CN106327402A - Emergency exercise management system - Google Patents
Emergency exercise management system Download PDFInfo
- Publication number
- CN106327402A CN106327402A CN201610686674.0A CN201610686674A CN106327402A CN 106327402 A CN106327402 A CN 106327402A CN 201610686674 A CN201610686674 A CN 201610686674A CN 106327402 A CN106327402 A CN 106327402A
- Authority
- CN
- China
- Prior art keywords
- rehearsal
- emergency
- module
- exercise
- analysis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
- G06Q50/265—Personal security, identity or safety
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B9/00—Simulators for teaching or training purposes
Abstract
The invention discloses an emergency exercise management system. The emergency exercise management system comprises an emergency preparedness database management module which is connected to an exercise planning and scheme designing module; the exercise planning and scheme designing module is connected to an exercise process tracking control module; and exercise process tracking control module is connected to an exercise effect estimation analysis and report module. The emergency exercise management system solves problems: the prior art cannot perform targeted exercising and training on emergency, has no exercises targeting various ranges and types on conditions of considering cost and operability and that the exercising effect can be effectively estimated, cannot scientifically and reasonably design and design an exercising scheme, cannot effectively estimate the emergency exercising effect, cannot guide improvement of exercising and training to reach the requirement satisfying estimation indexes, cannot shorten the gap with an actual combat effect, and cannot guide the emergency pre-arranged plan improvement technology according to the exercise effect estimation result.
Description
Technical field
The invention belongs to electric network emergency rescue technique, particularly relate to a kind of emergency drilling management system.
Background technology
Strengthen power emergency management work, establish and improve effective electric power safety emergency mechanism, be safeguard national security, society
Can stablize and the important leverage of people benefit, be to ensure that the essential condition that power system safety and stability runs.In recent years, press
According to country to the general requirement of emergency and deployment, power industry carries out that " country's Emergent Public Events is totally emergent pre-
Case ", " country dispose electric grid large area power cut event emergency preplan " and relevant document requirement, work hard, progressively set up, perfect
Electric grid large area power cut accident treatment emergency mechanism, preliminarily formed system, by different level, unanimous between the higher and lower levels, the division of labor clearly, phase
Coordinate mutually, accident emergency system that information is unobstructed.
But, along with China's power industry enters bulk power grid, large-sized unit, high voltage, the stage of high automatization, power system
The increasing of management complexity, the difficulty of electric power safety management work also strengthen, as State Grid's industry uses " country dash forward
Send out the overall emergency preplan of public accident ", " country dispose electric grid large area power cut event emergency preplan " there are following problems: 1,
Targetedly accident can not be drilled and train;2, considering that cost, operability and rehearsal effect can obtain
On the premise of effectively assessment, not for different range and the rehearsal of type, formulate the most scientifically and rationally, design rehearsal side
Case;3, can not effectively assess the effect of emergency drilling, and guide rehearsal and the improvement of training, make up to wanting of evaluation index
Ask, reduce the gap between Competitive effects;4, not according to the effect assessment result of rehearsal, the improvement etc. of emergency preplan is instructed
Technical problem.
Summary of the invention
The technical problem to be solved in the present invention: provide a kind of emergency drilling management system, to solve what prior art existed
1, targetedly accident can not be drilled and train;2, considering that cost, operability and rehearsal effect can
On the premise of effectively being assessed, not for different range and the rehearsal of type, formulate the most scientifically and rationally, design rehearsal
Scheme;3, can not effectively assess the effect of emergency drilling, and guide rehearsal and the improvement of training, make up to wanting of evaluation index
Ask, reduce the gap between Competitive effects;4, not according to the effect assessment result of rehearsal, the improvement etc. of emergency preplan is instructed
Technical problem.
Technical solution of the present invention:
A kind of emergency drilling manages system, and it includes:
Emergency preplan database management module: the prediction scheme content of written form is organized into the emergency preplan of database structure form,
It is saved in prediction scheme storehouse, is quoted during subsequent analysis and management;It is connected with conceptual design module with drill plan.
Drill plan and conceptual design module: according to assessment rehearsal demand, determine rehearsal scope, statement rehearsal purpose, really
Surely drill target, establishment rehearsal sight explanation, list the chain of events during rehearsal, list anticipatory action and ready message,
It is connected with rehearsal process tracking control module;
Rehearsal process tracking control module: utilize the action plan formulated in drill plan and process control block (PCB) to whole rehearsal
Process is monitored, and is tracked the situation of reaching of the every emergency disposal target in drill plan and data collection, and protects
It is stored in emergency disposal analysis record, forms rehearsal record, in order to carry out follow-up assessment and analysis, divide with rehearsal recruitment evaluation
Analysis and reporting modules connect,
Rehearsal recruitment evaluation analysis and reporting modules: utilize rehearsal to implement the rehearsal record of generation, Emergency Preparedness capability evaluation refers to
Mark and contingency capabilities assessment index, be estimated marking to rehearsal effect, finally collects and is organized into rehearsal report.
It also includes that emergency preplan is corrected and improves module, drill plan and training correction improvement module and evaluation index and power
Heavily correct and improve module;
Described emergency preplan is corrected and is improved module: be tracked for needing to improve the emergency disposal target corresponding to index item,
Determine and cause the basic reason of problem, correcting method measure and deadline, to the not enough item found in manoeuvre and rectification item
The performance of corrective action is followed the trail of, and to realize closed loop management, corrects improvement module with drill plan and training and is connected;
Drill plan and training are corrected and are improved module: utilize emergency disposal analysis record data and rehearsal corrective action, to rehearsal
Scheme is optimized improvement with drilling front training, corrects improvement module with evaluation index and weight and is connected;
Evaluation index and weight are corrected and are improved module: utilize emergency disposal analysis record data and index corrective action, to assessment
Index system and weight setting are optimized improvement.
The method have the benefit that
The present invention utilizes emergency preplan database management module, and the prediction scheme content of external system or written form is organized into data base's knot
The emergency preplan of structure form, is saved in prediction scheme storehouse, in order to quoted during subsequent analysis and management.
Can strengthen electric network emergency rehearsal, effective assessment of manoeuvre effect by the present invention, drill for improvement and optimization,
Scenario, personnel's skills training provide foundation and technical support, thus conscientiously improve grid company solution of emergent event or calamity
The ability of evil, promotes and improves electric network emergency management technique system specification, makes emergent normalization management work more systematization, rule
Generalized.
Planned for grid company emergency drilling by the present invention, tissue provides strong guidance foundation and management instrument, phase
The organization and administration work closing link can rely on the present invention to carry out functional simulation rehearsal and combat exercise completely, it is possible to saves a large amount of
Human and material resources resource;And enable rehearsal training to carry out science, reasonably to assess and improve, make the management of emergency drilling
Level rises to new height.
The system according to the present invention, can carry out: the planning of drill plan, editor, housekeeping;Training and the standard of rehearsal
Standby, work of organization and coordination;The tracing management of functional simulation rehearsal;Rehearsal effect is carried out science, reasonably assesses;Targetedly
Drill plan and evaluation index are improved by ground.
The present invention utilizes emergency disposal analysis record data and prediction scheme corrective action, and emergency preplan is optimized improvement.
Determine which index item needs the priority level improved according to " wooden pail effect ", for meeting an urgent need corresponding to index item to be improved
Dispose target, reductive analysis rehearsal have problems, and excavates new refinement target call, determine depending on concrete condition should take pre-
Case corrective action, rehearsal corrective action or index corrective action, and solve to wait to solve to relevant emergency organization by native system
Problem certainly or item are tracked, and determine and cause the basic reason of problem, correcting method measure and deadline, and by special messenger
It is responsible for following the trail of, the performance of the not enough item found in manoeuvre and the corrective action of rectification item to realize closed loop management.
The present invention can be that a large amount of human and material resources resources are saved in grid company emergency drilling management work, conscientiously carries simultaneously
High grid company accident (disaster) Emergency Preparedness and Response ability;Solve prior art exist 1, can not be targeted
Accident is drilled and trains;2, considering what cost, operability and rehearsal effect can effectively be assessed
Under premise, not for different range and the rehearsal of type, formulate the most scientifically and rationally, design drill plan;3, Bu Nengyou
Imitate the effect of assessment emergency drilling, and guide rehearsal and the improvement of training, make up to the requirement of evaluation index, reduce and actual combat
Gap between effect;4, not according to the effect assessment result of rehearsal, the technical problem such as improvement of emergency preplan is instructed.
Accompanying drawing illustrates:
Fig. 1 is emergency drilling management system module structural representation of the present invention.
Detailed description of the invention:
The present invention can run in the operating system of Windows Server 2008 R2 version, uses B/S architecture mode, based on
The programming language Asp.net(C# of main flow) develop;Data base selects Microsoft SQL Server 2008 R2
Version;Web service selects Microsoft IIS.
A kind of emergency drilling management system, it include emergency preplan database management module, drill plan and conceptual design module,
Rehearsal process tracking control module and rehearsal recruitment evaluation analysis and reporting modules;
Described emergency preplan database management module: the prediction scheme content of written form is organized into the emergent pre-of database structure form
Case, is saved in prediction scheme storehouse, is quoted during subsequent analysis and management;User can use emergency preplan library management mould
Block, is organized into the emergency preplan of database structure form by the prediction scheme content of written form, is saved in prediction scheme storehouse, in order to
Quoted during subsequent analysis and management.
Drill plan and conceptual design module: according to assessment rehearsal demand, determine rehearsal scope, statement rehearsal purpose, really
Surely drill target, establishment rehearsal sight explanation, list the chain of events during rehearsal, list anticipatory action and ready message;
Eight steps according to manoeuvre design: assess rehearsal demand, determine rehearsal scope, statement rehearsal purpose, determine rehearsal target, volume
System rehearsal sight explanation, listing the chain of events during rehearsal, list anticipatory action, ready message, this module provides correspondence
Eight functions.
Rehearsal process tracking control module: utilize the action plan formulated in drill plan and process control block (PCB) to whole
Rehearsal process is monitored, and is tracked the situation of reaching of the every emergency disposal target in drill plan and data collection,
And be saved in emergency disposal analysis record, form rehearsal record, in order to carry out follow-up assessment and analysis;
Rehearsal process tracking control module is during implementing functional simulation rehearsal or combat exercise, and system utilizes in drill plan
Whole rehearsal process is monitored, to the every emergency disposal in drill plan by action plan and the process control block (PCB) formulated
The situation of reaching of target is tracked and data collection, and is saved in emergency disposal analysis record, forms rehearsal record, in order to
Carry out follow-up assessment and analysis.
Rehearsal recruitment evaluation analysis and reporting modules: utilize rehearsal to implement the rehearsal record of generation, Emergency Preparedness ability is commented
Estimate index and contingency capabilities assessment index, rehearsal effect is estimated marking, finally collect and be organized into rehearsal report;
Emergency drilling management module also includes that emergency preplan is corrected and improves module, drill plan and training correction improvement module and comment
Estimate index and weight is corrected and improved module;
Described emergency preplan is corrected and is improved module: be tracked for needing to improve the emergency disposal target corresponding to index item,
Determine and cause the basic reason of problem, correcting method measure and deadline, to the not enough item found in manoeuvre and rectification item
The performance of corrective action is followed the trail of, to realize closed loop management;
This module, for the emergency disposal target corresponding to index item to be improved, has problems, concurrently in reductive analysis rehearsal
Dig new refinement target call, determine depending on concrete condition and prediction scheme corrective action, rehearsal corrective action or index should be taked to correct
Measure, and by native system, relevant emergency organization solution problem to be resolved or item are tracked, determine and cause problem
Basic reason, correcting method measure and deadline, and be responsible for the not enough item found in manoeuvre and rectification item by special messenger
The performance of corrective action is followed the trail of, to realize closed loop management.
Drill plan and training are corrected and are improved module: utilize emergency disposal analysis record data and rehearsal corrective action, right
Drill plan is optimized improvement with drilling front training;
Evaluation index and weight are corrected and are improved module: utilize emergency disposal analysis record data and index corrective action, to assessment
Index system and weight setting are optimized improvement.
Claims (2)
1. emergency drilling manages a system, and it includes:
Emergency preplan database management module: the prediction scheme content of written form is organized into the emergency preplan of database structure form,
It is saved in prediction scheme storehouse, is quoted during subsequent analysis and management;It is connected with conceptual design module with drill plan;
Drill plan and conceptual design module: according to assessment rehearsal demand, determine rehearsal scope, statement rehearsal purpose, determine and drill
Practice target, establishment rehearsal sight explanation, list the chain of events during rehearsal, list anticipatory action and ready message, and drill
Practice process tracking control module to connect;
Rehearsal process tracking control module: utilize the action plan formulated in drill plan and process control block (PCB) to whole rehearsal
Process is monitored, and is tracked the situation of reaching of the every emergency disposal target in drill plan and data collection, and protects
It is stored in emergency disposal analysis record, forms rehearsal record, in order to carry out follow-up assessment and analysis, divide with rehearsal recruitment evaluation
Analysis and reporting modules connect,
Rehearsal recruitment evaluation analysis and reporting modules: utilize rehearsal to implement the rehearsal record of generation, Emergency Preparedness capability evaluation refers to
Mark and contingency capabilities assessment index, be estimated marking to rehearsal effect, finally collects and is organized into rehearsal report.
A kind of emergency drilling management system the most according to claim 1, it is characterised in that: it also includes that emergency preplan is corrected
Improve module, drill plan and training and correct improvement module and evaluation index and weight correction improvement module;
Described emergency preplan is corrected and is improved module: be tracked for needing to improve the emergency disposal target corresponding to index item,
Determine and cause the basic reason of problem, correcting method measure and deadline, to the not enough item found in manoeuvre and rectification item
The performance of corrective action is followed the trail of, and to realize closed loop management, corrects improvement module with drill plan and training and is connected;
Drill plan and training are corrected and are improved module: utilize emergency disposal analysis record data and rehearsal corrective action, to rehearsal
Scheme is optimized improvement with drilling front training, corrects improvement module with evaluation index and weight and is connected;
Evaluation index and weight are corrected and are improved module: utilize emergency disposal analysis record data and index corrective action, to assessment
Index system and weight setting are optimized improvement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610686674.0A CN106327402A (en) | 2016-08-19 | 2016-08-19 | Emergency exercise management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610686674.0A CN106327402A (en) | 2016-08-19 | 2016-08-19 | Emergency exercise management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106327402A true CN106327402A (en) | 2017-01-11 |
Family
ID=57743073
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610686674.0A Pending CN106327402A (en) | 2016-08-19 | 2016-08-19 | Emergency exercise management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106327402A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107369123A (en) * | 2017-08-24 | 2017-11-21 | 东莞中国科学院云计算产业技术创新与育成中心 | Emergent simulated maneuver scheme generation method, device, medium and computer equipment |
CN107945073A (en) * | 2017-12-06 | 2018-04-20 | 南京学立安教育科技有限公司 | A kind of Campus Security emergency drilling management method |
CN107947964A (en) * | 2017-10-24 | 2018-04-20 | 贵州白山云科技有限公司 | A kind of emergency preplan evaluating method and device |
CN108764664A (en) * | 2018-05-15 | 2018-11-06 | 贵州电网有限责任公司 | Emergency preplan and disposal method mobile platform system |
CN111667150A (en) * | 2020-05-15 | 2020-09-15 | 南方电网科学研究院有限责任公司 | Power grid emergency operation management method, device, equipment and storage medium |
WO2021136454A1 (en) * | 2019-12-31 | 2021-07-08 | 清华大学 | Preset solution evaluation method and apparatus |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104573032A (en) * | 2015-01-14 | 2015-04-29 | 清华大学 | Emergency simulation drilling all-in-one machine for nuclear emergency device |
CN104809933A (en) * | 2015-05-13 | 2015-07-29 | 国网智能电网研究院 | Unscripted emergency drill system, method and equipment for power grid |
CN105225566A (en) * | 2015-09-06 | 2016-01-06 | 国家电网公司 | A kind of electric network emergency rehearsal visual simulating deduction system |
-
2016
- 2016-08-19 CN CN201610686674.0A patent/CN106327402A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104573032A (en) * | 2015-01-14 | 2015-04-29 | 清华大学 | Emergency simulation drilling all-in-one machine for nuclear emergency device |
CN104809933A (en) * | 2015-05-13 | 2015-07-29 | 国网智能电网研究院 | Unscripted emergency drill system, method and equipment for power grid |
CN105225566A (en) * | 2015-09-06 | 2016-01-06 | 国家电网公司 | A kind of electric network emergency rehearsal visual simulating deduction system |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107369123A (en) * | 2017-08-24 | 2017-11-21 | 东莞中国科学院云计算产业技术创新与育成中心 | Emergent simulated maneuver scheme generation method, device, medium and computer equipment |
CN107947964A (en) * | 2017-10-24 | 2018-04-20 | 贵州白山云科技有限公司 | A kind of emergency preplan evaluating method and device |
CN107945073A (en) * | 2017-12-06 | 2018-04-20 | 南京学立安教育科技有限公司 | A kind of Campus Security emergency drilling management method |
CN108764664A (en) * | 2018-05-15 | 2018-11-06 | 贵州电网有限责任公司 | Emergency preplan and disposal method mobile platform system |
WO2021136454A1 (en) * | 2019-12-31 | 2021-07-08 | 清华大学 | Preset solution evaluation method and apparatus |
CN111667150A (en) * | 2020-05-15 | 2020-09-15 | 南方电网科学研究院有限责任公司 | Power grid emergency operation management method, device, equipment and storage medium |
CN111667150B (en) * | 2020-05-15 | 2023-06-20 | 南方电网科学研究院有限责任公司 | Power grid emergency operation management method, device, equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106327402A (en) | Emergency exercise management system | |
CN106339971A (en) | Emergency drilling management and assessment analysis system | |
Short | A spatial database of wildfires in the United States, 1992-2011 | |
LoSchiavo et al. | Lessons learned from the first decade of adaptive management in comprehensive Everglades restoration | |
Shankar Kshirsagar et al. | Suitability of life cycle cost analysis (LCCA) as asset management tools for institutional buildings | |
CN107369123A (en) | Emergent simulated maneuver scheme generation method, device, medium and computer equipment | |
CN107146034A (en) | A kind of post competency assessment method | |
Stamatikos et al. | GRB 211211A: Swift-BAT refined analysis | |
Othman et al. | A disaster management metamodel (DMM) validated | |
Lin et al. | Loss estimation in Christchurch CBD following recent earthquakes: validation and refinement of current procedures | |
Engelmann et al. | Decision support for the members of an emergency operation centre after an earthquake | |
Raskob et al. | Innovative integrative tools and platforms. Key results of the PREPARE European Project | |
Croft et al. | Landscape-scale wireless technology for vertebrate pest control | |
Kafle | Integrated community based risk reduction: an approach to building disaster resilient communities | |
Ye et al. | Developing strong response capacity: training volunteers in the medical reserve corps | |
Altman et al. | Drought and water shortages: South Carolina’s response mechanisms, vulnerabilities, and needs | |
Yingnan et al. | Analysis of grass-roots communities' emergency management system model | |
Othman et al. | Metamodel-based decision support system for disaster management | |
Sujanto et al. | An Integrated Framework for Comprehensive Collaborative Emergency Management. | |
Knights et al. | USGS Telemetry Project | |
Shaw | Future perspectives of community-based disaster risk reduction | |
Noceda et al. | Community-based Disaster Risk Reduction Management For the Municipality of Pila | |
Indonesia | Spatial Planning Tools for Better Landscape Management and Conservation | |
Rencrantz et al. | A concept for inter-organizational crisis management exercises. | |
Yang et al. | Resilience Indicator of Urban Transport Infrastructure: A Review on Current Approaches. Infrastructures 2022, 7, 33 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170111 |