CN106334305B - A kind of hydraulic resistance mountain-climbing simulating fitness equipment - Google Patents
A kind of hydraulic resistance mountain-climbing simulating fitness equipment Download PDFInfo
- Publication number
- CN106334305B CN106334305B CN201611014658.3A CN201611014658A CN106334305B CN 106334305 B CN106334305 B CN 106334305B CN 201611014658 A CN201611014658 A CN 201611014658A CN 106334305 B CN106334305 B CN 106334305B
- Authority
- CN
- China
- Prior art keywords
- time
- right support
- support
- mark time
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B69/00—Training appliances or apparatus for special sports
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B21/00—Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices
- A63B21/008—Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices using hydraulic or pneumatic force-resisters
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B71/00—Games or sports accessories not covered in groups A63B1/00 - A63B69/00
- A63B71/06—Indicating or scoring devices for games or players, or for other sports activities
- A63B71/0619—Displays, user interfaces and indicating devices, specially adapted for sport equipment, e.g. display mounted on treadmills
- A63B71/0622—Visual, audio or audio-visual systems for entertaining, instructing or motivating the user
Landscapes
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Physical Education & Sports Medicine (AREA)
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biophysics (AREA)
- Orthopedic Medicine & Surgery (AREA)
- Multimedia (AREA)
- Human Computer Interaction (AREA)
- Fluid-Pressure Circuits (AREA)
Abstract
It climbs the mountain simulating fitness equipment the invention discloses a kind of hydraulic resistance, including left support, the first pin shaft, right support, first marks time, second marks time, the first one-way throttle valve, the second one-way throttle valve, hydraulic motor, sprocket wheel, key, chain, the second pin shaft, third pin shaft and micro computer.Hydraulic resistance mountain-climbing simulating fitness equipment proposed by the present invention can simulate body builder's mountaineering, and the both feet of body builder are during realizing alternately uplink, promote body wt, body energy is consumed, reaches body-building purpose, simultaneously, hydraulic resistance is climbed the mountain in simulating fitness equipment, principle is hindered according to liquid, the flowing of oil liquid generates hydraulic damping before and after throttle valve, acts on hydraulic motor, generate the moment of reaction, consumption and the gravitional force for absorbing body builder.Adjust the openings of sizes of throttle valve, thus it is possible to vary it marks time and moves up and down speed, adjust the exercise motion amount the configuration of the present invention is simple of mountain-climbing simulation body builder, it is easy to adjust, it is very suitable to family and body-building venue uses, have a vast market space.
Description
Technical field
The present invention relates to a kind of fitness equipments, and in particular to a kind of hydraulic resistance climb the mountain simulating fitness equipment, belong to electrically with
Field of electromechanical technology.
Background technique
With the raising of people's standard of living, the requirement to health is also continuously improved, so, body-building is one fine
Selection, body-building can be divided into outdoor body-building and indoor body-building, for indoor body-building, usually rely on fitness equipment, simulation is outdoor
Movement, achievees the purpose that body-building.Now, also relatively more for the type of the fitness equipment of indoor body-building, than if any conventional act
It weighs, ride, running and various ball activities.
Summary of the invention
The present invention proposes a kind of hydraulic resistance mountain-climbing simulating fitness equipment, simulates body builder's mountaineering, and the both feet of body builder exist
During realizing alternately uplink, body wt is promoted, body energy is consumed, reaches body-building purpose, meanwhile, hydraulic resistance mountain-climbing simulation
In fitness equipment, principle is hindered according to liquid, the flowing of oil liquid generates hydraulic damping before and after throttle valve, acts on hydraulic motor, produces
The raw moment of reaction, consumption and the gravitional force for absorbing body builder.Adjust the openings of sizes of throttle valve, thus it is possible to vary mark time up and down
Movement speed adjusts the exercise motion amount of mountain-climbing simulation body builder.Micro computer can recorde and show the weight of body builder, scrunch
Number, body-building intensity, the related datas such as consumption energy build good body-building atmosphere at the same time it can also play music, video etc.
It encloses.The configuration of the present invention is simple, it is easy to adjust, it is very suitable to family and body-building venue uses, have a vast market space.
The technical solution adopted by the present invention are as follows: a kind of hydraulic resistance is climbed the mountain simulating fitness equipment, including left support, the first pin shaft,
Right support first marks time, second marks time, the first one-way throttle valve, the second one-way throttle valve, hydraulic motor, sprocket wheel, key, chain,
Two pin shafts, third pin shaft and micro computer;The left support is by left support first crossbeam, left support second cross beam, left support
The first column of three crossbeams and left support, the second column of left support form a closed frame, the first column of left support, left support
The middle part of second column offers the second pin hole of the first pin hole of left support and left support respectively;The right support is by right support first
The first column of crossbeam, right support second cross beam and right support, the second column of right support, right support third column form a closing
Frame, fuel tank and hydraulic has also been fixedly mounted in the top between first column of right support and right support third column
Motor mount, the hydraulic motor mounting base are in the lower section of fuel tank, offer peace in the middle part of the hydraulic motor mounting base
Hole is filled, the first key seat of right support has been fixedly mounted for the top of first column of right support and right support first supports, the right side
The first pin hole of right support is offered on the first key seat of bracket, right support has been fixedly mounted in the top of the right support third column
Two key seats and right support second support, and offer the second pin hole of right support on second key seat of right support, the right support the
First is formed between the first column of one crossbeam, right support second cross beam and right support, the second column of right support to mark time sliding slot, it is described
Second is formed between the second column of right support first crossbeam, right support second cross beam and right support, right support third column to mark time
Sliding slot;Described first mark time by the first step plate, first mark time support plate, first mark time right sliding surface, first mark time left sliding
Face and first is marked time sliding block composition, described first mark time sliding block lower part among be fixedly installed with first and mark time key seat, described the
One, which marks time, offers the first interstitial hole and first on key seat and marks time pin hole;Described second marks time is marked time by the second step plate, second
Support plate, the second mark time right sliding surface, the second left sliding surface and second of marking time are marked time sliding block composition, and described second marks time sliding block
It is fixedly installed with second among lower part to mark time key seat, described second, which marks time, offers the second interstitial hole and the second stepping pin on key seat
Hole;The lower portion of the right support insertion left support, is separately connected the first pin hole of left support and right support by the first pin shaft
First pin hole and connection the second pin hole of left support and the second pin hole of right support, so that left support and right support are realized hingedly;Institute
Hydraulic motor is stated with oil inlet and oil outlet, hydraulic motor is fixedly mounted in hydraulic motor mounting base, and output shaft passes through
Mounting hole, and be connected by key with sprocket wheel;The oil inlet of first one-way throttle valve is connected by the first pipeline with fuel tank
Logical, the oil outlet of the first one-way throttle valve is connected by the second pipeline with the oil inlet of hydraulic motor;Described second unidirectional section
The oil inlet of stream valve is connected by third pipeline with fuel tank, the oil outlet of the second one-way throttle valve pass through the 4th pipeline with it is hydraulic
The oil outlet of motor is connected;Described first, which marks time, is mounted on the first of right support and marks time in sliding slot, and the first sliding block of marking time is inserted
Enter first to mark time in sliding slot, first left and right sides for marking time sliding block is marked time on the inside of sliding slot or so close to first respectively, and first marks time
Right sliding surface, the first left sliding surface of marking time are stepped on close to the upper surface of the first column of right support, the second column of right support, first respectively
Step is marked time to can be realized in sliding slot and be slided up and down the first of right support;Described second, which marks time, is mounted on the second of right support and marks time
In sliding slot, equally, second marks time marks time in sliding slot the second of right support, and the second sliding block insertion second of marking time is marked time sliding slot
Interior, second left and right sides for marking time sliding block is marked time on the inside of sliding slot or so close to second respectively, second mark time right sliding surface, second step on
Left sliding surface is walked respectively close to the upper surface of the second column of right support, right support third column, and second marks time the of right support
Two, which mark time to can be realized in sliding slot, slides up and down;The top of the chain is connected with sprocket wheel, and forms engagement, the left part of the chain
The first interstitial hole that first marks time and the second interstitial hole that second marks time are inserted into lower end and right part lower end respectively, and pass through the second pin
Axis and the first pin hole and first of marking time mark time to be formed hinged, are marked time and second by the pin hole and first of marking time of third pin shaft and second
Marking time, it is hinged to be formed;Described first mark time the initial position marked time when installing with second formed up and down dislocation, for example, first marks time
Initial position be in lowest order, the second initial position marked time is in highest order.The micro computer is mounted on left support first
On crossbeam, micro computer can be marked time by being arranged in first or second mark time on weight sensor (not marking) and counter
(not marking) records and shows the weight of body builder, scrunches number, and body-building intensity consumes the related datas such as energy, meanwhile, may be used also
To play music, video etc., good body-building atmosphere is built.
When carrying out mountain-climbing simulation body-building, a kind of hydraulic resistance mountain-climbing simulating fitness equipment start-up operation, due to hydraulic resistance
It climbs the mountain in simulating fitness equipment, the initial position that first marks time marks time when installing with second has dislocation up and down, for example, first marks time
Initial position be in lowest order, the second initial position marked time is in highest order, and body builder's foot first is climbed up first and stepped on
Step just generates a movement of ascending a height when body builder's another foot, which climbs up second, marks time, and body builder needs to overcome the weight of itself
Power plays consumption physical efficiency, achievees the purpose that body-building, and due to the effect of human bady gravitational, second, which marks time, can generate a sliding force, this
The second mark time key seat, third pin shaft, the right part lower end of chain, chain that a sliding force is marked time by second passes to sprocket wheel, is formed and is driven
Kinetic moment drives hydraulic motor rotation by key, it is assumed that according to rotationally clockwise, the oil liquid in fuel tank passes through hydraulic motor
First pipeline, the check valve in the first one-way throttle valve, the second pipeline, hydraulic motor oil inlet, into hydraulic motor, together
When hydraulic motor in oil liquid pass through throttle valve in the oil outlet of hydraulic motor, the 4th pipeline, the second one-way throttle valve, again
Three pipelines return to fuel tank, since hydraulic damping can be formed on the throttle valve in the second one-way throttle valve in oil liquid flow process,
The moment of reaction generated on hydraulic motor, balanced human's gravity consume gravitational potential energy of human body, and second marks time slowly to downslide
It is dynamic, meanwhile, it drives first to mark time to move up by the key seat of marking time of the left part lower end of chain, the second pin shaft, first, finally, first marks time
It marks time in extreme higher position, second in extreme lower position;If marked time next, body builder climbs up first, first, which marks time, to produce
A raw sliding force, the first mark time key seat, the second pin shaft, the left part lower end of chain, chain that this sliding force is marked time by first pass
Sprocket wheel is passed, driving moment is formed, hydraulic motor rotation is driven by key, realizes rotating in an anti-clockwise direction for hydraulic motor, oil
Oil liquid in case is entered by the oil outlet of third pipeline, the check valve in the second one-way throttle valve, the 4th pipeline, hydraulic motor
Oil liquid in hydraulic motor, while in hydraulic motor passes through the oil inlet of hydraulic motor, the second pipeline, the first one-way throttle valve again
In throttle valve, the first pipeline return to fuel tank, can be on the throttle valve in the first one-way throttle valve due in oil liquid flow process
Formation hydraulic damping, the moment of reaction generated on hydraulic motor, balanced human's gravity, consumption gravitational potential energy of human body, first
It marks time slow slide downward, meanwhile, it drives second to mark time to move up by the key seat of marking time of the right part lower end of chain, third pin shaft, second,
Finally, it second marks time in extreme higher position, first marks time in extreme lower position, forms circulation.By adjusting the first one-way throttle
The openings of sizes of throttle valve in valve and the throttle valve in the second one-way throttle valve, may be implemented first mark time with second mark time on
The speed of lower movement speed adjusts the exercise motion amount of mountain-climbing simulation body builder., micro computer can mark time by being arranged first
Or second mark time on weight sensor (not marking) and counter (not marking) record and show the weight of body builder, scrunch time
Number, body-building intensity, the related datas such as consumption energy build good body-building atmosphere at the same time it can also play music, video etc..
The hydraulic motor can also be replaced with hydraulic oil pump.
Between the left support and right support, it also may be implemented to be fixedly connected.
The beneficial effects of the present invention are:
Hydraulic resistance mountain-climbing simulating fitness equipment proposed by the present invention, can simulate body builder's mountaineering, the both feet of body builder
During realizing alternately uplink, body wt is promoted, body energy is consumed, reaches body-building purpose, meanwhile, hydraulic resistance mountain-climbing mould
In quasi- fitness equipment, principle is hindered according to liquid, the flowing of oil liquid generates hydraulic damping before and after throttle valve, acts on hydraulic motor,
Generate the moment of reaction, consumption and the gravitional force for absorbing body builder.
Adjust the openings of sizes of throttle valve, thus it is possible to vary mark time and move up and down speed, adjust the forging of mountain-climbing simulation body builder
Amount of exercise is refined, micro computer can recorde and show the weight of body builder, scrunch number, body-building intensity, the dependency numbers such as consumption energy
According to building good body-building atmosphere at the same time it can also play music, video etc..
The configuration of the present invention is simple, it is easy to adjust, it is very suitable to family and body-building venue uses, have a vast market sky
Between.
Detailed description of the invention
Present invention will be explained in further detail for the embodiment provided with reference to the accompanying drawing.
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the partial enlarged view of C in Fig. 1;
Fig. 3 is the structural schematic diagram of left support;
Fig. 4 is the structural schematic diagram of right support;
Fig. 5 is the side view of Fig. 4;
Fig. 6 is the first structural schematic diagram marked time;
Fig. 7 is the A of Fig. 6 to schematic diagram;
Fig. 8 is the second structural schematic diagram marked time;
Fig. 9 is the B of Fig. 8 to schematic diagram.
Specific embodiment
As shown in figs 1-9, a kind of hydraulic resistance is climbed the mountain simulating fitness equipment, including left support 1, the first pin shaft 2, right support 3, the
One mark time 4, second mark time the 12, first one-way throttle valve 5, the second one-way throttle valve 6, hydraulic motor 7, sprocket wheel 8, key 9, chain 10,
Second pin shaft 11, third pin shaft 13 and micro computer 14;Left support 1 is by left support first crossbeam 1-1, left support second cross beam 1-
2, left support third crossbeam 1-3 and the first column of left support 1-4, left support the second column 1-5 form a closed frame, left
The first column of bracket 1-4, the second column of left support 1-5 middle part offer left support the first pin hole 1-6 and left support respectively
Two pin hole 1-7;Right support 3 is by right support first crossbeam 3-1, right support second cross beam 3-2 and the first column of right support 3-3, the right side
The second column of bracket 3-4, right support third column 3-5 form a closed frame, right support the first column 3-3 and right support
Fuel tank 3-7 and hydraulic motor mounting base 3-6, hydraulic motor mounting base has also been fixedly mounted in top between third column 3-5
3-6 is in the lower section of fuel tank 3-7, and mounting hole 3-8, the first column of right support 3-3 are offered in the middle part of hydraulic motor mounting base 3-6
Top right support the first key seat 3-9 and right support first be fixedly mounted support 3-13, opened up on the first key seat of right support 3-9
There is right support the first pin hole 3-11, right support the second key seat 3-10 and the right side has been fixedly mounted in the top of right support third column 3-5
Bracket second supports 3-14, offers right support the second pin hole 3-12, right support first crossbeam on the second key seat of right support 3-10
First is formed between 3-1, right support second cross beam 3-2 and the first column of right support 3-3, the second column of right support 3-4 to mark time cunning
Slot 3-15, right support first crossbeam 3-1, right support second cross beam 3-2 and the second column of right support 3-4, right support third column
Second is formed between 3-5 to mark time sliding slot 3-16;First mark time 4 by the first step plate 4-1, first mark time support plate 4-2, first step on
Walk right sliding surface 4-3, the first left sliding surface 4-4 and first that marks time marks time sliding block 4-5 composition, the first lower part for marking time sliding block 4-5
Centre is fixedly installed with first and marks time key seat 4-6, and first, which marks time, offers the first interstitial hole 4-7 and first on key seat 4-6 and mark time
Pin hole 4-8;Second mark time 12 by the second step plate 12-1, second mark time support plate 12-2, second mark time right sliding surface 12-3,
Two mark time left sliding surface 12-4 and second mark time sliding block 12-5 composition, second mark time sliding block 12-5 lower part among be fixedly installed with
Second marks time key seat 12-6, and second, which marks time, offers the second interstitial hole 12-7 and second on key seat 12-6 and mark time pin hole 12-8;It is right
Bracket 3 is inserted into the lower portion of left support 1, is separately connected left support the first pin hole 1-6 and right support first by the first pin shaft 2
Pin hole 3-11 and connection left support the second pin hole 1-7 and right support the second pin hole 3-12, so that left support 1 and right support 3 are real
It is now hinged;Hydraulic motor 7 has oil inlet 7-1 and oil outlet 7-2, and hydraulic motor 7 is fixedly mounted on hydraulic motor mounting base 3-6
On, output shaft passes through mounting hole 3-8, and is connected by key 9 with sprocket wheel 8;The oil inlet of first one-way throttle valve 5 passes through the
One pipeline 5-1 is connected with fuel tank 3-7, and the oil outlet of the first one-way throttle valve 5 passes through the second pipeline 5-2 and hydraulic motor 7
Oil inlet 7-1 is connected;The oil inlet of second one-way throttle valve 6 is connected by third pipeline 6-1 with fuel tank 3-7, and second is single
It is connected to the oil outlet of throttle valve 6 by the 4th pipeline 6-2 with the oil outlet 7-2 of hydraulic motor 7;First, which marks time, 4 is mounted on
The first of right support 3 is marked time in sliding slot 3-15, and the first sliding block 4-5 insertion of marking time first is marked time in sliding slot 3-15, and first marks time
The left and right sides of sliding block 4-5 is marked time on the inside of sliding slot 3-15 or so close to first respectively, first mark time right sliding surface 4-3, first step on
Walk left sliding surface 4-4 respectively close to the upper surface of the first column of right support 3-3, the second column of right support 3-4, first mark time 4
The first of right support 3 marks time to can be realized in sliding slot 3-15 and slide up and down;Second, which marks time, 12 is mounted on the second of right support 3 and marks time
In sliding slot 3-16, equally, second marks time 12 marks time in sliding slot 3-16 the second of right support 3, and the second sliding block 12-5 that marks time is inserted
Enter second to mark time in sliding slot 3-16, second left and right sides for marking time sliding block 12-5 is marked time in sliding slot 3-16 or so close to second respectively
Side, second mark time right sliding surface 12-3, second mark time left sliding surface 12-4 respectively close to the second column of right support 3-4, right support
The upper surface of third column 3-5, second marks time 12 marks time to can be realized in sliding slot 3-16 and slides up and down the second of right support 3;
The top of chain 10 is connected with sprocket wheel 8, and forms engagement, and the left part lower end and right part lower end of chain 10 are inserted into first respectively and mark time 4
The first interstitial hole 4-7 and second mark time 12 the second interstitial hole 12-7, and marked time pin hole 4-8 by the second pin shaft 11 and first
It is hinged with the first 4 formation of marking time, it is hinged by 12 formation of marking time of pin hole 12-8 and second of marking time of third pin shaft 13 and second;First
Mark time 4 and second mark time 12 installation when initial position necessarily be formed up and down dislocation, for example, first mark time 4 initial position
In lowest order, the second mark time 12 initial position is in highest order, and micro computer 14 is mounted on left support first crossbeam 1-1, micro-
Computer 14 can be marked time by being arranged in first and 4 or second mark time weight sensor (not marking) on 12 and counter (is not marked
Note) record and show the weight of body builder, scrunch number, body-building intensity, the related datas such as consumption energy, at the same time it can also broadcast
It puts the music on, video etc., builds good body-building atmosphere.
When carrying out mountain-climbing simulation body-building, a kind of hydraulic resistance mountain-climbing simulating fitness equipment start-up operation, due to hydraulic resistance
Climb the mountain simulating fitness equipment in, first mark time 4 and second mark time 12 installation when initial position exist up and down dislocation, for example, first
4 initial position of marking time is in lowest order, and the second mark time 12 initial position is in highest order, and body builder's foot first is climbed up
First marks time 4, when body builder's another foot climb up second mark time 12 when, just generate a movement of ascending a height, body builder's needs overcome
The gravity of itself plays consumption physical efficiency, achievees the purpose that body-building, and due to the effect of human bady gravitational, second, which marks time, 12 can generate one
A sliding force, this sliding force by second mark time 12 second mark time key seat 12-6, third pin shaft 13, chain 10 right part under
End, chain 10 pass to sprocket wheel 8, form driving moment, drive hydraulic motor 7 to rotate by key 9, it is assumed that hydraulic motor 7 is according to suitable
Clockwise rotates, and the oil liquid in fuel tank 3-7 passes through the first pipeline 5-1, the check valve in the first one-way throttle valve 5, the second pipe
The oil inlet 7-1 of road 5-2, hydraulic motor 7, into hydraulic motor 7, while the oil liquid in hydraulic motor 7 passes through hydraulic horse again
Fuel tank 3-7 is returned to up to throttle valve, the third pipeline 6-1 in 7 oil outlet 7-2, the 4th pipeline 6-2, the second one-way throttle valve 6,
Since hydraulic damping can be formed on the throttle valve in the second one-way throttle valve 6, on hydraulic motor 7 in oil liquid flow process
The moment of reaction of generation, balanced human's gravity consume gravitational potential energy of human body, and second marks time 12 slow slide downwards, meanwhile, lead to
Cross the left part lower end of chain 10, the second pin shaft 11, the first key seat 4-6 that marks time drive first to mark time 4 to move up, finally, first marks time at 4
In extreme higher position, second marks time 12 in extreme lower position;If first marks time 4 meetings next, body builder, which climbs up first, marks time 4
Generate a sliding force, this sliding force by first mark time 4 the first left part for marking time key seat 4-6, the second pin shaft 11, chain 10
Lower end, chain 10 pass to sprocket wheel 8, form driving moment, drive hydraulic motor 7 to rotate by key 9, realize the inverse of hydraulic motor 7
Clockwise rotates, and the oil liquid in fuel tank 3-7 passes through third pipeline 6-1, the check valve in the second one-way throttle valve 6, the 4th pipe
Road 6-2, hydraulic motor 7 oil outlet 7-2 enter in hydraulic motor 7, while the oil liquid in hydraulic motor 7 passes through hydraulic motor again
7 oil inlet 7-1, the second pipeline 5-2, the throttle valve in the first one-way throttle valve 5, the first pipeline 5-1 return to fuel tank 3-7, by
In oil liquid flow process, hydraulic damping can be formed on the throttle valve in the first one-way throttle valve 5, be produced on hydraulic motor 7
The raw moment of reaction, balanced human's gravity consume gravitational potential energy of human body, and first marks time 4 slow slide downwards, meanwhile, pass through
The right part lower end of chain 10, third pin shaft 13, the second key seat 12-6 that marks time drive second to mark time 12 to move up, and finally, second marks time 12
In extreme higher position, first marks time 4 in extreme lower position, forms circulation.By adjusting the throttle valve in the first one-way throttle valve 5
With the openings of sizes of the throttle valve in the second one-way throttle valve 6, it may be implemented first and mark time 4 and second to mark time and 12 move up and down speed
The speed of degree adjusts the exercise motion amount of mountain-climbing simulation body builder.Micro computer 14 can be marked time 4 or second by setting first
It marks time the weight sensor (not marking) on 12 and counter (not marking) records and show the weight of body builder, scrunch number,
Body-building intensity, the related datas such as consumption energy build good body-building atmosphere at the same time it can also play music, video etc..
Hydraulic motor 7 in the present invention can also be replaced with hydraulic oil pump.
In the present invention between left support 1 and right support 3, it also may be implemented to be fixedly connected.
Hydraulic resistance mountain-climbing simulating fitness equipment proposed by the present invention, can simulate body builder's mountaineering, the both feet of body builder
During realizing alternately uplink, body wt is promoted, body energy is consumed, reaches body-building purpose, meanwhile, hydraulic resistance mountain-climbing mould
In quasi- fitness equipment, principle is hindered according to liquid, the flowing of oil liquid generates hydraulic damping before and after throttle valve, acts on hydraulic motor,
Generate the moment of reaction, consumption and the gravitional force for absorbing body builder.
Adjust the openings of sizes of throttle valve, thus it is possible to vary mark time and move up and down speed, adjust the forging of mountain-climbing simulation body builder
Amount of exercise is refined, micro computer can recorde and show the weight of body builder, scrunch number, body-building intensity, the dependency numbers such as consumption energy
According to building good body-building atmosphere at the same time it can also play music, video etc..
The configuration of the present invention is simple, it is easy to adjust, it is very suitable to family and body-building venue uses, have a vast market sky
Between.
The above is only a preferred embodiment of the present invention, it should be pointed out that: for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (3)
- The simulating fitness equipment 1. a kind of hydraulic resistance is climbed the mountain, it is characterised in that: including left support (1), the first pin shaft (2), right support (3), first mark time (4), second mark time (12), the first one-way throttle valve (5), the second one-way throttle valve (6), hydraulic motor (7), Sprocket wheel (8), key (9), chain (10), the second pin shaft (11), third pin shaft (13) and micro computer (14);The left support (1) by Left support first crossbeam (1-1), the first column of left support second cross beam (1-2), left support third crossbeam (1-3) and left support (1-4), the second column of left support (1-5) form a closed frame, and the first column of left support (1-4), left support second are vertical The middle part of column (1-5) offers the first pin hole of left support (1-6) and the second pin hole of left support (1-7) respectively;The right support (3) By right support first crossbeam (3-1), right support second cross beam (3-2) and the first column of right support (3-3), the second column of right support (3-4), right support third column (3-5) form a closed frame, first column of right support (3-3) and right support the Fuel tank (3-7) and hydraulic motor mounting base (3-6), the hydraulic horse has also been fixedly mounted in top between three columns (3-5) It is in the lower section of fuel tank (3-7) up to mounting base (3-6), offers mounting hole (3- in the middle part of the hydraulic motor mounting base (3-6) 8), the first key seat of right support (3-9) has been fixedly mounted in the top of first column of right support (3-3) and right support first supports (3-13) offers the first pin hole of right support (3-11), the right support third column on first key seat of right support (3-9) The top of (3-5) has been fixedly mounted the second key seat of right support (3-10) and right support second and has supported (3-14), the right support the The second pin hole of right support (3-12) is offered on two key seats (3-10), the right support first crossbeam (3-1), right support second are horizontal It forms first between beam (3-2) and the first column of right support (3-3), the second column of right support (3-4) to mark time sliding slot (3-15), institute State right support first crossbeam (3-1), right support second cross beam (3-2) and the second column of right support (3-4), right support third column Second is formed between (3-5) marks time sliding slot (3-16);Described first mark time (4) marked time support by the first step plate (4-1), first Plate (4-2), first mark time right sliding surface (4-3), first mark time left sliding surface (4-4) and first mark time sliding block (4-5) composition, institute State first mark time sliding block (4-5) lower part among be fixedly installed with first and mark time key seat (4-6), described first marks time key seat (4- 6) the first interstitial hole (4-7) and first is offered on marks time pin hole (4-8);Described second marks time (12) by the second step plate (12- 1), the second mark time support plate (12-2), the second mark time right sliding surface (12-3), the second left sliding surface (12-4) and second of marking time is stepped on Walk sliding block (12-5) composition, described second mark time sliding block (12-5) lower part among be fixedly installed with second and mark time key seat (12- 6) it, described second marks time and offers the second interstitial hole (12-7) and second on key seat (12-6) and mark time pin hole (12-8);The right side Bracket (3) is inserted into the lower portion of left support (1), is separately connected the first pin hole of left support (1-6) and the right side by the first pin shaft (2) The first pin hole of bracket (3-11) and connection the second pin hole of left support (1-7) and the second pin hole of right support (3-12), so that left branch Frame (1) and right support (3) are realized hinged;The hydraulic motor (7) has oil inlet (7-1) and oil outlet (7-2), hydraulic motor (7) it is fixedly mounted on hydraulic motor mounting base (3-6), output shaft passes through mounting hole (3-8), and passes through key (9) and sprocket wheel (8) it is connected;The oil inlet of first one-way throttle valve (5) is connected by the first pipeline (5-1) with fuel tank (3-7), the The oil outlet of one one-way throttle valve (5) is connected by the second pipeline (5-2) with the oil inlet (7-1) of hydraulic motor (7);It is described The oil inlet of second one-way throttle valve (6) is connected by third pipeline (6-1) with fuel tank (3-7), the second one-way throttle valve (6) Oil outlet be connected with the oil outlet (7-2) of hydraulic motor (7) by the 4th pipeline (6-2);Described first mark time (4) installation It marks time in sliding slot (3-15) the first of right support (3), sliding slot (3-15) is marked time in first sliding block (4-5) insertion first of marking time Interior, first left and right sides for marking time sliding block (4-5) is marked time the left and right sliding slot (3-15) inside close to first respectively, and first marks time right cunning Dynamic face (4-3), first mark time left sliding surface (4-4) respectively close to the first column of right support (3-3), the second column of right support (3- 4) upper surface, first mark time (4) mark time to can be realized in sliding slot (3-15) the first of right support (3) and slide up and down;It is described Second mark time (12) be mounted on the second of right support (3) and mark time in sliding slot (3-16), equally, second marks time (12) in right support (3) second is marked time in sliding slot (3-16), and second sliding block (12-5) insertion second of marking time is marked time in sliding slot (3-16), and second steps on It walks the left and right sides of sliding block (12-5) to mark time the left and right sliding slot (3-16) inside close to second respectively, second marks time right sliding surface (12- 3), second mark time left sliding surface (12-4) respectively close to the second column of right support (3-4), right support third column (3-5) it is upper Surface, second mark time (12) mark time to can be realized in sliding slot (3-16) the second of right support (3) and slide up and down;The chain (10) Top be connected with sprocket wheel (8), and form engagement, the left part lower end and right part lower end of the chain (10) are inserted into first respectively and are stepped on It walks first interstitial hole (4-7) of (4) and the second interstitial hole (12-7) that second marks time (12), and passes through the second pin shaft (11) and the One mark time pin hole (4-8) with first mark time (4) formed hinged, marked time pin hole (12-8) by third pin shaft (13) and second and the Two mark time (12) formation hingedly;Described first mark time (4) and second mark time (12) installation when initial position formed up and down dislocation, The micro computer (14) is mounted on left support first crossbeam (1-1), and micro computer (14) is marked time (4) or the by setting first Two mark time weight sensor on (12) and counter records and the weight for showing body builder, scrunch number, body-building intensity, consumption The related data of energy.
- The simulating fitness equipment 2. a kind of hydraulic resistance according to claim 1 is climbed the mountain, it is characterised in that: the hydraulic motor (7) It can be replaced with hydraulic oil pump.
- The simulating fitness equipment 3. a kind of hydraulic resistance according to claim 1 is climbed the mountain, it is characterised in that: the left support (1) and Right support is fixedly connected between (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611014658.3A CN106334305B (en) | 2016-11-17 | 2016-11-17 | A kind of hydraulic resistance mountain-climbing simulating fitness equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611014658.3A CN106334305B (en) | 2016-11-17 | 2016-11-17 | A kind of hydraulic resistance mountain-climbing simulating fitness equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106334305A CN106334305A (en) | 2017-01-18 |
CN106334305B true CN106334305B (en) | 2018-12-18 |
Family
ID=57841394
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611014658.3A Expired - Fee Related CN106334305B (en) | 2016-11-17 | 2016-11-17 | A kind of hydraulic resistance mountain-climbing simulating fitness equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106334305B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3970302A (en) * | 1974-06-27 | 1976-07-20 | Mcfee Richard | Exercise stair device |
US5169361A (en) * | 1992-06-05 | 1992-12-08 | Hsu Hsien Long | Hydraulic cylinder assembly for climbing exercisers |
CN101642614A (en) * | 2008-08-07 | 2010-02-10 | 陈昱廷 | Slant walking rehabilitation device |
CN104288981A (en) * | 2014-10-10 | 2015-01-21 | 青岛润鑫伟业科贸有限公司 | Mountain-climbing exercise instrument |
-
2016
- 2016-11-17 CN CN201611014658.3A patent/CN106334305B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3970302A (en) * | 1974-06-27 | 1976-07-20 | Mcfee Richard | Exercise stair device |
US5169361A (en) * | 1992-06-05 | 1992-12-08 | Hsu Hsien Long | Hydraulic cylinder assembly for climbing exercisers |
CN101642614A (en) * | 2008-08-07 | 2010-02-10 | 陈昱廷 | Slant walking rehabilitation device |
CN104288981A (en) * | 2014-10-10 | 2015-01-21 | 青岛润鑫伟业科贸有限公司 | Mountain-climbing exercise instrument |
Also Published As
Publication number | Publication date |
---|---|
CN106334305A (en) | 2017-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106563261B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106334305B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106621254B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106334306B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106621252B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106377890B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN202015448U (en) | Rocking racing/exercise bike | |
CN104998389A (en) | Physical training device | |
CN106474710B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106669128B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106621253B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106377888B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN103252060A (en) | Skiing bodybuilding equipment | |
CN106823250A (en) | Climb training aids | |
CN106377889B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN205872348U (en) | Scooter with drive device | |
CN205412059U (en) | Water resistance spinning | |
CN106334304B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
TW202120155A (en) | Frame lifting mechanism for fitness equipment reducing energy consumption and improving operating efficiency | |
CN203647965U (en) | Novel mountain climbing machine | |
CN106621343A (en) | Wearable uphill and downhill simulation device | |
CN101284170A (en) | Disk type running device | |
CN206613086U (en) | Climb training aids | |
CN201415025Y (en) | A surfing-simulating body-building device | |
CN201426944Y (en) | Indoor rock-climbing machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181218 Termination date: 20211117 |
|
CF01 | Termination of patent right due to non-payment of annual fee |