CN106288989B - A kind of blasting hole with water powder charge and obstruction method - Google Patents

A kind of blasting hole with water powder charge and obstruction method Download PDF

Info

Publication number
CN106288989B
CN106288989B CN201610822443.8A CN201610822443A CN106288989B CN 106288989 B CN106288989 B CN 106288989B CN 201610822443 A CN201610822443 A CN 201610822443A CN 106288989 B CN106288989 B CN 106288989B
Authority
CN
China
Prior art keywords
blasthole
support bar
hole
lining rope
weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610822443.8A
Other languages
Chinese (zh)
Other versions
CN106288989A (en
Inventor
尹涛
周传波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences
Original Assignee
China University of Geosciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences filed Critical China University of Geosciences
Priority to CN201610822443.8A priority Critical patent/CN106288989B/en
Publication of CN106288989A publication Critical patent/CN106288989A/en
Application granted granted Critical
Publication of CN106288989B publication Critical patent/CN106288989B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • F42D1/10Feeding explosives in granular or slurry form; Feeding explosives by pneumatic or hydraulic pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • F42D1/18Plugs for boreholes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The present invention relates to a kind of blasting hole with water powder charge and obstruction methods, bind weight in one end of lining rope, the lining rope for being banded with weight is put into blasthole, detect blast hole depth and pore-forming effect;Strip emulsion is tied up on support bar, support bar is put into blasthole, and support bar is pressed into set depth by the lining rope for being banded with weight;Blinding covering support bar is put into blasthole, then extracts lining rope;Dynamite charge is completed by the charge constitution of setting;Blasthole is blocked up completely with blinding after completing dynamite charge, then can carry out networking explosion;Blast hole projectile filling and obstruction method provided by the invention are easy to operate, and use cost is low, and demolition effect is good;It can solve to be full of water in rainy hole after having underground water in hole or being drilled hole, explosive swims in the water surface and does not sink under water when filling strip emulsion, and explosion is caused to generate foundation, blasting flyrock and because the floating of strip emulsion makes excessive lead to the problem of of spacing between explosive miss-fire in water.

Description

A kind of blasting hole with water powder charge and obstruction method
Technical field
The present invention relates to a kind of blast hole projectile filling and obstruction method, especially surface mining has ground after blasthole is drilled in hole Lower water is drilled behind hole because of the blast hole projectile filling and obstruction method that are full of in hole of raining during water, belongs to blasting engineering technical field.
Background technology
Blasthole has underground water or is drilled hole rains later, and blasthole easily occurs collapse hole or leads to hole depth not by chip ballast plug-hole The problem of enough.Blasthole has underground water or is drilled after hole full of water in hole of raining, in the strip emulsion for filling waterproof simultaneously When, explosive, which can swim in the water surface and not sink under water, causes that explosion generates foundation, blasting flyrock and strip emulsion swim in water In excessive lead to the problem of of spacing between explosive is made to miss-fire.
When common plugging material such as stemming blocks blasting hole with water, stemming can loosely fall in water, lose the effect of blocking.
Invention content
It is an object of the invention to overcome the deficiencies in the prior art, and a kind of blasting hole with water powder charge and obstruction method are provided, It solves to have underground water in hole or be drilled behind hole in hole of raining to be full of water, explosive, which swims in the water surface and do not sink under water, causes explosion to produce Take root bottom, blasting flyrock and strip emulsion floating excessive lead to the problem of of spacing between explosive is made to miss-fire in water.
Technical solution is a kind of blasting hole with water powder charge and obstruction method, including as follows used by realizing the object of the invention Step:
(1) weight is bound in one end of lining rope with a scale, the lining rope for being banded with weight is put into blasthole, detect blasthole Depth and pore-forming effect;
(2) strip emulsion is tied up on support bar, support bar is put into blasthole, will by the lining rope for being banded with weight Support bar is pressed into set depth;
(3) diameter 1cm~1.5cm blindings covering support bar of 0.8kg~1.2kg and strip emulsification are put into blasthole Explosive then extracts lining rope and weight;
(4) step (2) and/or step (3) are repeated, dynamite charge is completed by the charge constitution of setting;
(5) blasthole is blocked up completely with diameter 1cm~1.5cm blindings after completing dynamite charge.
If it is detected that collapse hole occurs for blasthole or blast hole depth is below standard in step (1), perforations adding is needed so that drilling effect Fruit meets design requirement.
The weight used in step (1) is cylindrical metal block;Or weight is conical metal block, lining rope is bound in circular cone The tip of shape metal derby.
The support bar used in step (2) is the pvc pipe piece that arc length is 1/2~1/8 circumference.
Groove is opened up on the side of pvc pipe piece before the binding of strip emulsion in step (2), for binding strip emulsification The binding strap card of explosive is in a groove.
The charge constitution set in step (4) as continuous charging structure, decking structure, bottom hole decking structure or Multicharge structure.
If continuous charging structure, then more support bars are connected to total length by adhesive tape in step (2) and are equal to setting Shot depth, strip emulsion is bound as required on the support bar, by being banded with the lining rope of weight by support bar pressure Enter set depth, followed by step (3).
If decking, will be supported by being banded with the lining rope of weight after one section of support bar is often placed in step (4) Item is pressed into set depth, and lining rope is required to be put into diameter 1cm~1.5cm rubbles of 0.8kg~1.2kg in blasthole before extracting Son.
Compared with prior art, beneficial effects of the present invention are as follows:
1st, blast hole projectile filling and obstruction method provided by the invention tie up strip emulsion is reloaded into blasthole on support bar, Using support bar as the carrier of strip emulsion, support bar uses pvc pipe piece of the arc length for 1/2~1/8 circumference, will Pvc pipe is cut into 2~8 pvc pipe pieces, you can meet powder charge demand, pvc pipe surface is smooth and tube wall is thin, and its own With radian can with blasthole and the shape perfect matching of strip emulsion, convenient for explosive decentralization simultaneously will not blasthole with Gap is formed between strip emulsion, it is ensured that effect during coupling charging, pvc pipe price is low and is easily obtained in demolition site , use cost is extremely low, groove is opened up on the side of pvc pipe piece before emulsion binding, for binding strip emulsion Binding strap card in a groove, it is ensured that strip emulsion lashing location is fixed, and will not be floated up and down with flow, ensure explosion Effect.
2nd, blast hole projectile filling and obstruction method provided by the invention can be set charge constitution by changing the length of pvc pipe piece It is set to continuous charging structure, decking structure or multicharge structure;It can be by powder charge knot by the radius for changing pvc pipe piece Structure is set as coupling charging or Uncoincided charge.
3rd, blast hole projectile filling and obstruction method provided by the invention before dynamite charge in advance using the lining rope for being banded with weight Blast hole depth and pore-forming effect are detected, if it is detected that collapse hole occurs for blasthole or blast hole depth is below standard, needs perforations adding so that Drilling effect meets the explosion requirement of setting, and the explosion caused by collapse hole leads to dynamite charge position inaccuracy can be avoided to fail, Lining rope is with a scale, the practical hole depth of blasthole can be directly acquired by scale, and height of water level in blasthole can be judged according to washmarking, To formulate best blasting scheme, ensure demolition effect.
4th, blast hole projectile filling and obstruction method provided by the invention it is every placement one section of support bar after by being banded with weight Lining rope support bar is pressed into set depth, on the one hand play the role of be compacted support bar, on the other hand can be pressed in support bar It is fixed in fact to obtain the placement depth and real time water level for being compacted support bar in real time by lining rope in the process;Lining rope is equal before extracting Support bar is covered by diameter 1cm~1.5cm blindings of 0.8kg~1.2kg, is first compacted strip emulsion using blinding And support bar, then weight is proposed again, avoids proposing that strip emulsion and support bar float again during weight, weight is selected There is bottom surface to be tied up for plane convenient for compacting strip emulsion and support bar, lining rope for cylindrical metal block or conical metal block The tip of conical metal block is tied in, convenient for above carrying for weight.
5th, blast hole projectile filling and obstruction method provided by the invention use diameter 1cm~1.5cm blindings as explosive interval Material and multiple-row blasting material, blinding will not float in water, and in water will not be loose, ensure to block effect.
6th, blast hole projectile filling and obstruction method provided by the invention are easy to operate, and use cost is low, and demolition effect is good;It can solve Certainly there is underground water in hole or be drilled after hole in hole of raining full of water, explosive swims in the water surface and do not sink during dress strip emulsion Enter the bottom, and between explosion is caused to generate foundation, blasting flyrock and make in water between explosive because of the floating of strip emulsion It miss-fires away from excessive lead to the problem of.
Specific embodiment
The present invention is illustrated in detail with reference to specific embodiment, present disclosure is not limited to following reality Apply example.
Embodiment 1:
A kind of blasting hole with water powder charge and obstruction method, include the following steps:
(1) cylindrical metal block is bound in one end of lining rope with a scale, the lining rope for being banded with cylindrical metal block is put into big gun Kong Zhong detects blast hole depth and pore-forming effect, if it is detected that collapse hole occurs for blasthole or blast hole depth is below standard, needs perforations adding, So that drilling effect meets the explosion requirement of setting;
(2) using continuous charging structure, pvc pipe piece of a plurality of arc length for 1/6 circumference is connected to overall length by adhesive tape Degree opens up groove on the side of pvc pipe piece, is tied up strip emulsion in arc by binding strap equal to the shot depth of setting The pvc pipe on piece of a length of 1/6 circumference, binding strap card in a groove, then by pvc pipe piece and the strip emulsion that has bound It is put into blasthole, pvc pipe piece and strip emulsion is pressed by set depth by the lining rope for being banded with cylindrical metal block;
(3) diameter 1cm~1.5cm blindings covering support bar of 0.8kg~1.2kg and strip emulsification are put into blasthole Explosive then extracts lining rope, completes dynamite charge;
(4) blasthole is blocked up completely with diameter 1cm~1.5cm blindings after completing dynamite charge.
Embodiment 2:
A kind of blasting hole with water powder charge and obstruction method, include the following steps:
(1) conical metal block is bound in one end of lining rope with a scale, lining rope is bound in the tip of conical metal block, The lining rope for being banded with conical metal block is put into blasthole, detects blast hole depth and pore-forming effect, if it is detected that blasthole occurs Collapse hole or blast hole depth are below standard, need perforations adding so that drilling effect meets the explosion requirement of setting;
(2) by binding strap by strip emulsion tie up arc length be 1/6 circumference pvc pipe on piece, then by pvc pipe Piece and the strip emulsion bound are put into blasthole, by being banded with the lining rope of conical metal block by pvc pipe piece and item Shape emulsion is pressed into set depth;
(3) diameter 1cm~1.5cm blindings covering support bar of 0.8kg~1.2kg is put into blasthole, is then extracted Lining rope and conical metal block;
(4) using decking structure, step (2) and step (3) are repeated to setting shot elevation is reached, in the process Pvc pipe piece and the press-in of strip emulsion are set by being banded with the lining rope of conical metal block after often placing one section of support bar Depthkeeping degree, lining rope are required to be put into diameter 1cm~1.5cm blindings of 0.8kg~1.2kg in blasthole before extracting;
(5) blasthole is blocked up completely with diameter 1cm~1.5cm blindings after completing dynamite charge.
Blasting hole with water powder charge provided by the invention and obstruction method are equally applicable to bottom hole decking structure, multicharge Blinding can be used in structure, explosive interval, also can bind explosive, shape by the charge constitution of setting in a longer pvc pipe piece Into water spacer, remaining step is with reference to above-described embodiment, and details are not described herein again for concrete operation method.
It in addition, can be can charge constitution be set as to coupling charging, not couple dress by the radius for changing pvc pipe piece Medicine.
By the way that pvc pipe cutting is obtained, pvc pipe easily obtains pvc pipe piece in the present invention in demolition site, easy to use, It is at low cost.

Claims (6)

1. a kind of blasting hole with water powder charge and obstruction method, which is characterized in that include the following steps:
(1) weight is bound in one end of lining rope with a scale, the lining rope for being banded with weight is put into blasthole, detect blast hole depth And pore-forming effect;Height of water level in blasthole is judged according to the washmarking of lining rope, formulate blasting scheme and determines that the blasting scheme corresponds to Charge constitution;
(2) strip emulsion is tied up on support bar, support bar is put into blasthole, will be supported by the lining rope for being banded with weight Item is pressed into set depth, and support bar is the pvc pipe piece that arc length is 1/2~1/8 circumference, and weight is cylindrical metal block or cone Metal derby, lining rope are bound in the tip of conical metal block;
(3) diameter 1cm~1.5cm blindings covering support bar and the strip emulsification that 0.8kg~1.2kg is put into blasthole are fried Medicine then extracts lining rope and weight;
(4) step (2) and/or step (3) are repeated, dynamite charge is completed by the charge constitution of setting;
(5) blasthole is blocked up completely with diameter 1cm~1.5cm blindings after completing dynamite charge.
2. blasting hole with water powder charge according to claim 1 and obstruction method, it is characterised in that:In step (1) if it is detected that Collapse hole occurs for blasthole or blast hole depth is below standard, needs perforations adding so that drilling effect meets design requirement.
3. blasting hole with water powder charge according to claim 1 and obstruction method, it is characterised in that:Strip emulsifies in step (2) Groove is opened up on the side of pvc pipe piece before explosive binding, for binding the binding strap card of strip emulsion in a groove.
4. blasting hole with water powder charge according to claim 1 and obstruction method, it is characterised in that:The dress set in step (4) Medicine structure is continuous charging structure, decking structure or multicharge structure.
5. blasting hole with water powder charge according to claim 4 and obstruction method, it is characterised in that:If continuous charging structure, More support bars are then connected to total length by adhesive tape in step (2) and are equal to the shot depth set, are pressed on the support bar It is required that binding strip emulsion, is pressed into set depth, followed by step by the lining rope for being banded with weight by support bar (3)。
6. blasting hole with water powder charge according to claim 4 and obstruction method, it is characterised in that:If decking, step (4) support bar is pressed into set depth by being banded with the lining rope of weight after one section of support bar is often placed in, before lining rope is extracted It is required to be put into diameter 1cm~1.5cm blindings of 0.8kg~1.2kg in blasthole.
CN201610822443.8A 2016-09-14 2016-09-14 A kind of blasting hole with water powder charge and obstruction method Active CN106288989B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610822443.8A CN106288989B (en) 2016-09-14 2016-09-14 A kind of blasting hole with water powder charge and obstruction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610822443.8A CN106288989B (en) 2016-09-14 2016-09-14 A kind of blasting hole with water powder charge and obstruction method

Publications (2)

Publication Number Publication Date
CN106288989A CN106288989A (en) 2017-01-04
CN106288989B true CN106288989B (en) 2018-06-26

Family

ID=57710717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610822443.8A Active CN106288989B (en) 2016-09-14 2016-09-14 A kind of blasting hole with water powder charge and obstruction method

Country Status (1)

Country Link
CN (1) CN106288989B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113639603A (en) * 2021-09-22 2021-11-12 六盘水华安爆破工程有限公司 Water hole explosive filling device and filling method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106895751A (en) * 2017-01-12 2017-06-27 中交公局第五工程有限公司 A kind of medium-length hole blasting calculating method
CN108387155B (en) * 2018-03-04 2023-06-23 保利新联爆破工程集团有限公司 Simple explosive separation device for sectional charging of open-air low-water cannon hole
CN112378298B (en) * 2020-09-28 2022-11-04 新疆雪峰爆破工程有限公司 Water hole blasting device and using method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102032844A (en) * 2009-11-17 2011-04-27 广东爆破工程有限公司 Method for blasting closed rock of shield tunnel in complex strata
RU2425324C1 (en) * 2010-05-12 2011-07-27 Виктор Сергеевич Федотенко Combined charge shaping method
CN202133340U (en) * 2011-07-05 2012-02-01 内蒙古康宁爆破有限责任公司 Powder loading device for blasting hole with water
CN202709899U (en) * 2012-06-26 2013-01-30 中铁港航局集团有限公司 Charge weighting device for underwater drilling and blasting
CN103940308A (en) * 2014-04-09 2014-07-23 中国矿业大学 Air spaced explosive charging method and device for cannon hole with water

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102032844A (en) * 2009-11-17 2011-04-27 广东爆破工程有限公司 Method for blasting closed rock of shield tunnel in complex strata
RU2425324C1 (en) * 2010-05-12 2011-07-27 Виктор Сергеевич Федотенко Combined charge shaping method
CN202133340U (en) * 2011-07-05 2012-02-01 内蒙古康宁爆破有限责任公司 Powder loading device for blasting hole with water
CN202709899U (en) * 2012-06-26 2013-01-30 中铁港航局集团有限公司 Charge weighting device for underwater drilling and blasting
CN103940308A (en) * 2014-04-09 2014-07-23 中国矿业大学 Air spaced explosive charging method and device for cannon hole with water

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113639603A (en) * 2021-09-22 2021-11-12 六盘水华安爆破工程有限公司 Water hole explosive filling device and filling method
CN113639603B (en) * 2021-09-22 2024-02-06 六盘水华安爆破工程有限公司 Water hole explosive filling method

Also Published As

Publication number Publication date
CN106288989A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106288989B (en) A kind of blasting hole with water powder charge and obstruction method
CN101419041B (en) Deep hole blasting process in frost weathering bedrock segment
CN105387777B (en) A kind of photoface exploision spaced loading joint-cutting pipe
CN103244124B (en) Method for coal mine tunnel working surface to pass through abandoned roadway in forced caving pressure relief mode
CN107957222A (en) Reduce blasthole spaced loading and the method for ignition of methods of blasting toes in open generation rate
CN104405436B (en) A kind of method improving ore body Tight filling rate
CN108253849A (en) Coal petrography explosion pre-splitting method and device based on liquid explosives envelope note detonation in deep hole
CN203837604U (en) Full-face hole bottom air-spaced loading mechanism for underground roadway tunneling
CN109870084A (en) A kind of VCR mining codes exempt from cleaning bottom of hole blast charging structure and its construction method
RU131146U1 (en) UNIVERSAL BAG-SHAPED DISPOSABLE CHARGES OF EXPLOSIVE SUBSTANCE IN THE HOLE OF A WELL
CN107367207B (en) Joint-cutting explosive package and axial uncoupled explosive-loading step deep hole smooth blasting device
CN106121644B (en) The water-filling pressure-bearing unloading pressure by blasting of cellular structure and supporting reinforcement are crosslinked based on drilling in coal and rock plane
CN108413826A (en) A kind of deep hole standing shot device and method
CN113982528A (en) Method for quickly pushing and sealing upward long water injection drill hole in coal seam
CN101749987B (en) Long borehole blast charging method
CN206360720U (en) A kind of novel flexible filling isolation barricade
CN106352749B (en) A kind of method of tunnelling periphery hole homogeneous energy explosion
RU2286457C1 (en) Pillar removal method
CN109186390A (en) Hole Blasting In Open-pit Mines water spacer-coupling charging blasting method and dedicated water column bag
CN101799262B (en) Smoothwall blasting method for digging tunnel
CN210346501U (en) A all round hole loaded constitution for tunnel smooth blasting
CN101825417A (en) Kerf sand inclusion blasting cartridge and blasting installation device and production technology thereof
CN207816121U (en) A kind of deep hole standing shot device
CN110644439B (en) Method for quickly forming barrier body impervious wall
CN110644440B (en) Method for forming groove on anti-seepage wall of dam plug body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant