CN106310865A CN201610892823.9A CN201610892823A CN106310865A CN 106310865 A CN106310865 A CN 106310865A CN 201610892823 A CN201610892823 A CN 201610892823A CN 106310865 A CN106310865 A CN 106310865A
Authority
CN
China
Prior art keywords
framework
fixing
block
pipeline
drainage screen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610892823.9A
Other languages
Chinese (zh)
Inventor
车国容
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Fuyang Technology Development Co Ltd
Original Assignee
Chengdu Fuyang Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Fuyang Technology Development Co Ltd filed Critical Chengdu Fuyang Technology Development Co Ltd
Priority to CN201610892823.9A priority Critical patent/CN106310865A/en
Publication of CN106310865A publication Critical patent/CN106310865A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours
    • B01D50/60Combinations of devices covered by groups B01D46/00 and B01D47/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/26Drying gases or vapours

Abstract

The invention relates to an air purifying and dust-removing system for a power plant workshop. The air purifying and dust-removing system comprises an air extractor (1), a first frame (2), a water pumping device (3), an air spraying device (4), a first pipeline device (5), a first filtering device (6), a second pipeline device (7), an exhausting device (8) and a second filtering device (9), wherein the air extractor (1) comprises an air extracting pipe (11), a first fan (12), a first valve (13) and a first support rod (14); a first through hole (21), a second through hole (22), a third through hole (23), a fourth through hole (24), a first pipeline (25), a second valve, a first slope plate and a fifth through hole are formed in the first frame (2); and the water pumping device comprises a water pumping pipe, a first water pump and a third valve. The air purifying and dust-removing system can suck the exhaust gas in the power plant workshop, and then the exhaust gas is in full contact with the sprayed purified water, so that most impurities in the exhaust gas can be removed.

Description

A kind of air cleaning being applicable to power plant workshop and dust pelletizing system
Technical field
The present invention relates to technical field of dust removal equipment, particularly relate to a kind of air cleaning being applicable to power plant workshop and dedusting System.
Background technology
In traditional power plant produces, workshop can produce more dust and flue gas, and these dust or flue gas are in workshop The healthy of operator produce bigger threat, be chronically at the damage that can cause physical function in such environment, and pass The air cleaning facility dust removing effects of system is undesirable, it is impossible to meet the needs of the workshop conditions such as fire coal.
Chinese patent literature CN205235675U discloses a kind of power plant workshop air circulating-dedusting system, and it includes leading to Cross exhaust equipment that ventilation shaft is sequentially connected with, precipitation apparatus, electrostatic dust collection equipment, scrubbing tower, sterilization device, adsorption filtration set Standby and blowing device, wherein said exhaust equipment and blowing device one end is equipped with detachable type dual-layer drainage screen, described quiet Electric dust-removing equipment includes high tension generator, high-voltage probe and rustless steel ventilation duct, and described high-voltage probe is positioned at rustless steel ventilation duct Central axis at, it is capable of the circulation to air, dedusting and sterilization.But it uses high tension generator due to needs, So that using more dangerous, and need to consume relatively multi-energy, uneconomical environmental protection, use dangerous, there is certain prestige The side of body;And cannot effectively regulate the effect of filtration, i.e. when the smoke content in air is higher, it is impossible to by strengthening filter effect Make it that air fully to be filtered, finally cannot impurity in fully erased air, dust removing effects is undesirable;And it cannot Realization purification water is fully contacted with flue dust, thus filter effect is limited, it is impossible to well meet the demand of dedusting.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
Summary of the invention
The problem to be solved in the present invention is to provide a kind of air cleaning being applicable to power plant workshop and dust pelletizing system, including taking out Device of air, the first framework, water plug, air jet system, the first plumbing installation, the first defecator, second pipe device, discharge Device and the second defecator, air extractor includes exhaust tube, the first blower fan, the first valve and the first support bar, the first framework It is provided with the first through hole, the second through hole, third through-hole, fourth hole, the first pipeline, the second valve, the first swash plate, five-way Hole, water plug includes drinking-water pipe, the first water pump, the 3rd valve, and the flue dust in power plant workshop can be sucked wherein, so by the present invention It is fully contacted with the purification water sprayed afterwards, disposes the most of impurity in flue dust.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
A kind of air cleaning being applicable to power plant workshop and dust pelletizing system, including air extractor, be positioned at described air extractor Lower section the first framework, the water plug being arranged in described first framework, be positioned at the air jet system below described water plug, It is positioned at the first plumbing installation on the right side of described first framework, is positioned at the first defecator below described first plumbing installation, position Second pipe device below described first defecator, it is positioned at the discharger below described second pipe device and collecting The second defecator in described discharger, described air extractor includes exhaust tube, be arranged on described exhaust tube One blower fan, the first valve and be positioned at the first support bar below described first blower fan, described first framework is provided with position thereon First through hole on surface, it is positioned at the second through hole of its lower surface, is positioned at the third through-hole on its right surface, fourth hole, is positioned at it First pipeline of lower section, the second valve being arranged on described first pipeline, be contained in its first internal swash plate, to be positioned at it right The fifth hole on surface, described water plug includes drinking-water pipe, the first water pump of being arranged on described drinking-water pipe, the 3rd valve, Being positioned at the first support below described first water pump and be contained in the collection center of described first framework, described air jet system includes First transverse slat, it is positioned at the first block above described first transverse slat, is positioned at the second swash plate on the right side of described first block, is positioned at institute State the second transverse slat on the right side of the second swash plate, the first drainage screen between described first block and described second swash plate, be positioned at Closing frame, be positioned at the second pipe on the right side of described first framework, be arranged on described second pipe below described first transverse slat The 4th valve, be positioned at the 3rd pipeline of described closing frame, the second blower fan being arranged on described 3rd pipeline, be positioned at described Close the second drainage screen on the left of frame, be positioned at the second block below described closing frame, be positioned at the above described second block One sponge block, be positioned at the second sponge block on the right side of described second block, be positioned at the first spring on the right side of described second sponge block and Desiccant between described second block and described second sponge block, described first plumbing installation includes the 4th pipeline, sets It is placed in the 5th valve on described 4th pipeline, is positioned at the second support below described first framework, is positioned at described second support Lower section first fix bar, described first defecator include the second framework, the 5th pipeline being contained in described second framework, It is contained in the 3rd sponge block in described 5th pipeline, is positioned at the push pedal below described 3rd sponge block, is positioned under described push pedal The catch bar of side, it is positioned at the first brace of the described catch bar left and right sides, is positioned at the electric cylinder below described catch bar, is contained in institute State the 3rd drainage screen in the second framework, be positioned at the 4th drainage screen below described 3rd drainage screen and be positioned at described 4th filtration Second spring of side off the net, described second pipe device includes the 6th pipeline, first fixing of being arranged on described 6th pipeline Block, it is positioned at the 7th pipeline, the 6th valve being arranged on described 7th pipeline below described 6th pipeline, is positioned at the described 6th 3rd support of the pipeline left and right sides, the first cross bar being arranged on described 3rd support, it is positioned at about described 7th pipeline two 3rd support bar of side and be positioned at the second brace on the left of described 3rd support, described discharger includes the 3rd framework, is positioned at Discharge pipe, the 7th valve being arranged on described discharge pipe below described 3rd framework, it is contained in described 3rd framework Second fixed block and be positioned at the 3rd fixed block above described second fixed block, described second defecator includes the 4th sponge Block, be positioned at the 8th pipeline on the right side of described 4th sponge block, be arranged on described 8th pipeline second fix bar, be positioned at described Second fix the 5th drainage screen below bar, be positioned at the 3rd spring on the left of described 5th drainage screen, be positioned at described 5th filtration The 6th drainage screen on the right side of net, be positioned at the riser on the right side of described 6th drainage screen, be positioned at the 7th drainage screen on the right side of described riser, It is positioned at the 8th drainage screen on the right side of described 7th drainage screen and is positioned at the bar that leans on the left of described riser, described 3rd framework sets There are the 5th circular hole being positioned at its upper surface and the 6th circular hole being positioned at its lower surface.
Described first support bar is vertical shape, and the upper end of described first support bar is fixing with described first blower fan to be connected, institute The upper surface of the lower end and described first framework of stating the first support bar is fixed and is connected.
First through hole described in the lower end aligned of described exhaust tube and fixing with the upper surface of described first framework be connected, described The upper end of the first pipeline is directed at described second through hole and fixing with the lower surface of described first framework is connected, described first swash plate in Skewed, described first swash plate is fixing with the inner surface of described first framework to be connected.
The left end of described drinking-water pipe is directed at described third through-hole and fixing with the right surface of described first framework is connected, described First support is L-shaped, and one end of described first support is fixing with the right surface of described first framework to be connected, described first support The other end is fixing with described first water pump to be connected, and described collection center is hollow cuboid, the right surface of described collection center and institute Stating the fixing connection of inner surface of the first framework, described collection center is positioned at the left side of described third through-hole, the left-handed watch of described collection center Face is provided with some clematis stem holes.
Described first transverse slat is cuboid and horizontal positioned, the side of described first transverse slat and the interior table of described first framework Face is fixing to be connected, and the lower surface of described collection center is fixing with the upper surface of described first transverse slat to be connected, and described first transverse slat sets Having the 7th through hole and the 8th through hole running through its upper and lower surface, described first block is cuboid and vertically places, and described first The lower surface of block is fixing with the upper surface of described first transverse slat to be connected, and described first block is positioned at a left side for described 8th through hole Side, the described second inclined shape of swash plate, the lower end of described second swash plate is fixing with the upper surface of described first transverse slat to be connected, described Second swash plate is positioned at the right side of described 8th through hole, and described second transverse slat is horizontal, and the right-hand member of described second transverse slat is with described The left surface of collection center is fixing to be connected, and the left end of described second transverse slat is fixing with the right surface of described second swash plate to be connected, described First drainage screen is horizontal, and the right surface of the left end of described first drainage screen and described first block is fixing to be connected, and described the The right-hand member of one drainage screen is fixing with the left surface of described second swash plate to be connected, and the cross section of described closing frame is L-shaped, described closing The upper surface of frame is fixing with the lower surface of described first transverse slat to be connected, and the right surface of described closing frame is interior with described first framework Surface is fixing to be connected, and described closing frame is positioned at the left side of described fifth hole, the left end alignment the described 5th of described second pipe Through hole and fixing with the right surface of described first framework is connected, described 3rd pipeline is L-shaped, and the upper end of described 3rd pipeline is directed at Described 8th through hole and fixing with the lower surface of described first transverse slat being connected, the right-hand member described five-way of alignment of described 3rd pipeline Hole and fixing with the inner surface of described first framework be connected, described second drainage screen is cuboid and horizontal positioned, and described second The left end of drainage screen is fixing with the inner surface of described first framework to be connected, the right-hand member of described second drainage screen and described closing frame Left surface is fixing to be connected, and described second block is cuboid and vertically places, the lower surface of described second block and described first The inner surface of framework is fixing to be connected, and described first sponge block is cuboid and vertically places, the lower end of described first sponge block with The upper surface of described second block is fixing to be connected, and the upper end of described first sponge block is fixing with the lower surface of described closing frame to be connected Connecing, described second sponge block is cuboid and vertically places, the upper surface of described second sponge block and the following table of described closing frame Face is fixing to be connected, and the lower surface of described second sponge block is fixing with the inner surface of described first framework to be connected, described first spring Being provided with two, described first spring is horizontal, and the right-hand member of described first spring is fixing with the inner surface of described first framework to be connected Connecing, the left end of described first spring is fixing with the right surface of described second sponge block to be connected.
The upper end of described 4th pipeline is directed at described fourth hole and fixing with the right surface of described first framework is connected, institute Stating the second support L-shaped, the upper end of described second support is fixing with the lower surface of described first framework to be connected, described second support Lower end horizontal, described first fixes bar is cuboid and vertically places, and described first fixes the upper end of bar and described the The lower surface of two supports is fixing to be connected.
Described second framework is hollow round table-like, described second framework be provided be positioned at its upper surface the first circular hole and It is positioned at the second circular hole of its lower surface, the first circular hole described in the lower end aligned of described 4th pipeline and upper with described second framework Surface is fixing to be connected, and the lower end of described second support is fixing with the side of described second framework to be connected, and described 5th pipeline is horizontal stroke Cross section is the cylinder of annulus, and described 5th pipeline is vertical shape, the upper end of described 5th pipeline be directed at described first circular hole and with The inner surface of described second framework is fixing to be connected, and the lower end of described 5th pipeline is fixing with the inner surface of described second framework even Connecing, the upper end of described 5th pipeline is provided with several the 3rd circular holes, and described 3rd sponge block is cylinder and vertically places, described The upper surface of the 3rd sponge block is fixing with the inner surface of described second framework to be connected, and described 3rd sponge block is positioned at described first circle The lower section in hole, the side of described 3rd sponge block is slidably connected with the inner surface of described 5th pipeline, and described push pedal is cylinder And horizontal positioned, the lower surface of the upper surface of described push pedal and described 3rd sponge block is fixing to be connected, the side of described push pedal and The inner surface of described 5th pipeline is slidably connected, and described catch bar is cuboid and vertically places, the upper end of described catch bar with The lower surface of described push pedal is fixing to be connected, and the lower end of described catch bar is connected with described electricity cylinder, and described first brace is provided with two, The described first inclined shape of brace, the upper end of described first brace and the lower surface of described push pedal are fixing to be connected, described first oblique The lower end of bar is fixing with the side of described catch bar to be connected, and the described electricity lower surface of cylinder is fixed with the inner surface of described second framework Connecting, described 3rd drainage screen is horizontal, and the side of described 3rd drainage screen is fixing with the inner surface of described second framework even Connecing, described 5th pipeline runs through the upper and lower surface of described 3rd drainage screen and is secured to connect, and described 4th drainage screen is water Flat-shaped, the side of described 4th drainage screen acts against on the inner surface of described second framework and is slidably connected with it, and the described 5th Pipeline runs through the upper and lower surface of described 4th drainage screen and is slidably connected with it, and described second spring is provided with two, and described second Spring is vertical shape, and the upper end of described second spring is fixing with the lower surface of described 4th drainage screen to be connected, described second spring The inner surface of lower end and described second framework fixing be connected.
Described 6th pipeline is concave shape, the two ends of described 6th pipeline be directed at described second circular hole and with described second frame The lower surface of body is fixing to be connected, and described 6th pipeline is provided with the 4th circular hole, the upper surface of described first fixed block and described the The lower surface of two frameworks is fixing to be connected, and the lower surface of described first fixed block is fixing with described 6th pipeline to be connected, and the described 7th The upper end of pipeline is directed at described 4th circular hole and fixing with the outer surface of described 6th pipeline is connected, and described 3rd support is provided with two Individual, described 3rd support is L-shaped, and the upper end of described 3rd support is fixing with the side of described second framework to be connected, and the described 3rd The lower end of support is vertical shape, and described first cross bar is provided with two, and described first cross bar is cuboid and horizontal positioned, and described One end of one cross bar is fixing with described 3rd support to be connected, the other end of described first cross bar and the side of described 3rd support bar Fixing connecting, described 3rd support bar is provided with two, and described 3rd support bar is vertical shape, the upper end of described 3rd support bar with Described 6th pipeline is fixing to be connected, the described second inclined shape of brace, the upper end of described second brace and described 3rd support Side is fixing to be connected.
Described 3rd framework is hollow cuboid, described 3rd framework horizontal positioned, the lower end pair of described 7th pipeline Accurate described 5th circular hole and fixing with the upper surface of described 3rd framework being connected, the lower end of described 3rd support and described 3rd frame The upper surface of body is fixing to be connected, and the lower end of described 3rd support bar is fixed with the upper surface of described 3rd framework and is connected, and described the The upper surface of the lower end of two braces and described 3rd framework is fixing to be connected, and described discharge pipe is vertical shape, described discharge pipe upper End is directed at described 6th circular hole and fixing with the lower surface of described 3rd framework is connected, and described second fixed block is cuboid, institute The inner surface of the lower surface and described 3rd framework of stating the second fixed block is fixed and is connected, the upper surface of described 3rd fixed block and institute State the fixing connection of inner surface of the 3rd framework.
Described 4th sponge block is cuboid and vertically places, described 4th sponge block and the inner surface of described 3rd framework Fixing connecting, described 8th pipeline is L-shaped, the right-hand member of described 8th pipeline be directed at described 5th circular hole and with described 3rd framework Inner surface fixing connect, the left end of described 8th pipeline is fixed with the right surface of described 4th sponge block and is connected, described second Fixing bar is cuboid and vertically places, and the inner surface of the described second upper end and described 3rd framework fixing bar is fixed and is connected, Described 8th pipeline runs through the described second surface, left and right fixing bar and is secured to connect, and described 5th drainage screen is cuboid And vertically place, the upper surface of described 5th drainage screen fixes with described second that the lower surface of bar is fixing to be connected, described five faults in diagnosis and treatment The lower surface of filter screen is fixing with the inner surface of described 3rd framework to be connected, and described 3rd spring is vertical shape, described 3rd spring The inner surface of lower end and described 3rd framework fixing is connected, the upper end of described 3rd spring company fixing with described 8th pipeline Connecing, described riser is cuboid and vertically places, and the side of described riser is fixing with the inner surface of described 3rd framework to be connected, institute Stating riser and be provided with the 7th circular hole running through surface around, described 6th drainage screen is bending, described 6th drainage screen with The inner surface of described 3rd framework is slidably connected, and described 6th drainage screen acts against described second fixed block and the 3rd fixed block On, described in lean bar and be provided with two, described in lean bar be bending, described in lean the two ends of bar solid with the left surface of described riser Fixed connect, described in lean masthead and lean against on the right surface of described 6th drainage screen, described 7th drainage screen is hollow cuboid, The left surface of described 7th drainage screen is fixing with the right surface of described riser to be connected, and described 7th drainage screen is positioned at described 7th circle The right side in hole, the described 8th inclined shape of drainage screen, described 8th drainage screen is slidably connected with the inner surface of described 3rd framework, Described 8th drainage screen is provided with the 4th spring being positioned on the right side of it, and described 4th spring is provided with two and horizontal positioned, described The right-hand member of the 4th spring is fixing with the inner surface of described 3rd framework to be connected, and the left end of described 4th spring filters with the described 8th The right surface of net is fixing to be connected.
After using technique scheme, the air cleaning being applicable to power plant workshop and dust pelletizing system that the present invention proposes have Following advantage:
The air cleaning being applicable to power plant workshop of present invention proposition and dust pelletizing system simple in construction, easy to use, its energy Enough the flue dust in power plant workshop is sucked wherein, be then fully contacted with the purification water sprayed, dispose the major part in flue dust miscellaneous Matter, is then passed through the filtration of sponge block and the dried of desiccant, again filters it.Due to the setting of electricity cylinder, permissible The regulation effect to filtrating smoke dust, and then the air that dust concentration is different can be respectively processed, thereby may be ensured that Improve the efficiency of filtration while filter effect, save time and the energy;The most again air is carried out multi-filtering, until in air Impurity content be reduced to extremely low, then discharge it.The present invention is notable to the filter effect of flue dust, and filter efficiency is higher, energy Enough realize the air circulation in power plant workshop, the flue dust in power plant workshop is carried out sufficient purified treatment, reduce flue dust to workman's body The injury of body, and can ensure that the safety in production of power plant.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings proposition of the present invention is applicable to the air cleaning in power plant workshop and the concrete real of dust pelletizing system The mode of executing is described further:
Fig. 1 is the air cleaning being applicable to power plant workshop that proposes of the present invention and the structural representation of dust pelletizing system;
In figure: 1-air extractor;11-exhaust tube;12-the first blower fan;13-the first valve;14-the first support bar;2- One framework;21-the first through hole;22-the second through hole;23-third through-hole;24-fourth hole;25-the first pipeline;26-the second valve Door;27-the first swash plate;28-fifth hole;3-water plug;31-drinking-water pipe;32-the first water pump;33-the 3rd valve;34- One support;35-collection center;351-clematis stem hole;4-air jet system;41-the first transverse slat;411-the 7th through hole;412-the 8th leads to Hole;42-the first block;43-the second transverse slat;44-the second swash plate;45-the first drainage screen;46-closes frame;47-second pipe; 48-the 4th valve;49-the second drainage screen;40-the second block;401-the first sponge block;402-the second sponge block;403-first Spring;5-the first plumbing installation;51-the 4th pipeline;52-the 5th valve;53-the second support;54-first fixes bar;6-first Defecator;61-the second framework;611-the first circular hole;612-the second circular hole;62-the 5th pipeline;621-the 3rd circular hole;63- Three sponge blocks;64-push pedal;65-catch bar;66-the first brace;67-electricity cylinder;68-the second spring;69-the 3rd drainage screen;60- 4th drainage screen;7-second pipe device;71-the 6th pipeline;711-the 4th circular hole;72-the first fixed block;73-the 7th pipeline; 74-the 6th valve;75-the 3rd support;76-the first cross bar;77-the 3rd support bar;78-the second brace;8-discharger;81- 3rd framework;811-the 5th circular hole;812-the 6th circular hole;82-discharge pipe;83-the 7th valve;84-the second fixed block;85- Three fixed blocks;9-the second defecator;91-the 4th sponge block;92-the 8th pipeline;93-second fixes bar;94-the 5th filters Net;95-the 3rd spring;96-the 6th drainage screen;97-riser;971-the 7th circular hole;98-the 7th drainage screen;99-the 8th filters Net;991-the 4th spring;90-leans bar.
Detailed description of the invention
As it is shown in figure 1, the air cleaning being applicable to power plant workshop of present invention proposition and dust pelletizing system include air extractor 1, be positioned at the first framework 2 below described air extractor 1, the water plug 3 being arranged in described first framework 2, be positioned at described Air jet system 4 below water plug 3, it is positioned at the first plumbing installation 5 on the right side of described first framework 1, is positioned at described first pipe The first defecator 6 below duct device 5, be positioned at the second pipe device 7 below described first defecator 6, be positioned at described Discharger 8 below second pipe device 7 and the second defecator 9 being contained in described discharger 8.
As it is shown in figure 1, described air extractor 1 includes exhaust tube 11, the first blower fan 12 of being arranged on described exhaust tube 11, First valve 13 and be positioned at the first support bar 14 below described first blower fan 12.The left end of described exhaust tube 11 is placed on power plant In the workshop that interior smoke content is higher, such that it is able to the air in this workshop is pumped in described exhaust tube 11.Described first wind Machine 12 is electrically connected with the power supply so that extraneous air can be pumped in described exhaust tube 11 by described first blower fan 12.Institute State the first valve 13 other flow in controlling described exhaust tube 11.Described first support bar 14 in vertical shape, described The upper end of one support bar 14 is fixing with described first blower fan 12 to be connected, the lower end of described first support bar 14 and described first framework The upper surface of 2 is fixing to be connected.
As it is shown in figure 1, described first framework 2 in hollow cuboid and is vertically placed, described first framework 2 is provided with position Thereon surface the first through hole 21, be positioned at the second through hole 22 of its lower surface, be positioned at the third through-hole the 23, the 4th on its right surface Through hole 24, the first pipeline 25 being disposed below, the second valve 26 being arranged on described first pipeline 25, it is contained in inside it The first swash plate 27, be positioned at the fifth hole 28 on its right surface.Described first through hole the 21, second through hole 22, third through-hole 23, Four through holes 24 and fifth hole 28 is rounded and communicates with the inside of described first framework 2, the lower end aligned of described exhaust tube 11 Described first through hole 21 and fixing with the upper surface of described first framework 2 be connected so that the inside of described exhaust tube 11 is with described The inside of the first framework 2 communicates.The upper end of described first pipeline 25 be directed at described second through hole 22 and with described first framework 2 Lower surface is fixing to be connected so that the inside of described first pipeline 25 communicates with the inside of described first framework 2.Described second valve 26 for controlling the flow of water in described first pipeline 25.The described first inclined shape of swash plate 27, described first swash plate 27 and institute State the fixing connection of inner surface of the first framework 2.
As it is shown in figure 1, described water plug 3 includes drinking-water pipe 31, the first water pump 32 of being arranged on described drinking-water pipe 31, 3rd valve 33, it is positioned at the first support 34 below described first water pump 32 and is contained in the collection center of described first framework 2 35.The left end of described drinking-water pipe 31 is directed at described third through-hole 23 and fixing with the right surface of described first framework 2 is connected so that The inside of described drinking-water pipe 31 communicates with the inside of described first framework 2.Described first water pump 32 is electrically connected with the power supply, and is used for Water is pumped in described drinking-water pipe 31, then in described first framework 2.Described 3rd valve 33 is used for controlling described The flow of water in drinking-water pipe 31.Described first support 34 is L-shaped, one end of described first support 34 and described first framework 2 Right surface is fixing to be connected, and the other end of described first support 34 is fixing with described first water pump 32 to be connected.Described collection center 35 in Hollow cuboid, the cross section of described collection center 35 is the concave shape that side is put, the right surface of described collection center 35 and described the The inner surface of one framework 2 is fixing to be connected, and described collection center 35 is positioned at the left side of described third through-hole 23 so that from described threeway The water that hole 23 enters all focuses in described collection center 35, and the left surface of described collection center 35 is provided with some clematis stem holes 351, The height in described clematis stem hole 351 is different, thus the clematis stem hole 351 of top can be sprayed farther out, is positioned at the clematis stem of lower section It is relatively near that hole 351 sprays, such that it is able to expand its scope covered so that the flue dust entered from described first through hole 21 is filled The purification divided.
As it is shown in figure 1, described air jet system 4 includes the first transverse slat 41, is positioned at the first gear above described first transverse slat 42 Block 42, it is positioned at the second swash plate 44 on the right side of described first block 42, is positioned at the second transverse slat 43 on the right side of described second swash plate 44, position The first drainage screen 45 between described first block 42 and described second swash plate 44, it is positioned at the envelope below described first transverse slat 42 Close frame 46, be positioned at the second pipe 47 on the right side of described first framework 2, the 4th valve 48 being arranged on described second pipe 47, It is positioned at the 3rd pipeline of described closing frame 46, the second blower fan being arranged on described 3rd pipeline, is positioned at described closing frame 46 Second drainage screen 49 in left side, it is positioned at the second block 40 below described closing frame 46, is positioned at above described second block 40 First sponge block 401, it is positioned at the second sponge block 402 on the right side of described second block 40, is positioned on the right side of described second sponge block 402 The first spring 403 and desiccant between described second block 40 and described second sponge block 402.Described first transverse slat 41 in cuboid and horizontal positioned, and the side of described first transverse slat 41 is fixing with the inner surface of described first framework 2 to be connected, described The lower surface of collection center 35 is fixing with the upper surface of described first transverse slat 41 to be connected, and described first transverse slat 41 is provided with and runs through on it 7th through hole 411 and the 8th through hole 412 of lower surface, described 7th through hole 411 is rectangle, and described 8th through hole 412 is in circle Shape.Described first block 42 in cuboid and is vertically placed, the lower surface of described first block 42 and described first transverse slat 41 Upper surface is fixing to be connected, and described first block 42 is positioned at the left side of described 8th through hole 412.Described second swash plate 44 is inclined Shape, the lower end of described second swash plate 44 is fixing with the upper surface of described first transverse slat 41 to be connected, and described second swash plate 44 is positioned at institute State the right side of the 8th through hole 412.Described second transverse slat 43 is horizontal, the right-hand member of described second transverse slat 43 and described collection center 35 Left surface fixing connect, the left end of described second transverse slat 43 is fixed with the right surface of described second swash plate 44 and is connected.Described One drainage screen 45 is horizontal, and the left end of described first drainage screen 45 is fixing with the right surface of described first block 42 to be connected, institute The left surface of the right-hand member and described second swash plate 44 of stating the first drainage screen 45 is fixed and is connected, the upper surface of described first drainage screen 45 It is in same plane with the upper surface of described first block 42 and the second swash plate 44.Described closing frame 46 is in hollow rectangular Body, the cross section of described closing frame 46 is L-shaped, and the lower surface of the upper surface of described closing frame 46 and described first transverse slat 41 is fixed Connecting, the right surface of described closing frame 46 is fixing with the inner surface of described first framework 2 to be connected, and described closing frame 46 is positioned at described The left side of fifth hole 28, described closing frame 46 forms closing space with the inner surface of described first transverse slat 41 and the first framework 2. The left end of described second pipe 47 is directed at described fifth hole 28 and fixing with the right surface of described first framework 2 is connected so that The inside of described second pipe 47 communicates with the inside of described first framework 2.Described 4th valve 48 is used for controlling described second The flow of gas in pipeline 47.Described 3rd pipeline is L-shaped, the upper end of described 3rd pipeline be directed at described 8th through hole 412 and Fix with the lower surface of described first transverse slat 41 and be connected so that described 8th through hole 412 communicates with the inside of described 3rd pipeline, The right-hand member of described 3rd pipeline is directed at described fifth hole 28 and fixing with the inner surface of described first framework 2 is connected so that institute The inside of the inside and described 3rd pipeline of stating second pipe 47 communicates.Described second blower fan is electrically connected with the power supply, and described Two blower fans are for being pumped into the gas in described second pipe 47 in described 3rd pipeline.Described second drainage screen 49 is in rectangular Body and horizontal positioned, the left end of described second drainage screen 49 is fixing with the inner surface of described first framework 2 to be connected, described second mistake The right-hand member of filter screen 49 is fixing with the left surface of described closing frame 46 to be connected.Described second block 40 in cuboid and is vertically placed, The lower surface of described second block 40 is fixing with the inner surface of described first framework 2 to be connected, and described second block 40 can be by liquid Body and impurity are concentrated to the left.Described first sponge block 401 in cuboid and is vertically placed, described first sponge block 401 Lower end is fixing with the upper surface of described second block 40 to be connected, the upper end of described first sponge block 401 and described closing frame 46 Lower surface is fixing to be connected, and air can be filtered by described first sponge block 401, and can absorb the water of part in air Vapour.Described second sponge block 402 in cuboid and is vertically placed, the upper surface of described second sponge block 402 and described closing frame The lower surface of 46 is fixing to be connected, and the lower surface of described second sponge block 402 is fixing with the inner surface of described first framework 2 to be connected. Described first spring 403 is provided with two, and described first spring 403 is horizontal, the right-hand member of described first spring 403 and described the The inner surface of one framework 2 is fixing to be connected, and the right surface of the left end of described first spring 403 and described second sponge block 402 is fixed Connect, thus described second sponge block 402 is played a supporting role.
As it is shown in figure 1, described first plumbing installation 5 include the 4th pipeline 51, be arranged on described 4th pipeline 51 Five valves 52, it is positioned at the second support 53 below described first framework 2, is positioned at first below described second support 53 and fixes bar 54.The upper end of described 4th pipeline 51 is directed at described fourth hole 24 and fixing with the right surface of described first framework 2 is connected, and makes The inside obtaining described 4th pipeline 51 communicates with the inside of described first framework 2.Described 5th valve 52 is used for controlling described The flow of water in four pipelines 51.Described second support 53 is L-shaped, the upper end of described second support 53 and described first framework 2 Lower surface is fixing to be connected, and the lower end of described second support 53 is horizontal.Described first fixes bar 54 in cuboid and vertically puts Putting, the lower surface of the described first upper end and described second support 53 fixing bar 54 is fixed and is connected.
As it is shown in figure 1, described first defecator 6 include the second framework 61, be contained in described second framework 61 Five pipelines 62, the 3rd sponge block 63 being contained in described 5th pipeline 62, it is positioned at the push pedal below described 3rd sponge block 63 64, be positioned at the catch bar 65 below described push pedal 64, be positioned at described catch bar 65 left and right sides the first brace 66, be positioned at described Electric cylinder 67, the 3rd drainage screen 69 being contained in described second framework 61 below catch bar 65, it is positioned at described 3rd drainage screen The 4th drainage screen 60 below 69 and be positioned at the second spring 68 below described 4th drainage screen 60.Described second framework 61 is in sky The heart round table-like, described second framework 61 is provided with and is positioned at the first circular hole 611 of its upper surface and is positioned at the second of its lower surface Circular hole 612, rounded and with described second framework 61 the inside of described first circular hole 612 communicates, described 4th pipeline 51 times End is directed at described first circular hole 611 and fixing with the upper surface of described second framework 61 is connected so that described 4th pipeline 51 The inside of internal and described second framework 61 communicates, and the side of the lower end of described second support 53 and described second framework 61 is fixed Connecting, described second circular hole 612 is rounded and is provided with two, the inside phase of described second circular hole 612 and described second framework 61 Logical.Described 5th pipeline 62 is the cylinder of annulus in cross section, described 5th pipeline 62 in vertical shape, described 5th pipeline 62 Upper end is directed at described first circular hole 611 and the inside with described second framework 61 communicates so that the inside of described 4th pipeline 51 Communicating with the inside of described 5th pipeline 62, the lower end of described 5th pipeline 62 is fixing with the inner surface of described second framework 61 to be connected Connecing, the upper end of described 5th pipeline 62 is provided with several the 3rd circular holes 621, described 3rd circular hole 621 and described 5th pipeline 62 Inside communicate.Described 3rd sponge block 63 in cylinder and is vertically placed, and the upper surface of described 3rd sponge block 63 is with described The inner surface of the second framework 61 is fixing to be connected, and described 3rd sponge block 63 is positioned at the lower section of described first circular hole 611, and the described 3rd The side of sponge block 63 is slidably connected with the inner surface of described 5th pipeline 62.Described push pedal 64 in cylinder and horizontal positioned, The lower surface of the upper surface of described push pedal 64 and described 3rd sponge block 63 is fixing to be connected, the side of described push pedal 64 and described the The inner surface of five pipelines 62 is slidably connected.Described catch bar 65 in cuboid and is vertically placed, the upper end of described catch bar 65 with The lower surface of described push pedal 64 is fixing to be connected, and the lower end of described catch bar 65 is connected with described electricity cylinder 67 so that described electricity cylinder 67 Described catch bar 65 is driven to move up and down.Described first brace 66 is provided with two, the described first inclined shape of brace 66, and described The upper end of one brace 66 is fixing with the lower surface of described push pedal 64 to be connected, the lower end of described first brace 66 and described catch bar 65 Side fixing connect.Described electricity cylinder 67 is electrically connected with the power supply, the lower surface of described electricity cylinder 67 and described second framework 61 Inner surface is fixing to be connected.Described 3rd drainage screen 69 is horizontal, the side of described 3rd drainage screen 69 and described second framework The inner surface of 61 is fixing to be connected, and described 5th pipeline 62 runs through upper and lower surface and the company of being secured to of described 3rd drainage screen 69 Connect so that the gas from described 3rd circular hole 621 ejection can be filtered by it.Described 4th drainage screen 60 is horizontal, The side of described 4th drainage screen 60 acts against on the inner surface of described second framework 61 and is slidably connected with it, described 5th pipe Road 62 runs through the upper and lower surface of described 4th drainage screen 60 and is slidably connected with it so that described 4th drainage screen 60 can be upper and lower Mobile.Described second spring 68 is provided with two, and described second spring 68 is in vertical shape, and the upper end of described second spring 68 is with described The lower surface of the 4th drainage screen 60 is fixing to be connected, and the inner surface of the lower end of described second spring 68 and described second framework 61 is fixed Connect.
As it is shown in figure 1, described second pipe device 7 include the 6th pipeline 71, be arranged on described 6th pipeline 71 One fixed block 72, the 6th valve being positioned at the 7th pipeline 73 below described 6th pipeline 71, being arranged on described 7th pipeline 73 Door 74, the 3rd support 75 that is positioned at described 6th pipeline 71 left and right sides, the first cross bar of being arranged on described 3rd support 75 76, it is positioned at the 3rd support bar 77 of described 7th pipeline 73 left and right sides and is positioned at the second brace on the left of described 3rd support 75 78.Described 6th pipeline 71 is in concave shape, and the two ends of described 6th pipeline 71 are directed at described second circular hole 612 and with described second The lower surface of framework 61 is fixing to be connected so that the inside of described 6th pipeline 71 communicates with the inside of described second framework 61, institute Stating the 6th pipeline 71 and be provided with the 4th circular hole 711, described 4th circular hole 711 communicates with the inside of described 6th pipeline 71.Described The upper surface of the first fixed block 72 is fixing with the lower surface of described second framework 61 to be connected, the lower surface of described first fixed block 72 Fix with described 6th pipeline 71 and be connected.The upper end of described 7th pipeline 73 is directed at described 4th circular hole 711 and with the described 6th The outer surface of pipeline 71 is fixing to be connected so that the inside of described 7th pipeline 73 communicates with the inside of described 6th pipeline 71.Institute State the 6th valve 74 flow of gas in controlling described 7th pipeline 73.Described 3rd support 75 is provided with two, and described Three supports 75 are L-shaped, and the upper end of described 3rd support 75 is fixing with the side of described second framework 61 to be connected, described 3rd support The lower end of 75 is vertical shape.Described first cross bar 76 is provided with two, and described first cross bar 76 is in cuboid and horizontal positioned, described One end of first cross bar 76 is fixing with described 3rd support 75 to be connected, and the other end of described first cross bar 76 supports with the described 3rd The side of bar 77 is fixing to be connected.Described 3rd support bar 77 is provided with two, described 3rd support bar 77 in vertical shape, the described 3rd The upper end of support bar 77 is fixing with described 6th pipeline 71 to be connected.The described second inclined shape of brace 78, described second brace 78 The side of upper end and described 3rd support 75 fixing be connected.
As it is shown in figure 1, described discharger 8 includes the 3rd framework 81, is positioned at the discharge pipe below described 3rd framework 81 82, the 7th valve 83 being arranged on described discharge pipe 82, the second fixed block 84 and the position being contained in described 3rd framework 81 The 3rd fixed block 85 above described second fixed block 84.Described 3rd framework 81 in hollow cuboid, described 3rd frame Body 81 horizontal positioned, described 3rd framework 81 is provided with and is positioned at the 5th circular hole 811 of its upper surface and is positioned at the of its lower surface Six circular holes 812, described 5th circular hole 811 and rounded and with described 3rd framework 81 the inside of the 6th circular hole 812 communicate, described 5th circular hole 811 described in the lower end aligned of the 7th pipeline 73 and fixing with the upper surface of described 3rd framework 81 be connected so that institute The inside of the inside and described 3rd framework 81 of stating the 7th pipeline 73 communicates, the lower end of described 3rd support 75 and described 3rd frame The upper surface of body 81 is fixing to be connected, and the lower end of described 3rd support bar 77 is fixing with the upper surface of described 3rd framework 81 to be connected, The lower end of described second brace 78 is fixing with the upper surface of described 3rd framework 81 to be connected.Described discharge pipe 82 in vertical shape, institute State the upper end of discharge pipe 82 be directed at described 6th circular hole 812 and fixing with the lower surface of described 3rd framework 81 be connected so that institute The inside of the inside and described 3rd framework 81 of stating discharge pipe 82 communicates.Described 7th valve 83 is used for controlling described discharge pipe 82 The flow of interior gas.Described second fixed block 84 in cuboid, the lower surface of described second fixed block 84 and described 3rd framework The inner surface of 81 is fixing to be connected.The upper surface of described 3rd fixed block 85 is fixing with the inner surface of described 3rd framework 81 to be connected.
As it is shown in figure 1, described second defecator 9 includes the 4th sponge block 91, is positioned on the right side of described 4th sponge block 91 The 8th pipeline 92, be arranged on described 8th pipeline 92 second fix bar 93, be positioned at described second and fix below bar 93 5th drainage screen 94, it is positioned at the 3rd spring 95 on the left of described 5th drainage screen 94, is positioned on the right side of described 5th drainage screen 94 6th drainage screen 96, it is positioned at the riser 97 on the right side of described 6th drainage screen 96, is positioned at the 7th drainage screen on the right side of described riser 97 98, it is positioned at the 8th drainage screen 99 on the right side of described 7th drainage screen 98 and is positioned at and leans bar 90 on the left of described riser 97.Described 4th sponge block 91 in cuboid and is vertically placed, and described 4th sponge block 91 is fixing with the inner surface of described 3rd framework 81 to be connected Connect.Described 8th pipeline 92 is L-shaped, the right-hand member of described 8th pipeline 92 be directed at described 5th circular hole 811 and with described 3rd frame The inner surface of body 81 is fixing to be connected, and the left end of described 8th pipeline 92 is fixing with the right surface of described 4th sponge block 91 to be connected, Make to need the filtration through described 4th sponge block 91 from described 8th pipeline 92 expellant gas.Described second fixes bar 93 In cuboid and vertically placing, the inner surface of the described second upper end and described 3rd framework 81 fixing bar 93 is fixed and is connected, institute State the 8th pipeline 92 run through the described second surface, left and right fixing bar 93 and be secured to connect, thus to described 8th pipeline 92 Play a supporting role.Described 5th drainage screen 94 in cuboid and is vertically placed, the upper surface of described 5th drainage screen 94 and institute State the second fixing connection of lower surface fixing bar 93, the lower surface of described 5th drainage screen 94 and the interior table of described 3rd framework 81 Face is fixing to be connected.Described 3rd spring 95 in vertical shape, the lower end of described 3rd spring 95 and the interior table of described 3rd framework 81 Face is fixing to be connected, and the upper end of described 3rd spring 95 is fixing with described 8th pipeline 92 to be connected, thus to described 8th pipeline 92 Play a supporting role.Described riser 97 in cuboid and is vertically placed, the side of described riser 97 and described 3rd framework 81 Inner surface is fixing to be connected, and described riser 97 is provided with the 7th circular hole 971 running through surface around, described 7th circular hole 971 in Circular.Described 6th drainage screen 96 is in bending, and described 6th drainage screen 96 slides even with the inner surface of described 3rd framework 91 Connecing, described 6th drainage screen 96 acts against on described second fixed block 84 and the 3rd fixed block 85.The described bar 90 that leans is provided with two Individual, described in lean bar 90 in bending, described in lean that the left surface of the two ends of bar 90 and described riser 97 is fixing to be connected, described top Rod 90 acts against on the right surface of described 6th drainage screen 96, thus plays a supporting role described 6th drainage screen 96.Institute Stating the 7th drainage screen 98 in hollow cuboid, the cross section of described 7th drainage screen 98 is the concave shape that side is put, and the described 7th The left surface of drainage screen 98 is fixing with the right surface of described riser 97 to be connected, and described 7th drainage screen 98 is positioned at described 7th circular hole The right side of 971.The described 8th inclined shape of drainage screen 99, described 8th drainage screen 99 is sliding with the inner surface of described 3rd framework 81 Being dynamically connected so that described 8th drainage screen 99 can move left and right, described 8th drainage screen 99 is provided be positioned on the right side of it Four springs 991, described 4th spring 991 is provided with two and horizontal positioned, the right-hand member of described 4th spring 991 and described 3rd frame The inner surface of body 81 is fixing to be connected, and the left end of described 4th spring 991 is fixing with the right surface of described 8th drainage screen 99 to be connected, Thus described 8th drainage screen 99 is played a supporting role.
During as it is shown in figure 1, the air cleaning being applicable to power plant workshop of described present invention proposition and dust pelletizing system use, first First the left end of exhaust tube 11 is placed on the place that flue dust in power plant workshop is more.Then the second blower fan is started so that extraneous Air enters in described second pipe 47, opens the 4th valve 48 so that the air in second pipe enters into the described 3rd In pipeline, it is then passed through described 8th through hole 412 and upwards sprays, and due to the setting of described second swash plate 44 so that from described The gas of the 8th through hole 412 ejection sprays to upper left side.Then start the first water pump 32, and the right-hand member of drinking-water pipe 31 is placed In pond so that the water in pond enters in described drinking-water pipe 31, it is then passed through described third through-hole 23 and enters into described In collection center 35, it is then passed through described clematis stem hole 351 and is ejected into the left side of described collection center 35.Owing to gas is from the described 8th Through hole 412 sprays, such that it is able to send forth being ejected into the water on the left of described collection center 35 so that water is on described first transverse slat 41 Fully dispersed come.Then start the first blower fan 12, and open the first valve 13 so that extraneous air enter into described in bleed In pipe 11, it is then passed through described first through hole 21 and enters in described first framework 2, be then fully contacted with scattered water, from And the air of suction effectively can be purified, then air and water enter into described the through described 7th through hole 411 The lower section of one transverse slat 41, then the 3rd drainage screen 49 described in water-soaked, so that the 3rd drainage screen 49 can cross air filtering, and Clean-up effect is more preferable.Then water and air enters into the lower section of described 3rd drainage screen 49.Due to setting of described second block 40 Put so that water focuses on the left side of described second block 40, and then air enters after the filtration of described first sponge block 401 Right side to described first sponge block 401.When the water on the left of described second block 40 is more, open the second valve 26 so that More water enters in described first pipeline 25, then discharges from described first pipeline 25.Enter into described first sponge block Air on the right side of in the of 401 contacts with the desiccant being arranged on the right side of the first sponge block 401, can enter the air being fully contacted with water Row is dried, and air the most after drying enters into described second sponge block 402 after the filtration of described second sponge block 402 Right side, described second sponge block 402 can filter out desiccant, prevents desiccant from entering into described second sponge block 402 Right side, described second sponge block 402 is played a supporting role by described first spring 403.Then air enters into described 4th pipe In road 51, open the 5th valve 52 so that the air in described 4th pipeline 51 enters in described second framework 61.Work as air In flue dust more time, can start electricity cylinder 67 so that described catch bar 65 moves up so that described push pedal 64 upwards moves Dynamic, and then described 3rd sponge block 63 is compressed, so that the density of described 3rd sponge block 63 increases, and then make 3rd sponge block 63 is more preferable to the filter effect of air, can effectively remove the impurity in air, when the impurity in air relatively Time few, electricity cylinder 67 can be started so that described catch bar 65 moves down, and then described push pedal 64 is moved down, and then Described 3rd sponge block 63 is stretched, and then the density of described 3rd sponge block 63 is reduced, and then can be to flue dust Less air is as soon as possible through the filtration of described 3rd sponge block 63, thus both can ensure that the effect of filtration, can carry again The efficiency of high filtration.Air after described 3rd sponge block 63 filters enters into described the through described 3rd circular hole 621 Outside the pipe of five pipelines 62.Described 4th mistake is entered into after being then passed through the filtration of described 3rd drainage screen 69 and the 4th drainage screen 60 The lower section of filter screen 60, described second spring 68 can be compressed, and described 4th drainage screen 60 can move down.Then air enters In described 6th pipeline 71, it is then passed through described 4th circular hole 711 and enters in described 7th pipeline 73.Then the 6th is opened Valve 74 so that the air in the 7th pipeline 73 enters in described 8th pipeline 92, is then passed through described 4th sponge block 91 Filtration after enter in described 3rd framework 81, enter on the right side of it after being then passed through the filtration of described 5th drainage screen 94, Enter into the right side of described 6th drainage screen 96 after being then passed through the filtration of described 6th drainage screen 96, described in lean bar 90 to institute State the 6th drainage screen 96 to play a supporting role.Then air enters into described 7th drainage screen 98 through described 7th circular hole 971 In, enter in described discharge pipe 82 after being then passed through the filtration of the 8th drainage screen 99, open the 7th valve 83 so that it is discharge, The lower end of described discharge pipe 82 is placed in power plant workshop, such that it is able to the air after purifying is discharged in workshop, thus changes It is apt to the air quality in workshop, and exhaust tube 11 constantly extracts the air that flue dust is more, it is achieved the circulation of power plant's workshop air Dedusting.So far, the present invention proposes the air cleaning being applicable to power plant workshop and dust pelletizing system use process prescription complete.
The above, the only detailed description of the invention of the present invention, but protection scope of the present invention is not limited thereto, and any Those skilled in the art, in the technical scope that the invention discloses, can readily occur in change or replace, should contain Within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with described scope of the claims.

Claims (8)

1. it is applicable to air cleaning and the dust pelletizing system in power plant workshop, including air extractor (1), is positioned at described air extractor (1) lower section the first framework (2), the water plug (3) being arranged on described first framework (2), be positioned at described water plug (3) Lower section air jet system (4), be positioned at described first framework (1) right side the first plumbing installation (5), be positioned at described first pipeline dress Put (5) lower section the first defecator (6), be positioned at described first defecator (6) lower section second pipe device (7), be positioned at Described second pipe device (7) lower section discharger (8) and be contained in the second defecator in described discharger (8) (9), it is characterised in that: described air extractor (1) includes exhaust tube (11), the first blower fan being arranged on described exhaust tube (11) (12), the first valve (13) and be positioned at described first blower fan (12) lower section the first support bar (14);Described first defecator (6) include the second framework (61), the 5th pipeline (62) being contained in described second framework (61), be contained in described 5th pipeline (62) the 3rd sponge block (63) in, it is positioned at the push pedal (64) of described 3rd sponge block (63) lower section, is positioned at described push pedal (64) The catch bar (65) of lower section, it is positioned at first brace (66) of described catch bar (65) left and right sides, is positioned at described catch bar (65) Lower section electric cylinder (67), the 3rd drainage screen (69) being contained in described second framework (61), be positioned at described 3rd drainage screen (69) lower section the 4th drainage screen (60) and be positioned at described 4th drainage screen (60) lower section the second spring (68);Described discharge fills Put (8) to include the 3rd framework (81), the discharge pipe (82) being positioned at described 3rd framework (81) lower section, be arranged at described discharge pipe (82) the 7th valve (83), the second fixed block (84) being contained in described 3rd framework (81) on and to be positioned at described second solid Determine the 3rd fixed block (85) of block (84) top;Described water plug (3) includes drinking-water pipe (31), is arranged at described drinking-water pipe (31) the first water pump (32), the 3rd valve (33), the first support (34) being positioned at described first water pump (32) lower section and the receipts on It is dissolved in the collection center (35) in described first framework (2);Described air jet system (4) includes the first transverse slat (41), is positioned at described First block (42) of one transverse slat (41) top, be positioned at described first block (42) right side the second swash plate (44), be positioned at described Second transverse slat (43) on the second swash plate (44) right side, the be positioned between described first block (42) and described second swash plate (44) One drainage screen (45), it is positioned at the closing frame (46) of described first transverse slat (41) lower section, is positioned at the of described first framework (2) right side Two pipelines (47), the 4th valve (48) being arranged on described second pipe (47), it is positioned at the 3rd of described closing frame (46) Pipeline, the second blower fan being arranged on described 3rd pipeline, be positioned at described closing frame (46) left side the second drainage screen (49), position The second block (40) in described closing frame (46) lower section;Described air jet system (4) also includes being positioned at described second block (40) Top the first sponge block (401), be positioned at described second block (40) right side the second sponge block (402), be positioned at described second Sponge block (402) right side the first spring (403) and be positioned between described second block (40) and described second sponge block (402) Desiccant.
The air cleaning being applicable to power plant workshop the most according to claim 1 and dust pelletizing system, it is characterised in that: described One transverse slat (41) in cuboid and horizontal positioned, the inner surface of the side of described first transverse slat (41) and described first framework (2) Fixing connection, the lower surface of described collection center (35) is fixing with the upper surface of described first transverse slat (41) to be connected, and described first is horizontal Plate (41) is provided with the 7th through hole (411) and the 8th through hole (412) running through its upper and lower surface.
The air cleaning being applicable to power plant workshop the most according to claim 2 and dust pelletizing system, it is characterised in that: described One block (42) in cuboid and is vertically placed, the lower surface of described first block (42) and the upper table of described first transverse slat (41) Face is fixing to be connected, and described first block (42) is positioned at the left side of described 8th through hole (412), and described second swash plate (44) is inclined Shape, the lower end of described second swash plate (44) is fixing with the upper surface of described first transverse slat (41) to be connected, described second swash plate (44) It is positioned at the right side of described 8th through hole (412).
The air cleaning being applicable to power plant workshop the most according to claim 1 and dust pelletizing system, it is characterised in that: described Two transverse slats (43) are horizontal, and the right-hand member of described second transverse slat (43) is fixing with the left surface of described collection center (35) to be connected, institute The right surface of the left end and described second swash plate (44) of stating the second transverse slat (43) is fixed and is connected, and described first drainage screen (45) is in water Flat-shaped, the left end of described first drainage screen (45) is fixing with the right surface of described first block (42) to be connected, and described first filters The right-hand member of net (45) is fixing with the left surface of described second swash plate (44) to be connected.
The air cleaning being applicable to power plant workshop the most according to claim 1 and dust pelletizing system, it is characterised in that: described One framework (2) is provided with the fifth hole (28) being positioned at its right surface;The cross section of described closing frame (46) is L-shaped, described envelope The lower surface of the upper surface and described first transverse slat (41) that close frame (46) is fixed and is connected, the right surface of described closing frame (46) and institute Stating that the inner surface of the first framework (2) is fixing to be connected, described closing frame (46) is positioned at the left side of described fifth hole (28), and described the The left end of two pipelines (47) is directed at described fifth hole (28) and fixing with the right surface of described first framework (2) is connected.
The air cleaning being applicable to power plant workshop the most according to claim 2 and dust pelletizing system, it is characterised in that: described One framework (2) is provided with the fifth hole (28) being positioned at its right surface;Described 3rd pipeline is L-shaped, described 3rd pipeline upper End is directed at described 8th through hole (412) and fixing with the lower surface of described first transverse slat (41) is connected, the right side of described 3rd pipeline End is directed at described fifth hole (28) and fixing with the inner surface of described first framework (2) is connected, described second drainage screen (49) In cuboid and horizontal positioned, the left end of described second drainage screen (49) is fixing with the inner surface of described first framework (2) to be connected, The right-hand member of described second drainage screen (49) is fixing with the left surface of described closing frame (46) to be connected.
The air cleaning being applicable to power plant workshop the most according to claim 1 and dust pelletizing system, it is characterised in that: described Two blocks (40) in cuboid and are vertically placed, the lower surface of described second block (40) and the interior table of described first framework (2) Face is fixing to be connected, and described first sponge block (401) in cuboid and is vertically placed, the lower end of described first sponge block (401) with The upper surface of described second block (40) is fixing to be connected, the upper end of described first sponge block (401) and described closing frame (46) Lower surface is fixing to be connected.
The air cleaning being applicable to power plant workshop the most according to claim 1 and dust pelletizing system, it is characterised in that: described Two sponge blocks (402) in cuboid and are vertically placed, the upper surface of described second sponge block (402) and described closing frame (46) Lower surface is fixing to be connected, and the lower surface of described second sponge block (402) is fixing with the inner surface of described first framework (2) to be connected, Described first spring (403) is provided with two, and described first spring (403) is horizontal, the right-hand member of described first spring (403) with The inner surface of described first framework (2) is fixing to be connected, the left end of described first spring (403) and described second sponge block (402) Right surface fixing connect.
CN201610892823.9A 2016-10-13 2016-10-13 Air purifying and dust-removing system for power plant workshop Withdrawn CN106310865A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610892823.9A CN106310865A (en) 2016-10-13 2016-10-13 Air purifying and dust-removing system for power plant workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610892823.9A CN106310865A (en) 2016-10-13 2016-10-13 Air purifying and dust-removing system for power plant workshop

Publications (1)

Publication Number Publication Date
CN106310865A true CN106310865A (en) 2017-01-11

Family

ID=57820962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610892823.9A Withdrawn CN106310865A (en) 2016-10-13 2016-10-13 Air purifying and dust-removing system for power plant workshop

Country Status (1)

Country Link
CN (1) CN106310865A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2114464A (en) * 1982-01-06 1983-08-24 Chuan Tsai Ching Air pollution control apparatus
CN2329766Y (en) * 1997-12-03 1999-07-21 刘冠涛 Wet duster for tunnel
CN101804299A (en) * 2010-04-09 2010-08-18 镇江市电站辅机厂 Dry type desulfurizing, spraying and humidifying device and spraying and humidifying method
CN104083971A (en) * 2014-07-22 2014-10-08 顾宝君 Atomized dust removing device and dust removing process thereof
CN204219964U (en) * 2014-11-24 2015-03-25 邦达诚科技(常州)有限公司 Family expenses automatic air-purifying device
CN105305244A (en) * 2015-10-12 2016-02-03 夏烬楚 10kv switch cabinet system with dedusting function
CN105833613A (en) * 2016-06-10 2016-08-10 成都恒力达科技有限公司 Waste gas filtration and purification system
CN105935681A (en) * 2016-06-04 2016-09-14 王杨 Dust removal device for power equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2114464A (en) * 1982-01-06 1983-08-24 Chuan Tsai Ching Air pollution control apparatus
CN2329766Y (en) * 1997-12-03 1999-07-21 刘冠涛 Wet duster for tunnel
CN101804299A (en) * 2010-04-09 2010-08-18 镇江市电站辅机厂 Dry type desulfurizing, spraying and humidifying device and spraying and humidifying method
CN104083971A (en) * 2014-07-22 2014-10-08 顾宝君 Atomized dust removing device and dust removing process thereof
CN204219964U (en) * 2014-11-24 2015-03-25 邦达诚科技(常州)有限公司 Family expenses automatic air-purifying device
CN105305244A (en) * 2015-10-12 2016-02-03 夏烬楚 10kv switch cabinet system with dedusting function
CN105935681A (en) * 2016-06-04 2016-09-14 王杨 Dust removal device for power equipment
CN105833613A (en) * 2016-06-10 2016-08-10 成都恒力达科技有限公司 Waste gas filtration and purification system

Similar Documents

Publication Publication Date Title
CN105749682B (en) A kind of environmental-protecting and high-efficient type weaving dust exhaust apparatus
CN105771529A (en) Efficient environment-friendly indoor air purifying device
CN105771530A (en) Dust removal system for mineral production workshop
CN105771518A (en) Dust treatment device used in ore processing
CN207668149U (en) A kind of Weaving device with dust hood
CN104907280A (en) High-efficiency zero-damage tea leaf cleaner
CN106390631A (en) Dust filter
CN206273325U (en) A kind of dust filter unit
CN205570017U (en) Dust extraction is used in high -efficient type weaving of environmental protection
CN106492552A (en) A kind of haze absorbing and purifying device
CN105854497A (en) Industrial waste gas purifying device
CN106268152A (en) A kind of industrial plant air circulating-dedusting system
CN105664630B (en) A kind of livestock-raising air cleaning unit
CN105879554A (en) Air purifying equipment
CN106310865A (en) Air purifying and dust-removing system for power plant workshop
CN106284154A (en) A kind of dust arrester of sweeping machine
CN106345212A (en) Industrial smoke purification equipment with high efficiency and environmental friendliness
CN106474831A (en) A kind of dust-filtering method
CN106268153A (en) A kind of energy filtering dust and the air circulating purification system of microgranule
CN106310795B (en) A kind of air filtration purification processing system
CN106310864A (en) Industrial air filtration and purification device
CN206262280U (en) A kind of large space air filtration processing unit
CN205496242U (en) Building dust treatment device
CN106606913A (en) Dust purification equipment for furniture and building material production
CN207708740U (en) A kind of air-filtering equipment used for air compressor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170111

WW01 Invention patent application withdrawn after publication