CN106312829A - Treatment process for scale on surface of fastener raw material - Google Patents

Treatment process for scale on surface of fastener raw material Download PDF

Info

Publication number
CN106312829A
CN106312829A CN201610909529.4A CN201610909529A CN106312829A CN 106312829 A CN106312829 A CN 106312829A CN 201610909529 A CN201610909529 A CN 201610909529A CN 106312829 A CN106312829 A CN 106312829A
Authority
CN
China
Prior art keywords
raw material
securing member
scale
shot
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610909529.4A
Other languages
Chinese (zh)
Other versions
CN106312829B (en
Inventor
廖宗军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Longchang Materials Co Ltd
Original Assignee
China Railway Longchang Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Longchang Materials Co Ltd filed Critical China Railway Longchang Materials Co Ltd
Priority to CN201610909529.4A priority Critical patent/CN106312829B/en
Publication of CN106312829A publication Critical patent/CN106312829A/en
Application granted granted Critical
Publication of CN106312829B publication Critical patent/CN106312829B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24CABRASIVE OR RELATED BLASTING WITH PARTICULATE MATERIAL
    • B24C1/00Methods for use of abrasive blasting for producing particular effects; Use of auxiliary equipment in connection with such methods
    • B24C1/08Methods for use of abrasive blasting for producing particular effects; Use of auxiliary equipment in connection with such methods for polishing surfaces, e.g. smoothing a surface by making use of liquid-borne abrasives
    • B24C1/086Descaling; Removing coating films

Abstract

The invention discloses a treatment process for scale on the surface of a fastener raw material. The process includes the steps that a passing-type shot blasting machine is used for conducting shot blasting on the surface of the fastener raw material so as to remove the scale; spraying is conducted on the surface of the fastener raw material subjected to shot blasting; and the sprayed surface of the fastener raw material is coated with a lubricating layer in a saponification pool, and specifically, supersaturated fatty acid, sodium hydroxide, lime and clear water are added into the saponification pool according to the proportion of 2:1:10:600 to be evenly stirred to prepare a saponification solution, and the supersaturated fatty acid and the sodium hydroxide can be dissolved in water easily. By means of the treatment process, the shot-blasting cleaning quality of the surface of steel can reach the thorough-cleaning level in the Sa2.5 standard of the ISO8501-1 standard issued by the national standardization organization; and meanwhile, the treatment process has no bad influence on the mechanical property index of the raw material, and environment pollution is reduced.

Description

Securing member raw material scale on surface processes technique
Technical field
The present invention relates to a kind of securing member raw material scale on surface and process technique.
Background technology
Steel after hot rolled or heat treatment have one layer of iron scale to cover at steel surface.The existence of iron scale, On the one hand affect lubricant effect, on the other hand, when cold group, owing to iron scale hardness is relatively big, easily cause the surfaces such as road plan and lack Fall into, also can make to draw the power of dialling to increase simultaneously, make die wear aggravate, cause and dial system difficulty, do not reach cold group of steel smooth finish surface Requirement.So its scale on surface must be cleaned out before cold group by steel, iron scale composition is mainly three oxidations two Ferrum and ferroso-ferric oxide.
In securing member is conventionally produced, first production technology raw material deoxygenation iron sheet technique is conventional following two Kind production technology:
One, the method for raw material bending wire shelling, mainly deforms raw material bending wire, draws by means of drawbench is powerful Power, so that the iron scale of wire surface is stripped in wire rod bending deformation process, but this production technology is only limited in Former material diameter mild steel raw material below 20 millimeters, if raw material diameter is more than 20 millimeters, raw material be medium carbon steel or During low-alloy steel, raw-material yield strength increases, the method using bending shelling, raw material metal fiber in flexural deformation and Under strong pulling force effect, must be destroyed or be pulled off, thus affect the mechanical performance of material, so the shelling of raw material bending wire Method has certain limitation in securing member produces.
Two, in securing member is conventionally produced, first production technology raw material descaling technique all uses pickling, Its acid cleaning process flow process is: pickling washing neutralizes surface coating lubricating layer, is also called saponification, and pickling is that securing member produces In the key that produces of the cold group of steel.
Raw material wire rod pickling there are following problem except iron scale:
(1) owing to, in acid cleaning process, being put affected by acid concentration, pickle temperature and raw material wire rod, metal with Acid produces chemistry reflection, produces part hydrogen atom, and it penetrates in the crystal lattice of metal, and make it deform, makes hydrogen after deformation More to metal internal diffusion, its partial hydrogen atom passes metal molecularization, escapes, the partly molecularization of hydrogen atom from acid solution On " micro-emptying aperture " border that lattice deformability produces, or being mingled with and carry out in hole of metal, hydrogen pressure in emptying aperture can Reach very high values, in making metal, create the internal stress causing hydrogen embrittlement;
(2) metal storage period in acid solution is long, and under acid solution effect, surface gradually becomes the phenomenon of coarse pitted skin Being referred to as overpickling, its mechanical performance elongation percentage of the raw material of overpickling substantially reduces, draw dial during be easily generated fracture and broken Broken;
(3) putting or pickling time deficiency due to raw material wire rod, causes material surface partial oxidation iron sheet not clear up Totally, being referred to as owing pickling, the iron scale owing not clear up in pickling is during cold group, and iron scale hardness is relatively big, is attached to former Material surface raw material enters in wire poking module, causes the surface defects such as road plan, also can make to draw the power of dialling to increase simultaneously, make mould grind Damage aggravation;
(4) waste of water, steel after overpickling, hang in the acid solution that cleaning material surface in service sink is attached, raw material After hanging out in service sink, it is carried out by water under high pressure again, and in whole water-washing process, the waste to water is bigger;
(5) after pickling, spent acid processes and the cleanout fluid impact on environment, and spent acid processes the neutralization in namely technique, and it is main If being put in neutralization pond by spent acid, then adding solid caustic soda to neutralization pond, allowing spent acid and Caustic soda that chemistry reflection occurs, generating water And hydrogen, but spent acid there is also a large amount of ferrous sulfate can not normal reaction, cleanout fluid also has the existence of a large amount of acid simultaneously, dense Degree is little, is eventually adding in Caustic soda and reflect, although but liquid after neutralization reaches discharge standard, but such industry water gives off After going, will also result in soil compaction, ferrous sulfate is discharged the most simultaneously, certainly will thus affect crop growth, and pickling Possibly together with substantial amounts of heavy metal ion in waste water in journey, it exceed standard and the pollution to water body that causes, biology is poisoned, or even Finally the injury to human health is all self-evident;
(6) in acid cleaning process, acid is to equipment, the harm of people, and in acid cleaning process, acid pond gives out substantial amounts of acid mist, the most just It it is so-called acid gas.On the one hand acid mist is by the volatilization of acid;On the other hand it is that in pickling, metallic iron reflects with acid, generates big Amount hydrogen, hydrogen escapes from acid pond, is formed with acid solution together with microgranule water droplet and is brought out, forms acid mist, due to acid in air The existence of mist, makes house in workshop, equipment suffer erosion and premature breakdown, and in workshop, overhead traveling crane is owing to being corroded by acid mist, typically makes Can not use with 5-6, have an effect on workman healthy simultaneously;
(7) due to raw material produced hydrogen embrittlement, overpickling, deficient pickling after pickling, to rear operation antirust treatment requirement Higher, raw material is in saponification process, and the requirement of saponification liquor is first by required soap and animal oil, and quick lime three mixes Close uniformly, and after certain time ferments, place into service sink, add suitable quantity of water, owing to adding animal oil in preparation And soap, saponification liquor must be heated with boiler by raw material in saponification, makes animal oil and soap melted by heat.
Summary of the invention
In order to overcome the disadvantages mentioned above of prior art, the invention provides at a kind of securing member raw material scale on surface Science and engineering skill, can fundamentally solve environmental pollution caused by securing member raw material scale on surface acid cleaning process, to equipment, The harm of people, is optimized improvement to scale on surface acid cleaning process, uses raw material by formula ball blast, and ball blast sprays Drenching surface coating lubricating layer, through series of process optimization, product quality, environment get a promotion, and equipment, workers ' health are able to Ensure.
The technical solution adopted for the present invention to solve the technical problems is: at a kind of securing member raw material scale on surface Science and engineering skill, comprises the steps:
Step one, employing carry out ball blast by formula shot-blasting machine to securing member raw material surface and remove iron scale;
Step 2, the securing member raw material surface through Shot Blasting is sprayed;
Step 3, in saponification pond, the securing member materials statement topcoating after spray is applied lubricating layer:
Supersaturation fatty acid, Calx, clear water are put in saponification pond according to 2:1:10:600 and stirs, be configured to saponification Liquid.
Compared with prior art, the positive effect of the present invention is:
Through the process technique of the present invention, steel surface impeller blasting quality can reach what International Organization for Standardization was issued Sa2.5 standard in ISO8501-1 standard, i.e. the most thoroughly clear up level: do not use magnifier to observe, on the surface after cleaning not There is oils and fats and booty, the most there is not oxide skin, rust, old paint and impurity.Not being eliminated impurity thoroughly is with faintly visible Lamellar or strip exist.Raw-material mechanical performance index will not be caused any harmful effect by present treatment technique simultaneously, makes Obtaining product quality effectively to be promoted, environment has obtained effective change.Owing to not having acid mist, Devices in Workshop to make in workshop Obtain the growth of several times with the life-span, workman is healthy to be guaranteed;Simultaneously because boiler heating and spent acid neutralize eliminate, Greatly reduce production cost.
Detailed description of the invention
A kind of securing member raw material scale on surface processes technique, comprises the steps:
Step one, use and by formula shot-blasting machine, securing member raw material surface carried out ball blast and remove iron scale:
The present invention is directed to the harm in the acid cleaning process of existing technique and deficiency, for more preferable Environment control, protect workman Healthy, improve steel surface iron scale cleaning quality, in conjunction with steel practical situation, will be referred to tightly by formula shot-blasting machine In firmware raw material surface deoxygenation iron sheet, it is that shot is thrown to steel by the impeller utilizing high speed rotating that ball blast removes iron scale Surface reaches the purpose except iron scale.
During ball blast, it is necessary to the determination carrying out following parameter works:
One, shot diameter used by ball blast is selected
During raw material surface roughness value directly affects cold group of finishing operations, raw material draws group rear surface presentation quality And the service life of wire poking module;Due to medium carbon steel, low-alloy steel mechanical performance in yield strength relatively mild steel high, elongation percentage Low compared with mild steel, if the choosing of shot granularity is excessive, necessarily hit by big face large impact power at ball blast Central Plains material surface, from And make material surface form processing hardening, and cause raw material yield strength relatively mild steel to increase, elongation percentage relatively mild steel reduces, with Time shot excessive, ball blast also will make materials statement surface roughness reduce, draw dial during all can cause raw material be pulled off and Shorten the service life of wire poking module, if shot undersized, although raw material surface obtains higher roughness, but due to former Material its rigidity is higher, and the service life of shot is short;Reduction and shot in order to ensure the roughness value after raw material ball blast Adequate service life the shot of 0.5-0.75mm diameter typically should be used to be advisable;If raw material is mild steel, can be selected for The shot of 1.2-2mm diameter is advisable.
Two, the determination of shot ball blast per minute amount during ball blast
For medium carbon steel, low-alloy steel, surface Sa2.5 to be reached standard, each ramming head ball blast per minute amount is according to standard Every 1KW10-15Kg.Owing to using by formula shot-blasting machine, raw material be piecemeal by carrying out Shot Blasting, be all round Steel, raw material surface is little, and the utilization rate of shot can only achieve 25-40%, so selecting the upper limit 40% to be advisable.
Three, the determination of raw material feeding speed during ball blast
Using by formula shot-blasting machine, ramming head is three ramming heads, is by raw material round steel one pieces ball blast in shot-blasting machine, From raw material feeds ball blast raw material discharging, whole equipment uses PLC to control, and raw material is each during whole ball blast All ensure that a seriality between part, and out unload to raw material at feeding process, raw material all moves in not stall, to ensure Each surface of material can be cleared up.For ensureing that raw material Surface Machining can reach Sa2.5 standard, also need to control raw material and enter To speed, working as excessive velocities, the iron scale cleaning on raw material surface is not clean, and surface also residual oxidization iron sheet does not reaches Sa2.5 requirement;And when speed is the slowest, the bump of material surface is hit by shot, raw material Surface Machining must be caused to harden, Both of which by under the influence of raw-material the drawing of the cold sequence of exchanging work in road dial quality and the service life of wire poking module, in conjunction with ball blast amount per minute and Raw material diameter, raw material diameter, at 20-25mm, sets selected raw material feeding speed speed per minute at PLC program Being 32 meters to be advisable, raw material diameter, at 26-35mm, sets selected raw material speed per minute at PLC program and is advisable as 30 meters.With Time due to raw material diameter bigger, its reason of conduct oneself with dignity, and the coefficient of friction increase of drawing-inroller, so its feed speed the most relatively diameter Little is fast, and the feeding speed that diameter group that in above two factors i.e. PLC, diameter is little is big sets big reason.
Step 2, on discharging material guide mechanism, securing member raw material surface is sprayed:
Raw material is after ball blast, and its surface must produce processing hardening and occur uneven, for not affecting cold exchanging work Quality is dialled in drawing of sequence material, it is necessary to rationally solves produced problem in ball blast, and makes full use of the uneven of material surface.First First raw material after ball blast on discharging material guide mechanism, utilize the waste heat after material ball blast, increase and together material surface is sprayed Drenching operation, the raw material after ball blast is at high temperature through spray, and surface quickly generates the rust powder of a layer the thinnest, rust powder Produce and reduce the raw material coefficient of friction at cold group of process in which materials Yu wire poking module, due to the coefficient of friction of material Yu wire poking module It is effectively improved.
Hardening through ball blast rear surface for solving raw material, raw material is former after ball blast all to be used to whole heap material trickle, by Mutually pile up in material, cannot pour on following most raw material surface;For ensureing that every raw material surface can uniformly be drenched Water, devises a spray water tank at shot-blasting machine discharging opening, and waterbox design, for respectively to open a mouth, is passed through for raw material, It is designed with in water tank under nozzle, water tank and is designed with return pipe, for not wasting water, be also devised with a water storage tank, water container backwater pipe Being connected with water storage tank with water pipe, the water after pouring reclaims in water tank and comes back to water storage tank, Reusability, design peace on water storage tank Equipped with water pump, it is connected with nozzle with water pipe, thus forms a spray loop closed.
Step 3, securing member materials statement topcoating is applied lubricating layer:
Raw material after ball blast applies lubricating layer on next procedure surface, needed for practice finds that saponification liquor is in preparation Animal oil and soap all can eliminate, utilize the characteristic that supersaturation fatty acid, sodium hydroxide are soluble in water, with supersaturation fat Acid, sodium hydroxide substitute animal oil and soap, when preparing saponification liquor, only need to by supersaturation fatty acid, sodium hydroxide according to than Example is directly placed into saponification pond, and adds required Calx in proportion, stirs, in process for preparation, and supersaturation fatty acid, hydrogen-oxygen Change sodium, Calx, clear water quality are prepared in strict accordance with 2:1:10:600;According to the saponification liquor of aforementioned proportion preparation, through saponification Just go out the steel surface in pond, had Calx and supersaturation fatty acid, sodium hydroxide solution that chemical reaction fully occurs, generate fatty acid Sodium salt and fatty acid calcium salt coating, touching with the sensation of viscous hands, fatty acid sodium salt and fatty acid calcium salt with hands is a kind of good profit Slip, the processing technology of soap uses supersaturation fatty acid and sodium hydroxide to react post-heating exactly and forms, and the one-tenth of animal oil Part it is exactly fatty acid, utilizes the characteristic that supersaturation fatty acid and sodium hydroxide are soluble in water, so with supersaturation fatty acid and hydrogen Sodium oxide directly eliminates animal oil and soap;Just because of the eliminating of animal oil and soap, material is at coating lubricating layer saponifying process On be not required to saponification liquor is heated, thus eliminated boiler, in room temperature state the most directly by after ball blast gets rusty in production Material hangs in saponification pond and carries out saponification, serves the effect reducing aided process, has accomplished low-carbon environment-friendly production, simultaneously because mistake Satisfied fatty acid, sodium hydroxide have extraordinary lubricity, are substantially soluble in again water, supersaturation fatty acid, sodium hydroxide, stone After ash, clear water fully react, forming brand-name grease and stick to steel surface, steel are after drawing and dialling, and surface preserves Preferably grease, serves good lubrication for lower road contracting bar, decreases the damage of contracting bar mould, reduce cost, former To heat liquid with due to boiler, steel and saponification liquor are all hot, and steel surface coating lubricating layer moisture content quickly volatilizees, by In having eliminated boiler, steel and saponification liquor are all room temperature, and steel, after saponification, are put out by steel in time, thus are beneficial to Steel surface coating lubricating layer moisture content volatilization.

Claims (6)

1. a securing member raw material scale on surface processes technique, it is characterised in that: comprise the steps:
Step one, employing carry out ball blast by formula shot-blasting machine to securing member raw material surface and remove iron scale;
Step 2, the securing member raw material surface through Shot Blasting is sprayed;
Step 3, in saponification pond, the securing member materials statement topcoating after spray is applied lubricating layer:
Supersaturation fatty acid, sodium hydroxide, Calx, clear water are put in saponification pond according to 2:1:10:600 and stirs, preparation Becoming saponification liquor, supersaturation fatty acid, sodium hydroxide are soluble in water.
Securing member raw material scale on surface the most according to claim 1 processes technique, it is characterised in that: in step one During described ball blast, if raw material is medium carbon steel or low-alloy steel, then use the shot of 0.5-0.75mm diameter;If it is former Material is mild steel, then use the shot of 1.2-2mm diameter.
Securing member raw material scale on surface the most according to claim 1 processes technique, it is characterised in that: in step one During described ball blast, it is 10-15Kg/1KW by each ramming head of formula shot-blasting machine ball blast per minute amount.
Securing member raw material scale on surface the most according to claim 1 processes technique, it is characterised in that: in step one During described ball blast, if a diameter of 20-25mm of raw material, then feeding speed is 32 meters per minute;If raw material diameter For 26-35mm, then feeding speed is 30 meters per minute.
Securing member raw material scale on surface the most according to claim 1 processes technique, it is characterised in that: step 2 institute The spray process stated completes in spray water tank, and described spray water tank is arranged on by formula shot-blasting machine discharge outlet.
Securing member raw material scale on surface the most according to claim 5 processes technique, it is characterised in that: described spray Respectively open a mouth before and after water tank, pass through for raw material, tank top is provided with nozzle, water tank bottom is provided with return pipe Being connected with water storage tank, be provided with water pump on water storage tank, described water pump is connected with nozzle by water pipe, thus forms a closing Spray loop.
CN201610909529.4A 2016-10-19 2016-10-19 Fastener raw material scale on surface treatment process Active CN106312829B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610909529.4A CN106312829B (en) 2016-10-19 2016-10-19 Fastener raw material scale on surface treatment process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610909529.4A CN106312829B (en) 2016-10-19 2016-10-19 Fastener raw material scale on surface treatment process

Publications (2)

Publication Number Publication Date
CN106312829A true CN106312829A (en) 2017-01-11
CN106312829B CN106312829B (en) 2019-03-22

Family

ID=57818936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610909529.4A Active CN106312829B (en) 2016-10-19 2016-10-19 Fastener raw material scale on surface treatment process

Country Status (1)

Country Link
CN (1) CN106312829B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107695117A (en) * 2017-11-09 2018-02-16 中铁隆昌铁路器材有限公司 A kind of saponification process technique for bolt class product
CN110328270A (en) * 2019-05-31 2019-10-15 南通海洲紧固件制造有限公司 Bolt blank undergauge treatment process
CN111958494A (en) * 2020-08-21 2020-11-20 无锡银臻材料科技有限公司 Production process of surface oxide of base material for composite board

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101172327A (en) * 2007-11-23 2008-05-07 阚柳凤 Anchor clipper through hole type workblank cold pressing technique
CN102107227A (en) * 2010-12-10 2011-06-29 玉环普天单向器有限公司 Method for manufacturing internal gear of speed-reducing starter
CN102248373A (en) * 2011-06-21 2011-11-23 台州市百达制冷有限公司 Method for manufacturing air condition compressor balance block
US8728244B2 (en) * 2005-03-17 2014-05-20 Sms Siemag Aktiengesellschaft Method and device for descaling a metal strip
CN105458027A (en) * 2016-01-20 2016-04-06 上海久进精密锻造有限公司 Cold extrusion forming process and die for vibration block forge piece
CN105880304A (en) * 2016-05-27 2016-08-24 上海工程技术大学 Cold extruding forming method used for automotive spline sleeve part

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8728244B2 (en) * 2005-03-17 2014-05-20 Sms Siemag Aktiengesellschaft Method and device for descaling a metal strip
CN101172327A (en) * 2007-11-23 2008-05-07 阚柳凤 Anchor clipper through hole type workblank cold pressing technique
CN102107227A (en) * 2010-12-10 2011-06-29 玉环普天单向器有限公司 Method for manufacturing internal gear of speed-reducing starter
CN102248373A (en) * 2011-06-21 2011-11-23 台州市百达制冷有限公司 Method for manufacturing air condition compressor balance block
CN105458027A (en) * 2016-01-20 2016-04-06 上海久进精密锻造有限公司 Cold extrusion forming process and die for vibration block forge piece
CN105880304A (en) * 2016-05-27 2016-08-24 上海工程技术大学 Cold extruding forming method used for automotive spline sleeve part

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107695117A (en) * 2017-11-09 2018-02-16 中铁隆昌铁路器材有限公司 A kind of saponification process technique for bolt class product
CN110328270A (en) * 2019-05-31 2019-10-15 南通海洲紧固件制造有限公司 Bolt blank undergauge treatment process
CN111958494A (en) * 2020-08-21 2020-11-20 无锡银臻材料科技有限公司 Production process of surface oxide of base material for composite board

Also Published As

Publication number Publication date
CN106312829B (en) 2019-03-22

Similar Documents

Publication Publication Date Title
Talbert Paint technology handbook
CN1035442C (en) Cleaning agent for cold-rolled silicon steel plate
CN104056865B (en) Steel plate surface treatment method and device
CN204779835U (en) Belted steel cleaning system
CN106312829A (en) Treatment process for scale on surface of fastener raw material
CN103046036A (en) Metal derusting and antirusting agent and preparation method of metal derusting and antirusting agent
CN104674247B (en) Stainless steel rail pickling and passivation treatment method
CN101787525A (en) Stainless steel passivation process
CN101343739A (en) Acid washing passivation technology for stainless steel
CN102839365A (en) Environmental-friendly type multifunctional steel surface treating fluid
CN102534633A (en) Water-based metal cleaner
CN106967968B (en) High-efficiency environment friendly steel derusting conjunctiva agent and preparation method thereof
CN102337550A (en) Passivator for cleaning zinc-aluminum-magnesium galvanized steel plate work piece and preparation method thereof
CN101692382B (en) Hydrogen removing method for radiator for transformer
CN103643121B (en) A kind of Stranded Galvanized Steel Wire for built on stilts bracing wire and production technique thereof
US10479957B2 (en) Lubricant for metal cold forming processes and methods of use of the same
CN107282689A (en) A kind of production technology of fluid pressure line stainless steel tube
CN101333911A (en) Small caliber cold-drawing oil conduit and its processing method
CN104278261A (en) Environment-friendly type phosphate concentrated liquor for removing rust and iron oxide scales and phosphating and application of environment-friendly type phosphate concentrated liquor
CN101100755A (en) Acid pickling method of copper pipe for automobile oil cooler
CN101245458A (en) Four-function treating liquid for surface of iron or steel
CN101353948A (en) 25Mn2 small diameter oil conduit for waste oil well secondary development and its processing method
CN102363889B (en) Cleaning antirust agent for diesel engine casting body and preparation method thereof
CN106521525A (en) Stainless steel surface treating agent as well as preparation method thereof and using method thereof
CN109234657A (en) A kind of surface treatment method of high-voltage power transmission tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant