CN109234657A - A kind of surface treatment method of high-voltage power transmission tower - Google Patents

A kind of surface treatment method of high-voltage power transmission tower Download PDF

Info

Publication number
CN109234657A
CN109234657A CN201811400835.0A CN201811400835A CN109234657A CN 109234657 A CN109234657 A CN 109234657A CN 201811400835 A CN201811400835 A CN 201811400835A CN 109234657 A CN109234657 A CN 109234657A
Authority
CN
China
Prior art keywords
workpiece
zinc
pickling
acid
rust removing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811400835.0A
Other languages
Chinese (zh)
Inventor
祁石成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Qi Tian Iron Tower Manufacturing Co Ltd
Original Assignee
Jiangsu Qi Tian Iron Tower Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Qi Tian Iron Tower Manufacturing Co Ltd filed Critical Jiangsu Qi Tian Iron Tower Manufacturing Co Ltd
Priority to CN201811400835.0A priority Critical patent/CN109234657A/en
Publication of CN109234657A publication Critical patent/CN109234657A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/04Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the coating material
    • C23C2/06Zinc or cadmium or alloys based thereon
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/02Pretreatment of the material to be coated, e.g. for coating on selected surface areas
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/26After-treatment

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Electroplating Methods And Accessories (AREA)
  • Cleaning And De-Greasing Of Metallic Materials By Chemical Methods (AREA)

Abstract

The present invention is a kind of surface treatment method of high-voltage power transmission tower, and this method derusted the steel tower workpiece processed, galvanizing by dipping, forms fe-zn alloy layer and pure zinc layer from the inside to surface in workpiece surface;Its step includes feeding, acid pickling and rust removing, rinses, helps to cross and help coating depositing one layer to workpiece surface, then will be by helping the workpiece for crossing processing to immerse in zinc bath, in the process that workpiece surface forms zinc and zinc-iron alloy layer by galvanizing by dipping;Cooling post-passivation processing, then by the workpiece after Passivation Treatment carry out rinsing processing to get.Steel tower workpiece is handled by the method for the invention, keeps workpiece continuous whole, flat and smooth, the defects of no dust stratification and product zinc do not have cadmia on galvanized workpiece, basic member bubble, pimple, speckle.The antiseptic and rustproof effect of work is substantially increased, treated workpiece provides guarantee for the safe operation of steel tower.

Description

A kind of surface treatment method of high-voltage power transmission tower
Technical field
The present invention relates to a kind for the treatment of preparation method thereof of steel tower, especially a kind of surface treatment side of high-voltage power transmission tower Method.
Background technique
Electric power industry development initial stage, power plant are generally built near power consumer.With in power generation scale and load The expansion of heart scale, transmission line capability is also increasing, and transmission voltage is with regard to higher and higher.
In China, power transmission network voltage class is generally divided into high pressure, super-pressure and extra-high voltage.High pressure refers to 110 kilovolts and 220,000 Volt;Super-pressure refers to 330 kilovolts, 500 kilovolts and 750 kilovolts;Extra-high voltage refers to 1000 kilovolts or more.The route of voltage levels needs Safe distance that will be bigger, will be obtained very high by frame, and the only steel tower burden that could have the ability weighs tens of tons of route.Steel tower Tower can be divided into wine glass-shaped tower, cathead tower, dry font steel tower, double loop drum type tower etc..In the manufacture of high-voltage power transmission tower In the process, the surface treatment quality after workpiece shaping is directly related to the service life and transmission of electricity safety of high-voltage power transmission tower.Institute With the process of surface treatment for researching and developing new high treating effect has great importance.
Summary of the invention
The technical problem to be solved by the present invention is in view of the deficiencies of the prior art, provide a kind of design of method rationally, can Strong operability, greatly improve high-voltage power transmission tower anti-rust and corrosionproperties a kind of high-voltage power transmission tower surface treatment method.
The technical problem to be solved by the present invention is to what is realized by technical solution below.The present invention is a kind of high pressure The surface treatment method of electric power pylon, its main feature is that, this method derusted the steel tower workpiece processed, galvanizing by dipping, Workpiece surface forms fe-zn alloy layer and pure zinc layer from the inside to surface;The specific steps of which are as follows:
(1) feeding: the workpiece zinc-plated to need is hung;(2) acid pickling and rust removing: the workpiece of hanging is moved in pickling tube and is carried out Acid pickling and rust removing, pickling use hydrochloric acid, and the working concentration of hydrochloric acid is 40-200 grams per liter pickling aqueous solution;The acid pickling and rust removing time is 20- 45 minutes;Pickling to workpiece surface is in silver gray, the smooth no dark brown patch in surface, spot, and attached without greasy dirt and other impurity ?;
(3) it rinses: workpiece after acid pickling and rust removing being moved into potcher and is rinsed through flowing water, pickling solution remained on surface is removed;Workpiece from After potcher is hung out, stops above potcher to drop and remove surface area water;
(4) it helps and crosses: zinc amine of the workpiece immersion containing zinc chloride and/or ammonium chloride after rinsing is helped to cross carrying out helping plating in solution, Help plating temperature be 50 DEG C -60 DEG C, help be plating to workpiece surface deposit one layer help coating;
(5) zinc-plated: galvanizing by dipping is will to form zinc by helping the workpiece for crossing processing to immerse in zinc bath in workpiece surface and zinc-iron closes The process of layer gold;Zinc bath temperature is 430 DEG C -450 DEG C, and the zinc bath time is -12 minutes 50 seconds;Wait for that the heating of zinc liquid reaches when operation After 430 DEG C -450 DEG C, then by workpiece immerse zinc liquid in galvanizing by dipping;Zinc-plated zinc used is zinc ingot metal and/or zinc-containing alloy;
(6) cooling: workpiece being immersed in cooling water immediately after zinc-plated and is cooled down, the temperature of cooling water is 20 DEG C ~ 50 DEG C; Cooling time;It is 1 ~ 3 minute;(7) it is passivated: workpiece is immersed in passivating solution Passivation Treatment 10 ~ 60 seconds;Passivating solution is by containing The sodium dichromate of mass concentration 0.4%-0.6%, 0.1% sulfuric acid aqueous solution, formed by Passivation Treatment on galvanized workpiece surface One layer of passivating film;(8) rinse: by the workpiece after Passivation Treatment carry out rinsing processing to get.
A kind of surface treatment method of high-voltage power transmission tower of the present invention, further preferred technical solution is: During acid pickling and rust removing, hydrochloric acid adds water to be configured to the acid that concentration is 40-200 grams per liter using technical hydrochloric acid more than 28% concentration Aqueous solution;During acid pickling and rust removing, when the concentration of pickling aqueous solution is down to 40 grams per liters or less, frerrous chloride content rises to 200 When more than grams per liter, handled as spent acid;When the content of acid washing water Chlorine in Solutionization ferrous iron is less than 200 grams per liters, concentration of hydrochloric acid When lower than 40 grams per liter, technical hydrochloric acid is added in right amount to pickling aqueous solution, continues to use.
A kind of surface treatment method of high-voltage power transmission tower of the present invention, further preferred technical solution is: When the concentration of the hydrochloric acid in pickling aqueous solution is in 180-200 grams per liter, the acid pickling and rust removing time is 20-25 minutes;Concentration is in 150- 180 grams per liters, acid pickling and rust removing time are 25-30 minutes;For concentration in 100-150 grams per liter, the acid pickling and rust removing time is 30-40 minutes; For concentration in 40-100 grams per liter, the acid pickling and rust removing time is 40-45 minutes.
A kind of surface treatment method of high-voltage power transmission tower of the present invention, further preferred technical solution is: During acid pickling and rust removing, by vibration pickling 2-3 times above and below workpiece, and propose that liquid level checks acid pickling and rust removing quality;Part is owed The surface of acid pickling and rust removing carries out acid pickling and rust removing after removing using grinding wheel, wire brush or other tools again.
A kind of surface treatment method of high-voltage power transmission tower of the present invention, further preferred technical solution is: The time for helping plating is 1-2 minutes.
A kind of surface treatment method of high-voltage power transmission tower of the present invention, further preferred technical solution is: Zinc bath temperature is 435 DEG C -445 DEG C.
A kind of surface treatment method of high-voltage power transmission tower of the present invention, further preferred technical solution is: When zinc-plated, it is 100-400mm that workpiece surface, which immerses zinc liquid depth,.
A kind of surface treatment method of high-voltage power transmission tower of the present invention, further preferred technical solution is: Before acid pickling and rust removing, ungrease treatment is carried out to workpiece, workpiece is attached to the paint, minerals, conjunction on surface in the fabrication process Ungrease treatment is carried out at resin, pitch or other attachments;The method of processing includes that polishing or fire are roasting.
A kind of surface treatment method of high-voltage power transmission tower of the present invention, further preferred technical solution is: It helps and crosses in solution, the content of zinc chloride or ammonium chloride is 80-150 grams per liter.
A kind of surface treatment method of high-voltage power transmission tower of the present invention, further preferred technical solution is: Zinc-plated running hours, carry out fishing slag according to the actual situation, fish out and zinc liquid temperature is increased to 450 DEG C -460 DEG C before slag, to cadmia Pull cadmia after sinking out.
Compared with prior art, the invention has the following advantages: by the method for the invention to steel tower workpiece at Reason, form fe-zn alloy layer and pure zinc layer from the inside to surface in workpiece surface, keep workpiece continuous whole, flat and smooth, no dust stratification and Product zinc, invariably recoverability thermal deformation do not have cadmia on galvanized workpiece, no injurous defect, basic first bubble on galvanized workpiece, The defects of pimple, speckle.The antiseptic and rustproof effect of work is substantially increased, treated, and workpiece provides for the safe operation of steel tower It ensures.
Specific embodiment
The specific technical solution of the present invention described further below, in order to which those skilled in the art is further understood that The present invention, without constituting the limitation to its right.
Embodiment 1, a kind of surface treatment method of high-voltage power transmission tower, this method remove the steel tower workpiece processed Rust, galvanizing by dipping, form fe-zn alloy layer and pure zinc layer in workpiece surface from the inside to surface;The specific steps of which are as follows:
(1) feeding: the workpiece zinc-plated to need is hung;(2) acid pickling and rust removing: the workpiece of hanging is moved in pickling tube and is carried out Acid pickling and rust removing, pickling use hydrochloric acid, and the working concentration of hydrochloric acid is 40-200 grams per liter pickling aqueous solution;The acid pickling and rust removing time is 20- 45 minutes;Pickling to workpiece surface is in silver gray, the smooth no dark brown patch in surface, spot, and attached without greasy dirt and other impurity ?;
(3) it rinses: workpiece after acid pickling and rust removing being moved into potcher and is rinsed through flowing water, pickling solution remained on surface is removed;Workpiece from After potcher is hung out, stops above potcher to drop and remove surface area water;
(4) it helps and crosses: zinc amine of the workpiece immersion containing zinc chloride and/or ammonium chloride after rinsing is helped to cross carrying out helping plating in solution, Help plating temperature be 50 DEG C -60 DEG C, help be plating to workpiece surface deposit one layer help coating;
(5) zinc-plated: galvanizing by dipping is will to form zinc by helping the workpiece for crossing processing to immerse in zinc bath in workpiece surface and zinc-iron closes The process of layer gold;Zinc bath temperature is 430 DEG C -450 DEG C, and the zinc bath time is -12 minutes 50 seconds;Wait for that the heating of zinc liquid reaches when operation After 430 DEG C -450 DEG C, then by workpiece immerse zinc liquid in galvanizing by dipping;Zinc-plated zinc used is zinc ingot metal and/or zinc-containing alloy;
(6) cooling: workpiece being immersed in cooling water immediately after zinc-plated and is cooled down, the temperature of cooling water is 20 DEG C ~ 50 DEG C; Cooling time;It is 1 ~ 3 minute;(7) it is passivated: workpiece is immersed in passivating solution Passivation Treatment 10 ~ 60 seconds;Passivating solution is by containing The sodium dichromate of mass concentration 0.4%-0.6%, 0.1% sulfuric acid aqueous solution, formed by Passivation Treatment on galvanized workpiece surface One layer of passivating film;(8) rinse: by the workpiece after Passivation Treatment carry out rinsing processing to get.
Embodiment 2, a kind of surface treatment method of high-voltage power transmission tower described in embodiment 1: during acid pickling and rust removing, salt Acid adds water to be configured to the pickling aqueous solution that concentration is 40-200 grams per liter using technical hydrochloric acid more than 28% concentration;Acid pickling and rust removing Period cancels when the concentration of pickling aqueous solution is down to 40 grams per liters or less, frerrous chloride content rises to 200 grams per liters or more Acid is handled;When the content of acid washing water Chlorine in Solutionization ferrous iron is lower than 40 grams per liter less than 200 grams per liters, concentration of hydrochloric acid, to Technical hydrochloric acid is added in pickling aqueous solution in right amount, continues to use.
Embodiment 3, a kind of surface treatment method of high-voltage power transmission tower, this method remove the steel tower workpiece processed Rust, galvanizing by dipping, form fe-zn alloy layer and pure zinc layer in workpiece surface from the inside to surface;The specific steps of which are as follows:
(1) feeding: the workpiece zinc-plated to need is hung;(2) acid pickling and rust removing: the workpiece of hanging is moved in pickling tube and is carried out Acid pickling and rust removing, pickling use hydrochloric acid, and the working concentration of hydrochloric acid is 40-200 grams per liter pickling aqueous solution;The acid pickling and rust removing time is 20- 45 minutes;Pickling to workpiece surface is in silver gray, the smooth no dark brown patch in surface, spot, and attached without greasy dirt and other impurity ?;When the concentration of the hydrochloric acid in pickling aqueous solution is in 180-200 grams per liter, the acid pickling and rust removing time is 20-25 minutes;Concentration exists 150-180 grams per liter, acid pickling and rust removing time are 25-30 minutes;For concentration in 100-150 grams per liter, the acid pickling and rust removing time is 30-40 points Clock;For concentration in 40-100 grams per liter, the acid pickling and rust removing time is 40-45 minutes.
(3) it rinses: workpiece after acid pickling and rust removing being moved into potcher and is rinsed through flowing water, pickling solution remained on surface is removed;Work After part is hung out from potcher, stops above potcher to drop and remove surface area water;
(4) it helps and crosses: zinc amine of the workpiece immersion containing zinc chloride and/or ammonium chloride after rinsing is helped to cross carrying out helping plating in solution, Help plating temperature be 50 DEG C -60 DEG C, help be plating to workpiece surface deposit one layer help coating;
(5) zinc-plated: galvanizing by dipping is will to form zinc by helping the workpiece for crossing processing to immerse in zinc bath in workpiece surface and zinc-iron closes The process of layer gold;Zinc bath temperature is 430 DEG C -450 DEG C, and the zinc bath time is -12 minutes 50 seconds;Wait for that the heating of zinc liquid reaches when operation After 430 DEG C -450 DEG C, then by workpiece immerse zinc liquid in galvanizing by dipping;Zinc-plated zinc used is zinc ingot metal and/or zinc-containing alloy;
(6) cooling: workpiece being immersed in cooling water immediately after zinc-plated and is cooled down, the temperature of cooling water is 20 DEG C ~ 50 DEG C; Cooling time;It is 1 ~ 3 minute;(7) it is passivated: workpiece is immersed in passivating solution Passivation Treatment 10 ~ 60 seconds;Passivating solution is by containing The sodium dichromate of mass concentration 0.4%-0.6%, 0.1% sulfuric acid aqueous solution, formed by Passivation Treatment on galvanized workpiece surface One layer of passivating film;(8) rinse: by the workpiece after Passivation Treatment carry out rinsing processing to get.
Embodiment 4, in a kind of surface treatment method of high-voltage power transmission tower described in embodiment 1 or 2 or 3: being removed in pickling During rust, by vibration pickling 2-3 times above and below workpiece, and propose that liquid level checks acid pickling and rust removing quality;To the deficient acid pickling and rust removing in part Surface using grinding wheel, wire brush or other tools removal after carry out acid pickling and rust removing again.
Embodiment 5, in a kind of surface treatment method of high-voltage power transmission tower described in embodiment 1 or 2 or 3: helping plating Time be 1-2 minutes.
Embodiment 6, in a kind of surface treatment method of high-voltage power transmission tower described in embodiment 1: zinc bath temperature 435 DEG C -445 DEG C, remaining is same as Example 1.
Embodiment 7, in a kind of surface treatment method of high-voltage power transmission tower described in embodiment 1 or 2 or 3: when zinc-plated, work It is 100-400mm that zinc liquid depth is immersed in part upper surface.
Embodiment 8, in a kind of surface treatment method of high-voltage power transmission tower described in embodiment 1 or 2 or 3: being removed in pickling Before rust, ungrease treatment is carried out to workpiece, workpiece is attached to the paint, minerals, synthetic resin, cypress on surface in the fabrication process Oily or other attachments carry out ungrease treatment;The method of processing includes that polishing or fire are roasting.
Embodiment 9, in a kind of surface treatment method of high-voltage power transmission tower described in embodiment 1 or 2 or 3: helping and cross solution In, the content of zinc chloride or ammonium chloride is 80-150 grams per liter.
Embodiment 10, in a kind of surface treatment method of high-voltage power transmission tower described in embodiment 1 or 2 or 3: zinc-plated continuous When work, fishing slag is carried out according to the actual situation, fish out and zinc liquid temperature is increased to 450 DEG C -460 DEG C before slag, fish out after cadmia sinking Cadmia out.
Embodiment 11, a kind of surface treatment method of high-voltage power transmission tower, this method carry out the steel tower workpiece processed Derusting, galvanizing by dipping, form fe-zn alloy layer and pure zinc layer in workpiece surface from the inside to surface;The specific steps of which are as follows:
(1) feeding: the workpiece zinc-plated to need is hung;(2) acid pickling and rust removing: the workpiece of hanging is moved in pickling tube and is carried out Acid pickling and rust removing, pickling use hydrochloric acid, and the working concentration of hydrochloric acid is 100-200 grams per liter pickling aqueous solution;The acid pickling and rust removing time is 25 Minute;Pickling to workpiece surface is in silver gray, the smooth no dark brown patch in surface, spot, and is adhered to without greasy dirt and other impurity;
(3) it rinses: workpiece after acid pickling and rust removing being moved into potcher and is rinsed through flowing water, pickling solution remained on surface is removed;Workpiece from After potcher is hung out, stops above potcher to drop and remove surface area water;
(4) it helps and crosses: zinc amine of the workpiece immersion containing zinc chloride and ammonium chloride after rinsing being helped to cross carrying out helping plating in solution, helps plating Temperature be 55 DEG C, help be plating to workpiece surface deposit one layer help coating;The content of zinc chloride is 80 grams per liters, and the content of ammonium chloride is 120 grams per liters;
(5) zinc-plated: galvanizing by dipping is will to form zinc by helping the workpiece for crossing processing to immerse in zinc bath in workpiece surface and zinc-iron closes The process of layer gold;Zinc bath temperature is 440 DEG C, and the zinc bath time is 2 minutes;When operation after the heating of zinc liquid reaches 440 DEG C, then by work Part immerses galvanizing by dipping in zinc liquid;Zinc-plated zinc used is zinc ingot metal and/or zinc-containing alloy;
(6) cooling: workpiece being immersed in cooling water immediately after zinc-plated and is cooled down, the temperature of cooling water is 35 DEG C;It is cooling Time;It is 2 minutes;(7) it is passivated: workpiece is immersed in passivating solution Passivation Treatment 20 seconds;Passivating solution is by containing mass concentration 0.5% sodium dichromate, 0.1% sulfuric acid aqueous solution, by Passivation Treatment galvanized workpiece surface formed one layer of passivating film; (8) rinse: by the workpiece after Passivation Treatment carry out rinsing processing to get.

Claims (10)

1. a kind of surface treatment method of high-voltage power transmission tower, which is characterized in that this method carries out the steel tower workpiece processed Derusting, galvanizing by dipping, form fe-zn alloy layer and pure zinc layer in workpiece surface from the inside to surface;The specific steps of which are as follows:
(1) feeding: the workpiece zinc-plated to need is hung;(2) acid pickling and rust removing: the workpiece of hanging is moved in pickling tube and is carried out Acid pickling and rust removing, pickling use hydrochloric acid, and the working concentration of hydrochloric acid is 40-200 grams per liter pickling aqueous solution;The acid pickling and rust removing time is 20- 45 minutes;Pickling to workpiece surface is in silver gray, the smooth no dark brown patch in surface, spot, and attached without greasy dirt and other impurity ?;
(3) it rinses: workpiece after acid pickling and rust removing being moved into potcher and is rinsed through flowing water, pickling solution remained on surface is removed;Workpiece from After potcher is hung out, stops above potcher to drop and remove surface area water;
(4) it helps and crosses: zinc amine of the workpiece immersion containing zinc chloride and/or ammonium chloride after rinsing is helped to cross carrying out helping plating in solution, Help plating temperature be 50 DEG C -60 DEG C, help be plating to workpiece surface deposit one layer help coating;
(5) zinc-plated: galvanizing by dipping is will to form zinc by helping the workpiece for crossing processing to immerse in zinc bath in workpiece surface and zinc-iron closes The process of layer gold;Zinc bath temperature is 430 DEG C -450 DEG C, and the zinc bath time is -12 minutes 50 seconds;Wait for that the heating of zinc liquid reaches when operation After 430 DEG C -450 DEG C, then by workpiece immerse zinc liquid in galvanizing by dipping;Zinc-plated zinc used is zinc ingot metal and/or zinc-containing alloy;
(6) cooling: workpiece being immersed in cooling water immediately after zinc-plated and is cooled down, the temperature of cooling water is 20 DEG C ~ 50 DEG C; Cooling time;It is 1 ~ 3 minute;(7) it is passivated: workpiece is immersed in passivating solution Passivation Treatment 10 ~ 60 seconds;Passivating solution is by containing The sodium dichromate of mass concentration 0.4%-0.6%, 0.1% sulfuric acid aqueous solution, formed by Passivation Treatment on galvanized workpiece surface One layer of passivating film;(8) rinse: by the workpiece after Passivation Treatment carry out rinsing processing to get.
2. a kind of surface treatment method of high-voltage power transmission tower according to claim 1, it is characterised in that: acid pickling and rust removing mistake Cheng Zhong, hydrochloric acid add water to be configured to the pickling aqueous solution that concentration is 40-200 grams per liter using technical hydrochloric acid more than 28% concentration; During acid pickling and rust removing, when the concentration of pickling aqueous solution is down to 40 grams per liters or less, frerrous chloride content rises to 200 grams per liters or more When, it is handled as spent acid;When acid washing water Chlorine in Solutionization ferrous iron content less than 200 grams per liters, concentration of hydrochloric acid lower than 40 grams/ When rising, technical hydrochloric acid is added in right amount to pickling aqueous solution, continues to use.
3. a kind of surface treatment method of high-voltage power transmission tower according to claim 1 or 2, it is characterised in that: work as pickling For the concentration of hydrochloric acid in aqueous solution in 180-200 grams per liter, the acid pickling and rust removing time is 20-25 minutes;Concentration 150-180 grams/ It rises, the acid pickling and rust removing time is 25-30 minutes;For concentration in 100-150 grams per liter, the acid pickling and rust removing time is 30-40 minutes;Concentration exists 40-100 grams per liter, acid pickling and rust removing time are 40-45 minutes.
4. a kind of surface treatment method of high-voltage power transmission tower according to claim 1 or 2, it is characterised in that: in pickling In descaling process, by vibration pickling 2-3 times above and below workpiece, and propose that liquid level checks acid pickling and rust removing quality;The deficient pickling in part is removed The surface of rust carries out acid pickling and rust removing after removing using grinding wheel, wire brush or other tools again.
5. a kind of surface treatment method of high-voltage power transmission tower according to claim 1, it is characterised in that: help plating Time is 1-2 minutes.
6. a kind of surface treatment method of high-voltage power transmission tower according to claim 1, it is characterised in that: zinc bath temperature is 435℃-445℃。
7. a kind of surface treatment method of high-voltage power transmission tower according to claim 1, it is characterised in that: when zinc-plated, work It is 100-400mm that zinc liquid depth is immersed in part upper surface.
8. a kind of surface treatment method of high-voltage power transmission tower according to claim 1, it is characterised in that: in acid pickling and rust removing Before, ungrease treatment is carried out to workpiece, workpiece is attached to paint, minerals, synthetic resin, the pitch on surface in the fabrication process Or other attachments carry out ungrease treatment;The method of processing includes that polishing or fire are roasting.
9. a kind of surface treatment method of high-voltage power transmission tower according to claim 1, it is characterised in that: help and cross solution In, the content of zinc chloride or ammonium chloride is 80-150 grams per liter.
10. a kind of surface treatment method of high-voltage power transmission tower according to claim 1, it is characterised in that: zinc-plated continuous When work, fishing slag is carried out according to the actual situation, fish out and zinc liquid temperature is increased to 450 DEG C -460 DEG C before slag, fish out after cadmia sinking Cadmia out.
CN201811400835.0A 2018-11-22 2018-11-22 A kind of surface treatment method of high-voltage power transmission tower Pending CN109234657A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811400835.0A CN109234657A (en) 2018-11-22 2018-11-22 A kind of surface treatment method of high-voltage power transmission tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811400835.0A CN109234657A (en) 2018-11-22 2018-11-22 A kind of surface treatment method of high-voltage power transmission tower

Publications (1)

Publication Number Publication Date
CN109234657A true CN109234657A (en) 2019-01-18

Family

ID=65075864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811400835.0A Pending CN109234657A (en) 2018-11-22 2018-11-22 A kind of surface treatment method of high-voltage power transmission tower

Country Status (1)

Country Link
CN (1) CN109234657A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972068A (en) * 2019-03-04 2019-07-05 京信通信系统(中国)有限公司 Method for anticorrosion treatment, anti-corrosion electric conducting component and the equipment of component
CN113061825A (en) * 2021-03-24 2021-07-02 日照中意华坤金属制造有限公司 Iron art railing galvanizing process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013007390A1 (en) * 2011-07-13 2013-01-17 Tata Steel Uk Limited Method of providing a multifunctional coating on a metal substrate
CN105755415A (en) * 2014-12-13 2016-07-13 重庆泰达模具制造有限公司 Hot-dip galvanizing process
CN107794474A (en) * 2016-08-31 2018-03-13 浙江通兴铁塔有限公司 A kind of rare earth alloy hot-dip galvanizing technique

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013007390A1 (en) * 2011-07-13 2013-01-17 Tata Steel Uk Limited Method of providing a multifunctional coating on a metal substrate
CN105755415A (en) * 2014-12-13 2016-07-13 重庆泰达模具制造有限公司 Hot-dip galvanizing process
CN107794474A (en) * 2016-08-31 2018-03-13 浙江通兴铁塔有限公司 A kind of rare earth alloy hot-dip galvanizing technique

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972068A (en) * 2019-03-04 2019-07-05 京信通信系统(中国)有限公司 Method for anticorrosion treatment, anti-corrosion electric conducting component and the equipment of component
CN113061825A (en) * 2021-03-24 2021-07-02 日照中意华坤金属制造有限公司 Iron art railing galvanizing process

Similar Documents

Publication Publication Date Title
CN104561876B (en) A kind of hot dip galvanizing process method
CN100497717C (en) Hot dip galvanizing method for steel pieces
CN104928956B (en) The preparation method of high anti-corrosion Steel wire rope in fishery industry
Khusanboyev et al. IMPROVING THE STRENGTH OF DETAILS BY CHROMING THE SURFACES
CN111304570A (en) Hot galvanizing production process with high automation degree
CN108149179A (en) A kind of fastener hot dip galvanizing production process
CN109852914A (en) A kind of high-strength alloyed steel plate hot dip galvanizing process
CN109234657A (en) A kind of surface treatment method of high-voltage power transmission tower
CN107794474A (en) A kind of rare earth alloy hot-dip galvanizing technique
CN107142435A (en) Power iron fitting hot dip galvanizing process
CN110129703A (en) A kind of hot dip galvanizing process and hot dip liquid system for iron tower construction member
CN110699622A (en) Production method of electric power iron tower structural member with surface zinc layer peeling resistance
CN102765037A (en) Process method for removing oxide skin on surface of metal wire
CN104562107A (en) Highly-corrosion-resistant environment-friendly black tin-cobalt alloy electroplating liquid and electroplating method thereof.
CN103643121A (en) Zinc-plating steel strand for overhead guying, and production process thereof
CN107740022B (en) A kind of hot-dip aluminum zinc magnesium alloy fluxing agent
CN105648378A (en) Antirust heat treatment technology for spare parts
CN111074188A (en) Hot galvanizing processing technology
CN111945092A (en) Novel intelligent hot galvanizing process method for fastener
CN103898529A (en) Rust-removing method
CN106835163A (en) For the cleaning of Ni―Ti anode noble metal surface plated film
CN207598260U (en) A kind of cold galvanizing tunnel steel plate ontology
CN109339550A (en) A kind of preparation method suitable for extra-high voltage direct-current transmission steel tower
CN107557798A (en) A kind of fastener raw material acid cleaning process
WO2018218435A1 (en) Brightening agent, aluminum alloy workpiece, and surface ash and stain removal method therefor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 222000 No. 8 Changjiang Road, Xinpu Economic Development Zone, Haizhou District, Lianyungang City, Jiangsu Province

Applicant after: Jiangsu Qi Tian Iron Tower Manufacturing Co., Ltd.

Address before: 222000 West Rizhao Avenue, Zhewang Lingang Industrial Zone, Ganyu County, Lianyungang City, Jiangsu Province

Applicant before: Jiangsu Qi Tian Iron Tower Manufacturing Co., Ltd.

CB02 Change of applicant information
CB02 Change of applicant information

Address after: 222000 No.8 Changjiang Road, Xinpu Development Zone, Haizhou District, Lianyungang City, Jiangsu Province

Applicant after: JIANGSU QITIAN IRON TOWER MANUFACTURING Co.,Ltd.

Address before: 222000 No. 8 Changjiang Road, Xinpu Economic Development Zone, Haizhou District, Lianyungang City, Jiangsu Province

Applicant before: JIANGSU QITIAN IRON TOWER MANUFACTURING Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190118