CN106285526B - Simulate experimental provision and experimental method that Cementing rinses mud cake - Google Patents

Simulate experimental provision and experimental method that Cementing rinses mud cake Download PDF

Info

Publication number
CN106285526B
CN106285526B CN201610849503.5A CN201610849503A CN106285526B CN 106285526 B CN106285526 B CN 106285526B CN 201610849503 A CN201610849503 A CN 201610849503A CN 106285526 B CN106285526 B CN 106285526B
Authority
CN
China
Prior art keywords
simulation
mud cake
cementing
hole
wellbore hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610849503.5A
Other languages
Chinese (zh)
Other versions
CN106285526A (en
Inventor
徐�明
闫学锋
靳建洲
袁进平
于永金
刘硕琼
周崇峰
李勇
张弛
沈吉云
纪宏飞
李万军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Engineering Technology R&D Co Ltd
Beijing Petroleum Machinery Co Ltd
Original Assignee
China National Petroleum Corp
CNPC Drilling Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, CNPC Drilling Research Institute Co Ltd filed Critical China National Petroleum Corp
Priority to CN201610849503.5A priority Critical patent/CN106285526B/en
Publication of CN106285526A publication Critical patent/CN106285526A/en
Application granted granted Critical
Publication of CN106285526B publication Critical patent/CN106285526B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells

Abstract

The present invention provides the experimental provision and experimental method of a kind of simulation Cementing flushing mud cake, the simulation Cementing rinses the experimental provision of mud cake for simulating flushing of the Cementing to the mud cake on target wellbore wall, comprising: hollow ontology, its have mutually by back to top and bottom end, wherein bottom end is to block end, is provided with the first opening and the second opening on ontology;It is threaded through in ontology and can be along the simulation wellbore hole of ontology moved radially by the first opening;Through hole is provided in simulation wellbore hole;Mud cake can be arranged on the outer wall of simulation wellbore hole;The second annular space is formed between simulation wellbore hole and ontology;When Cementing flows into the second annular space and flow out from the second opening from through hole, Cementing can be rinsed mud cake.The present invention, which realizes, provides a kind of purpose of the experimental provision of simulation Cementing flushing mud cake of energy real simulation process that practical mud cake rinses.

Description

Simulate experimental provision and experimental method that Cementing rinses mud cake
Technical field
The present invention relates to the experiments that oil gas well cementing operation technical field more particularly to a kind of simulation Cementing rinse mud cake Device and experimental method.
Background technique
During oil gas well drilling, under the action of pressure difference, hole from Free water in drilling fluid to rock of borehole or The phenomenon that being permeated in gap, referred to as the leak-off effect of drilling fluid.As drilling fluid is in the leak-off of the borehole wall, Free water enters stratum, Solid phase particles in drilling fluid, which are just attached on the borehole wall, forms mud cake.
Well cementation is the tripping in casing into well, and is made to the construction of the first annular space injection cement between wellbore and casing Industry.Since well cementation is in the first annular space of casing and the borehole wall to inject cement, so drilling fluid is consolidated in drilling process The mud cake that phase particle is formed on the borehole wall can be mixed between cement slurry and stratum, to make to the bonding quality of well cementation second interface At influence.
In order to improve well cementation interface agglutination quality, extends oil/gas well Production Life, need the forward direction well in cementing It injects one section of liquid in first annular space between wall and casing to clean the borehole wall and casing, referred to as prepad fluid.Through Years of researches are crossed, achieve significant progress in terms of prepad fluid both at home and abroad, but are directed to the flushing effect of prepad fluid, It there is no the practice and standard of scientific unity both at home and abroad at present, this also becomes one of obstruction Cementing technological progress mainly Factor.
Chinese invention patent application CN104675345A discloses a kind of " Cementing flush efficiency engineering simulation quantization Evaluating apparatus and method ".The Cementing flush efficiency engineering simulation quantitatively evaluating device includes bracket, Support tray, artificial Rock core, core holding unit, variable speed electric motors, particularly, mass sensor, computer acquisition terminal have height adjustment fixture on the bracket, The slurry cup for containing Cementing is placed on the Support tray, the height adjustment fixture is sequentially connected mass sensor, speed change Motor and core holding unit, the core holding unit are connected with motor by the fixed artificial core of fastening screw, the variable speed electric motors, particularly Speed regulator, the mass sensor are connected with computer acquisition terminal.The Cementing flush efficiency stage die analog quantity Although the mud cake on artificial core can be rinsed by changing evaluating apparatus, which is before artificial core is located at well cementation It sets in liquid, is rinsed by rotation artificial core, and in actual well cementing operation, the mud cake on the borehole wall is to cement the well Prepad fluid injects in the first annular space between the borehole wall and casing, and is rinsed during being discharged by casing, and covers Pipe usually has certain degree of eccentricity in the wellbore of oil well, so Cementing has the mud cake of different zones on the borehole wall Different flushing effects, and the Cementing of device flushing effect having the same to the mud cake of different zones on artificial core Fruit, so the process that the device does not have the practical mud cake of real simulation to rinse, to affect the authenticity for rinsing result.
Summary of the invention
The object of the present invention is to provide the simulation Cementing punchings for the process that a kind of practical mud cake of energy real simulation rinses Wash the experimental provision and experimental method of mud cake.
Following technical proposal can be used to realize in above-mentioned purpose of the invention: a kind of simulation Cementing rinses mud cake Experimental provision, the simulation Cementing rinse the experimental provision of mud cake for simulating Cementing to target wellbore wall Mud cake flushing comprising: hollow ontology, have mutually by back to top and bottom end, wherein the bottom end be block It holds, is provided with the first opening and the second opening on the ontology;It is threaded through in the ontology by first opening and can edge The simulation wellbore hole of the ontology moved radially;Through hole is provided in the simulation wellbore hole;On the outer wall of the simulation wellbore hole It can arrange the mud cake;The second annular space is formed between the simulation wellbore hole and the ontology;When the Cementing When flowing into second annular space from the through hole and flow out from second opening, the Cementing can be to described Mud cake is rinsed;Or when the Cementing flows into second annular space from second opening and passes through from described When through-hole flows out, the Cementing can be rinsed the mud cake;Shell;The simulation wellbore hole can be arranged in the shell In vivo, so as to which third annular space can be formed between the outer wall of the simulation wellbore hole and the inner wall of the shell;The simulation Pit shaft includes the simulation rock stratum with hole, and the hole can be connected to the third annular space and the through hole, and described For injecting drilling fluid, the drilling fluid can flow under the effect of the pressure in the through hole three annular spaces, with can be in institute It states and forms the mud cake on the outer wall of simulation rock stratum.
As a preferred embodiment, the ontology includes having the cylinder of the bottom end and with the top Lid, the simulation wellbore hole are mutually fixed with the lid, and the lid can be moved relative to the cylinder along the radial direction of the ontology It is dynamic.
As a preferred embodiment, being set in the protrusion comprising: be set to the protrusion on the lid outer wall It is equipped with the through slot radially extended;The fixing piece being movably arranged in the through slot, when the lid is relative to institute Cylinder is stated after the moving radially of the ontology, the fixing piece is capable of fixing the cylinder and the lid.
As a preferred embodiment, the height of second opening is higher than the highest point of the mud cake.
As a preferred embodiment, the first valve and the second valve are provided on the ontology, first valve Door can control the opening and closing of first opening, and second valve can control the opening and closing of second opening.
As a preferred embodiment, the simulation wellbore hole includes inner tube and the simulation rock that is arranged in said inner tube Layer, the simulation rock stratum have scheduled porosity, the porosity of the scheduled porosity and the rock stratum of the target wellbore It is identical.
As a preferred embodiment, the simulation wellbore hole includes the connection detachably connected with said inner tube Part, the connector are arranged in first opening, and the through hole, setting in the connector are provided in said inner tube There is the interface channel being connected with the through hole.
As a preferred embodiment, comprising: cementing device and test device;The cementing device includes cylinder Be set to the intracorporal cement of the column, the cement is for the outer wall after mud cake is rinsed, with the simulation wellbore hole It is mutually cementing, to form cement sheath;The test device can obtain the active force that the simulation wellbore hole is detached from the cement sheath.
The experimental method of the experimental provision of mud cake is rinsed using above-mentioned simulation Cementing comprising: Xiang Suoshu mould The simulation rock stratum of quasi- pit shaft inputs liquid water, until the water content of the simulation wellbore hole no longer changes;Obtain the simulation First mass of pit shaft;The mud cake is arranged on the outer wall of the simulation wellbore hole;Obtain the second mass of the simulation wellbore hole; Mud cake on the simulation wellbore hole is rinsed;Obtain the third quality of the simulation wellbore hole;According to scheduled rule, according to Flush efficiency described in first mass, second mass and the third Mass Calculation.
As a preferred embodiment, the pre-defined rule is flush efficiencyWherein, m1It is first Quality;m2For the second mass;m3For third quality.
A kind of beneficial effect of experimental provision that simulation Cementing rinses mud cake provided by the invention is: the present invention is set Setting can be along the simulation wellbore hole of ontology moved radially, so as to by moving radially simulation wellbore hole, to reach real simulation oil The degree of eccentricity of well middle sleeve in the wellbore is provided with through hole in the simulation wellbore hole, when Cementing flows into the from through hole Second ring space and from second opening outflow when, Cementing can be rinsed mud cake;Or when Cementing is from the When two openings flow into the second annular space and flow out from through hole, Cementing can be rinsed the mud cake, so as to The process that the practical mud cake of true reappearance rinses.There are the degree of eccentricitys by the practical mud cake flushing process middle sleeve of real simulation by the present invention The case where and the process rinsed of the practical mud cake of true reappearance, realize provide it is a kind of can the process rinsed of the practical mud cake of real simulation Simulation Cementing rinse mud cake experimental provision purpose.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
The simulation Cementing that Fig. 1 one embodiment of the present invention provides rinses the structural representation of the experimental provision of mud cake Figure;
The structural schematic diagram of the experimental provision for the arrangement mud cake that Fig. 2 one embodiment of the present invention provides;
The structural schematic diagram for the cementing device that Fig. 3 one embodiment of the present invention provides;
The simulation Cementing that Fig. 4 one embodiment of the present invention provides rinses the flow chart of the experimental method of mud cake.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1.The present invention provides a kind of experimental provision of simulation Cementing flushing mud cake, the simulation well cementation The experimental provision of preflush mud cake is for simulating flushing of the Cementing to the mud cake on target wellbore wall comprising: Hollow ontology 11, have mutually by back to top 13 and bottom end 15, wherein the bottom end 15 be block end, the ontology 11 On be provided with the first opening 19 and the second opening 21;It is threaded through in the ontology 11 and can be along described by first opening 19 The simulation wellbore hole 39 of ontology 11 moved radially;Through hole 43 is provided in the simulation wellbore hole 39;The simulation wellbore hole 39 The mud cake can be arranged on outer wall;The second annular space 17 is formed between the simulation wellbore hole 39 and the ontology 11;Work as institute State Cementing from the through hole 43 flow into second annular space 17 and from it is described second opening 21 outflow when, it is described Cementing can be rinsed the mud cake;Or when the Cementing flows into described the from second opening 21 Second ring space 17 and from the through hole 43 flow out when, the Cementing can be rinsed the mud cake.
The experimental provision setting that a kind of simulation Cementing provided by the invention rinses mud cake can be along the radial direction of ontology 11 Mobile simulation wellbore hole 39, so as to by moving radially simulation wellbore hole 39, to reach real simulation oil well middle sleeve in well The degree of eccentricity in eye is provided with through hole 43 in the simulation wellbore hole 39, when Cementing flows into the second annular from through hole 43 Space 17 and from second opening 21 outflow when, Cementing can be rinsed mud cake;Or work as Cementing from second When opening 21 flows into the second annular space 17 and flows out from through hole 43, Cementing can be rinsed mud cake, so as to The process that the practical mud cake of true reappearance rinses.There are the degree of eccentricitys by the practical mud cake flushing process middle sleeve of real simulation by the present invention The case where and the process rinsed of the practical mud cake of true reappearance, realize provide it is a kind of can the process rinsed of the practical mud cake of real simulation Simulation Cementing rinse mud cake experimental provision purpose.
As shown in Figure 1, in the present embodiment, a kind of experiment of simulation Cementing flushing mud cake provided by the invention Device is for simulating flushing of the Cementing to the mud cake on target wellbore wall, with the mistake of the practical mud cake flushing of energy real simulation Journey.The target wellbore refers to the pit shaft for needing practical oil well to be simulated.The experimental provision packet of simulation Cementing flushing mud cake It includes: hollow ontology 11.The ontology 11 is for rinsing mud cake.The ontology 11 have mutually by back to top 13 and bottom end 15, Middle bottom end 15 is to block end, and the first opening 19 and the second opening 21 are provided on the ontology.
In the present embodiment, it is provided with the first opening 19 in the ontology 11 and is arranged in simulation wellbore hole 39 therein. The simulation wellbore hole 39 is used to simulate the borehole wall of practical oil well, so as to carry out in ontology 11 to the mud cake on the simulation wellbore hole 39 It rinses.The simulation wellbore hole 39 can moving radially along ontology 11, so as to by moving radially simulation wellbore hole 39, to reach true The degree of eccentricity of real simulation oil well middle sleeve in the wellbore.It is provided with through hole 43 in the simulation wellbore hole 39, which can be with Cementing is set to circulate.
In the present embodiment, the second annular space 17 is formed between the simulation wellbore hole 39 and ontology 11.The simulation well Mud cake can be arranged on the outer wall of cylinder 39;When Cementing from through hole 43 flow into the second annular space 17 and from second opening 21 When outflow, Cementing can be rinsed mud cake;Or when Cementing flows into the second annular sky from the second opening 21 Between 17 and when being flowed out from through hole 43, Cementing can be rinsed mud cake, rinse so as to the practical mud cake of true reappearance Process.The present invention by the practical mud cake flushing process middle sleeve of real simulation there are the degree of eccentricitys the case where and true reappearance it is practical The process that mud cake rinses realizes and provides a kind of simulation Cementing flushing of energy real simulation process that practical mud cake rinses The purpose of the experimental provision of mud cake.
As shown in Fig. 2, in the present embodiment, the present invention provides a kind of to arrange mud on the outer wall of the simulation wellbore hole 39 The experimental provision of cake comprising: shell 53;The shell 53 is for accommodating simulation wellbore hole 39, on the outer wall of simulation wellbore hole 39 Arrange mud cake.The simulation wellbore hole 39 is set in the shell 53, is formed between the outer wall of simulation wellbore hole 39 and the inner wall of shell 53 There is third annular space 59;The third annular space 59 can inject drilling fluid.The simulation wellbore hole 39 includes the simulation with hole Rock stratum 41, the porosity communication third annular space 59 and through hole 43, when drilling fluid flows into through hole from third annular space 59 When 43, drilling fluid can form mud cake on the outer wall of simulation rock stratum 41.
In the present embodiment, which includes opposite facing first end face 47 and second end face 49, first end Face 47 and second end face 49 are engaged with the inner wall of shell 53, so that the drilling fluid in the third annular space 59 cannot be from mould The end face of quasi- pit shaft 39 passes through, to ensure that mud cake can only be arranged on the outer wall of simulation wellbore hole 39.Specifically, the shell 53 It is inside provided with the choking portion 51 that can be matched with first end face 47, is provided with pad between the first end face 47 and the choking portion 51 Piece is provided with gasket between the second end face 49 and the inner wall of shell 53.
In the present embodiment, the centerline collineation of the center line of simulation wellbore hole 39 and shell 53, so that mud cake can be uniformly It is arranged on the outer wall of the simulation wellbore hole 39.
In the present embodiment, it is provided with the first aperture 55 being connected with through hole 43 on shell 53, is set on shell 53 The second aperture 57 being connected with third annular space 59 is set, the second aperture 57 is used to have drilling fluid in third annular space 59 When, it pressurizes to drilling fluid, so that drilling fluid flows into through hole 43 from third annular space 59, thus in simulation wellbore hole 39 Outer wall on form mud cake.
In one embodiment, ontology 11 includes the cylinder 23 with bottom end 15 and the lid 25 with top 13, mould Quasi- pit shaft 39 is fixed with 25 phase of lid, and lid 25 can be relative to the moving radially along ontology 11 of cylinder 23.
In the present embodiment, when the lid 25 relative to cylinder 23 moving radially along ontology 11, with 25 phase of lid The simulation wellbore hole 39 of connection also can be relative to the moving radially along ontology 11 of cylinder 23, so as to adjust simulation wellbore hole 39 in ontology The degree of eccentricity in 11, with the degree of eccentricity of simulation oil well middle sleeve in the wellbore.
In one embodiment, ontology 11 includes the cylinder 23 with bottom end 15 and the lid 25 with top 13, mould Quasi- pit shaft 39 is fixed with 25 phase of lid, and lid 25 can be relative to the moving radially along ontology 11 of cylinder 23.
In one embodiment, the top of ontology 11 is provided with limiting device, which is fixedly connected on this On limiting device.The limiting device includes the multiple limiting sections radially extended along ontology, and multiple limiting section simulates well for making 39 moving radially along ontology 11 of cylinder, so as to adjust the degree of eccentricity of the simulation wellbore hole 39 in ontology 11, to be covered in simulation oil well The degree of eccentricity of pipe in the wellbore.Multiple limiting section can be threaded hole, which can be with spiral shell fixed on the simulation wellbore hole Nail is threadedly coupled.
In the present embodiment, a kind of experiment dress for arranging mud cake on the outer wall of the simulation wellbore hole 39 provided by the invention Setting includes: the protrusion 31 being set on 25 outer wall of lid, is provided with the through slot radially extended in protrusion 31;Movably set The fixing piece 33 being placed in through slot, when lid 25 relative to cylinder 23 along ontology 11 after moving radially, fixing piece 33 can be solid Safety barrel body 23 and lid 25.
In one embodiment, which can be bolt, and the through slot which can radially extend is mobile, When lid 25 relative to cylinder 23 along ontology 11 after moving radially, which can be bolted with lid 25.
As shown in Figure 1, in one embodiment, the height of the second opening 21 is higher than the highest point of mud cake.
In the present embodiment, the highest point of the mud cake refers to the 39 highest mud cake of outer wall upper position of simulation wellbore hole, second The height of opening 21 is higher than the highest point of mud cake, it is ensured that when Cementing flows into the second annular space 17 from through hole 43 And from when the second 21 outflow of opening, which can be full of in the second annular space, so that on 39 outer wall of simulation wellbore hole Mud cake can be rinsed.
In one embodiment, the first valve 27 and the second valve 29 are provided on ontology 11, the first valve 27 can be controlled The opening and closing of the first opening 19 of system, the second valve 29 can control the opening and closing of the second opening 21.
In the present embodiment, it when needing to be rinsed the mud cake in ontology 11 on simulation wellbore hole 39, can open First valve 27 and the second valve 29, to open the first opening 19 and the second opening 21;When flushing finishes, this can be closed First valve 27 and the second valve 29, to close the first opening 19 and the second opening 21.
In one embodiment, simulation wellbore hole 39 includes inner tube 45 and the simulation rock stratum 41 being arranged in inner tube 45, mould Quasi- rock stratum 41 has scheduled porosity, and the scheduled porosity is identical as the porosity of the rock stratum of target wellbore.
In the present embodiment, the porosity of rock stratum of porosity and target wellbore of the simulation rock stratum 41 is identical, thus Rock stratum in the 41 energy real simulation pit shaft 39 of simulation rock stratum, so as to simulated when drilling fluid is flowed through from the hole of simulation rock stratum 41 It is identical as mud cake formed in pit shaft that mud cake is formed by the outer wall of rock stratum 41.
In one embodiment, simulation wellbore hole 39 includes the connector 35 being detachably connected with inner tube 45, connector 35 It is arranged in the first opening 19, through hole 43 is provided in inner tube 45, be provided in the connector 35 and be connected with through hole 43 Interface channel 37.
In the present embodiment, connector 35 is arranged in the first opening 19, can be that screw is fixed, bolt is fixed, is welded Connect fixation.It is provided with through hole 43 in the inner tube 45, the inner tube 45 and connector 35 are detachably connected, thus the simulation wellbore hole 39 can be detachably connected with ontology 11.This, which is detachably connected, to be threaded connection.It is provided with and penetrates through in the connector 35 The interface channel 37 that hole 43 is connected;So as to inject Cementing into through hole 43 by the interface channel 37.It should The eyelet being connected with through hole 43 is disposed on the side wall of inner tube 45, so that drilling fluid can enter through hole 43 by the eyelet It is interior, to make mud cake on the outer wall of simulation wellbore hole 39.
As shown in figure 3, in one embodiment, a kind of reality of simulation Cementing flushing mud cake provided by the invention Experiment device includes: cementing device and test device;Cementing device includes cylinder 61 and the cement 63 that is set in cylinder 61, cement 63 for arranging that the wall of mud cake is mutually cementing with simulation wellbore hole 39, to form cement sheath after mud cake is rinsed;Test device can obtain Simulation wellbore hole 39 is taken to be detached from the active force of cement sheath.
In the present embodiment, which is used for after mud cake is rinsed, and the wall phase of mud cake is arranged with simulation wellbore hole 39 It is cementing, to form cement sheath, the actual conditions of simulation well cementation may be implemented.The test device can obtain simulation wellbore hole 39 and be detached from water The active force of mud ring, can be cementing strong according to the contact area of the active force and simulation wellbore hole 39 and cement sheath to be calculated Degree, and the size of the cementing strength can characterize the cementing situation of cementing concrete 63 slurry and formation rock, so the cementing strength energy For as the foundation actually cemented the well.
As shown in figure 4, in the present embodiment, utilizing above-mentioned simulation Cementing flushing the present invention provides a kind of The experimental method of the experimental provision of mud cake comprising:
S1: inputting liquid water into the simulation rock stratum 41 of simulation wellbore hole 39, until the water content of simulation wellbore hole 39 no longer becomes It turns to only, obtains the first mass of simulation wellbore hole 39.
In the present embodiment, liquid water is inputted into simulation wellbore hole 39 can be simulation wellbore hole 39 is soaked in pit shaft Water sample in a period of time so that water sample can enter in the hole of simulation wellbore hole 39.The pretreatment this refer to for a period of time so that Water sample can be well into the time in the hole of simulation rock stratum 41.The aqueous no longer variation of the simulation wellbore hole 39 refers to, into this Water in 39 hole of simulation wellbore hole and the water phase etc. flowed out from 39 hole of simulation wellbore hole.Obtain the first matter of simulation wellbore hole 39 Amount, simulation wellbore hole 39 can be placed on electronic scale and be weighed.First mass includes the quality and mould of simulation wellbore hole 39 The quality of water in quasi- 39 hole of pit shaft.First mass is m1
S2: mud cake is arranged on the wall of simulation wellbore hole 39;Obtain the second mass of simulation wellbore hole 39.
In the present embodiment, mud cake is arranged on the wall of simulation wellbore hole 39, the one kind that can be provided through the invention exists Arrange that the experimental provision of mud cake is arranged, and can also carry out cloth by high-temperature and high-pressure filter press on the outer wall of the simulation wellbore hole 39 It sets.The second mass for obtaining simulation wellbore hole 39, simulation wellbore hole 39 can be placed on electronic scale and be weighed.Second mass The quality of the mud cake of the quality and production of water in quality, 39 hole of simulation wellbore hole including simulation wellbore hole 39.Second mass is m2
S3: the mud cake on simulation wellbore hole 39 is rinsed;Obtain the third quality of simulation wellbore hole 39;
In the present embodiment, the mud cake on simulation wellbore hole 39 is rinsed, the one kind that can be provided through the invention The experimental provision that simulation Cementing rinses mud cake is rinsed.The third quality for obtaining simulation wellbore hole 39, can will simulate Pit shaft 39 is placed on electronic scale and is weighed.The third quality includes the quality of simulation wellbore hole 39, in 39 hole of simulation wellbore hole The quality of remaining mud cake after the quality and flushing of water.The third quality is m3
S4: according to scheduled rule, according to the first mass, the second mass and third Mass Calculation flush efficiency.
In the present embodiment, which refers to flush efficiency
Wherein, m1For the first mass;m2For the second mass;m3For third quality.
The flush efficiency is for characterizing flushing effect, so as to for rushing before instructing practical well cementation to mud cake on well bore wall It washes.
It should be understood that above description is to illustrate rather than to be limited.By reading above-mentioned retouch It states, many embodiments and many applications except provided example all will be aobvious and easy for a person skilled in the art See.Therefore, the range of this introduction should not be determined referring to foregoing description, but should referring to preceding claims and this The full scope of the equivalent that a little claims are possessed determines.For comprehensive purpose, all articles and with reference to including special The disclosure of benefit application and bulletin is all by reference to being incorporated herein.Theme disclosed herein is omitted in preceding claims Any face is not intended to abandon the body matter, also should not be considered as applicant and the theme is not thought of as to disclosed Shen Please theme a part.

Claims (10)

1. a kind of simulation Cementing rinses the experimental provision of mud cake, the simulation Cementing rinses the experiment dress of mud cake Set the flushing for simulating Cementing to the mud cake on target wellbore wall, characterized in that it comprises:
Hollow ontology is provided on the ontology with opposite facing top and bottom end wherein the bottom end is to block end The first opening and the second opening;
It is threaded through in the ontology and can be along the simulation wellbore hole of the ontology moved radially by first opening;
Through hole is provided in the simulation wellbore hole;
The mud cake can be arranged on the outer wall of the simulation wellbore hole;Annular sky is formed between the simulation wellbore hole and the ontology Between;
It is described solid when the Cementing flows into the annular space and flow out from second opening from the through hole Well prepad fluid can be rinsed the mud cake;Or when the Cementing flows into the annular sky from second opening Between and from the through hole flow out when, the Cementing can be rinsed the mud cake;
Shell;The simulation wellbore hole can be arranged in the shell, so that the outer wall of the simulation wellbore hole and the shell is interior Third annular space can be formed between wall;The simulation wellbore hole includes the simulation rock stratum with hole, and the hole can be connected to The third annular space and the through hole, for injecting drilling fluid, the drilling fluid can press the third annular space It is flowed under the action of power in the through hole, the mud cake can be formed on the outer wall of the simulation rock stratum.
2. the experimental provision that simulation Cementing according to claim 1 rinses mud cake, it is characterised in that:
The ontology includes the cylinder with the bottom end and the lid with the top, the simulation wellbore hole and the lid Mutually fixed, the lid can be relative to the cylinder moving radially along the cylinder.
3. the experimental provision that simulation Cementing according to claim 2 rinses mud cake, characterized in that it comprises:
The protrusion being set on the lid outer wall, it is described protrusion on be provided with the through slot radially extended;
The fixing piece being movably arranged in the through slot, when the lid relative to the cylinder along the diameter of the ontology To after movement, the fixing piece is capable of fixing the cylinder and the lid.
4. the experimental provision that simulation Cementing according to claim 1 rinses mud cake, it is characterised in that: described second The height of opening is higher than the highest point of the mud cake.
5. the experimental provision that simulation Cementing according to claim 1 rinses mud cake, it is characterised in that: the ontology On be provided with the first valve and the second valve, first valve can control the opening and closing of first opening, second valve It can control the opening and closing of second opening.
6. the experimental provision that simulation Cementing according to claim 1 rinses mud cake, it is characterised in that: the simulation Pit shaft includes inner tube and the simulation rock stratum that is arranged in said inner tube, and the simulation rock stratum is described pre- with scheduled porosity Fixed porosity is identical as the porosity of the rock stratum of the target wellbore.
7. the experimental provision that simulation Cementing according to claim 6 rinses mud cake, it is characterised in that: the simulation Pit shaft includes the connector detachably connected with said inner tube, and the connector is arranged in first opening, described interior It is provided with the through hole in pipe, the interface channel being connected with the through hole is provided in the connector.
8. the experimental provision that simulation Cementing according to claim 1 rinses mud cake, characterized in that it comprises: Cementing device and test device;The cementing device includes cylinder and is set to the intracorporal cement of the column, and the cement is used for It is mutually cementing with the outer wall of the simulation wellbore hole after mud cake is rinsed, to form cement sheath;The test device can obtain The simulation wellbore hole is detached from the active force of the cement sheath.
9. rinsing the experimental provision of mud cake using simulation Cementing described in any claim in claim 1 to 8 Experimental method, characterized in that it comprises:
Liquid water is inputted to the simulation rock stratum of the simulation wellbore hole, until the water content of the simulation wellbore hole no longer changes;
Obtain the first mass of the simulation wellbore hole;
The mud cake is arranged on the outer wall of the simulation wellbore hole;
Obtain the second mass of the simulation wellbore hole;
Mud cake on the simulation wellbore hole is rinsed;
Obtain the third quality of the simulation wellbore hole;
According to scheduled rule, according to first mass, second mass and the third Mass Calculation flush efficiency.
10. simulation Cementing according to claim 9 rinses the experimental method of the experimental provision of mud cake, feature exists In:
It is described according to scheduled rule, rinsed and imitated according to first mass, second mass and the third Mass Calculation Rate calculates according to the following equation:
Wherein, m1For the first mass;m2For the second mass;m3For third quality.
CN201610849503.5A 2016-09-23 2016-09-23 Simulate experimental provision and experimental method that Cementing rinses mud cake Active CN106285526B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610849503.5A CN106285526B (en) 2016-09-23 2016-09-23 Simulate experimental provision and experimental method that Cementing rinses mud cake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610849503.5A CN106285526B (en) 2016-09-23 2016-09-23 Simulate experimental provision and experimental method that Cementing rinses mud cake

Publications (2)

Publication Number Publication Date
CN106285526A CN106285526A (en) 2017-01-04
CN106285526B true CN106285526B (en) 2019-04-09

Family

ID=57714912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610849503.5A Active CN106285526B (en) 2016-09-23 2016-09-23 Simulate experimental provision and experimental method that Cementing rinses mud cake

Country Status (1)

Country Link
CN (1) CN106285526B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110658094B (en) * 2018-06-29 2022-08-30 中国石油天然气股份有限公司 Evaluation system and evaluation method for cleaning effect of slurry cleaning liquid
CN113882852A (en) * 2020-06-18 2022-01-04 中国石油天然气集团有限公司 Well cementation pad fluid flushing efficiency evaluation device and evaluation method
CN111734405B (en) * 2020-06-29 2023-07-07 中国石油天然气集团有限公司 Device for improving accuracy of mud cake flushing efficiency by pad fluid in well cementation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4538452A (en) * 1983-11-14 1985-09-03 Ontario Research Foundation Bore-hole hydraulics simulator
CN203097874U (en) * 2012-12-06 2013-07-31 中国海洋石油总公司 Well cementation cement sheath performance simulation experiment device
CN103541675A (en) * 2013-11-12 2014-01-29 西南石油大学 Well cementation flushing fluid evaluation device and method based on principle of identical shearing rate
CN204024635U (en) * 2014-07-22 2014-12-17 中国石油大学(华东) A kind of Oil/gas Well cement ring sealing characteristics simulating test device
CN104863533A (en) * 2015-04-20 2015-08-26 中国石油大学(华东) Evaluation device and method of well cementation flushing efficiency
CN204646148U (en) * 2015-04-30 2015-09-16 梅雨堃 A kind of well cementation interface cleaning efficiency evaluating apparatus
CN206220888U (en) * 2016-09-23 2017-06-06 中国石油天然气集团公司 Simulation Cementing rinses the experimental provision of mud cake

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2487695B (en) * 2007-05-18 2012-09-19 Mi Llc Reusable filters for fluid loss measurements of drilling fluids

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4538452A (en) * 1983-11-14 1985-09-03 Ontario Research Foundation Bore-hole hydraulics simulator
CN203097874U (en) * 2012-12-06 2013-07-31 中国海洋石油总公司 Well cementation cement sheath performance simulation experiment device
CN103541675A (en) * 2013-11-12 2014-01-29 西南石油大学 Well cementation flushing fluid evaluation device and method based on principle of identical shearing rate
CN204024635U (en) * 2014-07-22 2014-12-17 中国石油大学(华东) A kind of Oil/gas Well cement ring sealing characteristics simulating test device
CN104863533A (en) * 2015-04-20 2015-08-26 中国石油大学(华东) Evaluation device and method of well cementation flushing efficiency
CN204646148U (en) * 2015-04-30 2015-09-16 梅雨堃 A kind of well cementation interface cleaning efficiency evaluating apparatus
CN206220888U (en) * 2016-09-23 2017-06-06 中国石油天然气集团公司 Simulation Cementing rinses the experimental provision of mud cake

Also Published As

Publication number Publication date
CN106285526A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106285526B (en) Simulate experimental provision and experimental method that Cementing rinses mud cake
CN106640061B (en) A kind of pit shaft and formation fracture Coupled Flow imitative experimental appliance and method
CN106401551B (en) A kind of staged fracturing of horizontal well or synchronous pressure break experimental system for simulating
CN103556993B (en) Low permeability oil field plane Five-point method pattern carbon dioxide flooding emulation experiment analogy method
CN106593384B (en) Hydraulic fracturing physical simulating method with spiral perforated horizontal wells
CN104863533B (en) Evaluation device and method of well cementation flushing efficiency
CN106382111B (en) Method for increasing complexity of shale gas fracturing fracture
CN104727805B (en) Cement sheath cementing strength evaluating apparatus
CN108240185B (en) Evaluation device and method for well cementation flushing efficiency
CN107976520A (en) Nearly well band temporarily blocks up simulating lab test device and method
CN104675345B (en) Engineering simulation set and method for quantitative evaluation of flushing efficiency of cementing pre-flushing fluid
CN203614095U (en) Cement sheath cementing strength evaluation device
CN106593383A (en) Hydraulic-fracturing physical simulation method for downhole rock core
CN206903650U (en) A kind of Visual Dynamic becomes the proppant sanding analogue means of slit width
CN104990776A (en) Device for simulating underground drilling fluid cake forming and flushing fluid flushing
CN104849404A (en) Well cementation flushing fluid evaluation device and experiment method thereof based on dynamic mud cake forming
CN109236269B (en) Device and method for testing influence of water channeling on well cementation quality
CN208137906U (en) Actual triaxial testing apparatus is used in a kind of temporarily stifled steering behaviour evaluation
CN110529098A (en) Nearly horizontal directional drilling reality drill jig is intended and drilling parameter test device and method
CN206220888U (en) Simulation Cementing rinses the experimental provision of mud cake
CN104033138A (en) Device and method for integrating functions of steam injection fluctuation and chemical blocking removal of heavy oil reservoir without removing tubular columns
CN110793861B (en) Test method and device for determining hydraulic fracturing gravel penetration discharge capacity of conglomerate test piece
CN112065352B (en) Indoor hydraulic fracturing simulation device, system, manufacturing method and test method
CN112096359B (en) Pitching temporary blocking steering fracturing test device, system and manufacturing method
CN108121844B (en) Method for obtaining hydraulic wave radius

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: China National Petroleum Corp.

Patentee after: CNPC Drilling Engineering Technology Research Institute Co.,Ltd.

Address before: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee before: China National Petroleum Corp.

Patentee before: DRILLING RESEARCH INSTITUTE OF CHINA NATIONAL PETROLEUM Co.

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC ENGINEERING TECHNOLOGY R & D Co.,Ltd.

Address before: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee before: China National Petroleum Corp.

Patentee before: CNPC Drilling Engineering Technology Research Institute Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20230104

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC ENGINEERING TECHNOLOGY R & D Co.,Ltd.

Patentee after: BEIJING PETROLEUM MACHINERY Co.,Ltd.

Address before: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee before: CHINA NATIONAL PETROLEUM Corp.

Patentee before: CNPC ENGINEERING TECHNOLOGY R & D Co.,Ltd.

TR01 Transfer of patent right