Prior art keywords
anatonosis
salt
pipe
hole
collector pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610766477.XA
Other languages
Chinese (zh)
Other versions
CN106376264A (en
Inventor
王胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Sunway Saline Alkali Soil Technology Co Ltd
Original Assignee
Shandong Sunway Saline Alkali Soil Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Sunway Saline Alkali Soil Technology Co Ltd filed Critical Shandong Sunway Saline Alkali Soil Technology Co Ltd
Priority to CN201610766477.XA priority Critical patent/CN106376264B/en
Publication of CN106376264A publication Critical patent/CN106376264A/en
Application granted granted Critical
Publication of CN106376264B publication Critical patent/CN106376264B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B77/00Machines for lifting and treating soil
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Soil Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Environmental Sciences (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Cultivation Of Plants (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The invention discloses a kind of salt-soda soil comprehensive improvement systems, belong to alkaline land soil improving technology field, include the latticed saline and alkaline plot equipped with cofferdam and moisture content separation layer, control salt anatonosis hidden pipe, collector pipe, plough has trapezoidal mound and inverted trapezoidal ditch on saline and alkaline plot, it is drilled with control salt anatonosis hole, gully-hole and detection scale respectively thereon, there is non-woven fabrics filtrate on control salt anatonosis hidden pipe, has inlet opening on collector pipe;The modification method of the improvement system is also provided, including:Selection of land is laid with moisture content separation layer, buries and puts control salt anatonosis hidden pipe and collector pipe, finishing cofferdam, trapezoidal mound, inverted trapezoidal ditch, punches, applies soil fertility fertilizer, Planting Crops, salt anatonosis hidden pipe and collector pipe management are controlled in field management.The present invention can not only improve soil water storage ability, keep nutrient, additionally it is possible to improve loose soil divergence, improve soil hardening degree, water conservation, fertilizer conservation, to heat effect good, ploughs area's salinity and declines to a great extent, salt content control is within 0.2%.

Description

A kind of salt-soda soil comprehensive improvement system and modification method
Technical field
The present invention relates to a kind of arable land comprehensive improvement system and modification method, especially a kind of salt-soda soil comprehensive improvement system And modification method, belong to alkaline land soil improving technology field.
Background technology
The existing 100,000,000 hectares of salt-soda soils of China, are largely distributed in that North China, northwest and northeast etc. is arid, semiarid zone, main To include Xinjiang, Qinghai, Gansu, Ningxia, Shaanxi, the Inner Mongol, the northeast of Shanxi Province, above-mentioned salt-soda soil hydrological geological conditions are complicated, Water system belongs to Yellow River System more, and level of ground water is influenced especially pronounced by Yellow River System, and level of ground water is high, and local beverage well generally exists 20m or so, for phreatic line in 2m or so, In The Soils are solonchak and aeolian sandy soil, be developed in drift-sand matrix and At young soil, great amount of soluble salt is contained in soil, rainfall is low, and the annual 180mm that is about averaged, the evaporation of illumination abundance is fast, Salt-soda soil is formed, earth's surface forms hardening salt knot layer, and the saline and alkaline type in above-mentioned salt-soda soil is mostly based on Saline-Sodic, and salinity is high, alkali Property it is strong, for topsoil soils salt content generally in 3~5g/kg, some is up to 10g/kg;PH value is generally 8.3~9.2, and some is up to 10 or more;For basicity generally 10~30%, high reaches 50~70%, since soil colloid adsorbs more sodium ion, leads to Gas, water permeability are poor, and soil property is viscous heavy, hardened, earth's surface cracking are shunk when doing, muddy when wet, tilth is very poor.Currently, to salt-soda soil Ameliorative measure mainly with chemical measure, water resources industry improvement soil based on, agronomic measures mainly with overlay film covering, stalk also Based on field, applying organic manure and the screening of saline-alkali tolerant crop species, although there is certain effect, simultaneously to the improved effect in salt-soda soil Unobvious, there is no applications, and there are no the effective salt-soda soil comprehensive improvement systems of formation and modification method therefore to work out A kind of salt-soda soil comprehensive improvement system and modification method are to alkaline land improving effect and promote and apply and all have more important meaning Justice.
Invention content
The main object of the present invention is to solve improved effect unobvious present in current alkaline land improving technology, no The problem of conducive to application, provides a kind of salt-soda soil comprehensive improvement system and modification method.
The purpose of the present invention can reach by using following technical solution:
A kind of salt-soda soil comprehensive improvement system, including be divided into latticed saline and alkaline plot and be arranged described latticed Saline and alkaline plot under moisture content separation layer, control salt anatonosis hidden pipe, collector pipe, the moisture content separation layer is arranged in the control salt anatonosis The lower section of hidden pipe and the collector pipe replaces laying between the control salt anatonosis hidden pipe and the collector pipe, described latticed The periphery in saline and alkaline plot is equipped with cofferdam, is ploughed in the latticed saline and alkaline plot at several width using automation equipment of plowing Equal, equally spaced trapezoidal mound, formation width is equal between two adjacent trapezoidal mounds, the identical inverted trapezoidal of depth Ditch is drilled with a row by drilling device on every trapezoidal mound and controls salt anatonosis hole, on a plurality of adjacent trapezoidal mound The control salt anatonosis hole be in quincuncial arrangement, being drilled with one by drilling device on every inverted trapezoidal ditch arranges in a row water hole, institute Gully-hole and control salt anatonosis hole interlaced arrangement are stated, the gully-hole on a plurality of adjacent inverted trapezoidal ditch is also in plum blossom Shape arranges that the trapezoidal mound is equipped with a control salt anatonosis hidden pipe depth detection scale, the control salt equipped with spaced apart Anatonosis hidden pipe depth detection scale is deep into the control salt anatonosis hidden pipe, and the inverted trapezoidal ditch is equipped with spaced apart set There are a collector pipe depth detection scale, the collector pipe depth detection scale to be deep into the collector pipe, the control salt anatonosis It is staggered between hidden pipe depth detection scale and the collector pipe depth detection scale, the control salt anatonosis hidden pipe is equipped with one Layer non-woven fabrics filtrate, the collector pipe are equipped with multiple inlet openings.
Further, the latticed saline and alkaline plot is rectangle plot, and the upper width of the trapezoidal mound is 0.8 ~1.2m, lower width be 1.5~1.8m, be highly 35~45cm, the upper width of the inverted trapezoidal ditch be 1.0~1.2m, Lower width is 0.4~0.6m, depth is 35~45cm, and the cofferdam is trapezoidal cofferdam, the upper width in the trapezoidal cofferdam It is 0.6~0.8m for 0.3~0.5m, lower width, is highly 15~25cm.
Further, the control salt anatonosis hidden pipe and the collector pipe are pipe, the control salt anatonosis hidden pipe and described The caliber of collector pipe is all higher than 140mm, and the inlet opening on the collector pipe is no less than 12 along one week number of caliber, institute It states in inlet opening and penetrates into water in the collector pipe filled with infiltration medium, the infiltration medium, by silt, soil barrier in institute It states outside collector pipe.
Further, the effective water absorption area of every meter of the collector pipe be more than 65 square centimeters, the control salt anatonosis hidden pipe with It is 2~3m that the burying of the collector pipe, which puts depth, and it is 2.5~3.5m, the control salt anatonosis that the burying of the moisture content separation layer, which puts depth, Staff guage hole is provided on hidden pipe and the collector pipe, the control salt anatonosis hidden pipe depth detection scale is inserted by the staff guage hole In the control salt anatonosis hidden pipe, the collector pipe depth detection scale is inserted by the staff guage hole in the collector pipe, described Control ranging from 3.5~4.5m of salt anatonosis hidden pipe depth detection scale and the collector pipe depth detection scale.
Further, the control salt anatonosis hole and the aperture of the gully-hole, hole depth are equal, the control salt anatonosis hole and The aperture of the gully-hole is 70mm, 85mm, 105mm or 140mm, and the control salt anatonosis hole and the hole depth of the gully-hole are 1.2~1.5m is filled with the fertilizer and fine sand increase soil fertility, the fertilizer in the control salt anatonosis hole and the gully-hole Mass ratio with the fine sand is 1:49,8~12kg of dose, fertilizer formula use microbial organic fertilizer and plant growth per acre Conditioning agent, volume ratio are 85~90:10~15.
Further, the moisture content separation layer is made of the graded broken stone layer of 35~45cm thickness, is laid on the metalling There are the geotextiles of 0.2~0.4cm as filter layer, is laid with one layer of maize straw, one layer of alfisol on the filter layer, applies thereon Salt reduction alkaline agent, the alfisol and the salt reduction alkaline agent is added to be located on the control salt anatonosis hidden pipe and the collector pipe.
A kind of modification method such as above-mentioned salt-soda soil comprehensive improvement system is additionally provided, is included the following steps:
Step 1:Selection of land
Prepartion of land, soil plough horizon salt content is selected to be less than 0.3%, pH value 7.2~7.8, the content of organic matter 3% or more Plot, the soil texture is neutral;
Step 2:It is laid with moisture content separation layer
Plot is divided into several latticed saline and alkaline plot, the saline-alkali soil in latticed saline and alkaline plot is routed up, is turned over Native depth is 2.5~3.5m, and the graded broken stone layer that 35~45cm thickness is laid in the bottom for climbing over soil is constituted, and is equipped on metalling The geotextiles of 0.2~0.4cm are laid with one layer of maize straw, one layer of alfisol, apply salt reduction thereon as filter layer on filter layer Alkaline agent;
Step 3:It buries and puts control salt anatonosis hidden pipe and collector pipe
After moisture content separation layer is laid with, is buried on alfisol and salt reduction alkaline agent and put control salt anatonosis hidden pipe and collector pipe, salt will be controlled Anatonosis hidden pipe depth detection scale, collector pipe depth detection scale are inserted respectively into control salt anatonosis hidden pipe and collector pipe, and Protective case is arranged outside control salt anatonosis hidden pipe depth detection scale, collector pipe depth detection scale, then in control salt anatonosis hidden pipe sum aggregate Alkaline land soil is arranged on water pipe, and the position of control salt anatonosis hidden pipe and collector pipe is marked;
Step 4:Modify cofferdam, trapezoidal mound, inverted trapezoidal ditch
The alkaline land soil plough arranged on salt anatonosis hidden pipe and collector pipe will be controlled into several using equipment of plowing is automated Width is equal, equally spaced trapezoidal mound, formation width is equal between two adjacent trapezoidal mounds, depth it is identical fall Trapezoid-shaped trench builds cofferdam in the periphery in latticed saline and alkaline plot;
Step 5:It punches, apply soil fertility fertilizer
A row is drilled with by drilling device on every trapezoidal mound and controls salt anatonosis hole, it is a plurality of adjacent described trapezoidal The control salt anatonosis hole on mound is in quincuncial arrangement, and being drilled with one by drilling device on every inverted trapezoidal ditch arranges in a row Water hole, the gully-hole and control salt anatonosis hole interlaced arrangement, the gully-hole on a plurality of adjacent inverted trapezoidal ditch Also it is in quincuncial arrangement, the fertilizer and fine sand increase soil fertility is filled in the control salt anatonosis hole and the gully-hole;
Step 6:Planting Crops
Plantation seeds, wheat, soya bean, crops or the interplanting corn such as corn and soya bean, interplant of bean and small as needed The interplanting crops such as wheat;
Step 7:Field management
The field management such as weeding, deinsectization, watering, fertilising periodically are carried out to crops;
Step 8:Control salt anatonosis hidden pipe and collector pipe management
It is inspected periodically to burying the control salt anatonosis hidden pipe put well and collector pipe, checks the control salt anatonosis hidden pipe and described Whether water in collector pipe, and control salt anatonosis hidden pipe and collector pipe are blocked, and are checked according to the scale of the scale of depth Control the depth of salt anatonosis hidden pipe and collector pipe.
Further, in the step 3, the effective water absorption area of every meter of the collector pipe is more than 65 square centimeters, the control It is 2~3m that the burying of salt anatonosis hidden pipe and the collector pipe, which puts depth, and it is 2.5~3.5m that the burying of the moisture content separation layer, which puts depth, Ranging from 3.5~4.5m of control the salt anatonosis hidden pipe depth detection scale and the collector pipe depth detection scale;The step In rapid 4, the latticed saline and alkaline plot is rectangle plot, and the upper width of the trapezoidal mound is 0.8~1.2m, lower part Width is 1.5~1.8m, is highly 35~45cm, and the upper width of the inverted trapezoidal ditch is 1.0~1.2m, lower width is 0.4~0.6m, depth are 35~45cm, and the cofferdam is trapezoidal cofferdam, the upper width in the trapezoidal cofferdam is 0.3~ 0.5m, lower width are 0.6~0.8m, are highly 15~25cm.
Further, it in the step 5, controls salt anatonosis hole and the aperture of the gully-hole, hole depth is equal, the control salt Anatonosis hole and the aperture of the gully-hole are 70mm, 85mm, 105mm or 140mm, the control salt anatonosis hole and the gully-hole Hole depth is 1.2~1.5m, and the mass ratio of the fertilizer and the fine sand is 1:49,8~12kg of dose, fertilizer formula are adopted per acre With microbial organic fertilizer and plant growth regulator, volume ratio is 85~90:10~15.
Further, it in the step 8, is examined to burying the control salt anatonosis hidden pipe put well and the collector pipe weekly It looks into, when the water total amount in the inspection control salt anatonosis hidden pipe and the collector pipe is less than the control salt anatonosis hidden pipe and the collection The reservoir storage of water pipe 30% when, need the water filling into the control salt anatonosis hidden pipe and the collector pipe, be filled to the control salt Water in anatonosis hidden pipe and the collector pipe is more than the 30% of its reservoir storage, when the control salt anatonosis hidden pipe and the collector pipe When being blocked, tamper is removed in time;It is examined according to the control salt anatonosis hidden pipe depth detection scale and the collector pipe depth The scale of mark ruler come check it is described control salt anatonosis hidden pipe and the collector pipe depth, when the scale that scale rises or falls is big When 20cm, the control salt anatonosis hidden pipe and the collector pipe are checked, prevent the control salt anatonosis hidden pipe and described Fracture or displacement occur for collector pipe.
The method have the benefit that:Comprehensive improvement system in salt-soda soil provided by the invention and modification method, pass through It buries in the soil and puts control salt anatonosis hidden pipe and collector pipe, and punched on the soil of control salt anatonosis hidden pipe and collector pipe, It is put into microbial organic fertilizer and plant growth regulator in hole, the water-holding capacity of soil can not only be effectively improved, keeps supporting Point, additionally it is possible to the shatter value for improving soil improves the hardened degree of soil, and the ability of rainwater and irrigation water is collected in enhancing, moisture content every Absciss layer metalling is constituted, and geotextiles are equipped on metalling and are used as filter layer, be laid on filter layer one layer of maize straw, one layer drench Molten soil applies salt reduction alkaline agent thereon, and alfisol and salt reduction alkaline agent are located on control salt anatonosis hidden pipe and collector pipe, and are periodically put to burying It controls salt anatonosis hidden pipe well and collector pipe is checked, be conducive to water conservation, fertilizer conservation, heat, improve crop yield, increase in conjunction with control salt Hidden pipe and collector pipe are oozed, salt leaching and filtering can be accelerated using the method for the present invention, so that crop is ploughed area's salinity and declines to a great extent, plough The salt content in area controls within 0.2%, and the method for the present invention is simply easy to spread, is a kind of good cultivation mode.
Description of the drawings
Fig. 1 is comprehensive improvement system schematic in salt-soda soil of the present invention.
In figure:The latticed saline and alkaline plot 100-, 200- moisture content separation layers, 300- control salt anatonosis hidden pipes, 400- collector pipes, The cofferdam 500-, the trapezoidal mounds of 101-, 102- inverted trapezoidal ditches, 103- control salt anatonosis hole, 104- gully-holes, and 105- controls salt anatonosis hidden pipe Depth detection scale, 106- collector pipe depth detection scales, 301- non-woven fabrics filtrates, the inlet openings 401-.
Specific implementation mode
To make the more clear and clear technical scheme of the present invention of those skilled in the art, with reference to embodiment and attached drawing The present invention is described in further detail, and embodiments of the present invention are not limited thereto.
As shown in Figure 1, a kind of salt-soda soil comprehensive improvement system, including be divided into latticed saline and alkaline plot 100 and set Set moisture content separation layer 200, control salt anatonosis hidden pipe 300, collector pipe 400 under the latticed saline and alkaline plot 100, the water Part separation layer 200 is arranged in the lower section of the control salt anatonosis hidden pipe 300 and the collector pipe 400, the control salt anatonosis hidden pipe 300 Replace laying between the collector pipe 400, the periphery in the latticed saline and alkaline plot 100 is equipped with cofferdam 500, using automatic Equal at several width, equally spaced trapezoidal mound 101 is ploughed in the latticed saline and alkaline plot 100 by change equipment of plowing, and two Formation width is equal between the adjacent trapezoidal mound 101 of item, the identical inverted trapezoidal ditch 102 of depth, every trapezoidal soil A row is drilled with by drilling device on heap 101 and controls salt anatonosis hole 103, the control on a plurality of adjacent trapezoidal mound 101 Salt anatonosis hole 103 is in quincuncial arrangement, and being drilled with one by drilling device on every inverted trapezoidal ditch 102 arranges in a row water hole 104, institute Gully-hole 104 and 103 interlaced arrangement of control salt anatonosis hole are stated, described on a plurality of adjacent inverted trapezoidal ditch 102 is catchmented Hole 104 is also in quincuncial arrangement, and the trapezoidal mound 101 is equipped with the control salt anatonosis hidden pipe depth spaced apart that is equipped with and examines Mark ruler 105, the control salt anatonosis hidden pipe depth detection scale 105 are deep into the control salt anatonosis hidden pipe 300, the ladder Shape ditch 102 is equipped with a collector pipe depth detection scale 106, the collector pipe depth detection scale equipped with spaced apart 106 are deep into the collector pipe 400, the control salt anatonosis hidden pipe depth detection scale 105 and the collector pipe depth detection It is staggered between scale 106, the control salt anatonosis hidden pipe 300 is equipped with layer of non-woven fabric filtrate 301, the collector pipe 400 It is equipped with multiple inlet openings 401.
Further, the latticed saline and alkaline plot 100 is rectangle plot, and the top of the trapezoidal mound 101 is wide Degree is 0.8~1.2m, lower width is 1.5~1.8m, is highly 35~45cm, and the upper width of the inverted trapezoidal ditch 102 is 1.0~1.2m, lower width are 0.4~0.6m, depth is 35~45cm, and the cofferdam 500 is trapezoidal cofferdam, described trapezoidal to enclose The upper width on weir is 0.3~0.5m, lower width is 0.6~0.8m, is highly 15~25cm.
Further, the control salt anatonosis hidden pipe 300 and the collector pipe 400 are pipe, the control salt anatonosis hidden pipe 300 and the caliber of the collector pipe 400 be all higher than 140mm, the inlet opening 401 on the collector pipe 400 was along caliber one week Number be no less than 12, water is penetrated into the collector pipe filled with infiltration medium, the infiltration medium in the inlet opening 401 In 400, by silt, soil barrier outside the collector pipe 400.
Further, the effective water absorption area of every meter of the collector pipe 400 is more than 65 square centimeters, the control salt anatonosis hidden pipe 300 and the collector pipe 400 bury that put depth be 2~3m, it is 2.5~3.5m, institute that the burying of the moisture content separation layer 200, which puts depth, It states and is provided with staff guage hole, the control salt anatonosis hidden pipe depth detection scale on control salt anatonosis hidden pipe 300 and the collector pipe 400 105 are inserted by the staff guage hole in the control salt anatonosis hidden pipe 300, and the collector pipe depth detection scale 106 passes through described Staff guage hole is inserted into the collector pipe 400, the control salt anatonosis hidden pipe depth detection scale 105 and the collector pipe depth detection Ranging from 3.5~4.5m of scale 106.
Further, the control salt anatonosis hole 103 and the aperture of the gully-hole 104, hole depth are equal, and the control salt increases The aperture of seepage hole 103 and the gully-hole 104 is 70mm, 85mm, 105mm or 140mm, control salt anatonosis hole 103 and described The hole depth of gully-hole 104 is 1.2~1.5m, is filled in control salt anatonosis hole 103 and the gully-hole 104 and improves soil fertilizer The mass ratio of the fertilizer and fine sand of power, the fertilizer and the fine sand is 1:49,8~12kg of dose, fertilizer formula are adopted per acre With microbial organic fertilizer and plant growth regulator, volume ratio is 85~90:10~15.
Further, the moisture content separation layer 200 is made of the graded broken stone layer of 35~45cm thickness, the metalling upper berth Geotextiles equipped with 0.2~0.4cm are laid with one layer of maize straw, one layer of alfisol, thereon as filter layer on the filter layer Apply salt reduction alkaline agent, the alfisol and the salt reduction alkaline agent are located at the control salt anatonosis hidden pipe 300 and the collector pipe 400 On.
A kind of modification method such as above-mentioned salt-soda soil comprehensive improvement system is additionally provided, is included the following steps:
Step 1:Selection of land
Prepartion of land, soil plough horizon salt content is selected to be less than 0.3%, pH value 7.2~7.8, the content of organic matter 3% or more Plot, the soil texture is neutral;
Step 2:It is laid with moisture content separation layer
Plot is divided into several latticed saline and alkaline plot 100, the saline-alkali soil in latticed saline and alkaline plot 100 is turned over Go out, depth of turning soil is 2.5~3.5m, and the graded broken stone layer that 35~45cm thickness is laid in the bottom for climbing over soil is constituted, on metalling The geotextiles of 0.2~0.4cm are equipped with as filter layer, one layer of maize straw, one layer of alfisol is laid on filter layer, applies thereon Add salt reduction alkaline agent;
Step 3:It buries and puts control salt anatonosis hidden pipe and collector pipe
After moisture content separation layer is laid with, is buried on alfisol and salt reduction alkaline agent and puts control salt anatonosis hidden pipe 300 and collector pipe 400, Control salt anatonosis hidden pipe depth detection scale 105, collector pipe depth detection scale 106 are inserted respectively into control salt anatonosis hidden pipe 300 In collector pipe 400, and protection is arranged outside control salt anatonosis hidden pipe depth detection scale 105, collector pipe depth detection scale 106 Set, then alkaline land soil is arranged on control salt anatonosis hidden pipe 300 and collector pipe 400, and to control salt anatonosis hidden pipe 300 and collector pipe 400 position is marked;
Step 4:Modify cofferdam, trapezoidal mound, inverted trapezoidal ditch
Using automation plow equipment will control the alkaline land soil plough arranged on salt anatonosis hidden pipe 300 and collector pipe 400 at Several width are equal, equally spaced trapezoidal mound 101, between two adjacent trapezoidal mounds 101 formation width it is equal, The identical inverted trapezoidal ditch 102 of depth builds cofferdam in the periphery in latticed saline and alkaline plot 100;
Step 5:It punches, apply soil fertility fertilizer
A row is drilled with by drilling device on every trapezoidal mound 101 and controls salt anatonosis hole 103, a plurality of adjacent institute The control salt anatonosis hole 103 stated on trapezoidal mound 101 is in quincuncial arrangement, passes through brill on every inverted trapezoidal ditch 102 Hole equipment is drilled with one and arranges in a row water hole 104, the gully-hole 104 and 103 interlaced arrangement of control salt anatonosis hole, a plurality of adjacent institute The gully-hole 104 stated on inverted trapezoidal ditch 102 is also in quincuncial arrangement, in control salt anatonosis hole 103 and the gully-hole The fertilizer and fine sand that filling is increase soil fertility in 104;
Step 6:Planting Crops
Plantation seeds, wheat, soya bean, crops or the interplanting corn such as corn and soya bean, interplant of bean and small as needed The interplanting crops such as wheat;
Step 7:Field management
The field management such as weeding, deinsectization, watering, fertilising periodically are carried out to crops;
Step 8:Control salt anatonosis hidden pipe and collector pipe management
It is inspected periodically to burying the control salt anatonosis hidden pipe put well and collector pipe, checks the control salt anatonosis hidden pipe and described Whether water in collector pipe, and control salt anatonosis hidden pipe and collector pipe are blocked, and are checked according to the scale of the scale of depth Control the depth of salt anatonosis hidden pipe and collector pipe.
Further, in the step 3, the effective water absorption area of every meter of the collector pipe 400 is described more than 65 square centimeters It is 2~3m that the burying of control salt anatonosis hidden pipe 300 and the collector pipe 400, which puts depth, and the burying of the moisture content separation layer 200 puts depth and be 2.5~3.5m, the control salt anatonosis hidden pipe depth detection scale 105 and the collector pipe depth detection scale 106 are ranging from 3.5~4.5m;In the step 4, the latticed saline and alkaline plot 100 be rectangle plot, the trapezoidal mound 101 it is upper Portion's width is 0.8~1.2m, lower width is 1.5~1.8m, is highly 35~45cm, and the top of the inverted trapezoidal ditch 102 is wide Degree is 1.0~1.2m, lower width is 0.4~0.6m, depth is 35~45cm, and the cofferdam 500 is trapezoidal cofferdam, the ladder The upper width in shape cofferdam is 0.3~0.5m, lower width is 0.6~0.8m, is highly 15~25cm.
Further, in the step 5, control salt anatonosis hole 103 and the aperture of the gully-hole 104, hole depth are equal, institute The aperture for stating control salt anatonosis hole 103 and the gully-hole 104 is 70mm, 85mm, 105mm or 140mm, control salt anatonosis hole 103 and the hole depth of the gully-hole 104 be 1.2~1.5m, the mass ratio of the fertilizer and the fine sand is 1:49, it applies fertilizer per acre 8~12kg is measured, it is 85~90 that fertilizer formula, which uses microbial organic fertilizer and plant growth regulator, volume ratio,:10~15.
Further, in the step 8, weekly to burying the control salt anatonosis hidden pipe 300 put well and the collector pipe 400 It is checked, when the water total amount in the inspection control salt anatonosis hidden pipe 300 and the collector pipe 400 is less than the control salt anatonosis The reservoir storage of hidden pipe 300 and the collector pipe 400 30% when, need to the control salt anatonosis hidden pipe 300 and the collector pipe Water filling in 400, the water being filled in the control salt anatonosis hidden pipe 300 and the collector pipe 400 is more than the 30% of its reservoir storage, When the control salt anatonosis hidden pipe 300 and the collector pipe 400 are blocked, tamper is removed in time;Increased according to the control salt The scale of hidden pipe depth detection scale 105 and the collector pipe depth detection scale 106 is oozed to check the control salt anatonosis hidden pipe 300 and the collector pipe 400 depth, when the scale that scale rises or falls be more than 20cm when, it is dark to the control salt anatonosis Pipe 300 and the collector pipe 400 checked, prevent the control salt anatonosis hidden pipe 300 and the collector pipe 400 occur fracture or Displacement.
In conclusion comprehensive improvement system in salt-soda soil provided in this embodiment and modification method, are put by burying in the soil Salt anatonosis hidden pipe and collector pipe are controlled, and is punched on the soil of control salt anatonosis hidden pipe and collector pipe, micro- life is put into hole Organic fertilizer and plant growth regulator can not only effectively improve the water-holding capacity of soil, keep nutrient, additionally it is possible to improve The shatter value of soil, improves the hardened degree of soil, and the ability of rainwater and irrigation water, moisture content separation layer metalling structure are collected in enhancing At being equipped with geotextiles on metalling as filter layer, one layer of maize straw, one layer of alfisol be laid on filter layer, is applied thereon Add salt reduction alkaline agent, alfisol and salt reduction alkaline agent to be located on control salt anatonosis hidden pipe and collector pipe, and periodically puts control salt anatonosis well to burying Hidden pipe and collector pipe are checked, are conducive to water conservation, fertilizer conservation, are heated, and crop yield is improved, in conjunction with control salt anatonosis hidden pipe sum aggregate Water pipe can accelerate salt leaching and filtering using the method for the present invention, so that crop is ploughed area's salinity and decline to a great extent, plough the salt content in area Control is within 0.2%, and the method for the present invention is simply easy to spread, is a kind of good cultivation mode.
The above, further embodiment only of the present invention, but scope of protection of the present invention is not limited thereto, and it is any Within the scope of the present disclosure, according to the technique and scheme of the present invention and its design adds those familiar with the art With equivalent substitution or change, protection scope of the present invention is belonged to.

Claims (10)

1. a kind of salt-soda soil comprehensive improvement system, which is characterized in that including being divided into latticed saline and alkaline plot (100) and setting Set moisture content separation layer (200), control salt anatonosis hidden pipe (300), collector pipe under the latticed saline and alkaline plot (100) (400), the moisture content separation layer (200) is arranged in the lower section of control salt anatonosis hidden pipe (300) and the collector pipe (400), Replace laying, the latticed saline and alkaline plot (100) between the control salt anatonosis hidden pipe (300) and the collector pipe (400) Periphery be equipped with cofferdam (500), using automation plow equipment will the latticed saline and alkaline plot (100) plough it is wide at several Spend equal, equally spaced trapezoidal mound (101), formation width is equal between two adjacent trapezoidal mounds (101), depth Identical inverted trapezoidal ditch (102) is drilled with a row by drilling device on every trapezoidal mound (101) and controls salt anatonosis hole (103), the control salt anatonosis hole (103) on a plurality of adjacent trapezoidal mound (101) is in quincuncial arrangement, described in every One is drilled with by drilling device arrange in a row water hole (104), the gully-hole (104) and the control salt anatonosis on inverted trapezoidal ditch (102) Hole (103) interlaced arrangement, the gully-hole (104) on a plurality of adjacent inverted trapezoidal ditch (102) are also in quincuncial arrangement, The trapezoidal mound (101) is equipped with a control salt anatonosis hidden pipe depth detection scale (105), the control equipped with spaced apart Salt anatonosis hidden pipe depth detection scale (105) is deep into the control salt anatonosis hidden pipe (300), on the inverted trapezoidal ditch (102) It is equipped with a collector pipe depth detection scale (106) equipped with spaced apart, the collector pipe depth detection scale (106) is deeply In to the collector pipe (400), the control salt anatonosis hidden pipe depth detection scale (105) and the collector pipe depth detection scale (106) it is staggered between, the control salt anatonosis hidden pipe (300) is equipped with layer of non-woven fabric filtrate (301), the collector pipe (400) multiple inlet openings (401) are equipped with.
2. a kind of salt-soda soil comprehensive improvement system according to claim 1, which is characterized in that the latticed salt-soda soil Block (100) is rectangle plot, the upper width of the trapezoidal mound (101) is 0.8~1.2m, lower width be 1.5~ 1.8m, be highly 35~45cm, the upper width of the inverted trapezoidal ditch (102) is 1.0~1.2m, lower width be 0.4~ 0.6m, depth are 35~45cm, and the cofferdam (500) is trapezoidal cofferdam, the upper width in the trapezoidal cofferdam is 0.3~ 0.5m, lower width are 0.6~0.8m, are highly 15~25cm.
3. a kind of salt-soda soil comprehensive improvement system according to claim 1, which is characterized in that the control salt anatonosis hidden pipe (300) and the collector pipe (400) is pipe, and the caliber of the control salt anatonosis hidden pipe (300) and the collector pipe (400) is equal More than 140mm, the inlet opening (401) on the collector pipe (400) is no less than 12 along one week number of caliber, it is described into Water is penetrated into the collector pipe (400) filled with infiltration medium, the infiltration medium in water hole (401), silt, soil are hindered It is interposed between the collector pipe (400) outside.
4. a kind of salt-soda soil comprehensive improvement system according to claim 1, which is characterized in that the collector pipe (400) is every Meter You Xiao water absorption areas are more than 65 square centimeters, and the control salt anatonosis hidden pipe (300) and burying for the collector pipe (400) put depth For 2~3m, it is 2.5~3.5m that the burying of the moisture content separation layer (200), which puts depth, the control salt anatonosis hidden pipe (300) and described Staff guage hole is provided on collector pipe (400), the control salt anatonosis hidden pipe depth detection scale (105) is inserted by the staff guage hole In the control salt anatonosis hidden pipe (300), the collector pipe depth detection scale (106) described in staff guage hole insertion by catchmenting It manages in (400), the model of control salt anatonosis hidden pipe depth detection scale (105) and the collector pipe depth detection scale (106) It encloses for 3.5~4.5m.
5. a kind of salt-soda soil comprehensive improvement system according to claim 1, which is characterized in that control salt anatonosis hole (103) it is equal with the aperture of the gully-hole (104), hole depth, control salt anatonosis hole (103) and the gully-hole (104) Aperture be 70mm, 85mm, 105mm or 140mm, control salt anatonosis hole (103) and the hole depth of the gully-hole (104) are 1.2~1.5m is filled with the fertilizer increase soil fertility and carefully in control salt anatonosis hole (103) and the gully-hole (104) The mass ratio of sand, the fertilizer and the fine sand is 1:49,8~12kg of dose, fertilizer formula are organic using microorganism per acre Fertilizer and plant growth regulator, volume ratio are 85~90:10~15.
6. a kind of salt-soda soil comprehensive improvement system according to claim 1, which is characterized in that the moisture content separation layer (200) it is made of the graded broken stone layer of 35~45cm thickness, the geotextiles that 0.2~0.4cm is equipped on the metalling were used as Filtering layer is laid with one layer of maize straw, one layer of alfisol on the filter layer, applies salt reduction alkaline agent, the alfisol and institute thereon Salt reduction alkaline agent is stated to be located on the control salt anatonosis hidden pipe (300) and the collector pipe (400).
7. a kind of modification method of such as salt-soda soil comprehensive improvement system of claim 1-6 any one, which is characterized in that including Following steps:
Step 1:Selection of land
Prepartion of land, soil plough horizon salt content is selected to be less than the 0.3%, ground of pH value 7.2~7.8, the content of organic matter 3% or more Block, the soil texture are neutral;
Step 2:It is laid with moisture content separation layer
Plot is divided into several latticed saline and alkaline plot (100), the saline-alkali soil of latticed saline and alkaline plot (100) is turned over Go out, depth of turning soil is 2.5~3.5m, and the graded broken stone layer that 35~45cm thickness is laid in the bottom for climbing over soil is constituted, on metalling The geotextiles of 0.2~0.4cm are equipped with as filter layer, one layer of maize straw, one layer of alfisol is laid on filter layer, applies thereon Add salt reduction alkaline agent;
Step 3:It buries and puts control salt anatonosis hidden pipe and collector pipe
After moisture content separation layer is laid with, is buried on alfisol and salt reduction alkaline agent and puts control salt anatonosis hidden pipe (300) and collector pipe (400), Salt anatonosis hidden pipe depth detection scale (105) will be controlled, collector pipe depth detection scale (106) is inserted respectively into control salt anatonosis hidden pipe (300) and in collector pipe (400), and in control salt anatonosis hidden pipe depth detection scale (105), collector pipe depth detection scale (106) it is arranged protective case outside, then arranges alkaline land soil on control salt anatonosis hidden pipe (300) and collector pipe (400), and to controlling salt The position of anatonosis hidden pipe (300) and collector pipe (400) is marked;
Step 4:Modify cofferdam, trapezoidal mound, inverted trapezoidal ditch
Using automation plow equipment will control the alkaline land soil arranged on salt anatonosis hidden pipe (300) and collector pipe (400) plough at Several width are equal, equally spaced trapezoidal mound (101), formation width between two adjacent trapezoidal mounds (101) Equal, the identical inverted trapezoidal ditch (102) of depth builds cofferdam in the periphery of latticed saline and alkaline plot (100);
Step 5:It punches, apply soil fertility fertilizer
A row is drilled with by drilling device on every trapezoidal mound (101) and controls salt anatonosis hole (103), a plurality of adjacent institute The control salt anatonosis hole (103) stated on trapezoidal mound (101) is in quincuncial arrangement, on every inverted trapezoidal ditch (102) It is drilled with one by drilling device and arranges in a row water hole (104), the gully-hole (104) and the control salt anatonosis hole (103) interlaced arrangement, The gully-hole (104) on a plurality of adjacent inverted trapezoidal ditch (102) is also in quincuncial arrangement, in control salt anatonosis hole (103) fertilizer and fine sand increase soil fertility and are filled in the gully-hole (104);
Step 6:Planting Crops
Crops or interplanting corn and soya bean, interplant of bean and wheat such as plantation seeds, wheat, soya bean, corn etc. as needed Interplanting crops;
Step 7:Field management
The field management such as weeding, deinsectization, watering, fertilising periodically are carried out to crops;
Step 8:Control salt anatonosis hidden pipe and collector pipe management
It inspects periodically, check the control salt anatonosis hidden pipe and described catchments to burying the control salt anatonosis hidden pipe put well and collector pipe Whether water in pipe, and control salt anatonosis hidden pipe and collector pipe are blocked, and control salt is checked according to the scale of the scale of depth The depth of anatonosis hidden pipe and collector pipe.
8. a kind of modification method of salt-soda soil comprehensive improvement system according to claim 7, which is characterized in that the step In 3, the effective water absorption area of every meter of the collector pipe (400) is more than 65 square centimeters, the control salt anatonosis hidden pipe (300) and described It is 2~3m that the burying of collector pipe (400), which puts depth, and it is 2.5~3.5m, the control that the burying of the moisture content separation layer (200), which puts depth, Ranging from 3.5~4.5m of salt anatonosis hidden pipe depth detection scale (105) and the collector pipe depth detection scale (106);Institute It states in step 4, the latticed saline and alkaline plot (100) is rectangle plot, and the upper width of the trapezoidal mound (101) is 0.8~1.2m, lower width are 1.5~1.8m, are highly 35~45cm, and the upper width of the inverted trapezoidal ditch (102) is 1.0 ~1.2m, lower width are 0.4~0.6m, depth is 35~45cm, and the cofferdam (500) is trapezoidal cofferdam, described trapezoidal to enclose The upper width on weir is 0.3~0.5m, lower width is 0.6~0.8m, is highly 15~25cm.
9. a kind of modification method of salt-soda soil comprehensive improvement system according to claim 7, which is characterized in that the step In 5, controls salt anatonosis hole (103) and the aperture of the gully-hole (104), hole depth are equal, control salt anatonosis hole (103) and institute The aperture for stating gully-hole (104) is 70mm, 85mm, 105mm or 140mm, control salt anatonosis hole (103) and the gully-hole (104) hole depth is 1.2~1.5m, and the mass ratio of the fertilizer and the fine sand is 1:49,8~12kg of dose, fertile per acre It is 85~90 that material formula, which uses microbial organic fertilizer and plant growth regulator, volume ratio,:10~15.
10. a kind of modification method of salt-soda soil comprehensive improvement system according to claim 7, which is characterized in that the step In rapid 8, check burying the control salt anatonosis hidden pipe (300) put well and the collector pipe (400) weekly, described in inspection The water total amount controlled in salt anatonosis hidden pipe (300) and the collector pipe (400) is less than the control salt anatonosis hidden pipe (300) and described The reservoir storage of collector pipe (400) 30% when, need the note into the control salt anatonosis hidden pipe (300) and the collector pipe (400) Water, the water being filled in the control salt anatonosis hidden pipe (300) and the collector pipe (400) they are more than the 30% of its reservoir storage, when When the control salt anatonosis hidden pipe (300) and the collector pipe (400) are blocked, tamper is removed in time;According to the control salt Anatonosis hidden pipe depth detection scale (105) and the scale of the collector pipe depth detection scale (106) check that the control salt increases The depth for oozing hidden pipe (300) and the collector pipe (400) will be to described when the scale that scale rises or falls is more than 20cm Control salt anatonosis hidden pipe (300) and the collector pipe (400) are checked, the control salt anatonosis hidden pipe (300) and the collection are prevented Fracture or displacement occur for water pipe (400).
CN201610766477.XA 2016-08-30 2016-08-30 A kind of salt-soda soil comprehensive improvement system and modification method Expired - Fee Related CN106376264B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610766477.XA CN106376264B (en) 2016-08-30 2016-08-30 A kind of salt-soda soil comprehensive improvement system and modification method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610766477.XA CN106376264B (en) 2016-08-30 2016-08-30 A kind of salt-soda soil comprehensive improvement system and modification method

Publications (2)

Publication Number Publication Date
CN106376264A CN106376264A (en) 2017-02-08
CN106376264B true CN106376264B (en) 2018-10-09

Family

ID=57938068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610766477.XA Expired - Fee Related CN106376264B (en) 2016-08-30 2016-08-30 A kind of salt-soda soil comprehensive improvement system and modification method

Country Status (1)

Country Link
CN (1) CN106376264B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110161211A (en) * 2019-05-10 2019-08-23 中国水产科学研究院东海水产研究所 Simulate the experimental rig that secondary saline-alkali water generates process

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107046841A (en) * 2017-04-02 2017-08-18 北京军秀咨询有限公司 A kind of method of saline land greening afforestation
CN106797723A (en) * 2017-04-02 2017-06-06 北京军秀咨询有限公司 A kind of alkaline land improving system and modification method
CN109601048A (en) * 2019-01-02 2019-04-12 天津市农业资源与环境研究所 A kind of method that stalk orifice breaks soil plough sole
CN110786094B (en) * 2019-11-04 2022-01-18 河海大学 Integrated isolation pad and method for saline-alkali soil double-S-shaped drainage and salt control pipeline
CN112931120B (en) * 2021-01-29 2023-01-24 中国科学院地理科学与资源研究所 Method for planting fenugreek in saline-alkali soil
CN113475181B (en) * 2021-07-19 2022-05-20 沣田宝农业科技有限公司 Comprehensive treatment system and method for saline-alkali soil
CN114451230B (en) * 2022-03-01 2023-02-17 华清农业开发有限公司 Planting method of moderate and severe saline-alkali soil water retention, salt resistance and carbon increase fertile soil

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101536643A (en) * 2009-04-24 2009-09-23 朱高升 Saline and alkali land improvement method
CN101743882B (en) * 2009-12-29 2011-07-27 中国科学院地理科学与资源研究所 Drip irrigation greening forestation method for saline-alkali land in coastal areas
CN201830631U (en) * 2010-09-07 2011-05-18 深圳市文科园艺实业有限公司 Greening and desalting system for saline-alkali soil
CN102057775B (en) * 2010-11-15 2012-06-20 中国科学院南京土壤研究所 Controlled-salinity cultivation method for plating crop on moderate and medium and severe saline-alkali soil
CN103718686B (en) * 2014-01-07 2015-09-16 北京东方园林股份有限公司 The afflux anatonosis of a kind of local presses down alkaline land improving system and the improvement method of evaporation
WO2015166378A1 (en) * 2014-04-30 2015-11-05 Bendke Teja Root watering systems and apparatus thereof
CN104541641B (en) * 2014-12-31 2016-08-31 广西壮族自治区农业科学院经济作物研究所 A kind of powder ridge underdrain system arranges and makes soil light salt salt discharge method for increasing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110161211A (en) * 2019-05-10 2019-08-23 中国水产科学研究院东海水产研究所 Simulate the experimental rig that secondary saline-alkali water generates process
CN110161211B (en) * 2019-05-10 2022-05-17 中国水产科学研究院东海水产研究所 Test device for simulating secondary saline-alkali water generation process

Also Published As

Publication number Publication date
CN106376264A (en) 2017-02-08

Similar Documents

Publication Publication Date Title
CN106376264B (en) A kind of salt-soda soil comprehensive improvement system and modification method
Kumawat et al. Soil and water conservation measures for agricultural sustainability
Abrol et al. Salt-affected soils and their management
Osman Soil degradation, conservation and remediation
Virgo et al. Soil and erosion features of the Central Plateau region of Tigrai, Ethiopia
Hooke et al. Use of vegetation to combat desertification and land degradation: Recommendations and guidelines for spatial strategies in Mediterranean lands
Shahid et al. Soil salinity development, classification, assessment and management in irrigated agriculture
Cannell et al. A study of mole drainage with simplified cultivation for autumn-sown crops on a clay soil: 1. Background, experiment and site details, drainage systems, measurement of drainflow and summary of results, 1978–80
CN106358479A (en) Open trench-concealed conduit combined water discharging and salt reducing method
CN108076719A (en) A kind of engineering improvement on heavy salinized ground of haftplatte and ecological planting and establishing method
CN106385843A (en) Method for increasing leaching efficiency of soil salinity in plough layer
CN105706555B (en) Saline land greening engineering original soil structure-improved and its construction method
Ali et al. Management of salt-affected soils
Tang et al. Subsurface flow processes in sloping cropland of purple soil
CN107027369A (en) Return salt-soda soil control system and its method in a kind of greenhouse
CN105850261A (en) System for collecting rainwater for salt leaching for slope type saline and alkaline land
CN108464225A (en) A kind of desert marginal zone sacsaoul wood drip irrigation system and sacsaoul wood implantation methods and application
Dustnazarova et al. The threat of saline lands, for example, in the Republic of Uzbekistan
Gupta et al. Salt affected soils: reclamation and management
Utsev et al. Irrigation soil analysis in River Katsina-Ala catchment areas of North-Central Nigeria
CN106545017A (en) A kind of soil basketing method of Plain rolling terrain highway construction soil
Susilawati Rainwater management model development for agriculture in the Savu Island semi-arid region
CN205389381U (en) Good structure of former land reform of saline and alkaline land greening engineering
Worcester et al. Classification and management of saline seeps in western North Dakota
Lovell et al. The Romwe Catchment Study, Zimbabwe: The effects of changing rainfall and land use on recharge to crystalline basement aquifers, and the implications for rural water supply and small-scale irrigation. Final Report

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 261108 800 Xiangjiang street, Binhai Economic Development Zone, Weifang, Shandong

Applicant after: Shandong Sheng Wei salt alkali land Technology Co.,Ltd.

Address before: 261108 800 Xiangjiang street, Binhai Economic Development Zone, Weifang, Shandong

Applicant before: SHANDONG SUNWAY LANDSCAPE TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181009