The appearance of the problems such as cause blank surface cracking during pressure;The present invention is passing through extruding, in-car hole, is cutting the works such as groove, milling boss Blank is processed as after satisfactory External Shape sequence, and it has been carried out with the place at least including carburizing and quenching and drawing process Reason, thus further increasing the hardness of workpiece, and makes the metallographic structure of workpiece meet the requirement of QC/T262-1999, quick To qualified automobile sprocket wheel workpiece;The present invention directly processes teeth portion structure by Cold Extrusion Process, cuts with of the prior art The process of cutting is compared, and the equipment being used is relatively simple, effectively increases production efficiency, can produce automobile sprocket wheel three or four thousand within one day Individual, and because whole part preparation process is in the hardness improving workpiece step by step, effectively prevent the abrasion to cutter, reduce Production cost.
Brief description
Fig. 1 is a kind of structural representation of automobile sprocket wheel in background of invention;
Fig. 2 is the structural representation of another angle of Fig. 1;
Fig. 3 is the blank structure schematic diagram after step (5) gained extruding in the embodiment of the present invention 1~4;
Fig. 4 is the blank structure schematic diagram behind step (6) gained in-car hole in the embodiment of the present invention 1~4;
Fig. 5 be the embodiment of the present invention 1~4 in step (7) gained cut groove after blank structure schematic diagram;
Fig. 6 is the blank structure schematic diagram after step (8) gained milling boss in the embodiment of the present invention 1~3;
Fig. 7 is the blank structure schematic diagram that in the embodiment of the present invention 1~4, step (10) gained processes after timing marks;
Fig. 8 is another kind of structural representation of automobile sprocket wheel in background of invention;
Fig. 9 be the embodiment of the present invention 4 in step (8) gained draw keyway after blank structure schematic diagram.
Specific embodiment
Below in conjunction with accompanying drawing embodiment, the present invention is described in further detail.
Embodiment 1:
In the present embodiment, the preparation method of automobile sprocket wheel comprises the following steps:
(1) blanking:The 20CrMo round steel saw bed of φ 45 is cut into needs the blank of length, and blank is two-sided Made allowance;
(2) annealing and ball blast:First blank is carried out with staged annealing, annealing process detailed process is
First it is warming up to 200 DEG C with stove, be incubated 2.2 hours;
It is warming up to 600 DEG C with stove again, be incubated 1.2 hours;
It is warming up to 780 DEG C with stove again, be incubated 8.2 hours;
It is cooled to 680 DEG C with stove, be incubated 8.2 hours;
It is cooled to 450 DEG C and less again, come out of the stove;In this temperature-fall period, first with stove cooling, when temperature is down to 550 DEG C, Open air blast to be lowered the temperature;
After annealing process completes and workpiece is cooled to normal temperature, using sand drum-type Shot Blasting;
Through above-mentioned processing procedure, the outward appearance non-scale of blank, hardness is maintained at below HRB80;
(3) straight-through cylindrical:Step (2) gained blank is worn on centerless grinder the cylindrical-shaped structure of standard;
(4) phospholeum:This process includes procedure below successively
Oil removing, containing percentage by weight being in 6% degreasing agent, temperature be 80 DEG C, pH be 10~12 environment in enter OK, process time is 5 minutes;
Wash for the first time, the clear water using overflow is carried out to blank at normal temperatures, scavenging period is 1min;
Rust cleaning, normal temperature, volume content be 20% hydrochloric acid solution in carry out, process time is 5 minutes;
Second washes, and the clear water using overflow is carried out to blank at normal temperatures, and scavenging period is 1min, clean to Blank surface pH value is 6~8;
Surface modulation, containing volume content being in 2 ‰ surface modulation agent solution, pH be 8~9 environment in carry out, Process time is 0.5 minute;
Phosphatization, containing volume content being in the solution of 6% supply agent LT-620, temperature be to carry out in 75 DEG C of environment, Process time is that in 15 minutes, and this supply agent LT-620 solution, total acid content is 45~55%, and free acid content is 5~7%;
Third time is washed, and the clear water using overflow is carried out to blank at normal temperatures, and scavenging period is 1min;
Saponification, containing volume content being in the solution of 5% lubricant, temperature be 70 DEG C, pH be 8~9 environment in enter OK, process time is 3 minutes;
By above-mentioned processing procedure, first pass through chemical action and form layer protecting film in blank surface, then made by physics One layer of lubricating film is adhered to outside diaphragm;
(5) extrude:Blank after phospholeum is placed in the die of press, under extruding force, squeezes out in blank periphery Teeth portion 1, and reserve one section of no teeth portion 2 at blank top, as shown in Figure 3;
(6) in-car hole:In the middle part of blank, turning vertically goes out endoporus 3, and the periphery turning in blank no teeth portion goes out between outer land Rank 4, go out interior step 5 in the inner circumferential turning of blank no teeth portion, as shown in Figure 4;
(7) cut groove:The turning of blank periphery go out spaced apart cut groove 6, and each edge cutting groove is carried out at chamfering Reason, as shown in Figure 5;
(8) milling boss:The top end face of blank no teeth portion processes boss 7, and this convex edge of table is fallen Angle is processed, as shown in Figure 6;
(9) deburring and surface polishing:With High speed sculpture machine, deburring process is carried out to blank, then use AFM machine to base Material carries out surface polishing;
(10) timing marks are processed:One circular hole is processed on any one teeth portion of blank bottom end face as timing marks 8, as shown in Figure 7;
(11) it is heat-treated:Heat treatment process includes pretreatment, carburizing and quenching, cleaning and tempering successively, wherein, pretreated Cheng Wei
First spray 3min, then spray 4min, soak 2min, shake 1min, soak standby 3min, spray 3min, draining 2min, is dried 20min;
Carburizing and quenching process is
It is warming up to 920 DEG C, be incubated 160min;
It is cooled to 850 DEG C with stove, be incubated 30min;
Workpiece is moved to cooling in 60 DEG C of oil groove;
Cleaning process is
After being cooled to room temperature, cleaning removes the carbon black greasy dirt of blank surface;
Drawing process is
Workpiece is warming up to 180 DEG C, is incubated 160min;
Come out of the stove air cooling;
Hardness >=the 90HR15N of blank teeth portion after above-mentioned carburizing and quenching, the hardness >=89HR15N of blank teeth portion after tempering; The effective case depth of blank surface is 0.40~0.80mm, and when metallography microscope instrument amplifies 100 times, blank is along teeth portion face Ferrite and bainite in 0.3mm depth bounds content be less than 10%;
(12) fine grinding endoporus and cleaning:Step (11) gained workpiece is carried out refine endoporus process using internal grinder;With The dirt on hanging type cleaning machine cleaning workpiece surface, that is, obtain target product automobile sprocket wheel.
Embodiment 2:
In the present embodiment, the preparation method of automobile sprocket wheel comprises the following steps:
(1) blanking:The 20CrMo round steel saw bed of φ 46 is cut into needs the blank of length, and blank is two-sided Made allowance;
(2) annealing and ball blast:First blank is carried out with staged annealing, annealing process detailed process is
First it is warming up to 210 DEG C with stove, be incubated 1.8 hours;
It is warming up to 610 DEG C with stove again, be incubated 0.8 hour;
It is warming up to 790 DEG C with stove again, be incubated 7.8 hours;
It is cooled to 690 DEG C with stove, be incubated 7.8 hours;
It is cooled to 450 DEG C and less again, come out of the stove;In this temperature-fall period, first with stove cooling, when temperature is down to 550 DEG C, Open air blast to be lowered the temperature;
After annealing process completes and workpiece is cooled to normal temperature, using Shot Blasting;
Through above-mentioned processing procedure,
The outward appearance non-scale of blank, hardness is maintained at below HRB80;
(3) straight-through cylindrical:Step (2) gained blank is worn on centerless grinder the cylindrical-shaped structure of standard;
(4) phospholeum:This process includes procedure below successively
Oil removing, containing percentage by weight being in 6% degreasing agent, temperature be 95 DEG C, pH be 10~12 environment in enter OK, process time is 10 minutes;
Wash for the first time, the clear water using overflow is carried out to blank at normal temperatures, scavenging period is 2min;
Rust cleaning, normal temperature, volume content be 20% hydrochloric acid solution in carry out, process time is 10 minutes;
Second washes, and the clear water using overflow is carried out to blank at normal temperatures, and scavenging period is 2min, clean to Blank surface pH value is 6~8;
Surface modulation, containing volume content being in 2 ‰ surface modulation agent solution, pH be 8~9 environment in carry out, Process time is 1 minute;
Phosphatization, containing volume content being in the solution of 6% supply agent LT-620, temperature be to carry out in 85 DEG C of environment, Process time is that in 25 minutes, and this supply agent LT-620 solution, total acid content is 45~55%, and free acid content is 5~7%;
Third time is washed, and the clear water using overflow is carried out to blank at normal temperatures, and scavenging period is 2min;
Saponification, containing volume content being in the solution of 6% lubricant, temperature be 80 DEG C, pH be 8~9 environment in enter OK, process time is 5 minutes;
By above-mentioned processing procedure, first pass through chemical action and form layer protecting film in blank surface, then made by physics One layer of lubricating film is adhered to outside diaphragm;
(5) extrude:Blank after phospholeum is placed in the die of press, under extruding force, squeezes out in blank periphery Teeth portion, and reserve one section of no teeth portion at blank top, as shown in Figure 3;
(6) in-car hole:In the middle part of blank, turning vertically goes out endoporus, and the periphery turning in blank no teeth portion goes out between outer land Rank, go out interior step in the inner circumferential turning of blank no teeth portion, as shown in Figure 4;
(7) cut groove:The turning of blank periphery go out spaced apart cut groove, and each edge cutting groove is carried out at chamfering Reason, as shown in Figure 5;
(8) milling boss:The top end face of blank no teeth portion processes boss, and chamfering is carried out to this convex edge of table Process, as shown in Figure 6;
(9) deburring and surface polishing:With High speed sculpture machine, deburring process is carried out to blank, then use AFM machine to base Material carries out surface polishing;
(10) timing marks are processed:One circular hole is processed on any one teeth portion of blank bottom end face as positive markers Note, as shown in Figure 7;
(11) it is heat-treated:Heat treatment process includes pretreatment, carburizing and quenching, cleaning and tempering successively, wherein, pretreated Cheng Wei
First spray 3min, then spray 4min, soak 2min, shake 1min, soak standby 3min, spray 3min, draining 2min, is dried 20min;
Carburizing and quenching process is
It is warming up to 930 DEG C, be incubated 150min;
It is cooled to 860 DEG C with stove, be incubated 30min;
Workpiece is moved to cooling in 80 DEG C of oil groove;
Cleaning process is
After being cooled to room temperature, cleaning removes the carbon black greasy dirt of blank surface;
Drawing process is
Workpiece is warming up to 190 DEG C, is incubated 150min;
Come out of the stove air cooling;
Hardness >=the 90HR15N of blank teeth portion after above-mentioned carburizing and quenching, the hardness >=89HR15N of blank teeth portion after tempering; The effective case depth of blank surface is 0.40~0.80mm, and when metallography microscope instrument amplifies 100 times, blank is along teeth portion face Ferrite and bainite in 0.3mm depth bounds content be less than 10%;
(12) fine grinding endoporus and cleaning:Step (11) gained workpiece is carried out refine endoporus process using internal grinder;With The dirt on hanging type cleaning machine cleaning workpiece surface, that is, obtain target product automobile sprocket wheel.
Embodiment 3:
In the present embodiment, the preparation method of automobile sprocket wheel comprises the following steps:
(1) blanking:The 20CrMo round steel saw bed of φ 40 is cut into needs the blank of length, and blank is two-sided Made allowance;
(2) annealing and ball blast:First blank is carried out with staged annealing, annealing process detailed process is
First it is warming up to 200 DEG C with stove, be incubated 2 hours;
It is warming up to 600 DEG C with stove again, be incubated 1 hour;
It is warming up to 780 DEG C with stove again, be incubated 8 hours;
It is cooled to 680 DEG C with stove, be incubated 8 hours;
It is cooled to 450 DEG C and less again, come out of the stove;In this temperature-fall period, first with stove cooling, when temperature is down to 550 DEG C, Open air blast to be lowered the temperature;
After annealing process completes and workpiece is cooled to normal temperature, using Shot Blasting;
Through above-mentioned processing procedure,
The outward appearance non-scale of blank, hardness is maintained at below HRB80;
(3) straight-through cylindrical:Step (2) gained blank is worn on centerless grinder the cylindrical-shaped structure of standard;
(4) phospholeum:This process includes procedure below successively
Oil removing, containing percentage by weight being in 6% degreasing agent, temperature be 85 DEG C, pH be 10~12 environment in enter OK, process time is 7 minutes;
Wash for the first time, the clear water using overflow is carried out to blank at normal temperatures, scavenging period is 1.5min;
Rust cleaning, normal temperature, volume content be 20% hydrochloric acid solution in carry out, process time is 8 minutes;
Wash for second, the clear water using overflow is carried out to blank at normal temperatures, scavenging period is 1.5min, cleaning It is 6~8 to blank surface pH value;
Surface modulation, containing volume content being in 2 ‰ surface modulation agent solution, pH be 8~9 environment in carry out, Process time is 0.8 minute;
Phosphatization, containing volume content being in the solution of 6% supply agent LT-620, temperature be to carry out in 80 DEG C of environment, Process time is that in 20 minutes, and this supply agent LT-620 solution, total acid content is 45~55%, and free acid content is 5~7%;
Third time is washed, and the clear water using overflow is carried out to blank at normal temperatures, and scavenging period is 1.5min;
Saponification, containing volume content being in the solution of 5.5% lubricant, temperature be 75 DEG C, pH be in 8~9 environment Carry out, process time is 4 minutes;
By above-mentioned processing procedure, first pass through chemical action and form layer protecting film in blank surface, then made by physics One layer of lubricating film is adhered to outside diaphragm;
(5) extrude:Blank after phospholeum is placed in the die of press, under extruding force, squeezes out in blank periphery Teeth portion, and reserve one section of no teeth portion at blank top, as shown in Figure 3;
(6) in-car hole:In the middle part of blank, turning vertically goes out endoporus, and the periphery turning in blank no teeth portion goes out between outer land Rank, go out interior step in the inner circumferential turning of blank no teeth portion, as shown in Figure 4;
(7) cut groove:The turning of blank periphery go out spaced apart cut groove, and each edge cutting groove is carried out at chamfering Reason, as shown in Figure 5;
(8) milling boss:The top end face of blank no teeth portion processes boss, and chamfering is carried out to this convex edge of table Process, as shown in Figure 6;
(9) deburring and surface polishing:With High speed sculpture machine, deburring process is carried out to blank, then use AFM machine to base Material carries out surface polishing;
(10) timing marks are processed:One circular hole is processed on any one teeth portion of blank bottom end face as positive markers Note, as shown in Figure 7;
(11) it is heat-treated:Heat treatment process includes pretreatment, carburizing and quenching, cleaning and tempering successively, wherein, pretreated Cheng Wei
First spray 3min, then spray 4min, soak 2min, shake 1min, soak standby 3min, spray 3min, draining 2min, is dried 20min;
Carburizing and quenching process is
It is warming up to 920 DEG C, be incubated 150min;
It is cooled to 850 DEG C with stove, be incubated 30min;
Workpiece is moved to cooling in 70 DEG C of oil groove;
Cleaning process is
After being cooled to room temperature, cleaning removes the carbon black greasy dirt of blank surface;
Drawing process is
Workpiece is warming up to 180 DEG C, is incubated 150min;
Come out of the stove air cooling;
Hardness >=the 90HR15N of blank teeth portion after above-mentioned carburizing and quenching, the hardness >=89HR15N of blank teeth portion after tempering; The effective case depth of blank surface is 0.40~0.80mm, and when metallography microscope instrument amplifies 100 times, blank is along teeth portion face Ferrite and bainite in 0.3mm depth bounds content be less than 10%;
(12) fine grinding endoporus and cleaning:Step (11) gained workpiece is carried out refine endoporus process using internal grinder;With The dirt on hanging type cleaning machine cleaning workpiece surface, that is, obtain target product automobile sprocket wheel.
Embodiment 4:
In the present embodiment, the preparation method of automobile sprocket wheel comprises the following steps:
(1) blanking:Hollow for the 20CrMo of φ 45 materials in the tube saw bed is cut into needs the blank of length, blank Two-sided made allowance;
(2) annealing and ball blast:First blank is carried out with staged annealing, annealing process detailed process is
First it is warming up to 200 DEG C with stove, be incubated 2.2 hours;
It is warming up to 600 DEG C with stove again, be incubated 1.2 hours;
It is warming up to 780 DEG C with stove again, be incubated 8.2 hours;
It is cooled to 680 DEG C with stove, be incubated 8.2 hours;
It is cooled to 450 DEG C and less again, come out of the stove;In this temperature-fall period, first with stove cooling, when temperature is down to 550 DEG C, Open air blast to be lowered the temperature;
After annealing process completes and workpiece is cooled to normal temperature, using Shot Blasting;
Through above-mentioned processing procedure,
The outward appearance non-scale of blank, hardness is maintained at below HRB80;
(3) straight-through cylindrical:Step (2) gained blank is worn on centerless grinder the cylindrical-shaped structure of standard;
(4) phospholeum:This process includes procedure below successively
Oil removing, containing percentage by weight being in 6% degreasing agent, temperature be 80 DEG C, pH be 10~12 environment in enter OK, process time is 5 minutes;
Wash for the first time, the clear water using overflow is carried out to blank at normal temperatures, scavenging period is 1min;
Rust cleaning, normal temperature, volume content be 20% hydrochloric acid solution in carry out, process time is 5 minutes;
Second washes, and the clear water using overflow is carried out to blank at normal temperatures, and scavenging period is 1min, clean to Blank surface pH value is 6~8;
Surface modulation, containing volume content being in 2 ‰ surface modulation agent solution, pH be 8~9 environment in carry out, Process time is 0.5 minute;
Phosphatization, containing volume content being in the solution of 6% supply agent LT-620, temperature be to carry out in 75 DEG C of environment, Process time is that in 15 minutes, and this supply agent LT-620 solution, total acid content is 45~55%, and free acid content is 5~7%;
Third time is washed, and the clear water using overflow is carried out to blank at normal temperatures, and scavenging period is 1min;
Saponification, containing volume content being in the solution of 5% lubricant, temperature be 70 DEG C, pH be 8~9 environment in enter OK, process time is 3 minutes;
By above-mentioned processing procedure, first pass through chemical action and form layer protecting film in blank surface, then made by physics One layer of lubricating film is adhered to outside diaphragm;
(5) extrude:Blank after phospholeum is placed in the die of press, under extruding force, squeezes out in blank periphery Teeth portion 1, and reserve one section of no teeth portion 2 at blank top, as shown in Figure 3;
(6) in-car hole:In the middle part of blank, turning vertically goes out endoporus 3, and the periphery turning in blank no teeth portion goes out between outer land Rank 4, go out interior step 5 in the inner circumferential turning of blank no teeth portion, as shown in Figure 4;
(7) cut groove:The turning of blank periphery go out spaced apart cut groove 6, and each edge cutting groove is carried out at chamfering Reason, as shown in Figure 5;
(8) draw inside groove:Keyway 9 is processed on the inner hole wall of blank, as shown in Figure 9;
(9) deburring and surface polishing:With High speed sculpture machine, deburring process is carried out to blank, then use AFM machine to base Material carries out surface polishing;
(10) timing marks are processed:One circular hole is processed on any one teeth portion of blank bottom end face as timing marks 8, as shown in Figure 8;
(11) it is heat-treated:Heat treatment process includes pretreatment, carburizing and quenching, cleaning and tempering successively, wherein, pretreated Cheng Wei
First spray 3min, then spray 4min, soak 2min, shake 1min, soak standby 3min, spray 3min, draining 2min, is dried 20min;
Carburizing and quenching process is
It is warming up to 920 DEG C, be incubated 160min;
It is cooled to 850 DEG C with stove, be incubated 30min;
Workpiece is moved to cooling in 60 DEG C of oil groove;
Cleaning process is
After being cooled to room temperature, cleaning removes the carbon black greasy dirt of blank surface;
Drawing process is
Workpiece is warming up to 180 DEG C, is incubated 160min;
Come out of the stove air cooling;
Hardness >=the 90HR15N of blank teeth portion after above-mentioned carburizing and quenching, the hardness >=89HR15N of blank teeth portion after tempering; The effective case depth of blank surface is 0.40~0.80mm, and when metallography microscope instrument amplifies 100 times, blank is along teeth portion face Ferrite and bainite in 0.3mm depth bounds content be less than 10%;
(12) fine grinding endoporus and cleaning:Step (11) gained workpiece is carried out refine endoporus process using internal grinder;With The dirt on hanging type cleaning machine cleaning workpiece surface, that is, obtain target product automobile sprocket wheel.

Claims (10)

1. a kind of preparation method of automobile sprocket wheel is it is characterised in that comprise the following steps:
(1) blanking:Round steel or hollow materials in the tube are cut into needs the blank of length, the two-sided made allowance of blank;
(2) annealing and ball blast:First blank is carried out making annealing treatment and again Shot Blasting is carried out to it so as to outward appearance non-scale, firmly Degree is maintained at below HRB80;
(3) straight-through cylindrical:Step (2) gained blank is worn into the cylindrical-shaped structure of standard;
(4) phospholeum:First phosphorating treatment is carried out to blank, form layer protecting film in blank surface;Carry out soap after phosphorating treatment Change is processed, and forms one layer of lubricating film outside diaphragm;
(5) extrude:Blank after phospholeum is placed in the die of press, squeezes out teeth portion in blank periphery, and on blank top Portion reserves one section of no teeth portion;
(6) in-car hole:Turning vertically in the middle part of blank goes out endoporus, and blank no teeth portion periphery turning go out outer step, The inner circumferential turning of blank no teeth portion goes out interior step;
(7) cut groove:Cut groove in the turning of blank periphery, make blank periphery maintain a row or multi-row teeth portion;
(8) locating and machining structure:
Milling boss:The top end face of blank no teeth portion processes boss, and chamfered is carried out to this convex edge of table;Or Person
Draw inside groove:Keyway is processed on the inner hole wall of blank;
(9) timing marks are processed:One circular hole is processed on any one teeth portion of blank bottom end face as timing marks;
(10) it is heat-treated:Carburizing and quenching and temper are carried out to step (9) gained blank, that is, obtains described automobile sprocket wheel.
2. automobile sprocket wheel according to claim 1 preparation method it is characterised in that:To gained automobile after step (10) Sprocket wheel carries out refining endoporus and cleaning treatment, makes surface no dirt.
3. automobile sprocket wheel according to claim 1 preparation method it is characterised in that:Described annealing process is ladder Formula heat up and cooling integrated disposal processing, annealing temperature 200 DEG C and more than.
4. automobile sprocket wheel according to claim 3 preparation method it is characterised in that:The concrete mistake of described annealing process Cheng Wei
First it is warming up to 200~210 DEG C with stove, be incubated 1.8~2.2 hours;
It is warming up to 600~610 DEG C with stove again, be incubated 0.8~1.2 hour;
It is warming up to 780~790 DEG C with stove again, be incubated 7.8~8.2 hours;
It is cooled to 680~690 DEG C with stove, be incubated 7.8~8.2 hours;
It is cooled to 450 DEG C and less again, come out of the stove.
5. automobile sprocket wheel according to claim 4 preparation method it is characterised in that:It is being cooled to 450 DEG C and less During, first with stove cooling, when temperature is down to 550 DEG C, opens air blast and lowered the temperature.
6. automobile sprocket wheel according to claim 1 preparation method it is characterised in that:Described annealing process complete and After workpiece is cooled to normal temperature, carry out Shot Blasting.
7. automobile sprocket wheel according to claim 1 preparation method it is characterised in that:Described phosphorus saponification process includes successively Oil removing, for the first time washing, rust cleaning, second washing, surface modulation, phosphatization, third time washing and saponification.
8. automobile sprocket wheel according to claim 7 preparation method it is characterised in that:Described oil removal process is containing weight Amount percentage be 6% degreasing agent in, temperature be 80~95 DEG C, pH be 10~12 environment in carry out;Described descaling process exists Volume content be 20% hydrochloric acid solution in carry out;Described surface modulation process is in the surface modulation being 2 ‰ containing volume content In agent solution, pH be 8~9 environment in carry out;Described Phosphating Treatment Process is in the solution being 6% supply agent containing volume content In, temperature be to carry out in 75~85 DEG C of environment;Described saponification process is in the solution being 5~6% lubricants containing volume content In, temperature be 70~80 DEG C, pH be 8~9 environment in carry out.
9. automobile sprocket wheel according to claim 1 preparation method it is characterised in that:Described heat treatment process is wrapped successively Include pretreatment, carburizing and quenching, cleaning and tempering, wherein, the hardness >=90HR15N of described blank teeth portion after carburizing and quenching, tempering Hardness >=the 89HR15N of described blank teeth portion afterwards.
10. automobile sprocket wheel according to claim 9 preparation method it is characterised in that:Described carburizing and quenching and being tempered Cheng Wei
It is warming up to 920~930 DEG C, be incubated 150~160min;
It is cooled to 850~860 DEG C with stove, be incubated 30~40min;
Workpiece is moved to cooling in 60~80 DEG C of oil groove;
After being down to room temperature, workpiece is warming up to 180~190 DEG C, is incubated 150~160min;
Come out of the stove air cooling.
CN201611013620.4A 2016-11-17 2016-11-17 Preparing method for automobile chain wheel Pending CN106378594A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611013620.4A CN106378594A (en) 2016-11-17 2016-11-17 Preparing method for automobile chain wheel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611013620.4A CN106378594A (en) 2016-11-17 2016-11-17 Preparing method for automobile chain wheel

Publications (1)

Publication Number Publication Date
CN106378594A true CN106378594A (en) 2017-02-08

Family

ID=57959055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611013620.4A Pending CN106378594A (en) 2016-11-17 2016-11-17 Preparing method for automobile chain wheel

Country Status (1)

Country Link
CN (1) CN106378594A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107030453A (en) * 2017-05-16 2017-08-11 江苏创精锻有限公司 The cold-forging technique of clutch sleeve
CN108161378A (en) * 2018-01-18 2018-06-15 连云港东睦新材料有限公司 A kind of production technology of transmission system high-precision VCT sprocket wheels
CN108188673A (en) * 2018-02-06 2018-06-22 山东金马工业集团股份有限公司 A kind of gear member forging technology for improving product qualification rate
CN109420879A (en) * 2017-08-22 2019-03-05 徐州徐工履带底盘有限公司 A kind of crawler belt guide processing method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04322915A (en) * 1991-04-22 1992-11-12 Hino Motors Ltd Method of manufacturing gear shaft
CN102876858A (en) * 2012-09-20 2013-01-16 洛阳鼎辉特钢制品股份有限公司 Spheroidizing annealing process of GCr15 ball bearing steels based on severe-convection protective gas
CN102896266A (en) * 2012-08-30 2013-01-30 镇江中虎弹簧有限公司 Cold forging process for external helical teeth
CN203547820U (en) * 2013-10-30 2014-04-16 东风汽车公司 Crankshaft sprocket for engine timing chain system
CN103737334A (en) * 2014-01-26 2014-04-23 无锡市神力齿轮冷挤有限公司 High-strength gear processing process
CN104673975A (en) * 2015-01-30 2015-06-03 南通弘峰机电有限公司 Processing technology of high-carbon steel gear for ship
CN105945536A (en) * 2016-06-03 2016-09-21 江苏保捷锻压有限公司 Forging technology of third gear for intermediate shaft of automobile gearbox

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04322915A (en) * 1991-04-22 1992-11-12 Hino Motors Ltd Method of manufacturing gear shaft
CN102896266A (en) * 2012-08-30 2013-01-30 镇江中虎弹簧有限公司 Cold forging process for external helical teeth
CN102876858A (en) * 2012-09-20 2013-01-16 洛阳鼎辉特钢制品股份有限公司 Spheroidizing annealing process of GCr15 ball bearing steels based on severe-convection protective gas
CN203547820U (en) * 2013-10-30 2014-04-16 东风汽车公司 Crankshaft sprocket for engine timing chain system
CN103737334A (en) * 2014-01-26 2014-04-23 无锡市神力齿轮冷挤有限公司 High-strength gear processing process
CN104673975A (en) * 2015-01-30 2015-06-03 南通弘峰机电有限公司 Processing technology of high-carbon steel gear for ship
CN105945536A (en) * 2016-06-03 2016-09-21 江苏保捷锻压有限公司 Forging technology of third gear for intermediate shaft of automobile gearbox

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王义行等: "《链轮设计制造应用手册》", 31 March 1995, 机械工业出版社 *
陆宝山等: "《模具材料与热处理(第二版)》", 31 July 2011, 上海科学技术出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107030453A (en) * 2017-05-16 2017-08-11 江苏创精锻有限公司 The cold-forging technique of clutch sleeve
CN107030453B (en) * 2017-05-16 2019-03-22 江苏创一精锻有限公司 The cold-forging technique of clutch sleeve
CN109420879A (en) * 2017-08-22 2019-03-05 徐州徐工履带底盘有限公司 A kind of crawler belt guide processing method
CN108161378A (en) * 2018-01-18 2018-06-15 连云港东睦新材料有限公司 A kind of production technology of transmission system high-precision VCT sprocket wheels
CN108188673A (en) * 2018-02-06 2018-06-22 山东金马工业集团股份有限公司 A kind of gear member forging technology for improving product qualification rate

Similar Documents

Publication Publication Date Title
CN106378594A (en) Preparing method for automobile chain wheel
CN104646956B (en) Process for machining ball cage bell-like shell
CN103737334B (en) High-strength gear processing technology
CN105108457B (en) The processing method of overall driven disc
CN105921672B (en) A kind of method of the isothermal forging of straight bevel gear
CN106964948A (en) A kind of processing technology of marine gear
CN104148888A (en) Process for cold extrusion forming of one-way device spline sleeve
CN104959794A (en) Method for machining large inner gear ring of wind turbine gear box
CN101954574A (en) Method for machining output shaft assembly
CN106514163B (en) A method of it improving conical gear and is hot-forged precision
CN101033769A (en) Special-shaped anti-removing nut and manufacture method thereof
CN105710620A (en) Manufacturing process for conjunction-tooth gear of car transmission
CN103157758A (en) Precision forging plastic forming process for inner gear ring in planetary reducer
CN105983843A (en) Reducer gear processing process
CN105880934A (en) Manufacturing method for high-precision cold-drawn inner-hole honed pipe
CN104551667A (en) Cold-rolled high-hardness seamless steel pipe manufacturing method
CN112719203A (en) Processing technology of high-strength bolt for automobile engine
CN105127682B (en) A kind of processing method of internal tooth washer
US20150196980A1 (en) Method of manufacturing gear with teeth involving forging
CN106216972A (en) Extrusion forming process of laughing somebody to scorn spent by a kind of isolator
CN105215641A (en) The forging processing method of locking bolt
CN111299481B (en) Closed forging and pressing forming process for gear shaft of new energy automobile engine
CN112025231B (en) Machining process for machining cutter
CN107964672A (en) A kind of metal surface treatment process
CN106736312B (en) A kind of manufacturing method of high intensity super abrasive cylinder sleeve

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170208

RJ01 Rejection of invention patent application after publication