CN106315431A - Tower crane dual embedded section and construction method thereof - Google Patents

Tower crane dual embedded section and construction method thereof Download PDF

Info

Publication number
CN106315431A
CN106315431A CN201610566696.3A CN201610566696A CN106315431A CN 106315431 A CN106315431 A CN 106315431A CN 201610566696 A CN201610566696 A CN 201610566696A CN 106315431 A CN106315431 A CN 106315431A
Authority
CN
China
Prior art keywords
tower crane
buried joint
joint
buried
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610566696.3A
Other languages
Chinese (zh)
Inventor
包纯南
窦金胜
傅婧
肖婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201610566696.3A priority Critical patent/CN106315431A/en
Publication of CN106315431A publication Critical patent/CN106315431A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Abstract

The invention provides a tower crane dual embedded section which comprises a large embedded section, a small embedded section, a connection rod, an inclined support and an inclined rod. The small embedded section is installed in the large embedded section, the small embedded section is connected with the large embedded section through the connection rod, and the large embedded section and the small embedded section are poured in a same concrete foundation platform. The invention further provides a construction method of the tower crane dual embedded section. The method comprises the following steps that 1, the tower crane dual embedded section is manufactured; 2, the tower crane concrete foundation platform is designed; 3, earth excavation is carried out to complete installation and fixing of the dual embedded section; 4, a template is erected, and the concrete foundation platform is poured. The tower crane dual embedded section has the beneficial effects that the technical problem of replacement of a small tower crane and a large tower crane in construction is effectively solved, the tower crane operation cost is reduced, tower crane replacement operation safety is ensured, the construction difficulty is lowered, the integrity is good, fixing is simple, and operation is convenient.

Description

The double pre-buried joint of a kind of tower crane and construction method thereof
Technical field
The present invention relates to the construction field of derrick crane, concretely relate to the double pre-buried joint of a kind of tower crane and construction thereof Method.
Background technology
Along with the increase of construction project scale, the tower crane of conventional model cannot meet construction requirement, the most large-scale public affairs Build in project and multi-storey basement project, often there is local or specific construction part, it is necessary to use the tower crane of larger number to replace The generation tower crane of conventional model is constructed.
Pre-buried joint for be embedded in concrete foundation in advance, the portion being connected with foundation for tower crane joint or the superstructure such as standard knot Point, be typically different the tower crane of model and need to arrange in pairs or groups the pre-buried joint of respective model is installed, the specification of tower crane model the most pre-buried different joint and Form is the most different, and the tower crane of different model cannot use the pre-buried joint of same to construct.
Meanwhile, the size of concrete foundation, arrangement of reinforcement etc. require to carry out respective design, if by difference also according to the model of tower crane The tower crane of model arbitrarily uses the different tower crane that the concrete foundation cushion cap of same model, especially performance parameter differ bigger with, Will result in bigger potential safety hazard, even result in tower crane and the security incident such as topple.
If desired use different model tower crane in the different construction stages, then original concrete foundation cushion cap must be carried out weight New construction, makes the tower crane concrete foundation cushion cap meeting construction requirement.But, construction concrete foundation cushion cap is not only subject to again To the strict restriction of site condition, also it is greatly increased construction cost, affects the normal progress of construction, unfavorable to construction.
Therefore, practice of construction the most just considers large-scale tower crane is installed, and large-scale tower crane lease, use etc. take With costly, roll up the input of construction cost.
Summary of the invention
The deficiency existed for prior art, it is an object of the invention to provide the double pre-buried joint of a kind of tower crane and construction party thereof Method, effectively solves the technical barrier that size type tower crane is replaced in construction, not only greatly reduces tower crane operating cost, it is ensured that The job safety of tower crane displacement, structural safety is reliable, simple to operation.
For achieving the above object, the technical scheme is that the double pre-buried joint of a kind of tower crane, including the most pre-buried Joint, little pre-buried joint, connecting rod, bearing diagonal and brace.Wherein, little pre-buried joint is arranged in big pre-buried joint, and little pre-buried joint is with the most pre-buried Joint is connected by connecting rod.
Preferably, in described little pre-buried joint, it is provided with bearing diagonal and brace, in big pre-buried joint, also is provided with brace, increase structure Bonding strength.
Preferably, described connecting rod is arranged on big pre-buried joint diagonal position, is connected with the supporting leg of little pre-buried joint, both can play Interconnection function may also function as skewed horizontal load effect, strengthens structural integrity.
Preferably, described big pre-buried joint is parallel with little pre-buried joint upper surface, it is ensured that the flatness of upper surface.
Preferably, described big pre-buried joint and little pre-buried joint are cast in same concrete foundation cushion cap.
Preferably, the described size of concrete foundation cushion cap, arrangement of reinforcement etc. require to be satisfied by the design requirement of big pre-buried joint.
Preferably, described connecting rod, bearing diagonal and brace are all fixed by welding in structure.
Preferably, described big pre-buried joint and little pre-buried joint are in the double pre-buried joint of same tower crane, by same specialized factory Design and produce.
Present invention also offers the construction method of the double pre-buried joint of a kind of tower crane, the technical scheme used mainly includes following Step:
Step one: make the double pre-buried joint of tower crane so that it is the tower crane meeting two kinds of different models uses, it is ensured that big pre-buried joint is pre-with little Bury joint upper surface parallel;
Step 2: design tower crane concrete foundation cushion cap by big model foundation for tower crane requirement;
Step 3: earth excavation to absolute altitude at the bottom of column foot cap design of pile, the double pre-buried joint embedment precalculated positions of colligation cushion cap reinforcing bar also general, The length of embedment of double pre-buried joints is satisfied by designing requirement with stretching out foundation platform height, and the installation completing double pre-buried joint is fixed;
Step 4: install template, casting concrete foundation platform.
Further, in described step 3, during double pre-buried joint integral built-in, it is ensured that levelness is in 1 ‰.
The invention has the beneficial effects as follows: the double pre-buried joint of a kind of tower crane and construction method thereof, embedded little pre-buried with big pre-buried joint The integral form of joint buries as in tower crane concrete foundation, it is not necessary to the most embedding, not only efficiently solves big small-sized tower crane in construction The technical barrier of middle displacement, greatly reduces tower crane operating cost, it is ensured that the job safety of tower crane displacement, on double pre-buried joints The flatness on surface is guaranteed the most simultaneously, and only need to pour tower crane concrete foundation once reduces difficulty of construction, ensures Construction speed, this device good integrity, double pre-buried joint location, pre-buried accuracy have been effectively ensured, fixing simple, operation side Just.
Below in conjunction with specification drawings and specific embodiments, the invention will be further described.
Accompanying drawing explanation
Fig. 1 is the structural representation of the double pre-buried joint of a kind of tower crane.
Fig. 2 is the profile of the double pre-buried joint of a kind of tower crane.
In accompanying drawing: 1, big pre-buried joint, 2, little pre-buried joint, 3, connecting rod, 4, bearing diagonal, 5, brace, 6, supporting leg, 7, coagulation soil matrix Plinth cushion cap.
Detailed description of the invention
As shown in Figure 1 and Figure 2, the double pre-buried joint of a kind of tower crane that the present invention provides, including big pre-buried joint 1, little pre-buried joint 2, connect Bar 3, bearing diagonal 4 and brace 5.Wherein, little pre-buried joint 2 is arranged in big pre-buried joint 1, and little pre-buried joint 2 and big pre-buried joint 1 are by even Bar 3 connects, and is provided with bearing diagonal 4 and brace 5 in little pre-buried joint 2, also is provided with brace 5 in big pre-buried joint 1, increases structure and connects strong Degree.Described connecting rod 3 is arranged on big pre-buried joint 1 diagonal position, is connected with the supporting leg 6 of little pre-buried joint 2, both can play interconnection function May also function as skewed horizontal load effect, strengthen structural integrity, big pre-buried joint 1 is parallel with little pre-buried joint 2 upper surface, it is ensured that upper surface Flatness, big pre-buried joint 1 and little pre-buried joint 2 be cast in same concrete foundation cushion cap 7, the chi of concrete foundation cushion cap 7 Very little, arrangements of reinforcement etc. require to be satisfied by the design requirement of big pre-buried joint 1, and connecting rod 3, bearing diagonal 4 and brace 5 are all fixed by welding in knot On structure, big pre-buried joint 1 and little pre-buried joint 2, in the double pre-buried joint of same tower crane, are designed and produced by same specialized factory.
The embodiment of the present invention additionally provides the construction method of the double pre-buried joint of this tower crane, mainly comprises the steps that
Step one: make the double pre-buried joint of tower crane so that it is the tower crane meeting two kinds of different models uses, it is ensured that big pre-buried joint is pre-with little Bury joint upper surface parallel;
Step 2: design tower crane concrete foundation cushion cap by big model foundation for tower crane requirement;
Step 3: earth excavation to absolute altitude at the bottom of column foot cap design of pile, the double pre-buried joint embedment precalculated positions of colligation cushion cap reinforcing bar also general, The length of embedment of double pre-buried joints is satisfied by designing requirement with stretching out foundation platform height, and the installation completing double pre-buried joint is fixed;
Step 4: install template, casting concrete foundation platform.
Further, in described step 3, during double pre-buried joint integral built-in, it is ensured that levelness is in 1 ‰.
The above-described embodiment specific descriptions to the present invention, are served only for being further described the present invention, it is impossible to be interpreted as Limiting the scope of the present invention, it is non-that the present invention is made some according to the content of foregoing invention by the technician of this area Within the improvement of essence and adjustment each fall within protection scope of the present invention.

Claims (10)

1. the double pre-buried joint of tower crane and construction method thereof, it is characterised in that: include big pre-buried joint (1), little pre-buried joint (2), connect Bar (3), bearing diagonal (4) and brace (5), wherein, little pre-buried joint (2) is arranged in big pre-buried joint (1), and little pre-buried joint (2) is with big Pre-buried joint (1) is connected by connecting rod (3).
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: described is little pre-buried It is provided with bearing diagonal (4) and brace (5) in joint (2), in big pre-buried joint (1), also is provided with brace (5).
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: described connecting rod (3) it is arranged on big pre-buried joint (1) diagonal position, is connected with the supporting leg (6) of little pre-buried joint (2).
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: described is the most pre-buried Joint (1) is parallel with little pre-buried joint (2) upper surface.
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: described is the most pre-buried Joint (1) and little pre-buried joint (2) are cast in same concrete foundation cushion cap (7).
The double pre-buried joint of a kind of tower crane the most according to claim 5 and construction method thereof, it is characterised in that: described concrete The size of foundation platform (7), arrangement of reinforcement etc. require to be satisfied by the design requirement of big pre-buried joint (1).
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: described connecting rod (3), bearing diagonal (4) and brace (5) are all fixed by welding in structure.
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: described is the most pre-buried Joint (1) and little pre-buried joint (2), in the double pre-buried joint of same tower crane, are designed and produced by same specialized factory.
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: a kind of tower crane is double pre- Bury the construction method of joint, mainly comprise the steps that
Step one: make the double pre-buried joint of tower crane so that it is the tower crane meeting two kinds of different models uses, it is ensured that big pre-buried joint is pre-with little Bury joint upper surface parallel;
Step 2: design tower crane concrete foundation cushion cap by big model foundation for tower crane requirement;
Step 3: earth excavation to absolute altitude at the bottom of column foot cap design of pile, the double pre-buried joint embedment precalculated positions of colligation cushion cap reinforcing bar also general, The length of embedment of double pre-buried joints is satisfied by designing requirement with stretching out foundation platform height, and the installation completing double pre-buried joint is fixed;
Step 4: install template, casting concrete foundation platform.
The double pre-buried joint of a kind of tower crane the most according to claim 9 and construction method thereof, it is characterised in that: described step In three, during double pre-buried joint integral built-in, it is ensured that levelness is in 1 ‰.
CN201610566696.3A 2016-07-19 2016-07-19 Tower crane dual embedded section and construction method thereof Pending CN106315431A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610566696.3A CN106315431A (en) 2016-07-19 2016-07-19 Tower crane dual embedded section and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610566696.3A CN106315431A (en) 2016-07-19 2016-07-19 Tower crane dual embedded section and construction method thereof

Publications (1)

Publication Number Publication Date
CN106315431A true CN106315431A (en) 2017-01-11

Family

ID=57740289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610566696.3A Pending CN106315431A (en) 2016-07-19 2016-07-19 Tower crane dual embedded section and construction method thereof

Country Status (1)

Country Link
CN (1) CN106315431A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179222A (en) * 2018-09-29 2019-01-11 温州建设集团有限公司 A kind of pre-buried section gradient of derrick crane and levelness control construction method
CN110002350A (en) * 2019-05-14 2019-07-12 中交一航局第二工程有限公司 Tower section displacement apparatus, the through-flooring construction method comprising its tower crane and the tower crane
CN110683470A (en) * 2019-08-22 2020-01-14 华恒建设集团有限公司 Shared foundation for tower crane conversion and processing method thereof
CN111186778A (en) * 2020-03-04 2020-05-22 山东中建众力设备租赁有限公司 Mechanism and method for variable cross-section installation of foundation sections of tower crane
CN112239162A (en) * 2020-11-04 2021-01-19 常德市荣程机械有限公司 Double-embedded-section structure of tower crane

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007217108A (en) * 2006-02-16 2007-08-30 Takenaka Komuten Co Ltd Method of supporting tower crane
JP2009184756A (en) * 2008-02-04 2009-08-20 Takenaka Komuten Co Ltd Tower crane support structure and building method thereof
CN103132537A (en) * 2013-02-04 2013-06-05 中天建设集团有限公司 Steel latticed column homocentric-square-shaped concrete bearing platform combination type tower crane base structure and construction method
CN104480959A (en) * 2014-12-18 2015-04-01 无锡伊诺永利文化创意有限公司 General tower crane supporting base
CN104818729A (en) * 2015-05-27 2015-08-05 浙江省一建建设集团有限公司 Common foundation for transformation of large and small tower cranes
CN204825952U (en) * 2015-07-31 2015-12-02 南通庞源机械工程有限公司 Tower machine steel platform basis fixed leg
CN205132971U (en) * 2015-09-30 2016-04-06 徐州建机工程机械有限公司 Pre -buried section structure in tower machine
CN205294673U (en) * 2015-12-29 2016-06-08 浙江大学城市学院 Change basic connection structure
CN205802813U (en) * 2016-07-19 2016-12-14 中天建设集团有限公司 The double pre-buried joint of a kind of tower crane

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007217108A (en) * 2006-02-16 2007-08-30 Takenaka Komuten Co Ltd Method of supporting tower crane
JP2009184756A (en) * 2008-02-04 2009-08-20 Takenaka Komuten Co Ltd Tower crane support structure and building method thereof
CN103132537A (en) * 2013-02-04 2013-06-05 中天建设集团有限公司 Steel latticed column homocentric-square-shaped concrete bearing platform combination type tower crane base structure and construction method
CN104480959A (en) * 2014-12-18 2015-04-01 无锡伊诺永利文化创意有限公司 General tower crane supporting base
CN104818729A (en) * 2015-05-27 2015-08-05 浙江省一建建设集团有限公司 Common foundation for transformation of large and small tower cranes
CN204825952U (en) * 2015-07-31 2015-12-02 南通庞源机械工程有限公司 Tower machine steel platform basis fixed leg
CN205132971U (en) * 2015-09-30 2016-04-06 徐州建机工程机械有限公司 Pre -buried section structure in tower machine
CN205294673U (en) * 2015-12-29 2016-06-08 浙江大学城市学院 Change basic connection structure
CN205802813U (en) * 2016-07-19 2016-12-14 中天建设集团有限公司 The double pre-buried joint of a kind of tower crane

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179222A (en) * 2018-09-29 2019-01-11 温州建设集团有限公司 A kind of pre-buried section gradient of derrick crane and levelness control construction method
CN109179222B (en) * 2018-09-29 2020-04-07 温州建设集团有限公司 Construction method for controlling inclination and levelness of embedded joint of tower crane
CN110002350A (en) * 2019-05-14 2019-07-12 中交一航局第二工程有限公司 Tower section displacement apparatus, the through-flooring construction method comprising its tower crane and the tower crane
CN110002350B (en) * 2019-05-14 2024-03-22 中交一航局第二工程有限公司 Tower section replacement device, tower crane comprising tower section replacement device and floor penetrating construction method of tower crane
CN110683470A (en) * 2019-08-22 2020-01-14 华恒建设集团有限公司 Shared foundation for tower crane conversion and processing method thereof
CN110683470B (en) * 2019-08-22 2020-12-11 华恒建设集团有限公司 Shared foundation for tower crane conversion and processing method thereof
CN111186778A (en) * 2020-03-04 2020-05-22 山东中建众力设备租赁有限公司 Mechanism and method for variable cross-section installation of foundation sections of tower crane
CN111186778B (en) * 2020-03-04 2021-06-22 山东中建众力设备租赁有限公司 Mechanism and method for variable cross-section installation of foundation sections of tower crane
CN112239162A (en) * 2020-11-04 2021-01-19 常德市荣程机械有限公司 Double-embedded-section structure of tower crane
CN112239162B (en) * 2020-11-04 2022-09-13 常德市荣程机械有限公司 Double-embedded-section structure of tower crane

Similar Documents

Publication Publication Date Title
CN106315431A (en) Tower crane dual embedded section and construction method thereof
CN104088397B (en) A kind of prefabricated post and precast construction method thereof
CN105544590B (en) Overall continuously adjustabe basis for project of transmitting and converting electricity shaft tower
CN107090975A (en) A kind of big across the cast-in-situ concrete beam Bailey bracket formwork construction method of superelevation
CN105484285A (en) Spliced steel pipe concrete column type high bearing platform tower crane foundation structure and construction method
CN105350639B (en) A kind of facade intersects grid structure peripheral frame and its installation method
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN105155602A (en) Multi-support foundation strengthening comprehensive controlling method
CN104372799A (en) Rigid unearthing platform foundation pit inner support structure and construction method
CN103967018B (en) Deep big foundation pit angle support level shear structure
CN105332388A (en) Assembled concrete-filled steel tubular column cap type tower crane foundation structure and construction method
CN205802813U (en) The double pre-buried joint of a kind of tower crane
CN205531399U (en) Interim support frame is installed in high -order steel truss segmentation
KR20150138785A (en) Vertical expansion remodeling method of existing building with seperate load path
CN110904992B (en) Elevator foundation member for integrally assembling elevator and construction method thereof
CN105525624A (en) Connecting and water resisting method for assembled steel pipe column type tower crane foundation and structural base plate
CN105421477A (en) Construction method for tower crane foundation
CN105858501B (en) Itself tower crane of attachment with foundation underpinning device and its construction method
CN102808420B (en) Bearing platform and construction method for connection between bearing platform and foundation pile
CN206693242U (en) A kind of vertical bearing structure of suspension support beam in base pit engineering
KR101282333B1 (en) Cross-type supporting structure and method for super-structure of bridge
Tait et al. A low damage design solution for a 15 storey steel framed building
CN103243722B (en) The construction method of novel inner support of foundation trench
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN104389354B (en) Semi-girder damping system capable of realizing self-restoration after earthquake in super high-rise building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170111

WD01 Invention patent application deemed withdrawn after publication