CN106320100A - 一种处理铁路路基翻浆冒泥病害的新工艺 - Google Patents
一种处理铁路路基翻浆冒泥病害的新工艺 Download PDFInfo
- Publication number
- CN106320100A CN106320100A CN201610677611.9A CN201610677611A CN106320100A CN 106320100 A CN106320100 A CN 106320100A CN 201610677611 A CN201610677611 A CN 201610677611A CN 106320100 A CN106320100 A CN 106320100A
- Authority
- CN
- China
- Prior art keywords
- railway
- new technology
- mud
- pumping
- drainage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005516 engineering process Methods 0.000 title claims abstract description 13
- 238000005086 pumping Methods 0.000 title abstract 4
- 239000000463 material Substances 0.000 claims abstract description 14
- 238000010276 construction Methods 0.000 claims abstract description 12
- 201000010099 disease Diseases 0.000 claims description 16
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 claims description 16
- 239000010410 layer Substances 0.000 claims description 12
- 239000002689 soil Substances 0.000 claims description 10
- 238000000034 method Methods 0.000 claims description 8
- 238000004140 cleaning Methods 0.000 claims description 6
- 238000007689 inspection Methods 0.000 claims description 6
- 230000008569 process Effects 0.000 claims description 6
- 230000008030 elimination Effects 0.000 claims description 5
- 238000003379 elimination reaction Methods 0.000 claims description 5
- 239000011241 protective layer Substances 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 13
- 230000000694 effects Effects 0.000 abstract description 7
- 208000024891 symptom Diseases 0.000 abstract description 2
- 238000007599 discharging Methods 0.000 abstract 1
- 238000012216 screening Methods 0.000 abstract 1
- 230000001681 protective effect Effects 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009835 boiling Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000004746 geotextile Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2/00—General structure of permanent way
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
- Railway Tracks (AREA)
Abstract
本发明公开了一种处理铁路路基翻浆冒泥病害的新工艺,属于铁路路基技术领域;上线作业前必须在天窗时间前半小时到达指定的上道口集合,并把所有工机具、材料在合适位置摆放整齐便于设备管理单位的防护人员清点拍照;作业前清除施工地段道砟并清筛干净便于回填;铺设30毫米的反虑层并找坡,坡度控制在3‑5度,反虑层级配应符合标准;铺设毛细排水材料,铺设采用满铺形式,每块板间距控制在10厘米,形成毛细排水层;安装集水管并连接集水管两端;安装排水管,修建排水沟使之与铁路的排水管网相连;比传统的处理效果好,能及时有效排出路基的水,根除翻浆冒泥根源,起到标本兼治的效果;从根本上消除翻浆冒泥病害,节省大量的施工时间,避免重复施工。
Description
技术领域
本发明涉及铁路路基技术领域,具体涉及一种处理铁路路基翻浆冒泥病害的新工艺。
背景技术:
各国传统处理翻浆冒泥病害的方法是隔一段时间对病害特别严重的地段采用换填、对有明显泉眼的地方进行疏导、用土工布导流等方法,这些施工工艺只是治标不治本,无法彻底消除病害。
发明内容
针对上述问题,本发明要解决的技术问题是提供一种能及时有效排出路基的水,根除翻浆冒泥根源,起到标本兼治的效果的处理铁路路基翻浆冒泥病害的新工艺。
本发明的一种处理铁路路基翻浆冒泥病害的新工艺,它包含以下步骤:
1、上线作业前必须在天窗时间前半小时到达指定的上道口集合,并把所有工机具、材料在合适位置摆放整齐便于设备管理单位的防护人员清点拍照;所有人员必须身着防护服,所有工机具必须在显著位置粘贴反光标志;在天窗点批复下来后有序的进入作业区段;
2、工机具、材料必须整齐有序的码放在施工现场,防止掉落,便于调用。
3、作业前清除施工地段道砟并清筛干净便于回填;
4、铺设30毫米的反虑层并找坡,坡度控制在3-5度,反虑层级配应符合标准;
5、铺设毛细排水材料,铺设采用满铺形式,每块板间距控制在10厘米,形成毛细排水层;
6、安装集水管并连接集水管两端;
7、安装排水管,修建排水沟使之与铁路的排水管网相连;
8、铺设保护层,厚度以大于30厘米为宜;
9、回填已经清筛过的道砟,形成道砟层,恢复线路使之达到运行条件;
10、在完成了既定的工作量后马上用轨检仪对轨道进行检测,如有超限区段可能会影响行车的马上进行消除;消除后再用轨检仪对轨道进行检测并保存数据;
11、到达下道口后有序的退出到线路外,在合适位置把所有工机具、材料等摆放整齐便于清点拍照,防护员消点。
本发明使用毛细排水(又称水钉排水或者虹吸排水)新工艺彻底消除病害。
本发明的有益效果:比传统的处理效果好,能及时有效排出路基的水,根除翻浆冒泥根源,起到标本兼治的效果;从根本上消除翻浆冒泥病害,节省大量的施工时间,避免重复施工。
附图说明
为了易于说明,本发明由下述的具体实施及附图作以详细描述。
图1是本发明的结构示意图;
图2是图1的A-A剖视图;
图中:
反虑层1、毛细排水层2、集水管3、排水管4、保护层5、道砟层6、轨道7。
具体实施方式
如图1至图2所示,本具体实施方式采用以下技术方案:它包含以下步骤:
1、上线作业前必须在天窗时间前半小时到达指定的上道口集合,并把所有工机具、材料在合适位置摆放整齐便于设备管理单位的防护人员清点拍照;所有人员必须身着防护服,所有工机具必须在显著位置粘贴反光标志;在天窗点批复下来后有序的进入作业区段;
2、工机具、材料必须整齐有序的码放在施工现场,防止掉落,便于调用。
3、作业前清除施工地段道砟并清筛干净便于回填;
4、铺设30毫米的反虑层1并找坡,坡度控制在3-5度,反虑层1级配应符合标准;
5、铺设毛细排水材料,铺设采用满铺形式,每块板间距控制在10厘米,形成毛细排水层2;
6、安装集水管3并连接集水管两端;
7、安装排水管4,修建排水沟使之与铁路的排水管网相连;
8、铺设保护层5,厚度以大于30厘米为宜;
9、回填已经清筛过的道砟,形成道砟层6,恢复线路使之达到运行条件;
10、在完成了既定的工作量后马上用轨检仪对轨道7进行检测,如有超限区段可能会影响行车的马上进行消除;消除后再用轨检仪对轨道进行检测并保存数据;
11、到达下道口后有序的退出到线路外,在合适位置把所有工机具、材料等摆放整齐便于清点拍照,防护员消点。
本具体实施方式使用毛细排水(又称水钉排水或者虹吸排水)新工艺彻底消除病害。
本具体实施方式比传统的处理效果好,能及时有效排出路基的水,根除翻浆冒泥根源,起到标本兼治的效果;从根本上消除翻浆冒泥病害,节省大量的施工时间,避免重复施工。
以上显示和描述了本发明的基本原理和主要特征以及本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。
Claims (1)
1.一种处理铁路路基翻浆冒泥病害的新工艺,其特征在于它包含以下步骤:
(1)、上线作业前必须在天窗时间前半小时到达指定的上道口集合,并把所有工机具、材料在合适位置摆放整齐便于设备管理单位的防护人员清点拍照;所有人员必须身着防护服,所有工机具必须在显著位置粘贴反光标志;在天窗点批复下来后有序的进入作业区段;
(2)、工机具、材料必须整齐有序的码放在施工现场,防止掉落,便于调用;
(3)、作业前清除施工地段道砟并清筛干净便于回填;
(4)、铺设30毫米的反虑层并找坡,坡度控制在3-5度,反虑层级配应符合标准;
(5)、铺设毛细排水材料,铺设采用满铺形式,每块板间距控制在10厘米,形成毛细排水层;
(6)、安装集水管并连接集水管两端;
(7)、安装排水管,修建排水沟使之与铁路的排水管网相连;
(8)、铺设保护层,厚度以大于30厘米为宜;
(9)、回填已经清筛过的道砟,形成道砟层,恢复线路使之达到运行条件;
(10)、在完成了既定的工作量后马上用轨检仪对轨道进行检测,如有超限区段可能会影响行车的马上进行消除;消除后再用轨检仪对轨道进行检测并保存数据;
(11)、到达下道口后有序的退出到线路外,在合适位置把所有工机具、材料等摆放整齐便于清点拍照,防护员消点。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610677611.9A CN106320100B (zh) | 2016-08-11 | 2016-08-11 | 一种处理铁路路基翻浆冒泥病害的工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610677611.9A CN106320100B (zh) | 2016-08-11 | 2016-08-11 | 一种处理铁路路基翻浆冒泥病害的工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106320100A true CN106320100A (zh) | 2017-01-11 |
CN106320100B CN106320100B (zh) | 2018-11-13 |
Family
ID=57740477
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610677611.9A Expired - Fee Related CN106320100B (zh) | 2016-08-11 | 2016-08-11 | 一种处理铁路路基翻浆冒泥病害的工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106320100B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107165003A (zh) * | 2017-05-18 | 2017-09-15 | 浙江大学 | 一种用于治理板式无砟轨道铁路路基翻浆冒泥的整治方法 |
CN109610253A (zh) * | 2018-11-19 | 2019-04-12 | 西南交通大学 | 一种评定无砟轨道路基冒浆危害等级的方法 |
CN113699835A (zh) * | 2021-10-26 | 2021-11-26 | 中国土木工程集团有限公司 | 一种港区货场铁路整体式道床岔区排水结构及施工方法 |
CN115262292A (zh) * | 2022-08-18 | 2022-11-01 | 西南交通大学 | 一种预防无砟轨道路基接触层翻浆冒泥的结构及施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010229696A (ja) * | 2009-03-27 | 2010-10-14 | Railway Technical Res Inst | 省力化軌道の補修方法 |
CN205223743U (zh) * | 2015-12-17 | 2016-05-11 | 中铁二院工程集团有限责任公司 | 无砟轨道铁路路基表层结构 |
CN105735055A (zh) * | 2016-02-04 | 2016-07-06 | 李谨武 | 渗吸排水法 |
CN105839476A (zh) * | 2016-05-24 | 2016-08-10 | 固远晨通科技发展有限公司 | 一种防止铁路路基翻浆冒泥的结构及其铺设方法 |
-
2016
- 2016-08-11 CN CN201610677611.9A patent/CN106320100B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010229696A (ja) * | 2009-03-27 | 2010-10-14 | Railway Technical Res Inst | 省力化軌道の補修方法 |
CN205223743U (zh) * | 2015-12-17 | 2016-05-11 | 中铁二院工程集团有限责任公司 | 无砟轨道铁路路基表层结构 |
CN105735055A (zh) * | 2016-02-04 | 2016-07-06 | 李谨武 | 渗吸排水法 |
CN105839476A (zh) * | 2016-05-24 | 2016-08-10 | 固远晨通科技发展有限公司 | 一种防止铁路路基翻浆冒泥的结构及其铺设方法 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107165003A (zh) * | 2017-05-18 | 2017-09-15 | 浙江大学 | 一种用于治理板式无砟轨道铁路路基翻浆冒泥的整治方法 |
CN107165003B (zh) * | 2017-05-18 | 2018-03-16 | 浙江大学 | 一种用于治理板式无砟轨道铁路路基翻浆冒泥的整治方法 |
CN109610253A (zh) * | 2018-11-19 | 2019-04-12 | 西南交通大学 | 一种评定无砟轨道路基冒浆危害等级的方法 |
CN113699835A (zh) * | 2021-10-26 | 2021-11-26 | 中国土木工程集团有限公司 | 一种港区货场铁路整体式道床岔区排水结构及施工方法 |
CN113699835B (zh) * | 2021-10-26 | 2022-01-28 | 中国土木工程集团有限公司 | 一种港区货场铁路整体式道床岔区排水结构的施工方法 |
CN115262292A (zh) * | 2022-08-18 | 2022-11-01 | 西南交通大学 | 一种预防无砟轨道路基接触层翻浆冒泥的结构及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106320100B (zh) | 2018-11-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106320100A (zh) | 一种处理铁路路基翻浆冒泥病害的新工艺 | |
CN104343077B (zh) | 一种沥青混凝土路面反射裂缝处理方法 | |
CN103669291B (zh) | 联接式护坡砖护坡的施工方法 | |
Fay et al. | Cost-effective and sustainable road slope stabilization and erosion control | |
CN103774618A (zh) | 一种生态护坡砌块及其护坡方法 | |
Sañudo et al. | Drainage in railways | |
CN105804048B (zh) | 一种软弱地基排水板加固方法 | |
CN106245688B (zh) | 一种预防地下室地面渗漏施工结构及其施工工艺 | |
CN210395030U (zh) | 适用于湿陷性黄土地区市政道路侧分隔带的防水结构 | |
Keller et al. | Low-volume roads engineering: Best management practices | |
CN209619788U (zh) | 一种水泥砼路面结构层排水系统 | |
KR20130140238A (ko) | 다이크집수거를 이용한 도로 포장시공방법 | |
CN220746471U (zh) | 一种软泥层地质区路基处理结构 | |
Orr | Roadway and roadside drainage | |
Shoop et al. | Maintenance and drainage guidance for the Scott Base Transition, Antarctica | |
KR100641032B1 (ko) | 연약지반의 배수처리방법 및 구조 | |
CN206143821U (zh) | 一种预防地下室地面渗漏施工结构 | |
CN215105840U (zh) | 一种道路雨污分离连续排水系统 | |
Keller et al. | Climate change and infrastructure in the Sierra Nevada | |
Walker | The discontinuance of Boltby reservoir, North Yorkshire, UK | |
Courtnadge | Worth Farm flood detention reservoir: challenges during construction | |
Tzanakakis et al. | Track Drainage | |
Malik et al. | Maitland Gaol, 6/18 John St, East Maitland | |
Bat et al. | Federal Highway Administration, Federal Railroad Administration, and Federal Transit Administration Programmatic Biological Assessment for Transportation Projects in the Range of the | |
CN205688548U (zh) | 一种生态排水装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181113 |
|
CF01 | Termination of patent right due to non-payment of annual fee |