CN106368457A - Mobile sandblast dust suppression workshop - Google Patents

Mobile sandblast dust suppression workshop Download PDF

Info

Publication number
CN106368457A
CN106368457A CN201610935611.4A CN201610935611A CN106368457A CN 106368457 A CN106368457 A CN 106368457A CN 201610935611 A CN201610935611 A CN 201610935611A CN 106368457 A CN106368457 A CN 106368457A
Authority
CN
China
Prior art keywords
workshop
skeleton
support
supports
vertical supports
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610935611.4A
Other languages
Chinese (zh)
Other versions
CN106368457B (en
Inventor
赵西文
张燕军
乔利斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ji'nan Fenghui Technology Co Ltd
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
Ji'nan Fenghui Technology Co Ltd
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ji'nan Fenghui Technology Co Ltd, SEPCO1 Electric Power Construction Co Ltd filed Critical Ji'nan Fenghui Technology Co Ltd
Priority to CN201610935611.4A priority Critical patent/CN106368457B/en
Publication of CN106368457A publication Critical patent/CN106368457A/en
Application granted granted Critical
Publication of CN106368457B publication Critical patent/CN106368457B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport

Abstract

The invention discloses a mobile sandblast dust suppression workshop which comprises a workshop framework. The workshop framework comprises a plurality of parallelly-arranged unit supporting frameworks, the unit supporting frameworks each comprise two vertical supports, a transverse support is connected between the tops of the two vertical supports, the bottoms of the vertical supports are arranged on a sliding rail, and the workshop framework can slide along the sliding rail. The adjacent unit supporting frameworks are connected through a plurality of connecting rod bodies, and the outside of the workshop framework is fixedly connected with a covering plate. The bottom of a workshop body is laid by adopting a bi-directional track, the whole workshop can move, and the problem of large occupied space is effectively solved. Because the workshop is a mobile workshop, a large machine does not need to be arranged in the workshop, the matched workshop is built according to on-site requirements, and the cost is reduced. An openable type protective body is adopted for sealing in the moving direction of the workshop, to facilitate feeding and discharging of steel structures and pipe fittings.

Description

Workshop is moved in sandblasting dust suppression
Technical field
The present invention relates to workshop is moved in a kind of sandblasting dust suppression.
Background technology
Presented in existing sand-blast shop technical scheme is divided into two kinds of differences: steel construction and steel beam column surface oxidation Skin, scab, floating rust rely on sandblasting to clear up, and sandblasting is fast and convenient to be its big advantage.
1. the sand-blast shop of large-scale making enterprise setting at present is larger, arranges hoisting machinery, dedusting system in workshop A series of complete auxiliary facilities such as system, need larger input and construction required time are longer during construction, but after it builds up The time limit that can use is longer, and sandblasting effect can be good;Using the sand-blast shop of large enterprise, to live place scale requirements more Harshness, hoisting machinery and dust pelletizing system install input and construction input in workshop is larger;
2. the job site of construction cycle is short, is exactly the place of fixing defined area, then simply four substantially Set up sandblasting ceiling and enclosing week, remain outdoor presence, there is no enough control for dedusting, dust suppression.Simple using enclosing Formula is arranged it is impossible to enough control airborne dusts are thus cause dust pollution.The steel beam column of sandblasting or pipeline is needed to need to use trailer It is transported to sandblasting place, consume substantial amounts of artificial and mechanical one-shift expense.And place limited space, it is difficult to launch too big work Face.
But for construction enterprises, on the one hand consider live place and build usage cycles and cost input, the opposing party Face will consider to control airborne dust to ensure live civilized construction.
The span of sand-blast shop is very big, and deadweight is also very big, and overall workshop also needs to consider its safety factors after making, its construction Require higher in cooperation for safety and other structures, if the intensity of sand-blast shop can not reach requirement it is easy to cause Injury to site operation personnel is it is impossible to ensure safe construction.
Content of the invention
The purpose of the present invention is for overcoming above-mentioned the deficiencies in the prior art, providing a kind of sandblasting dust suppression to move workshop, effectively Overcome that job site place is limited and a difficult problem for dust suppression, ensure that dust removing effects, save live land used, shorten simultaneously and build If the time, and decrease construction cost input.
For achieving the above object, the present invention adopts following technical proposals:
Workshop is moved in sandblasting dust suppression, and including workshop skeleton, described workshop skeleton includes the multiple unit supports be arrangeding in parallel Skeleton, described unit supports skeleton includes two vertical supports, connection horizontal support between two vertical supports tops, described vertical Frame bottom is laid on slide rail, and workshop skeleton can slide along slide rail;By multiple connections between adjacent described unit supports skeleton The body of rod connects, and the external stability of described workshop skeleton connects covering plate.
Whole workshop skeleton is divided into multiple unit supports skeletons be connected, rather than directly using overall skeleton, can Mitigate deadweight with very big;In the outside fixed covering plate of whole workshop skeleton, can be with the airborne dust in effective control sandblasting procedures;Will be single First support frame is arranged on slide rail, so that whole sand-blast shop can be moved, and when needing sandblasting, sand-blast shop is moved extremely Sand blasted area can carry out grit blasting operation in it, convenient and practical, and can reuse, and can save live land used.
Preferably, described horizontal support is at least included by the interconnective first support of fastening connection piece and second Frame, described first support is fastenedly connected with vertical supports of unit supports skeleton, described second support and unit supports skeleton Another vertical supports be fastenedly connected.Horizontal support is divided into first support and second support, workshop span can be solved too big And lead to workshop structure intensity can not meet the problem of requirement, by unit supports skeleton be arranged to vertical supports, first support, Two supports and the form of vertical supports, and it is fastenedly connected it is ensured that the intensity of whole skeleton between the two by adjacent, and skeleton Processing and manufacturing also more simple and convenient.
Described fastening connection piece includes the base plate being all engaged with the bottom surface of first support and second support, described base plate It is connected with top board by vertical connecting rod, top board is all engaged with the top surface of first support and second support.Fastening connection piece Base plate and top board first support and second support can be pressed from both sides in the inner, be equivalent to the connection making first support and second support Become and be rigidly connected it is ensured that the connection tightness of first support and second support is it is ensured that the intensity of junction.
Multiple head rod bodies being parallel to each other are connected between the vertical supports of adjacent described unit supports skeleton, adjacent Multiple the second connecting-rod bodies being parallel to each other are connected between the horizontal support of described unit supports skeleton.Unit by workshop skeleton All coupled together by connecting-rod body between support frame, arranging multiple connecting-rod bodies respectively between vertical supports will vertically prop up Frame connects, and arranges multiple connecting-rod bodies and connect horizontal support between horizontal support, so that workshop skeleton is formed overall, workshop The globality of skeleton, intensity are attained by job requirements, and the weight of entirety can reduce it is easier to realize the movement in workshop.
Preferably, described head rod body is mutually perpendicular to vertical supports, described second connecting-rod body and horizontal support It is mutually perpendicular to.
Preferably, also lay between the vertical supports of adjacent described unit supports skeleton and be connected with multiple skewed horizontal load bars Body.The skewed horizontal load body of rod is set between vertical supports again, strengthens bonding strength between vertical supports it is ensured that workshop skeleton Globality, both can guarantee that the safety of workshop skeleton, can greatly reduce the weight of workshop skeleton again, reduced the difficulty of workshop movement Degree is so that the mobile feasibility in workshop improves.
Preferably, it is in set angle between described first support and second support.Make workshop skeleton horizontal support top shape Become certain wedge angle, the support strength of horizontal support is higher, can strengthen the steadiness of workshop skeleton.
Preferably, described covering plate is fixedly connected on connecting-rod body.Covering plate is arranged on connecting-rod body, by multiple The setting of connecting-rod body is it is ensured that being reliably connected of covering plate and workshop skeleton.
Preferably, the outermost two unit supports skeletons of described workshop skeleton are respectively connected with protection body to be opened/closed.? When steel construction or pipe fitting etc. need turnover, protection body can be opened the normal transport it is ensured that work place;To prevent in sandblasting Watch box is closed and be can achieve dust suppression effect, simple to operation.
Described protection body includes the door curtain made of cloth that multiple tops are fixedly connected with unit supports skeleton.
Or, described protection body is push-and-pull door body or upset door body.
Preferably, described covering plate is made up of steel material.Can ensure that the intensity of covering plate it is ensured that total can By property.
Described vertical supports bottom connects pulley, and described pulley is matched with slide rail.
Preferably, it is connected with, in bottom, the first baffle arranging straight down between the vertical supports of described workshop skeleton; Described slide rail sidepiece is connected with the second baffle arranging straight up.
It is further preferred that described first baffle and second baffle overlap setting, the distance away from slide rail center for the first baffle More than the distance away from slide rail center for the second baffle.
First baffle is set at the pulley of vertical supports, slide rail is equipped with second baffle, can effectively prevent The sand dust of job site enters at slide rail, it is to avoid the cooperation of sand dust accumulation impact pulley and slide rail is it is ensured that workshop is reliable normal Mobile;First baffle is more than second baffle away from slide rail centre distance away from slide rail centre distance, and first baffle and second baffle intersect Folded, second baffle is kept off in the inner by first baffle, and preferably suppression sand dust enters slide rail.
The invention has the benefit that
The present invention employs two-way track laying in workshop body bottom portion, and workshop integrally can be moved, and effectively solves The big problem of floor space.
Due to being movable workshop, therefore big machinery does not need to be arranged in inside the present invention, needs to build phase according to scene The workshop adapting to, advantageously reduces cost.
The present invention the closing of workshop moving direction using can the closing of open and close type protection body, facilitate entering of steel construction and pipe fitting Go out.
The present invention can recycle, and once puts into, and will not produce the wasting of resources, and combination is convenient, detachable utilization, simultaneously Can be according to field condition Mobile solution.
Brief description
Fig. 1 is the structural representation in the mobile workshop of the present invention;
Fig. 2 is the front view in the mobile workshop of the present invention;
Fig. 3 is connection diagram between vertical supports of the present invention;
Fig. 4 is the connection diagram of fastening connection piece;
In figure, 1 slide rail, 2 ground, 3 workshop skeletons, 4 push-and-pull door body, 5 door curtains made of cloth, 6 unit supports skeletons, 7 covering plates, 8 is sliding Wheel, 9 vertical supports, 10 first supports, 11 second supports, 12 fastening connection pieces, 13 head rod bodies, 14 second connecting rods Body, the 15 skewed horizontal load bodies of rod, 16 first baffles, 17 second baffles, 18 base plates, 19 vertical connecting rods, 20 top boards, 21 reinforcements.
Specific embodiment
The present invention is further described with reference to the accompanying drawings and examples.
As Figure 1-Figure 4, workshop is moved in sandblasting dust suppression, and including workshop skeleton 3, workshop skeleton 3 includes be arrangeding in parallel Multiple unit supports skeletons 6 (arranging 3 unit supports skeletons in the present embodiment), unit supports skeleton 6 includes two vertical supports 9, connect horizontal support between two vertical supports 9 top, vertical supports 9 bottom is laid on slide rail 1, and workshop skeleton 3 can be along cunning Rail slides;Connected by multiple connecting-rod bodies between adjacent cells support frame 6, the external stability of workshop skeleton 3 connects covering Plate 7.It is respectively provided with covering plate 7 in the two sides of workshop skeleton 3 and top surface.
The outermost two unit supports skeletons 6 of workshop skeleton 3 are respectively connected with protection body to be opened/closed.In steel construction or pipe When part etc. needs turnover, protection body can be opened the normal transport it is ensured that work place;In sandblasting, protection body is closed Achievable dust suppression effect, simple to operation.
The door curtain made of cloth 5 that protection body can be fixedly connected with unit supports skeleton 6 using multiple tops.Will not be with equipment when mobile Mutually conflict.
Or, protection body is push-and-pull door body 4 or upset door body.When mobile, if running into fixing equipment etc., can be by protection body Push open or rotate, then mutually will not conflict with equipment etc..
In the present embodiment, the outermost unit supports skeleton 6 of workshop skeleton 3 connects the door curtain made of cloth 5 by horizontal support, in car Between the outermost another unit supports skeleton 6 of skeleton 3 by horizontal support connect push-and-pull door body 6, can be very good to seal workshop Close, entirely moving workshop is in box structure.
Whole workshop skeleton is divided into multiple unit supports skeletons be connected, rather than directly using overall skeleton, can Mitigate deadweight with very big;In the outside fixed covering plate of whole workshop skeleton, can be with the airborne dust in effective control sandblasting procedures;Will be single First support frame is arranged on slide rail, so that whole sand-blast shop can be moved, and when needing sandblasting, sand-blast shop is moved extremely Sand blasted area can carry out grit blasting operation in it, convenient and practical, and can reuse, and can save live land used.
Horizontal support at least includes by the interconnective first support 10 of fastening connection piece 12 and second support 11, and first Support 10 is fastenedly connected with vertical supports 9 of unit supports skeleton 6, and second support 11 is another perpendicular with unit supports skeleton 6 It is fastenedly connected to support 9.Horizontal support is divided into first support and second support, workshop span can be solved and lead to car greatly very much Between structural strength can not meet the problem of requirement, by unit supports skeleton be arranged to vertical supports, first support, second support and The form of vertical supports, and it is fastenedly connected it is ensured that the intensity of whole skeleton between the two by adjacent, and the processing system of skeleton Make also more simple and convenient.
Fastening connection piece 12 includes the base plate 18 being all engaged with the bottom surface of first support 10 and second support 11, base plate 18 are connected with top board 20 by vertical connecting rod 19, and top board 20 is all contacted with the top surface of first support 10 and second support 11 joins Close.First support 10 and second support 11 can be pressed from both sides in the inner by the base plate 18 of fastening connection piece 12 and top board 20, are equivalent to and make First support 10 and being connected to become of second support 11 are rigidly connected it is ensured that the connection of first support and second support fastens Property is it is ensured that the intensity of junction.
In the present embodiment, vertical supports 9, first support 10, second support 11 are all made using I-steel, and structural strength is more Height is it is easier to realize being connected with each other between structure, bonding strength is also more reliable.
Multiple head rod bodies 13 being parallel to each other are connected between the vertical supports 9 of adjacent cells support frame 6, adjacent Multiple the second connecting-rod bodies 14 being parallel to each other are connected between the horizontal support of unit supports skeleton 6.Unit by workshop skeleton 3 All coupled together by connecting-rod body between support frame 6, arranging multiple connecting-rod bodies respectively between vertical supports will be vertical Support connects, and arranges multiple connecting-rod bodies and connect horizontal support between horizontal support, so that workshop skeleton is formed overall, car Between the globality of skeleton, intensity be attained by job requirements, and the weight of entirety can reduce it is easier to realize the movement in workshop.
Head rod body 13 is mutually perpendicular to vertical supports 9, and the second connecting-rod body 14 is mutually perpendicular to horizontal support, that is, Second connecting-rod body 14 and the perpendicular setting of first support 10, or the perpendicular setting with second support 11.
Also lay between the vertical supports 9 of adjacent cells support frame 6 and be connected with multiple skewed horizontal load bodies of rod 15.Vertical The skewed horizontal load body of rod 15 is set between support 9 again, strengthens bonding strength between vertical supports 9 it is ensured that the entirety of workshop skeleton 3 Property, both can guarantee that the safety of workshop skeleton, and can greatly reduce the weight of workshop skeleton again, reduced the difficulty of workshop movement, made Obtain the mobile feasibility in workshop to improve.
It is in set angle between first support 10 and second support 11.Workshop skeleton horizontal support top is made to form certain point Angle, the support strength of horizontal support is higher, can strengthen the steadiness of workshop skeleton.
Covering plate 7 is fixedly connected on connecting-rod body, and the two sides of workshop skeleton 3 and top surface all lay covering plate 7, workshop The covering plate 7 of skeleton 3 side is connected on head rod body 13, and the covering plate 7 of workshop skeleton 3 top surface is connected to the second connection On the body of rod 14.Covering plate is arranged on connecting-rod body, by the setting of multiple connecting-rod bodies it is ensured that covering plate and workshop bone Being reliably connected of frame.
Covering plate 7 is made using steel material.Can ensure that the intensity of covering plate it is ensured that the reliability of total.
Vertical supports 9 bottom connects pulley, and pulley 9 is matched with slide rail 1.Slide rail 1 is fixed on ground 2, arranges two altogether Bar, two slide rails 1 are parallel to each other.
It is connected with, in bottom, the first baffle 16 arranging straight down between the vertical supports 9 of workshop skeleton 3;Slide rail 1 side Portion is connected with the second baffle 17 arranging straight up.First baffle 16 and second baffle 17 overlap setting, first baffle 16 away from The distance at slide rail 1 center is more than the distance away from slide rail 1 center for the second baffle 17.First gear is set at the pulley of vertical supports Plate, is equipped with second baffle on slide rail, can effectively prevent the sand dust of job site from entering at slide rail, it is to avoid sand dust accumulates The cooperation of impact pulley and slide rail is it is ensured that workshop is reliably normally moved;First baffle is more than second gear away from slide rail centre distance Away from slide rail centre distance, first baffle and second baffle overlap mutually plate, and second baffle is kept off in the inner by first baffle, preferably presses down Sand dust processed enters slide rail.
Because power plant's combined field sandblasting construction site is narrow and small, limited space, the present invention considers job site practical situation, this And effectively prevent the dust that sandblasting produces from polluting environment and facing the raising building the standard of setting up at present, make full use of the existing dragon of combined field Gantry crane track resources, sandblasting dust suppression workshop is adopted activity form, will be arranged in two fixations by sandblasting dust suppression workshop body On guide rail, and the equipment such as corresponding dedusting, sandblasting are arranged in fixed venue.The covering plate 7 of workshop body 3 is all tied using steel Structure, can be from color steel closing, and moving direction (i.e. end and slide rail 1 vertical direction) closing sets canvas using " curtain " Shi La Closing, so be ensure that in the moving process of movable workshop and is not conflicted with the equipment phase of arrangement.If desired for sandblasting, by sand-blast shop After body is removed, the semi-finished product made are placed on fixed venue, movable workshop is moved back into fixed venue by sliding rail, Need above the finished product of sandblasting, you can carry out operation.Using the mobile model workshop of steel construction, save construction place and decrease Build and put into.It is effectively controlled the impact that sandblasting airborne dust causes to live civilized construction.
Although the above-mentioned accompanying drawing that combines is described to the specific embodiment of the present invention, not model is protected to the present invention The restriction enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme, and those skilled in the art are not Need to pay the various modifications that creative work can make or deformation still within protection scope of the present invention.

Claims (10)

1. workshop is moved in sandblasting dust suppression, it is characterized in that, including workshop skeleton, described workshop skeleton includes the multiple lists be arrangeding in parallel First support frame, described unit supports skeleton includes two vertical supports, connects horizontal support between two vertical supports tops, described Vertical supports bottom is laid on slide rail, and workshop skeleton can slide along slide rail;Pass through many between adjacent described unit supports skeleton Individual connecting-rod body connects, and the external stability of described workshop skeleton connects covering plate.
2. mobile workshop as claimed in claim 1, is characterized in that, described horizontal support is at least included by fastening connection piece phase The first support connecting and second support, described first support is fastenedly connected with vertical supports of unit supports skeleton, institute Another vertical supports stating second support with unit supports skeleton are fastenedly connected.
3. mobile workshop as claimed in claim 2, is characterized in that, described fastening connection piece includes and first support and second The base plate that the bottom surface of frame is all engaged, described base plate is connected with top board by vertical connecting rod, top board and first support and the The top surface of two supports is all engaged;Preferably, it is in set angle between described first support and second support.
4. mobile workshop as claimed in claim 1, is characterized in that, connects between the vertical supports of adjacent described unit supports skeleton Connect multiple head rod bodies being parallel to each other, connect multiple mutually flat between the horizontal support of adjacent described unit supports skeleton Second connecting-rod body of row.
5. mobile workshop as claimed in claim 4, is characterized in that, described head rod body is mutually perpendicular to vertical supports, Described second connecting-rod body is mutually perpendicular to horizontal support;Preferably, between the vertical supports of adjacent described unit supports skeleton Also lay and be connected with multiple skewed horizontal load bodies of rod.
6. mobile workshop as claimed in claim 1, is characterized in that, described covering plate is fixedly connected on connecting-rod body;Preferably , described covering plate is made up of steel material.
7. mobile workshop as claimed in claim 1, is characterized in that, the outermost two unit supports skeletons of described workshop skeleton It is respectively connected with protection body to be opened/closed.
8. mobile workshop as claimed in claim 7, is characterized in that, described protection body includes multiple tops and unit supports skeleton The door curtain made of cloth being fixedly connected;Or, described protection body is push-and-pull door body or upset door body.
9. mobile workshop as claimed in claim 1, is characterized in that, connects in bottom between the vertical supports of described workshop skeleton There is the first baffle arranging straight down;Described slide rail sidepiece is connected with the second baffle arranging straight up.
10. mobile workshop as claimed in claim 9, is characterized in that, described first baffle and second baffle overlap and arrange, first The distance away from slide rail center for the baffle plate is more than the distance away from slide rail center for the second baffle.
CN201610935611.4A 2016-11-01 2016-11-01 Workshop is moved in sandblasting dust suppression Active CN106368457B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610935611.4A CN106368457B (en) 2016-11-01 2016-11-01 Workshop is moved in sandblasting dust suppression

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610935611.4A CN106368457B (en) 2016-11-01 2016-11-01 Workshop is moved in sandblasting dust suppression

Publications (2)

Publication Number Publication Date
CN106368457A true CN106368457A (en) 2017-02-01
CN106368457B CN106368457B (en) 2019-09-06

Family

ID=57895852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610935611.4A Active CN106368457B (en) 2016-11-01 2016-11-01 Workshop is moved in sandblasting dust suppression

Country Status (1)

Country Link
CN (1) CN106368457B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412241A (en) * 2018-05-14 2018-08-17 绍兴大明电力建设有限公司 GIS intelligence dust-free operations room
CN108612346A (en) * 2018-05-14 2018-10-02 绍兴大明电力建设有限公司 GIS intelligence dust-free operation methods
CN110005062A (en) * 2019-02-27 2019-07-12 上海市建筑装饰工程集团有限公司 A kind of application method between the anti-fugitive dust mobile working of letter dismounting
CN110173136A (en) * 2019-02-27 2019-08-27 上海市建筑装饰工程集团有限公司 Between a kind of anti-fugitive dust mobile working of letter dismounting

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10252150A (en) * 1997-03-14 1998-09-22 Masaichi Nagato Eight types of fittings for easily building garage, shed and greenhouse
CN201068658Y (en) * 2006-05-12 2008-06-04 彭剑 Foldable movable house
CN201395864Y (en) * 2009-05-11 2010-02-03 中铁十二局集团第七工程有限公司 Mobile reinforcement shed
CN102425318A (en) * 2011-09-27 2012-04-25 山东中通钢构建筑股份有限公司 Self-moving steel structure workshop
CN204098551U (en) * 2014-09-10 2015-01-14 广州文冲船厂有限责任公司 A kind of portable workshop
CN206189927U (en) * 2016-11-01 2017-05-24 山东电力建设第一工程公司 Sandblast presses down between dirt locomotive

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10252150A (en) * 1997-03-14 1998-09-22 Masaichi Nagato Eight types of fittings for easily building garage, shed and greenhouse
CN201068658Y (en) * 2006-05-12 2008-06-04 彭剑 Foldable movable house
CN201395864Y (en) * 2009-05-11 2010-02-03 中铁十二局集团第七工程有限公司 Mobile reinforcement shed
CN102425318A (en) * 2011-09-27 2012-04-25 山东中通钢构建筑股份有限公司 Self-moving steel structure workshop
CN204098551U (en) * 2014-09-10 2015-01-14 广州文冲船厂有限责任公司 A kind of portable workshop
CN206189927U (en) * 2016-11-01 2017-05-24 山东电力建设第一工程公司 Sandblast presses down between dirt locomotive

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412241A (en) * 2018-05-14 2018-08-17 绍兴大明电力建设有限公司 GIS intelligence dust-free operations room
CN108612346A (en) * 2018-05-14 2018-10-02 绍兴大明电力建设有限公司 GIS intelligence dust-free operation methods
CN110005062A (en) * 2019-02-27 2019-07-12 上海市建筑装饰工程集团有限公司 A kind of application method between the anti-fugitive dust mobile working of letter dismounting
CN110173136A (en) * 2019-02-27 2019-08-27 上海市建筑装饰工程集团有限公司 Between a kind of anti-fugitive dust mobile working of letter dismounting

Also Published As

Publication number Publication date
CN106368457B (en) 2019-09-06

Similar Documents

Publication Publication Date Title
CN106368457A (en) Mobile sandblast dust suppression workshop
CN104420641B (en) A kind of telescopic elevating construction platform
CN206189927U (en) Sandblast presses down between dirt locomotive
CN202767491U (en) Building operation overhanging type movable blanking platform
CN104763109A (en) Quick construction method for pressed bottom tile of large-span steel structure factory building roof
CN107933596A (en) Automatic telescopic movement station trolley
CN203924745U (en) Movable building engineering construction sunshade
CN208529376U (en) The steam-cured mechanism of track plates flow production line and system
CN203247031U (en) Hoisting device for curtain board transporting
CN205206284U (en) But detachably assembled formula elevartor shaft operation platform
CN109488041B (en) Reusable dismantling method for frame structure building
CN208267265U (en) A kind of assembled curtain wall decoration rod structure
CN203996334U (en) A kind of axle box rubber packing skeleton is processed Special small trolley
DE112014000114B4 (en) Adjustable false floor of a large double-decker conveyor basket and adjustment and movement of the same
CN211257769U (en) Truss bridging based on attached lifting platform
CN201239709Y (en) Automatic powder spraying system for container underframe
CN204876630U (en) Interim supporting platform of super high -rise building equipment
US3259250A (en) Climbing gantry crane
CN208749068U (en) A kind of moveable exterior wall auxiliary finishing cage ladder of reversely hung Yong
CN202728276U (en) Dragging trolley for concrete prefabricated slabs
CN101446118A (en) Curtain-wall board-shifting support
CN107442991A (en) One kind welding auxiliary mould
CN205218860U (en) Ball frame is thrown to truck foot iron plate U type
AU2015295620B2 (en) Mobile hall construction
CN218028885U (en) Coal conveying trestle maintenance operation platform of thermal power factory

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant