CN106315431A - Tower crane dual embedded section and construction method thereof - Google Patents
Tower crane dual embedded section and construction method thereof Download PDFInfo
- Publication number
- CN106315431A CN106315431A CN201610566696.3A CN201610566696A CN106315431A CN 106315431 A CN106315431 A CN 106315431A CN 201610566696 A CN201610566696 A CN 201610566696A CN 106315431 A CN106315431 A CN 106315431A
- Authority
- CN
- China
- Prior art keywords
- tower crane
- buried joint
- joint
- buried
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Abstract
The invention provides a tower crane dual embedded section which comprises a large embedded section, a small embedded section, a connection rod, an inclined support and an inclined rod. The small embedded section is installed in the large embedded section, the small embedded section is connected with the large embedded section through the connection rod, and the large embedded section and the small embedded section are poured in a same concrete foundation platform. The invention further provides a construction method of the tower crane dual embedded section. The method comprises the following steps that 1, the tower crane dual embedded section is manufactured; 2, the tower crane concrete foundation platform is designed; 3, earth excavation is carried out to complete installation and fixing of the dual embedded section; 4, a template is erected, and the concrete foundation platform is poured. The tower crane dual embedded section has the beneficial effects that the technical problem of replacement of a small tower crane and a large tower crane in construction is effectively solved, the tower crane operation cost is reduced, tower crane replacement operation safety is ensured, the construction difficulty is lowered, the integrity is good, fixing is simple, and operation is convenient.
Description
Technical field
The present invention relates to the construction field of derrick crane, concretely relate to the double pre-buried joint of a kind of tower crane and construction thereof
Method.
Background technology
Along with the increase of construction project scale, the tower crane of conventional model cannot meet construction requirement, the most large-scale public affairs
Build in project and multi-storey basement project, often there is local or specific construction part, it is necessary to use the tower crane of larger number to replace
The generation tower crane of conventional model is constructed.
Pre-buried joint for be embedded in concrete foundation in advance, the portion being connected with foundation for tower crane joint or the superstructure such as standard knot
Point, be typically different the tower crane of model and need to arrange in pairs or groups the pre-buried joint of respective model is installed, the specification of tower crane model the most pre-buried different joint and
Form is the most different, and the tower crane of different model cannot use the pre-buried joint of same to construct.
Meanwhile, the size of concrete foundation, arrangement of reinforcement etc. require to carry out respective design, if by difference also according to the model of tower crane
The tower crane of model arbitrarily uses the different tower crane that the concrete foundation cushion cap of same model, especially performance parameter differ bigger with,
Will result in bigger potential safety hazard, even result in tower crane and the security incident such as topple.
If desired use different model tower crane in the different construction stages, then original concrete foundation cushion cap must be carried out weight
New construction, makes the tower crane concrete foundation cushion cap meeting construction requirement.But, construction concrete foundation cushion cap is not only subject to again
To the strict restriction of site condition, also it is greatly increased construction cost, affects the normal progress of construction, unfavorable to construction.
Therefore, practice of construction the most just considers large-scale tower crane is installed, and large-scale tower crane lease, use etc. take
With costly, roll up the input of construction cost.
Summary of the invention
The deficiency existed for prior art, it is an object of the invention to provide the double pre-buried joint of a kind of tower crane and construction party thereof
Method, effectively solves the technical barrier that size type tower crane is replaced in construction, not only greatly reduces tower crane operating cost, it is ensured that
The job safety of tower crane displacement, structural safety is reliable, simple to operation.
For achieving the above object, the technical scheme is that the double pre-buried joint of a kind of tower crane, including the most pre-buried
Joint, little pre-buried joint, connecting rod, bearing diagonal and brace.Wherein, little pre-buried joint is arranged in big pre-buried joint, and little pre-buried joint is with the most pre-buried
Joint is connected by connecting rod.
Preferably, in described little pre-buried joint, it is provided with bearing diagonal and brace, in big pre-buried joint, also is provided with brace, increase structure
Bonding strength.
Preferably, described connecting rod is arranged on big pre-buried joint diagonal position, is connected with the supporting leg of little pre-buried joint, both can play
Interconnection function may also function as skewed horizontal load effect, strengthens structural integrity.
Preferably, described big pre-buried joint is parallel with little pre-buried joint upper surface, it is ensured that the flatness of upper surface.
Preferably, described big pre-buried joint and little pre-buried joint are cast in same concrete foundation cushion cap.
Preferably, the described size of concrete foundation cushion cap, arrangement of reinforcement etc. require to be satisfied by the design requirement of big pre-buried joint.
Preferably, described connecting rod, bearing diagonal and brace are all fixed by welding in structure.
Preferably, described big pre-buried joint and little pre-buried joint are in the double pre-buried joint of same tower crane, by same specialized factory
Design and produce.
Present invention also offers the construction method of the double pre-buried joint of a kind of tower crane, the technical scheme used mainly includes following
Step:
Step one: make the double pre-buried joint of tower crane so that it is the tower crane meeting two kinds of different models uses, it is ensured that big pre-buried joint is pre-with little
Bury joint upper surface parallel;
Step 2: design tower crane concrete foundation cushion cap by big model foundation for tower crane requirement;
Step 3: earth excavation to absolute altitude at the bottom of column foot cap design of pile, the double pre-buried joint embedment precalculated positions of colligation cushion cap reinforcing bar also general,
The length of embedment of double pre-buried joints is satisfied by designing requirement with stretching out foundation platform height, and the installation completing double pre-buried joint is fixed;
Step 4: install template, casting concrete foundation platform.
Further, in described step 3, during double pre-buried joint integral built-in, it is ensured that levelness is in 1 ‰.
The invention has the beneficial effects as follows: the double pre-buried joint of a kind of tower crane and construction method thereof, embedded little pre-buried with big pre-buried joint
The integral form of joint buries as in tower crane concrete foundation, it is not necessary to the most embedding, not only efficiently solves big small-sized tower crane in construction
The technical barrier of middle displacement, greatly reduces tower crane operating cost, it is ensured that the job safety of tower crane displacement, on double pre-buried joints
The flatness on surface is guaranteed the most simultaneously, and only need to pour tower crane concrete foundation once reduces difficulty of construction, ensures
Construction speed, this device good integrity, double pre-buried joint location, pre-buried accuracy have been effectively ensured, fixing simple, operation side
Just.
Below in conjunction with specification drawings and specific embodiments, the invention will be further described.
Accompanying drawing explanation
Fig. 1 is the structural representation of the double pre-buried joint of a kind of tower crane.
Fig. 2 is the profile of the double pre-buried joint of a kind of tower crane.
In accompanying drawing: 1, big pre-buried joint, 2, little pre-buried joint, 3, connecting rod, 4, bearing diagonal, 5, brace, 6, supporting leg, 7, coagulation soil matrix
Plinth cushion cap.
Detailed description of the invention
As shown in Figure 1 and Figure 2, the double pre-buried joint of a kind of tower crane that the present invention provides, including big pre-buried joint 1, little pre-buried joint 2, connect
Bar 3, bearing diagonal 4 and brace 5.Wherein, little pre-buried joint 2 is arranged in big pre-buried joint 1, and little pre-buried joint 2 and big pre-buried joint 1 are by even
Bar 3 connects, and is provided with bearing diagonal 4 and brace 5 in little pre-buried joint 2, also is provided with brace 5 in big pre-buried joint 1, increases structure and connects strong
Degree.Described connecting rod 3 is arranged on big pre-buried joint 1 diagonal position, is connected with the supporting leg 6 of little pre-buried joint 2, both can play interconnection function
May also function as skewed horizontal load effect, strengthen structural integrity, big pre-buried joint 1 is parallel with little pre-buried joint 2 upper surface, it is ensured that upper surface
Flatness, big pre-buried joint 1 and little pre-buried joint 2 be cast in same concrete foundation cushion cap 7, the chi of concrete foundation cushion cap 7
Very little, arrangements of reinforcement etc. require to be satisfied by the design requirement of big pre-buried joint 1, and connecting rod 3, bearing diagonal 4 and brace 5 are all fixed by welding in knot
On structure, big pre-buried joint 1 and little pre-buried joint 2, in the double pre-buried joint of same tower crane, are designed and produced by same specialized factory.
The embodiment of the present invention additionally provides the construction method of the double pre-buried joint of this tower crane, mainly comprises the steps that
Step one: make the double pre-buried joint of tower crane so that it is the tower crane meeting two kinds of different models uses, it is ensured that big pre-buried joint is pre-with little
Bury joint upper surface parallel;
Step 2: design tower crane concrete foundation cushion cap by big model foundation for tower crane requirement;
Step 3: earth excavation to absolute altitude at the bottom of column foot cap design of pile, the double pre-buried joint embedment precalculated positions of colligation cushion cap reinforcing bar also general,
The length of embedment of double pre-buried joints is satisfied by designing requirement with stretching out foundation platform height, and the installation completing double pre-buried joint is fixed;
Step 4: install template, casting concrete foundation platform.
Further, in described step 3, during double pre-buried joint integral built-in, it is ensured that levelness is in 1 ‰.
The above-described embodiment specific descriptions to the present invention, are served only for being further described the present invention, it is impossible to be interpreted as
Limiting the scope of the present invention, it is non-that the present invention is made some according to the content of foregoing invention by the technician of this area
Within the improvement of essence and adjustment each fall within protection scope of the present invention.
Claims (10)
1. the double pre-buried joint of tower crane and construction method thereof, it is characterised in that: include big pre-buried joint (1), little pre-buried joint (2), connect
Bar (3), bearing diagonal (4) and brace (5), wherein, little pre-buried joint (2) is arranged in big pre-buried joint (1), and little pre-buried joint (2) is with big
Pre-buried joint (1) is connected by connecting rod (3).
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: described is little pre-buried
It is provided with bearing diagonal (4) and brace (5) in joint (2), in big pre-buried joint (1), also is provided with brace (5).
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: described connecting rod
(3) it is arranged on big pre-buried joint (1) diagonal position, is connected with the supporting leg (6) of little pre-buried joint (2).
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: described is the most pre-buried
Joint (1) is parallel with little pre-buried joint (2) upper surface.
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: described is the most pre-buried
Joint (1) and little pre-buried joint (2) are cast in same concrete foundation cushion cap (7).
The double pre-buried joint of a kind of tower crane the most according to claim 5 and construction method thereof, it is characterised in that: described concrete
The size of foundation platform (7), arrangement of reinforcement etc. require to be satisfied by the design requirement of big pre-buried joint (1).
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: described connecting rod
(3), bearing diagonal (4) and brace (5) are all fixed by welding in structure.
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: described is the most pre-buried
Joint (1) and little pre-buried joint (2), in the double pre-buried joint of same tower crane, are designed and produced by same specialized factory.
The double pre-buried joint of a kind of tower crane the most according to claim 1 and construction method thereof, it is characterised in that: a kind of tower crane is double pre-
Bury the construction method of joint, mainly comprise the steps that
Step one: make the double pre-buried joint of tower crane so that it is the tower crane meeting two kinds of different models uses, it is ensured that big pre-buried joint is pre-with little
Bury joint upper surface parallel;
Step 2: design tower crane concrete foundation cushion cap by big model foundation for tower crane requirement;
Step 3: earth excavation to absolute altitude at the bottom of column foot cap design of pile, the double pre-buried joint embedment precalculated positions of colligation cushion cap reinforcing bar also general,
The length of embedment of double pre-buried joints is satisfied by designing requirement with stretching out foundation platform height, and the installation completing double pre-buried joint is fixed;
Step 4: install template, casting concrete foundation platform.
The double pre-buried joint of a kind of tower crane the most according to claim 9 and construction method thereof, it is characterised in that: described step
In three, during double pre-buried joint integral built-in, it is ensured that levelness is in 1 ‰.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610566696.3A CN106315431A (en) | 2016-07-19 | 2016-07-19 | Tower crane dual embedded section and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610566696.3A CN106315431A (en) | 2016-07-19 | 2016-07-19 | Tower crane dual embedded section and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106315431A true CN106315431A (en) | 2017-01-11 |
Family
ID=57740289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610566696.3A Pending CN106315431A (en) | 2016-07-19 | 2016-07-19 | Tower crane dual embedded section and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106315431A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109179222A (en) * | 2018-09-29 | 2019-01-11 | 温州建设集团有限公司 | A kind of pre-buried section gradient of derrick crane and levelness control construction method |
CN110002350A (en) * | 2019-05-14 | 2019-07-12 | 中交一航局第二工程有限公司 | Tower section displacement apparatus, the through-flooring construction method comprising its tower crane and the tower crane |
CN110683470A (en) * | 2019-08-22 | 2020-01-14 | 华恒建设集团有限公司 | Shared foundation for tower crane conversion and processing method thereof |
CN111186778A (en) * | 2020-03-04 | 2020-05-22 | 山东中建众力设备租赁有限公司 | Mechanism and method for variable cross-section installation of foundation sections of tower crane |
CN112239162A (en) * | 2020-11-04 | 2021-01-19 | 常德市荣程机械有限公司 | Double-embedded-section structure of tower crane |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007217108A (en) * | 2006-02-16 | 2007-08-30 | Takenaka Komuten Co Ltd | Method of supporting tower crane |
JP2009184756A (en) * | 2008-02-04 | 2009-08-20 | Takenaka Komuten Co Ltd | Tower crane support structure and building method thereof |
CN103132537A (en) * | 2013-02-04 | 2013-06-05 | 中天建设集团有限公司 | Steel latticed column homocentric-square-shaped concrete bearing platform combination type tower crane base structure and construction method |
CN104480959A (en) * | 2014-12-18 | 2015-04-01 | 无锡伊诺永利文化创意有限公司 | General tower crane supporting base |
CN104818729A (en) * | 2015-05-27 | 2015-08-05 | 浙江省一建建设集团有限公司 | Common foundation for transformation of large and small tower cranes |
CN204825952U (en) * | 2015-07-31 | 2015-12-02 | 南通庞源机械工程有限公司 | Tower machine steel platform basis fixed leg |
CN205132971U (en) * | 2015-09-30 | 2016-04-06 | 徐州建机工程机械有限公司 | Pre -buried section structure in tower machine |
CN205294673U (en) * | 2015-12-29 | 2016-06-08 | 浙江大学城市学院 | Change basic connection structure |
CN205802813U (en) * | 2016-07-19 | 2016-12-14 | 中天建设集团有限公司 | The double pre-buried joint of a kind of tower crane |
-
2016
- 2016-07-19 CN CN201610566696.3A patent/CN106315431A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007217108A (en) * | 2006-02-16 | 2007-08-30 | Takenaka Komuten Co Ltd | Method of supporting tower crane |
JP2009184756A (en) * | 2008-02-04 | 2009-08-20 | Takenaka Komuten Co Ltd | Tower crane support structure and building method thereof |
CN103132537A (en) * | 2013-02-04 | 2013-06-05 | 中天建设集团有限公司 | Steel latticed column homocentric-square-shaped concrete bearing platform combination type tower crane base structure and construction method |
CN104480959A (en) * | 2014-12-18 | 2015-04-01 | 无锡伊诺永利文化创意有限公司 | General tower crane supporting base |
CN104818729A (en) * | 2015-05-27 | 2015-08-05 | 浙江省一建建设集团有限公司 | Common foundation for transformation of large and small tower cranes |
CN204825952U (en) * | 2015-07-31 | 2015-12-02 | 南通庞源机械工程有限公司 | Tower machine steel platform basis fixed leg |
CN205132971U (en) * | 2015-09-30 | 2016-04-06 | 徐州建机工程机械有限公司 | Pre -buried section structure in tower machine |
CN205294673U (en) * | 2015-12-29 | 2016-06-08 | 浙江大学城市学院 | Change basic connection structure |
CN205802813U (en) * | 2016-07-19 | 2016-12-14 | 中天建设集团有限公司 | The double pre-buried joint of a kind of tower crane |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109179222A (en) * | 2018-09-29 | 2019-01-11 | 温州建设集团有限公司 | A kind of pre-buried section gradient of derrick crane and levelness control construction method |
CN109179222B (en) * | 2018-09-29 | 2020-04-07 | 温州建设集团有限公司 | Construction method for controlling inclination and levelness of embedded joint of tower crane |
CN110002350A (en) * | 2019-05-14 | 2019-07-12 | 中交一航局第二工程有限公司 | Tower section displacement apparatus, the through-flooring construction method comprising its tower crane and the tower crane |
CN110002350B (en) * | 2019-05-14 | 2024-03-22 | 中交一航局第二工程有限公司 | Tower section replacement device, tower crane comprising tower section replacement device and floor penetrating construction method of tower crane |
CN110683470A (en) * | 2019-08-22 | 2020-01-14 | 华恒建设集团有限公司 | Shared foundation for tower crane conversion and processing method thereof |
CN110683470B (en) * | 2019-08-22 | 2020-12-11 | 华恒建设集团有限公司 | Shared foundation for tower crane conversion and processing method thereof |
CN111186778A (en) * | 2020-03-04 | 2020-05-22 | 山东中建众力设备租赁有限公司 | Mechanism and method for variable cross-section installation of foundation sections of tower crane |
CN111186778B (en) * | 2020-03-04 | 2021-06-22 | 山东中建众力设备租赁有限公司 | Mechanism and method for variable cross-section installation of foundation sections of tower crane |
CN112239162A (en) * | 2020-11-04 | 2021-01-19 | 常德市荣程机械有限公司 | Double-embedded-section structure of tower crane |
CN112239162B (en) * | 2020-11-04 | 2022-09-13 | 常德市荣程机械有限公司 | Double-embedded-section structure of tower crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106315431A (en) | Tower crane dual embedded section and construction method thereof | |
CN104088397B (en) | A kind of prefabricated post and precast construction method thereof | |
CN105544590B (en) | Overall continuously adjustabe basis for project of transmitting and converting electricity shaft tower | |
CN107090975A (en) | A kind of big across the cast-in-situ concrete beam Bailey bracket formwork construction method of superelevation | |
CN105484285A (en) | Spliced steel pipe concrete column type high bearing platform tower crane foundation structure and construction method | |
CN105350639B (en) | A kind of facade intersects grid structure peripheral frame and its installation method | |
CN105442839A (en) | Erecting method of cantilever structure formwork bent | |
CN105155602A (en) | Multi-support foundation strengthening comprehensive controlling method | |
CN104372799A (en) | Rigid unearthing platform foundation pit inner support structure and construction method | |
CN103967018B (en) | Deep big foundation pit angle support level shear structure | |
CN105332388A (en) | Assembled concrete-filled steel tubular column cap type tower crane foundation structure and construction method | |
CN205802813U (en) | The double pre-buried joint of a kind of tower crane | |
CN205531399U (en) | Interim support frame is installed in high -order steel truss segmentation | |
KR20150138785A (en) | Vertical expansion remodeling method of existing building with seperate load path | |
CN110904992B (en) | Elevator foundation member for integrally assembling elevator and construction method thereof | |
CN105525624A (en) | Connecting and water resisting method for assembled steel pipe column type tower crane foundation and structural base plate | |
CN105421477A (en) | Construction method for tower crane foundation | |
CN105858501B (en) | Itself tower crane of attachment with foundation underpinning device and its construction method | |
CN102808420B (en) | Bearing platform and construction method for connection between bearing platform and foundation pile | |
CN206693242U (en) | A kind of vertical bearing structure of suspension support beam in base pit engineering | |
KR101282333B1 (en) | Cross-type supporting structure and method for super-structure of bridge | |
Tait et al. | A low damage design solution for a 15 storey steel framed building | |
CN103243722B (en) | The construction method of novel inner support of foundation trench | |
CN206220534U (en) | The pump line support meanss of concrete pumping equipment | |
CN104389354B (en) | Semi-girder damping system capable of realizing self-restoration after earthquake in super high-rise building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170111 |
|
WD01 | Invention patent application deemed withdrawn after publication |