CN106284649B - Bevelled halving construction method in a kind of ball of solder sphere rod member for grid - Google Patents

Bevelled halving construction method in a kind of ball of solder sphere rod member for grid Download PDF

Info

Publication number
CN106284649B
CN106284649B CN201610767901.2A CN201610767901A CN106284649B CN 106284649 B CN106284649 B CN 106284649B CN 201610767901 A CN201610767901 A CN 201610767901A CN 106284649 B CN106284649 B CN 106284649B
Authority
CN
China
Prior art keywords
rod piece
butting rod
docking
butting
plectane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610767901.2A
Other languages
Chinese (zh)
Other versions
CN106284649A (en
Inventor
张毅毅
刘辉
李鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Construction Machine Construction Group Co ltd
Original Assignee
Shaanxi Construction Machine Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Construction Machine Construction Group Co ltd filed Critical Shaanxi Construction Machine Construction Group Co ltd
Priority to CN201610767901.2A priority Critical patent/CN106284649B/en
Publication of CN106284649A publication Critical patent/CN106284649A/en
Application granted granted Critical
Publication of CN106284649B publication Critical patent/CN106284649B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B1/1903Connecting nodes specially adapted therefor
    • E04B1/1906Connecting nodes specially adapted therefor with central spherical, semispherical or polyhedral connecting element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B2001/1957Details of connections between nodes and struts
    • E04B2001/1972Welded or glued connection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • General Factory Administration (AREA)
  • Orthopedics, Nursing, And Contraception (AREA)

Abstract

A kind of bevelled halving construction method in the ball of solder sphere rod member for grid, comprising the following steps: the first step, according to setting-out drawing making fetal membrane;Second step, on fetal membrane according to the diameter of butting rod piece install positioning baffle, butting rod piece is put into positioning baffle;Third step, angle of the cutting for docking on butting rod piece, find out the highs and lows of cut angle and make marks;Branch center cross hairs is drawn on docking plectane, find out position of the highs and lows at butting rod piece angle end on cross hairs and is marked;4th step, the installation docking plectane on butting rod piece, are fixed temporarily;Size between 5th step, measurement butting rod piece both ends highest point confirms that rear entirety consistent with theoretical size is formal and fixes;Whether the 6th step, carrying out flaw detection butting rod piece integrated connection quality are qualified, and docking hemisphere is installed after qualified;7th step, in-site measurement unwrapping wire connect other rod pieces and form firm entirety.The present invention can ensure splicing accuracy, save construction cost.

Description

Bevelled halving construction method in a kind of ball of solder sphere rod member for grid
Technical field
The invention belongs to building engineering fields, and in particular to bevelled halving construction party in a kind of ball of solder sphere rod member for grid Method.
Background technique
Application of the large span welding ball grid in China is very extensive, and most common solder sphere grid node is designed as Rod piece and the direct butt welding of steel ball or rod piece are straight-through across the butt-welded two kinds of forms of steel ball.Both docking forms are applied Work is simple, and strong operability, precision is also easy to control.But with conference and exhibition center, the Olympic Sports Center, terminal, hangar, stadium Equal large-span steels building continues to bring out, and the structural modeling for welding ball grid becomes increasingly complex, is novel, cause node by Power also becomes increasingly complex.In order to adapt to working environment of today, need to change previous docking mode, i.e., by rod member for grid in ball It is interior to carry out bevelled halving with junction steel plate, so that the power transmission direction of rod piece is definitely, but also brought greatly to construction in this way Inconvenience, steel ball need to be processed into hemispherical, two hemisphere are passed through to pair of rod piece field joint and hemisphere after the completion of rod piece docking Welding seam is corresponding with the junction steel plate of rod piece.Therefore it can only break conventional installation thinking, do docking in good shot on the ground Moulding bed is installed, the angle of butting rod piece in ball is controlled using the oneself height of moulding bed, constructing operation carries out on ground, can make Duration shortens.
Summary of the invention
It is an object of the invention to be directed to above-mentioned the problems of the prior art, in the ball that a kind of solder sphere rod member for grid is provided Bevelled halving construction method is docked on the fetal membrane of ground, convenient for control bevelled halving splicing accuracy, can effectively ensure that docking location just Really.
To achieve the goals above, the technical solution adopted by the present invention the following steps are included:
The first step, according to setting-out drawing making fetal membrane, the height of each supporting point and the size of moulding bed, which meet, on fetal membrane puts The requirement of master drawing paper carries out reinforcing stabilization to fetal membrane, guarantees that fetal membrane is able to bear the load applied on it, butting rod piece Assembled angle carries out control adjustment by the height and spacing of moulding bed;
Second step verifies whether the relative position of each supporting point and height difference on fetal membrane are consistent with setting-out drawing, confirms nothing The center line for drawing butting rod piece after accidentally on fetal membrane installs positioning baffle according to the diameter of butting rod piece, prevents butting rod piece It swings;Butting rod piece is put into the positioning baffle on fetal membrane again, and is temporarily fixed on fetal membrane;
Third step, angle of the cutting for docking on butting rod piece, find out the highs and lows of cut angle simultaneously It makes marks, by adjusting butting rod piece is put in place;Branch center cross hairs is drawn on docking plectane, according to setting-out drawing ruler It is very little, it finds out position of the highs and lows at butting rod piece angle end on cross hairs and marks;
4th step, the installation docking plectane on butting rod piece, are respectively aligned to the highs and lows marked on angle The highs and lows marked on docking plectane;Check the height of position dimension and supporting point of the butting rod piece on moulding bed It is whether correct, by adjusting being allowed to be consistent with setting-out drawing position dimension, finally it is fixed temporarily;
5th step, two spot sizes for measuring butting rod piece both ends highest point, it is whole formal after confirmation is consistent with theoretical size It is fixed;
Installation docking hemisphere after 6th step, carrying out flaw detection are qualified, after the butted line of two hemisphere matches with docking plectane It is fixed;
7th step, in-site measurement unwrapping wire determine installation site and installation control line;Butting rod piece in assembled good ball is hung Being transported to position to be installed makes control line be consistent with ball center and tube hub line, connects other rod pieces and forms firm entirety.
The determination method of the cut angle highs and lows of butting rod piece are as follows: use paper identical with butting rod piece diameter Plate applies on cut angle, draws the cutting line of angle and carries out doubling, the intersection point at folding line and angle edge be highest point and Minimum point.
The docking plectane passes through plumb bob during installation and is allowed to keep vertical, will dock the highest point marked on plectane The highs and lows marked on the cut angle of butting rod piece are respectively aligned to minimum point.
The butting rod piece is all made of welding with the fixed form docked between plectane and two hemisphere.
6th step using ultrasonic examination detection butting rod piece with dock plectane fixation after integrated connection quality It is whether qualified.
The setting-out drawing is drawn by the workpiece that CAD software uses scene according to the size of 1:1.
The positioning baffle is welded on fetal membrane.
Compared with prior art, the present invention is with following the utility model has the advantages that can make to dock in ball by the fetal membrane of production Rod piece is completed in installation on ground, is then hoisted to position to be installed, without scaffold or other operating platforms are set up, is reduced height Security risk can be effectively reduced in idle job amount.Butting rod piece with docking plectane when connecting, due to being cut on butting rod piece tiltedly Mouthful, the highs and lows of cut angle are found out, the highs and lows marked on angle is made to be respectively aligned to docking plectane The upper highs and lows marked, it is ensured that the installation quality of assembled precision and scene.The work of construction method of the present invention Journey is at low cost, and mode of operation is simple, can be obviously improved economic benefit, has popularization and application foreground.
Further, butting rod piece of the present invention is all made of weldering with the fixed form docked between plectane and two hemisphere It connects, when welding needs to check that weld size deforms, and should adjust welding position and direction in time if any deviation, avoid causing precision It influences.
Detailed description of the invention
Connection relationship diagram in Fig. 1 work progress of the present invention;
The structural schematic diagram of bevelled halving rod piece composition rack in Fig. 2 ball;
In attached drawing: 1- butting rod piece;2- docks plectane;3- docks hemisphere;4- fetal membrane.
Specific embodiment
Present invention will be described in further detail below with reference to the accompanying drawings.
Referring to Fig. 1,2, bevelled halving construction method in the ball of solder sphere rod member for grid of the present invention, comprising the following steps:
1, the assembled angle of butting rod piece 1 is controlled with height, is made according to setting-out drawing square tube or channel steel blanking Fetal membrane 4, the height and moulding bed size of each supporting point meet drawing requirement on fetal membrane 4, reinforce to stablize and guarantee that fetal membrane 4 can sustain Portion's load.
2, on fetal membrane 4 place butting rod piece 1 before, first with level check fetal membrane 4 on each supporting point relative position, Whether height difference is consistent with setting-out drawing, and the center line of butting rod piece 1 is then popped up on fetal membrane 4, and it is fixed to be welded according to rod piece diameter Position baffle, prevents rod piece from swinging, this is a most key step.After accurate, butting rod piece 1 is put on fetal membrane 4 and is determined In the baffle of position, and it is temporarily fixed on fetal membrane 4.
3, it is applied with cardboard identical with 1 diameter of butting rod piece and is cutting with angle rod piece one end, draw angle cutting line and right Folding, thus has found the highs and lows of rod piece angle.Rotation butting rod piece 1 determines highest point and minimum with horizontal ruler Point puts its position correctly, then determines the highs and lows of another end with horizontal ruler and marks.
4, a point good central cross line is drawn on docking plectane 2, according to full-size drawing paper size, it is oblique finds out butting rod piece 1 respectively Position of the highs and lows at mouth end on cross hairs, and mark.
5, installation docking plectane 2 is allowed to vertically to allow the highest and lowest point marked on 1 angle end of butting rod piece with plumb bob It is respectively aligned to the corresponding position marked on docking plectane 2.Then position dimension and support of the butting rod piece 1 on moulding bed are checked Whether the height of point is correct, is finely adjusted if any variation, is consistent until with setting-out drawing position dimension, finally carries out welding interim It is fixed.
6, with steel tape measure 1 both ends highest point of butting rod piece two spot sizes, see it is whether consistent with theoretical size, just Start formally to be welded after really errorless, when welding notices that weld size deforms, and adjusts welding position and side in time if any deviation To.
7, in ball rod piece 1 with dock 2 bevelled halving welded seam of plectane after the completion of, carry out ultrasonic examination detection, it is qualified after again into Row two docking hemisphere 3 penetrates docking, and when docking rotates hemisphere, and the butt weld of hemisphere 3 is docked until two and is justified with docking After plate 2 matches, then start formally to be welded.Successively butting rod piece in other balls is carried out using this method later assembled.
8, scene measures unwrapping wire, determines installation site and installation control line.Butting rod piece in assembled good ball is hung Being transported to installation site makes control line be consistent with ball center and tube hub line, guarantees that installation site is accurate.Other rod pieces are connected to be formed It is firm whole.
Bevelled halving rod piece individually carries out installation on ground in ball of the present invention, it is assembled it is complete after be lifted into installation site again with other bars Part connection, forms and stablizes cell.Early period carries out 1:1 setting-out according to drawing size to bevelled halving rod piece in ball using CAD software, According to setting-out drawing making fetal membrane 4, the ground of 4 lower part of fetal membrane need to be smooth solid for construction site, prevents the overweight ground of pack weight Sink, influences splicing accuracy.It is oblique to rod piece in ball with tools such as level, steel tape, horizontal ruler, plumb bobs during assembly The assembled height of docking, size carry out check more and meet, and guarantee that splicing accuracy meets the requirements.
The present invention carries out assembly on ground, without scaffold or other operating platforms are set up, reduces amount of high-altitude operation, has Effect reduces security risk.Bevelled halving technical quality requires high in rod piece ball, and the present invention can ensure splicing accuracy, guarantees scene Installation quality.The rack tight for installation period, the method construction is simple reduce the set-up time, engineering cost can be made to drop It is low.

Claims (5)

1. bevelled halving construction method in a kind of ball of solder sphere rod member for grid, which comprises the following steps:
The first step, according to setting-out drawing making fetal membrane (4), the height of each supporting point and the size of moulding bed meet on fetal membrane (4) The requirement of setting-out drawing carries out reinforcing stabilization to fetal membrane (4), guarantees that fetal membrane (4) are able to bear the load applied on it, right The assembled angle of extension bar part (1) carries out control adjustment by the height and spacing of moulding bed;
Second step verifies whether the relative position of each supporting point and height difference on fetal membrane (4) are consistent with setting-out drawing, in tire after confirmation The center line that butting rod piece (1) is drawn on film (4) installs positioning baffle according to the diameter of butting rod piece (1), prevents butting rod piece (1) it swings;Butting rod piece (1) is put into positioning baffle, and is temporarily fixed on fetal membrane (4);
Third step, angle of the cutting for docking on butting rod piece (1), find out the highs and lows of cut angle and do Label, the determination method of the cut angle highs and lows of butting rod piece (1) are as follows: use is identical as butting rod piece (1) diameter Cardboard apply on cut angle, draw the cutting line of angle and carry out doubling, the intersection point at folding line and angle edge is highest Point and minimum point;By adjusting putting butting rod piece (1) in place;The picture branch center cross hairs in docking plectane (2), according to putting Master drawing paper size is found out position of the highs and lows at butting rod piece (1) angle end on cross hairs and is marked;
4th step, installation docking plectane (2) on butting rod piece (1), the docking plectane (2) are made by plumb bob during installation Holding it is vertical, the highs and lows marked on plectane (2) will be docked and be respectively aligned on butting rod piece (1) cut angle The highs and lows of label;Check whether the height of the position dimension and supporting point of butting rod piece (1) on moulding bed is correct, By adjusting being allowed to be consistent with setting-out drawing position dimension, finally it is fixed temporarily;
Size between 5th step, measurement butting rod piece (1) both ends highest point confirms that rear entirety consistent with theoretical size is formal admittedly It is fixed;
6th step, carrying out flaw detection butting rod piece (1) with dock plectane (2) it is fixed after integrated connection quality it is whether qualified, it is qualified Installation docking hemisphere (3) afterwards, the butted line of two hemisphere are fixed after matching with docking plectane (2);
7th step, in-site measurement unwrapping wire determine installation site and installation control line;Butting rod piece in assembled good ball is hoisted to Position to be installed makes control line be consistent with ball center and tube hub line, connects other rod pieces and forms firm entirety.
2. bevelled halving construction method in the ball of solder sphere rod member for grid, feature exist according to claim 1: the docking Rod piece (1) is all made of welding with the fixed form docked between plectane (2) and two docking hemisphere (3).
3. bevelled halving construction method in the ball of solder sphere rod member for grid, feature exist according to claim 1: described the 6th Step using ultrasonic examination detection butting rod piece (1) with dock plectane (2) fixation after integrated connection quality it is whether qualified.
4. bevelled halving construction method in the ball of solder sphere rod member for grid, feature exist according to claim 1: the setting-out Drawing is drawn by the workpiece that CAD software uses scene according to the size of 1:1.
5. bevelled halving construction method in the ball of solder sphere rod member for grid, feature exist according to claim 1: the positioning Baffle is welded on fetal membrane (4).
CN201610767901.2A 2016-08-29 2016-08-29 Bevelled halving construction method in a kind of ball of solder sphere rod member for grid Active CN106284649B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610767901.2A CN106284649B (en) 2016-08-29 2016-08-29 Bevelled halving construction method in a kind of ball of solder sphere rod member for grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610767901.2A CN106284649B (en) 2016-08-29 2016-08-29 Bevelled halving construction method in a kind of ball of solder sphere rod member for grid

Publications (2)

Publication Number Publication Date
CN106284649A CN106284649A (en) 2017-01-04
CN106284649B true CN106284649B (en) 2019-01-25

Family

ID=57675698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610767901.2A Active CN106284649B (en) 2016-08-29 2016-08-29 Bevelled halving construction method in a kind of ball of solder sphere rod member for grid

Country Status (1)

Country Link
CN (1) CN106284649B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108915279B (en) * 2018-09-14 2023-06-16 山西建筑工程集团有限公司 Ball node net rack small unit ground welding grabbing and splicing jig

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06200563A (en) * 1993-01-05 1994-07-19 Toshiro Suzuki Construction method for trussed structure
EP1443153A1 (en) * 2003-01-29 2004-08-04 Ecole Polytechnique Federale De Lausanne (Epfl) Strut assembly node for reticular space frame structure
CN104190956A (en) * 2014-08-27 2014-12-10 浙江精工钢结构集团有限公司 Method for assembling and locating intersecting round pipe
CN104264789A (en) * 2014-05-23 2015-01-07 浙江东南网架股份有限公司 Novel connecting node of cross grid structure, special molding bed and preparation method thereof
CN104831939A (en) * 2015-05-22 2015-08-12 常州第一建筑集团有限公司 Bolt ball welding ball mixed node large span cantilever grid structure construction method
CN105587130A (en) * 2014-11-14 2016-05-18 五冶集团上海有限公司 Space latticed shell welding ball locating device and application method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06200563A (en) * 1993-01-05 1994-07-19 Toshiro Suzuki Construction method for trussed structure
EP1443153A1 (en) * 2003-01-29 2004-08-04 Ecole Polytechnique Federale De Lausanne (Epfl) Strut assembly node for reticular space frame structure
CN104264789A (en) * 2014-05-23 2015-01-07 浙江东南网架股份有限公司 Novel connecting node of cross grid structure, special molding bed and preparation method thereof
CN104190956A (en) * 2014-08-27 2014-12-10 浙江精工钢结构集团有限公司 Method for assembling and locating intersecting round pipe
CN105587130A (en) * 2014-11-14 2016-05-18 五冶集团上海有限公司 Space latticed shell welding ball locating device and application method thereof
CN104831939A (en) * 2015-05-22 2015-08-12 常州第一建筑集团有限公司 Bolt ball welding ball mixed node large span cantilever grid structure construction method

Also Published As

Publication number Publication date
CN106284649A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN105401732B (en) A kind of assemble method of nuclear power station large-sized steel construction module
CN107818226B (en) Three-dimensional modeling method of bilge keel structure and bilge keel structure
CN107988908A (en) The total assembling method of tubular arch
CN110877674B (en) Positioning process of double rudder horn on subsection
CN103114732A (en) Cast steel penetration pipe node space positioning method
CN109184225A (en) Four string prismatic bending circular tube truss structural systems of one kind and assembling method
CN206917026U (en) A kind of steel disc shape node component for special-shaped Curtain wall frame
CN106284649B (en) Bevelled halving construction method in a kind of ball of solder sphere rod member for grid
CN103523169A (en) Double-shell ship building method
CN105382491B (en) The processing and fabricating and the method for inspection of arc-shaped steel tubing string
CN113814589A (en) Method for controlling splicing precision of oversized flange
CN107165317A (en) It is a kind of to be used for the steel disc shape node component and application process of special-shaped Curtain wall frame
CN114604391A (en) Pile fixing frame construction method
CN106323169A (en) Sphere center coordinate positioning method
CN112344917A (en) Pipeline butt joint auxiliary device and pipeline butt joint method
CN105113418B (en) A kind of bearing pad stone construction lofting method
CN101255767A (en) Method for measuring and locating virtual tetrahedron top of abnormity component
CN212294344U (en) Cable-stayed bridge cable beam anchoring structure
CN211783162U (en) Bathroom floor drain row brick positioning tool
CN210828370U (en) Support tool used as bottom plate gluten stirrup and gluten elevation control
CN113928504A (en) Shaft-rudder integrated sectional construction process
CN210684486U (en) Cable tower area beam section support
CN114044107A (en) Two-dimensional positioning method for ship broadside segment segmentation folding
CN207509200U (en) It is a kind of to cross welding hole, groove measurement lineation device
CN207919322U (en) Bicycle occupation bridge pillarwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant