CN106334304B - A kind of hydraulic resistance mountain-climbing simulating fitness equipment - Google Patents

A kind of hydraulic resistance mountain-climbing simulating fitness equipment Download PDF

Info

Publication number
CN106334304B
CN106334304B CN201611014640.3A CN201611014640A CN106334304B CN 106334304 B CN106334304 B CN 106334304B CN 201611014640 A CN201611014640 A CN 201611014640A CN 106334304 B CN106334304 B CN 106334304B
Authority
CN
China
Prior art keywords
cylinder
right support
oil
time
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201611014640.3A
Other languages
Chinese (zh)
Other versions
CN106334304A (en
Inventor
钱雪松
潘勇鑫
张翔
张翔宇
赵博智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Campus of Hohai University
Original Assignee
Changzhou Campus of Hohai University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Campus of Hohai University filed Critical Changzhou Campus of Hohai University
Priority to CN201611014640.3A priority Critical patent/CN106334304B/en
Publication of CN106334304A publication Critical patent/CN106334304A/en
Application granted granted Critical
Publication of CN106334304B publication Critical patent/CN106334304B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B69/00Training appliances or apparatus for special sports
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B21/00Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices
    • A63B21/008Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices using hydraulic or pneumatic force-resisters
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B71/00Games or sports accessories not covered in groups A63B1/00 - A63B69/00
    • A63B71/06Indicating or scoring devices for games or players, or for other sports activities
    • A63B71/0619Displays, user interfaces and indicating devices, specially adapted for sport equipment, e.g. display mounted on treadmills
    • A63B71/0622Visual, audio or audio-visual systems for entertaining, instructing or motivating the user

Landscapes

  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Physical Education & Sports Medicine (AREA)
  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biophysics (AREA)
  • Orthopedic Medicine & Surgery (AREA)
  • Multimedia (AREA)
  • Human Computer Interaction (AREA)
  • Actuator (AREA)

Abstract

It climbs the mountain simulating fitness equipment the invention discloses a kind of hydraulic resistance, including left support, the first pin shaft, right support, first marks time, second marks time, throttle valve, the second pin shaft, third pin shaft, the 4th pin shaft, the 5th pin shaft, the first oil cylinder, the first key seat, the second key seat and the second oil cylinder.Hydraulic resistance mountain-climbing simulating fitness equipment proposed by the present invention can simulate body builder's mountaineering, and the both feet of body builder are during realizing alternately uplink, promote body wt, body energy is consumed, reaches body-building purpose, simultaneously, hydraulic resistance is climbed the mountain in simulating fitness equipment, principle is hindered according to liquid, the flowing of oil liquid generates hydraulic damping before and after throttle valve, acts on hydraulic motor, generate the moment of reaction, consumption and the gravitional force for absorbing body builder.Adjust the openings of sizes of throttle valve, thus it is possible to vary mark time and move up and down speed, adjust the exercise motion amount of mountain-climbing simulation body builder.The configuration of the present invention is simple, it is easy to adjust, it is very suitable to family and body-building venue uses, have a vast market space.

Description

A kind of hydraulic resistance mountain-climbing simulating fitness equipment
Technical field
The present invention relates to a kind of fitness equipments, and in particular to a kind of hydraulic resistance climb the mountain simulating fitness equipment, belong to electrically with Field of electromechanical technology.
Background technique
With the raising of people's standard of living, the requirement to health is also continuously improved, so, body-building is one fine Selection, body-building can be divided into outdoor body-building and indoor body-building, for indoor body-building, usually rely on fitness equipment, simulation is outdoor Movement, achievees the purpose that body-building.Now, also relatively more for the type of the fitness equipment of indoor body-building, than if any conventional act It weighs, ride, running and various ball activities.
Summary of the invention
The present invention proposes a kind of hydraulic resistance mountain-climbing simulating fitness equipment, simulates body builder's mountaineering, and the both feet of body builder exist During realizing alternately uplink, body wt is promoted, body energy is consumed, reaches body-building purpose, meanwhile, hydraulic resistance mountain-climbing simulation In fitness equipment, principle is hindered according to liquid, the flowing of oil liquid generates hydraulic damping before and after throttle valve, acts on hydraulic motor, produces The raw moment of reaction, consumption and the gravitional force for absorbing body builder.Adjust the openings of sizes of throttle valve, thus it is possible to vary mark time up and down Movement speed adjusts the exercise motion amount of mountain-climbing simulation body builder.The configuration of the present invention is simple, it is easy to adjust, it is very suitable to family It is used with body-building venue, has a vast market space.
The technical solution adopted by the present invention are as follows: a kind of hydraulic resistance is climbed the mountain simulating fitness equipment, including left support, the first pin shaft, Right support, first mark time, second mark time, throttle valve, the second pin shaft, third pin shaft, the 4th pin shaft, the 5th pin shaft, the first oil cylinder, First key seat, the second key seat and the second oil cylinder;The left support is by left support first crossbeam, left support second cross beam, left branch The first column of frame third crossbeam and left support, the second column of left support form a closed frame, the first column of left support, a left side The middle part of the second column of bracket offers the second pin hole of the first pin hole of left support and left support respectively;The right support is by right support The first column of first crossbeam, right support second cross beam and right support, the second column of right support, right support third column form one The first attachment base of right support, the right support first has been fixedly mounted in closed frame, the top of first column of right support The front of attachment base offers the first pin hole of right support, and right support second has been fixedly mounted in the top of the right support third column Attachment base, the front of second attachment base of right support offer the second pin hole of right support, first column of right support, right branch The second column of frame, right support third column lower part be fixedly mounted key seat mounting rack, among the left part of the key seat mounting rack It has been fixedly mounted the first key seat, has been fixedly mounted the second key seat among the right part of key seat mounting rack, the right support first crossbeam, It forms first between the first column of right support second cross beam and right support, the second column of right support to mark time sliding slot, the right support Second is formed between the second column of first crossbeam, right support second cross beam and right support, right support third column to mark time sliding slot;Institute The lower portion for stating right support insertion left support is separately connected the first pin hole of left support by the first pin shaft and right support first is sold Hole and connection the second pin hole of left support and the second pin hole of right support, so that left support and right support are realized hingedly;Described first It marks time and is marked time cunning by mark time support plate, the first mark time right sliding surface, the first left sliding surface and first of marking time of the first step plate, first Block composition, described first mark time the first of sliding block mark time it is intermediate on the inside of front vertical plate be fixedly installed with first and mark time key seat, described the One, which marks time, offers first on key seat and marks time pin hole;Described second mark time by the second step plate, second mark time support plate, second step on Walk right sliding surface, second mark time left sliding surface and second mark time sliding block composition, described second mark time the second of sliding block mark time before stand Intermediate on the inside of plate to be fixedly installed with second and mark time key seat, described second, which marks time, offers second on key seat and marks time pin hole;Described One oil cylinder is by the first cylinder piston rod, the first oil cylinder piston, the first cylinder upper end lid, the first oil cylinder lower cover, the first oil cylinder Cylinder composition, the top of first cylinder piston rod have the first plunger, offer pin hole, the first oil cylinder piston in the first plunger The lower part of bar has the first oil cylinder piston, and the first oil cylinder lower cover lower part has the second plunger, offers in the second plunger Pin hole, the first oil cylinder lower cover right side central offer the first oil-through-hole, the first cylinder upper end lid and the first oil cylinder lower end Lid is separately mounted to the upper and lower end parts of the first cylinder tube, the first cylinder upper end lid, the first oil cylinder lower cover and the first oil cylinder Sealing element is installed between cylinder, first cylinder piston rod is mounted on inside the first cylinder tube together with the first oil cylinder piston, The top of first cylinder piston rod is pierced by from the centre bore of the first cylinder upper end lid, the first cylinder piston rod and the first cylinder upper end Guidance tape and dustband, the first oil cylinder piston, the first oil cylinder lower cover and the first cylinder tube are installed between the centre bore of lid Between form the first cylinder efficient chamber;Second oil cylinder is by the second cylinder piston rod, the second oil cylinder piston, the second cylinder upper end Lid, the second oil cylinder lower cover (14-7), the second cylinder tube composition, the top of second cylinder piston rod have third pin Head, pin hole is offered in third plunger, and the lower part of the second cylinder piston rod has the second oil cylinder piston, second oil cylinder lower end Lid lower part has the 4th plunger, and pin hole is offered in the 4th plunger, and the second oil cylinder lower cover left side central portion offers the second logical oil Hole, the second cylinder upper end lid and the second oil cylinder lower cover are separately mounted to the upper and lower end parts of the second cylinder tube, the second oil Sealing element is installed between cylinder upper end cover, the second oil cylinder lower cover and the second cylinder tube, second cylinder piston rod together with Second oil cylinder piston is mounted on inside the second cylinder tube, and the top of the second cylinder piston rod is from the center of the second cylinder upper end lid Hole is pierced by, and guidance tape and dustband, the second oil are equipped between the second cylinder piston rod and the centre bore of the second cylinder upper end lid The second cylinder efficient chamber is formed between the cylinder piston, the second oil cylinder lower cover and the second cylinder tube;Described first, which marks time, is mounted on The first of right support is marked time in sliding slot, and the first sliding block insertion of marking time first is marked time in sliding slot, the first left and right two for marking time sliding block Side is marked time on the inside of sliding slot or so close to first respectively, first mark time right sliding surface, first mark time left sliding surface respectively close to right branch The upper surface of the first column of frame, the second column of right support, first marks time marks time the first of right support can be realized in sliding slot Lower slider;Described second, which marks time, is mounted on the second of right support and marks time in sliding slot, and equally, second marks time steps on the second of right support Walk in sliding slot, the second sliding block insertion of marking time second is marked time in sliding slot, second mark time sliding block the left and right sides respectively close to second Mark time on the inside of sliding slot or so, second mark time right sliding surface, second mark time left sliding surface respectively close to the second column of right support, right branch The upper surface of frame third column, second marks time marks time to can be realized in sliding slot and slides up and down the second of right support;Described first The lower part of oil cylinder is by forming hinged installation, first oil between pin hole, third pin shaft and the first key seat in the second plunger The top of cylinder by pin hole in the first plunger, the second pin shaft and first mark time on first mark time and form hinged peace between key seat Dress;The lower part of second oil cylinder is hingedly installed by being formed between pin hole, the 5th pin shaft and the second key seat in the 4th plunger, The top of second oil cylinder by pin hole in third plunger, the 4th pin shaft and second mark time on second mark time key seat (12- 6) hinged installation is formed between;The oil inlet of the throttle valve is logical by first on the right side of the first pipeline and the first oil cylinder lower cover Oilhole is connected, and the oil outlet of throttle valve is connected by the second pipeline with the second oil-through-hole on the left of the second oil cylinder lower cover; First cylinder efficient chamber of first oil cylinder, the first oil-through-hole, the first pipeline, throttle valve, the second pipeline, the second oil-through-hole, The inside of second cylinder efficient chamber of the second oil cylinder is full of oil liquid;Described first marks time the initial position marked time when installing with second It necessarily is formed dislocation up and down, for example, the first initial position marked time is in lowest order, the second initial position marked time is in highest Position.
When carrying out mountain-climbing simulation body-building, a kind of hydraulic resistance mountain-climbing simulating fitness equipment start-up operation, due to hydraulic resistance It climbs the mountain in simulating fitness equipment, the initial position that first marks time marks time when installing with second has dislocation up and down, for example, first marks time Initial position be in lowest order, the second initial position marked time is in highest order, and body builder's foot first is climbed up first and stepped on Step just generates a movement of ascending a height when body builder's another foot, which climbs up second, marks time, and body builder needs to overcome the weight of itself Power plays consumption physical efficiency, achievees the purpose that body-building, and due to the effect of human bady gravitational, second, which marks time, can generate a sliding force, this A sliding force by second mark time second mark time key seat, the 4th pin shaft, pass to third plunger, act on the second oil cylinder piston On bar, the second oil cylinder piston is pushed to move down, and forms oil pressure, the oil liquid of the second cylinder efficient chamber in the second cylinder efficient chamber The first cylinder efficient chamber is flowed by the second oil-through-hole, the second pipeline, throttle valve, the first pipeline, the first oil-through-hole, due to oil liquid In flow process, hydraulic damping can be formed on throttle valve, the reaction force generated on the second oil cylinder piston, balanced human's weight Power consumes gravitational potential energy of human body, and second marks time slow slide downward, meanwhile, oil liquid flows into the first cylinder efficient chamber, oil pressure effect It on the first oil cylinder piston, is marked time key seat by the first cylinder piston rod, the first plunger, the second pin shaft and first, drives first It marks time and moves up, finally, first marks time in extreme higher position, and second marks time in extreme lower position;If next, body builder climbs up First marks time, and first, which marks time, can generate a sliding force, this sliding force by first mark time first mark time key seat, the second pin Axis passes to the first plunger, acts on the first cylinder piston rod, pushes the first oil cylinder piston to move down, and in the first oil cylinder Working chamber forms oil pressure, and the oil liquid of the first cylinder efficient chamber passes through the first oil-through-hole, the first pipeline, throttle valve, the second pipeline, the Two oil-through-holes flow into the second cylinder efficient chamber, due to that hydraulic damping can be formed on throttle valve, first in oil liquid flow process The reaction force generated on oil cylinder piston, balanced human's gravity consume gravitational potential energy of human body, and first marks time slow slide downward, Meanwhile oil liquid the second cylinder efficient chamber, oil pressure act on the second oil cylinder piston, by the second cylinder piston rod, third plunger, 4th pin shaft and second is marked time key seat, is driven second to mark time and is moved up, and finally, second marks time in extreme higher position, and first marks time place In extreme lower position, circulation is formed.By adjust throttle valve openings of sizes, may be implemented first mark time with second mark time on move down The speed of dynamic speed adjusts the exercise motion amount of mountain-climbing simulation body builder.
The hydraulic motor can also be replaced with hydraulic oil pump.
Between the left support and right support, it also may be implemented to be fixedly connected.
The beneficial effects of the present invention are:
Hydraulic resistance mountain-climbing simulating fitness equipment proposed by the present invention, can simulate body builder's mountaineering, the both feet of body builder During realizing alternately uplink, body wt is promoted, body energy is consumed, reaches body-building purpose, meanwhile, hydraulic resistance mountain-climbing mould In quasi- fitness equipment, principle is hindered according to liquid, the flowing of oil liquid generates hydraulic damping before and after throttle valve, acts on hydraulic motor, Generate the moment of reaction, consumption and the gravitional force for absorbing body builder.
Adjust the openings of sizes of throttle valve, thus it is possible to vary mark time and move up and down speed, adjust the forging of mountain-climbing simulation body builder Refine amount of exercise.The configuration of the present invention is simple, it is easy to adjust, it is very suitable to family and body-building venue uses, have a vast market sky Between.
Detailed description of the invention
Present invention will be explained in further detail for the embodiment provided with reference to the accompanying drawing.
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 be in Fig. 1 A to schematic diagram;
Fig. 3 is the structural schematic diagram of left support;
Fig. 4 is the structural schematic diagram of right support;
Fig. 5 is the left view of Fig. 4;
Fig. 6 is the right view of Fig. 4;
Fig. 7 is the first structural schematic diagram marked time;
Fig. 8 is the B of Fig. 7 to schematic diagram;
Fig. 9 is the second structural schematic diagram marked time;
Figure 10 is the C of Fig. 9 to schematic diagram.
Specific embodiment
Such as Fig. 1 -- shown in 10, a kind of hydraulic resistance is climbed the mountain simulating fitness equipment, including left support 1, the first pin shaft 2, right support 3, First, which marks time, 4, second marks time 12, throttle valve 5, the second pin shaft 6, third pin shaft 7, the 4th pin shaft 8, the 5th pin shaft 9, the first oil cylinder 10, the first key seat 11, the second key seat 13 and the second oil cylinder 14;Left support 1 is by left support first crossbeam 1-1, left support second Crossbeam 1-2, left support third crossbeam 1-3 and the first column of left support 1-4, left support the second column 1-5 composition one are closed Frame, the first column of left support 1-4, the second column of left support 1-5 middle part offer left support the first pin hole 1-6 and a left side respectively The second pin hole of bracket 1-7;Right support 3 is by right support first crossbeam 3-1, right support second cross beam 3-2 and the first column of right support 3-3, the second column of right support 3-4, right support third column 3-5 form a closed frame, the first column of right support 3-3's Right support the first attachment base 3-8 has been fixedly mounted in top, and the front of the first attachment base of right support 3-8 offers the pin of right support first Right support the second attachment base 3-9, the second attachment base of right support 3- has been fixedly mounted in hole 3-6, the top of right support third column 3-5 9 front offers right support the second pin hole 3-7, the first column of right support 3-3, the second column of right support 3-4, right support third Key seat mounting rack 3-10 has been fixedly mounted in the lower part of column 3-5, has been fixedly mounted first among the left part of key seat mounting rack 3-10 The second key seat 13, right support first crossbeam 3-1, right support has been fixedly mounted in the right part centre of key seat 11, key seat mounting rack 3-10 It forms first between second cross beam 3-2 and the first column of right support 3-3, the second column of right support 3-4 to mark time sliding slot 3-11, right branch It is formed between frame first crossbeam 3-1, right support second cross beam 3-2 and the second column of right support 3-4, right support third column 3-5 Second marks time sliding slot 3-12;Right support 3 is inserted into the lower portion of left support 1, is separately connected left support first by the first pin shaft 2 Pin hole 1-6 and right support the first pin hole 3-6 and connection left support the second pin hole 1-7 and right support the second pin hole 3-7, so that left Bracket 1 and right support 3 are realized hingedly;First mark time 4 by the first step plate 4-1, first mark time support plate 4-2, first mark time the right side Sliding surface 4-3, the first left sliding surface 4-4 and first that marks time mark time sliding block 4-5 composition, and first, which marks time, the first of sliding block 4-5 marks time Intermediate on the inside of front vertical plate 4-8 to be fixedly installed with first and mark time key seat 4-6, first, which marks time, offers the first stepping pin on key seat 4-6 Hole 4-7;Second mark time 12 by the second step plate 12-1, second mark time support plate 12-2, second mark time right sliding surface 12-3, second The left sliding surface 12-4 and second that marks time marks time sliding block 12-5 composition, and second, which marks time, the second of sliding block 12-5 marks time in front vertical plate 12-8 It is fixedly installed with second among side to mark time key seat 12-6, second, which marks time, offers second on key seat 12-6 and mark time pin hole 12-7;The One oil cylinder 10 is by the first cylinder piston rod 10-2, the first oil cylinder piston 10-4, the first cylinder upper end lid 10-3, the first oil cylinder lower end 10-7, the first cylinder tube 10-5 composition are covered, the top of the first cylinder piston rod 10-2 has the first plunger 10-1, the first plunger Pin hole is offered on 10-1, the lower part of the first cylinder piston rod 10-2 has the first oil cylinder piston 10-4, the first oil cylinder lower cover The lower part 10-7 has and offers pin hole, the first oil cylinder lower cover 10-7 right side central on the second plunger 10-8, the second plunger 10-8 It offers the first oil-through-hole 10-6, the first cylinder upper end lid 10-3 and the first oil cylinder lower cover 10-7 is separately mounted to the first oil cylinder The upper and lower end parts of cylinder barrel 10-5, the first cylinder upper end lid 10-3, the first oil cylinder lower cover 10-7 and the first cylinder tube 10-5 it Between sealing element is installed, the first cylinder piston rod 10-2 is mounted in the first cylinder tube 10-5 together with the first oil cylinder piston 10-4 The top in portion, the first cylinder piston rod 10-2 is pierced by from the centre bore of the first cylinder upper end lid 10-3, the first cylinder piston rod 10- 2 and first cylinder upper end lid 10-3 centre bore between guidance tape and dustband be installed, the first oil cylinder piston 10-4, the first oil The first cylinder efficient chamber 10-9 is formed between cylinder lower cover 10-7 and the first cylinder tube 10-5;Second oil cylinder 14 is by the second oil cylinder Piston rod 14-2, the second oil cylinder piston 14-4, the second cylinder upper end lid 14-3, the second oil cylinder lower cover 14-7, the second oil cylinder Cylinder 14-5 composition, the top of the second cylinder piston rod 14-2 have third plunger 14-1, offer pin hole on third plunger 14-1, The lower part of second cylinder piston rod 14-2 has the second oil cylinder piston 14-4, and the second oil cylinder lower part lower cover 14-7 is with the 4th pin Pin hole is offered on head 14-8, the 4th plunger 14-8, the second oil cylinder lower cover 14-7 left side central portion offers the second oil-through-hole 14- 6, the second cylinder upper end lid 14-3 and the second oil cylinder lower cover 14-7 are separately mounted to the upper and lower end parts of the second cylinder tube 14-5, Sealing element is installed between the second cylinder upper end lid 14-3, the second oil cylinder lower cover 14-7 and the second cylinder tube 14-5, second Cylinder piston rod 14-2 is mounted on inside the second cylinder tube 14-5 together with the second oil cylinder piston 14-4, the second cylinder piston rod The top of 14-2 is pierced by from the centre bore of the second cylinder upper end lid 14-3, the second cylinder piston rod 14-2 and the second cylinder upper end lid Guidance tape and dustband, the second oil cylinder piston 14-4, the second oil cylinder lower cover 14-7 and are installed between the centre bore of 14-3 The second cylinder efficient chamber 14-9 is formed between two cylinder tube 14-5;First, which marks time, 4 is mounted on the first of right support 3 and marks time sliding slot In 3-11, the first sliding block 4-5 insertion of marking time first is marked time in sliding slot 3-11, the first left and right sides difference for marking time sliding block 4-5 Mark time on the inside of sliding slot 3-11 or so close to first, first mark time right sliding surface 4-3, first mark time left sliding surface 4-4 respectively close to The upper surface of the first column of right support 3-3, the second column of right support 3-4, first marks time 4 marks time sliding slot the first of right support 3 It can be realized and slide up and down in 3-11;Second, which marks time, 12 is mounted on the second of right support 3 and marks time in sliding slot 3-12, equally, second It marks time and 12 marks time in sliding slot 3-12 the second of right support 3, the second sliding block 12-5 insertion second of marking time is marked time in sliding slot 3-12, Second left and right sides for marking time sliding block 12-5 is marked time on the inside of sliding slot 3-12 or so close to second respectively, and second marks time right sliding surface 12-3, second mark time left sliding surface 12-4 respectively close to the upper surface of the second column of right support 3-4, right support third column 3-5, Second marks time 12 marks time to can be realized in sliding slot 3-12 and slides up and down the second of right support 3;The lower part of first oil cylinder 10 passes through Hinged installation is formed between pin hole, third pin shaft 7 and the first key seat 11 on second plunger 10-8, the top of the first oil cylinder 10 is logical What the pin hole crossed on the first plunger 10-1, the second pin shaft 6 and first were marked time on 4 first marks time and forms hinged peace between key seat 4-6 Dress;The lower part of second oil cylinder 14 is hinged by being formed between pin hole, the 5th pin shaft 9 and the second key seat 13 on the 4th plunger 14-8 Installation, the top of the second oil cylinder 14 are marked time by pin hole on third plunger 14-1, the 4th pin shaft 8 and second and second on 12 are stepped on It walks and forms hinged installation between key seat 12-6;The oil inlet of throttle valve 5 passes through the first pipeline 5-1 and the first oil cylinder lower cover 10-7 The first oil-through-hole 10-6 on right side is connected, and the oil outlet of throttle valve 5 passes through the second pipeline 5-2 and the second oil cylinder lower cover 14-7 The second oil-through-hole 14-6 in left side is connected;The first cylinder efficient chamber 10-9, the first oil-through-hole 10-6, first of first oil cylinder 10 Pipeline 5-1, throttle valve 5, the second pipeline 5-2, the second oil-through-hole 14-6, the second oil cylinder 14 the second cylinder efficient chamber 14-9 it is interior Portion is full of oil liquid;First mark time 4 and second mark time 12 installation when initial position necessarily be formed up and down dislocation, for example, first steps on The initial position of step 4 is in lowest order, and the second mark time 12 initial position is in highest order.
When carrying out mountain-climbing simulation body-building, a kind of hydraulic resistance mountain-climbing simulating fitness equipment start-up operation, due to hydraulic resistance Climb the mountain simulating fitness equipment in, first mark time 4 and second mark time 12 installation when initial position exist up and down dislocation, for example, first 4 initial position of marking time is in lowest order, and the second mark time 12 initial position is in highest order, and body builder's foot first is climbed up First marks time 4, when body builder's another foot climb up second mark time 12 when, just generate a movement of ascending a height, body builder's needs overcome The gravity of itself plays consumption physical efficiency, achievees the purpose that body-building, and due to the effect of human bady gravitational, second, which marks time, 12 can generate one A sliding force, this sliding force by second mark time 12 second mark time key seat 12-6, the 4th pin shaft 8, pass to third plunger 14-1 is acted on the second cylinder piston rod 14-2, pushes the second oil cylinder piston 14-4 to move down, and in the second cylinder efficient Chamber 14-9 forms oil pressure, and the oil liquid of the second cylinder efficient chamber 14-9 passes through the second oil-through-hole 14-6, the second pipeline 5-2, throttle valve 5, the first pipeline 5-1, the first oil-through-hole 10-6 flow into the first cylinder efficient chamber 10-9, due to that can save in oil liquid flow process Hydraulic damping is formed on stream valve 5, the reaction force generated on the second oil cylinder piston 14-2, balanced human's gravity consumes human body Gravitional force, second marks time 12 slow slide downwards, meanwhile, oil liquid flows into the first cylinder efficient chamber 10-9, and oil pressure acts on the On one oil cylinder piston 10-4, marked time key seat by the first cylinder piston rod 10-2, the first plunger 10-1, the second pin shaft 6 and first 4-6 drives first to mark time and 4 moves up, and finally, first marks time 4 in extreme higher position, and second marks time 12 in extreme lower position;If Next, body builder, which climbs up first, marks time 4, first, which marks time, 4 can generate a sliding force, this sliding force marks time 4 by first The first mark time key seat 4-6, the second pin shaft 6 pass to the first plunger 10-1, act on the first cylinder piston rod 10-2, push First oil cylinder piston 10-4 is moved down, and forms oil pressure in the first cylinder efficient chamber 10-9, the first cylinder efficient chamber 10-9's Oil liquid flows into second by the first oil-through-hole 10-6, the first pipeline 5-1, throttle valve 5, the second pipeline 5-2, the second oil-through-hole 14-6 Cylinder efficient chamber 14-9, since hydraulic damping can be formed on throttle valve 5, in the first oil cylinder piston 10- in oil liquid flow process The reaction force generated on 2, balanced human's gravity consume gravitational potential energy of human body, and first marks time 4 slow slide downwards, meanwhile, oil Liquid the second cylinder efficient chamber 14-9, oil pressure act on the second oil cylinder piston 14-4, pass through the second cylinder piston rod 14-2, third Plunger 14-1, the 4th pin shaft 8 and second are marked time key seat 12-6, are driven second to mark time and 12 are moved up, finally, second marks time 12 in most High position, first marks time 4 in extreme lower position, forms circulation.By adjusting the openings of sizes of throttle valve 5, first may be implemented It marks time and 4 and second marks time 12 speeds for moving up and down speed, adjust the exercise motion amount of mountain-climbing simulation body builder.
Hydraulic motor in the present invention can also be replaced with hydraulic oil pump.
In the present invention between left support 1 and right support 3, it also may be implemented to be fixedly connected.
Hydraulic resistance mountain-climbing simulating fitness equipment proposed by the present invention, can simulate body builder's mountaineering, the both feet of body builder During realizing alternately uplink, body wt is promoted, body energy is consumed, reaches body-building purpose, meanwhile, hydraulic resistance mountain-climbing mould In quasi- fitness equipment, principle is hindered according to liquid, the flowing of oil liquid generates hydraulic damping before and after throttle valve, acts on hydraulic motor, Generate the moment of reaction, consumption and the gravitional force for absorbing body builder.
Adjust the openings of sizes of throttle valve, thus it is possible to vary mark time and move up and down speed, adjust the forging of mountain-climbing simulation body builder Refine amount of exercise.The configuration of the present invention is simple, it is easy to adjust, it is very suitable to family and body-building venue uses, have a vast market sky Between.
The above is only a preferred embodiment of the present invention, it should be pointed out that: for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (2)

  1. The simulating fitness equipment 1. a kind of hydraulic resistance is climbed the mountain, it is characterised in that: including left support (1), the first pin shaft (2), right support (3), it first marks time (4), second mark time (12), throttle valve (5), the second pin shaft (6), third pin shaft (7), the 4th pin shaft (8), Five pin shafts (9), the first oil cylinder (10), the first key seat (11), the second key seat (13) and the second oil cylinder (14);The left support (1) by left support first crossbeam (1-1), left support second cross beam (1-2), left support third crossbeam (1-3) and left support first Column (1-4), the second column of left support (1-5) form a closed frame, the first column of left support (1-4), left support the The middle part of two columns (1-5) offers the first pin hole of left support (1-6) and the second pin hole of left support (1-7) respectively;The right branch Frame (3) is by right support first crossbeam (3-1), right support second cross beam (3-2) and the first column of right support (3-3), right support Two columns (3-4), right support third column (3-5) form a closed frame, first column of right support (3-3) it is upper The first attachment base of right support (3-8) has been fixedly mounted in portion, and the front of first attachment base of right support (3-8) offers right support The second attachment base of right support (3-9), institute has been fixedly mounted in the top of first pin hole (3-6), the right support third column (3-5) The front for stating the second attachment base of right support (3-9) offers the second pin hole of right support (3-7), the first column of right support (3- 3), the second column of right support (3-4), right support third column (3-5) lower part key seat mounting rack (3-10), institute has been fixedly mounted It states and has been fixedly mounted the first key seat (11) among the left part of key seat mounting rack (3-10), among the right part of key seat mounting rack (3-10) It has been fixedly mounted the second key seat (13), the right support first crossbeam (3-1), right support second cross beam (3-2) and right support It forms first between one column (3-3), the second column of right support (3-4) to mark time sliding slot (3-11), the right support first crossbeam Is formed between (3-1), right support second cross beam (3-2) and the second column of right support (3-4), right support third column (3-5) Two mark time sliding slot (3-12);The lower portion of right support (3) insertion left support (1), is separately connected by the first pin shaft (2) The first pin hole of left support (1-6) and the first pin hole of right support (3-6) and connection the second pin hole of left support (1-7) and right support the Two pin holes (3-7), so that left support (1) and right support (3) are realized hingedly;Described first marks time (4) by the first step plate (4- 1), the first mark time support plate (4-2), the first mark time right sliding surface (4-3), the first left sliding surface (4-4) and first of marking time is marked time Sliding block (4-5) composition, described first, which marks time, the first of sliding block (4-5) marks time and intermediate on the inside of front vertical plate (4-8) is fixedly installed with the One marks time key seat (4-6), and described first, which marks time, offers first on key seat (4-6) and mark time pin hole (4-7);Described second marks time (12) by the second step plate (12-1), second mark time support plate (12-2), second mark time right sliding surface (12-3), second mark time a left side Sliding surface (12-4) and second is marked time sliding block (12-5) composition, and described second, which marks time, the second of sliding block (12-5) marks time front vertical plate Intermediate on the inside of (12-8) to be fixedly installed with second and mark time key seat (12-6), described second, which marks time, offers second on key seat (12-6) Mark time pin hole (12-7);First oil cylinder (10) is by the first cylinder piston rod (10-2), the first oil cylinder piston (10-4), first Cylinder upper end lid (10-3), the first oil cylinder lower cover (10-7), the first cylinder tube (10-5) composition, first oil cylinder piston The top of bar (10-2) has the first plunger (10-1), offers pin hole, the first cylinder piston rod in the first plunger (10-1) The lower part of (10-2) has the first oil cylinder piston (10-4), and the first oil cylinder lower cover lower part (10-7) has the second plunger (10-8), pin hole is offered in the second plunger (10-8), and first oil cylinder lower cover (10-7) right side central offers the first logical oil Hole (10-6), the first cylinder upper end lid (10-3) and the first oil cylinder lower cover (10-7) are separately mounted to the first cylinder tube The upper and lower end parts of (10-5), the first cylinder upper end lid (10-3), the first oil cylinder lower cover (10-7) and the first cylinder tube (10- 5) sealing element is installed, first cylinder piston rod (10-2) is mounted on the first oil together with the first oil cylinder piston (10-4) between Cylinder cylinder barrel (10-5) is internal, and the top of the first cylinder piston rod (10-2) is worn from the centre bore of the first cylinder upper end lid (10-3) Out, guidance tape and dust-proof is installed between first cylinder piston rod (10-2) and the centre bore of the first cylinder upper end lid (10-3) Circle forms the first oil between the first oil cylinder piston (10-4), the first oil cylinder lower cover (10-7) and the first cylinder tube (10-5) Cylinder working chamber (10-9);Second oil cylinder (14) is by the second cylinder piston rod (14-2), the second oil cylinder piston (14-4), second Cylinder upper end lid (14-3), the second oil cylinder lower cover (14-7), the second cylinder tube (14-5) composition, second oil cylinder piston The top of bar (14-2) has third plunger (14-1), offers pin hole, the second cylinder piston rod in third plunger (14-1) The lower part of (14-2) has the second oil cylinder piston (14-4), and the second oil cylinder lower cover lower part (14-7) has the 4th plunger (14-8), pin hole is offered in the 4th plunger (14-8), and second oil cylinder lower cover (14-7) left side central portion offers the second logical oil Hole (14-6), the second cylinder upper end lid (14-3) and the second oil cylinder lower cover (14-7) are separately mounted to the second cylinder tube The upper and lower end parts of (14-5), the second cylinder upper end lid (14-3), the second oil cylinder lower cover (14-7) and the second cylinder tube (14- 5) sealing element is installed, second cylinder piston rod (14-2) is mounted on the second oil together with the second oil cylinder piston (14-4) between Cylinder cylinder barrel (14-5) is internal, and the top of the second cylinder piston rod (14-2) is worn from the centre bore of the second cylinder upper end lid (14-3) Out, guidance tape and dust-proof is installed between second cylinder piston rod (14-2) and the centre bore of the second cylinder upper end lid (14-3) Circle forms the second oil between the second oil cylinder piston (14-4), the second oil cylinder lower cover (14-7) and the second cylinder tube (14-5) Cylinder working chamber (14-9);Described first mark time (4) be mounted on the first of right support (3) and mark time in sliding slot (3-11), first steps on Step sliding block (4-5) insertion first is marked time in sliding slot (3-11), and first left and right sides for marking time sliding block (4-5) is stepped on close to first respectively Walk the left and right sliding slot (3-11) inside, first mark time right sliding surface (4-3), first mark time left sliding surface (4-4) respectively close to right branch The upper surface of the first column of frame (3-3), the second column of right support (3-4), first mark time (4) mark time the first of right support (3) It can be realized and slide up and down in sliding slot (3-11);Described second mark time (12) be mounted on the second of right support (3) and mark time sliding slot (3- 12) in, equally, second mark time (12) mark time in sliding slot (3-12) the second of right support (3), second marks time sliding block (12-5) Insertion second is marked time in sliding slot (3-12), and second left and right sides for marking time sliding block (12-5) is marked time sliding slot (3- close to second respectively 12) left and right inside, the second mark time right sliding surface (12-3), the second left sliding surface (12-4) of marking time are vertical close to right support second respectively The upper surface of column (3-4), right support third column (3-5), second mark time (12) mark time sliding slot (3- the second of right support (3) 12) it can be realized and slide up and down in;The lower part of first oil cylinder (10) passes through pin hole, the third pin on the second plunger (10-8) Hinged installation is formed between axis (7) and the first key seat (11), the top of first oil cylinder (10) passes through the first plunger (10-1) On pin hole, the second pin shaft (6) and first mark time on (4) first mark time and form hinged installation between key seat (4-6);Described The lower part of two oil cylinders (14) between pin hole, the 5th pin shaft (9) and the second key seat (13) in the 4th plunger (14-8) by forming The top of hinged installation, second oil cylinder (14) is stepped on by pin hole, the 4th pin shaft (8) and second on third plunger (14-1) Second in step (12), which marks time, forms hinged installation between key seat (12-6);The oil inlet of the throttle valve (5) passes through the first pipe Road (5-1) is connected with the first oil-through-hole (10-6) on the right side of the first oil cylinder lower cover (10-7), and the oil outlet of throttle valve (5) is logical The second pipeline (5-2) is crossed to be connected with the second oil-through-hole (14-6) on the left of the second oil cylinder lower cover (14-7);First oil The first cylinder efficient chamber (10-9), the first oil-through-hole (10-6), the first pipeline (5-1), throttle valve (5), the second pipe of cylinder (10) Road (5-2), the second oil-through-hole (14-6), the second oil cylinder (14) the second cylinder efficient chamber (14-9) inside be full of oil liquid;Institute State first mark time (4) and second mark time (12) installation when initial position formed up and down dislocation.
  2. The simulating fitness equipment 2. a kind of hydraulic resistance according to claim 1 is climbed the mountain, it is characterised in that: the left support (1) and Right support is fixedly connected between (3).
CN201611014640.3A 2016-11-17 2016-11-17 A kind of hydraulic resistance mountain-climbing simulating fitness equipment Expired - Fee Related CN106334304B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611014640.3A CN106334304B (en) 2016-11-17 2016-11-17 A kind of hydraulic resistance mountain-climbing simulating fitness equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611014640.3A CN106334304B (en) 2016-11-17 2016-11-17 A kind of hydraulic resistance mountain-climbing simulating fitness equipment

Publications (2)

Publication Number Publication Date
CN106334304A CN106334304A (en) 2017-01-18
CN106334304B true CN106334304B (en) 2019-05-03

Family

ID=57841406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611014640.3A Expired - Fee Related CN106334304B (en) 2016-11-17 2016-11-17 A kind of hydraulic resistance mountain-climbing simulating fitness equipment

Country Status (1)

Country Link
CN (1) CN106334304B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5169361A (en) * 1992-06-05 1992-12-08 Hsu Hsien Long Hydraulic cylinder assembly for climbing exercisers
US5370592A (en) * 1994-01-10 1994-12-06 Cheng-Shiung Chang Modified mechanism for the adjusting valve on the hydraulic cylinder of a stepper
CN101642614A (en) * 2008-08-07 2010-02-10 陈昱廷 Slant walking rehabilitation device
CN201510687U (en) * 2009-09-22 2010-06-23 厦门宙隆运动器材有限公司 Stepper simulating climbing action

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9017233B2 (en) * 2013-09-24 2015-04-28 Southern Taiwan University Of Science And Technology Water resistance lower body reciprocating exerciser

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5169361A (en) * 1992-06-05 1992-12-08 Hsu Hsien Long Hydraulic cylinder assembly for climbing exercisers
US5370592A (en) * 1994-01-10 1994-12-06 Cheng-Shiung Chang Modified mechanism for the adjusting valve on the hydraulic cylinder of a stepper
CN101642614A (en) * 2008-08-07 2010-02-10 陈昱廷 Slant walking rehabilitation device
CN201510687U (en) * 2009-09-22 2010-06-23 厦门宙隆运动器材有限公司 Stepper simulating climbing action

Also Published As

Publication number Publication date
CN106334304A (en) 2017-01-18

Similar Documents

Publication Publication Date Title
US5951449A (en) Exercise device
US5199932A (en) Gymnastic apparatus providing animation of cliff climbing
US5087037A (en) Pneumatically elevating recreational exercise device
CN1943825A (en) Alpine ski training apparatus
US9017233B2 (en) Water resistance lower body reciprocating exerciser
CN106334304B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
CN106377888B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
CN106377889B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
KR20070000547U (en) The indoor health machine
CN106563261B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
CN106823250A (en) Climb training aids
CN106474710B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
CN106377890B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
CN211611466U (en) Multifunctional novel body-building treadmill
CN106621254B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
CN106334306B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
CN103550915A (en) Indoor rock climbing sport equipment capable of simulating real rock wall
CN106334305B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
CN106669128B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
CN206613086U (en) Climb training aids
CN103830872A (en) Hydraulic counter-weight device for fitness device
CN106621253A (en) Liquid-resistance type mountaineering simulation body builder
CN106621252B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
CN203736775U (en) Hydrauliccounterweight device for fitness equipment
US8262548B1 (en) Air management for enhancing pneumatic rebound training

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190503

Termination date: 20211117