CN207919322U - Bicycle occupation bridge pillarwork - Google Patents
Bicycle occupation bridge pillarwork Download PDFInfo
- Publication number
- CN207919322U CN207919322U CN201721781393.XU CN201721781393U CN207919322U CN 207919322 U CN207919322 U CN 207919322U CN 201721781393 U CN201721781393 U CN 201721781393U CN 207919322 U CN207919322 U CN 207919322U
- Authority
- CN
- China
- Prior art keywords
- section
- web
- cross
- pillarwork
- pipeline section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of bicycle occupation bridge pillarworks comprising cushion cap, pier stud and footing, the pier stud setting is on the cushion cap top, and the footing is arranged in the cushion cap lower part, and the pier stud includes:Variable cross-section portion and the cross-section portion being connect with the bottom in the variable cross-section portion, and the shape all same of each cross section in variable cross-section portion.The bicycle occupation bridge pillarwork of the utility model can sectional, welding, convenience in transport, construction efficiency be high at the scene;And structure is slim and graceful, solid reliable, low cost.
Description
Technical field
The utility model is related to structural engineering field more particularly to a kind of bicycle occupation bridge pillarworks.
Background technology
China is that the maximum country of bicycle ownership has especially with flourishing for shared bicycle in the world
The bicycle of the characteristics such as green, body-building, convenient will occupy an important position in the trip of people.But current China lacks bicycle
Accommodation road, bicycle, pedestrian and motor vehicle mixing go together, thus lead to Frequent Accidents, both affected the driving of motor vehicle
Efficiency also brings security risk to bicycle and pedestrian, reduces the comfort and convenience of cycling trip.
Utility model content
The utility model is directed to the drawbacks described above of the prior art, provides a kind of bicycle occupation bridge pillarwork, ties
Structure is simple, easy to assembly, low cost.
Technical solution adopted by the utility model to solve its technical problems is:
There is provided a kind of bicycle occupation bridge pillarwork comprising cushion cap, pier stud and footing, the pier stud setting exist
The cushion cap top, the footing are arranged in the cushion cap lower part, and the pier stud includes:Variable cross-section portion and with the variable cross-section
The cross-section portion of the bottom connection in portion, and the shape all same of each cross section in variable cross-section portion.
Preferably, the cross section in the variable cross-section portion and cross-section portion is ellipse, and the cross in the variable cross-section portion
Area of section is gradually reduced from top to bottom.
Preferably, the variable cross-section portion includes:First semicircle pipeline section, the first web, the second semicircle pipeline section and the second abdomen
Plate;The first semicircle pipeline section, the first web, the second semicircle pipeline section and the second web are sequentially connected, and are cut with surrounding described become
Face;And the top of the first semicircle pipeline section and the second semicircle pipeline section is bent outwards.
Preferably, the first semicircle pipeline section and the second semicircle pipeline section include sequentially connected several straight from top to bottom
Line segment.
Preferably, the cross-section portion includes:Positioned at the third semicircle pipeline section of the first semicircle pipeline section bottom, positioned at institute
State the third web of the first web bottom, positioned at the 4th semicircle pipeline section of the second semicircle pipeline section bottom and positioned at described the
4th web of two web bottoms.
Preferably, the footing includes:Anchoring base and the support portion being arranged on the anchoring base.
Preferably, the support portion peripheral surface is provided with several external stiffeners, and setting inside the support portion
Inside stiffener arranged in a crossed manner.
Preferably, the anchoring base lower surface is provided with several anchor ribs.
The advantageous effect of technical solutions of the utility model is:
The bridge structure of the utility model can sectional, welding, convenience in transport, construction efficiency be high at the scene;And structure
Merrily and lightheartedly, solid reliable, low cost.
Description of the drawings
Below in conjunction with accompanying drawings and embodiments, the utility model is described in further detail, in attached drawing:
Fig. 1 is the overall structure figure of bicycle occupation bridge pillarwork in the embodiments of the present invention one;
Fig. 2 is the overall structure figure of pier stud in the embodiments of the present invention one;
Fig. 3 is the Structure explosion diagram of pier stud in the embodiments of the present invention one;
Fig. 4 is the first semicircle pipeline section in the embodiments of the present invention one, the first web, the second semicircle pipeline section, the second abdomen
The structure chart of plate;
Fig. 5 a are the structure charts of footing in the embodiments of the present invention one;
Fig. 5 b are the vertical views of the structure of footing in the embodiments of the present invention one;
Fig. 6 is the spelling schematic diagram of two cathetus section of the embodiments of the present invention;
Fig. 7 is the structure chart of internal stiffener in the embodiments of the present invention two.
Specific implementation mode
In order to make the purpose of this utility model, technical solution and advantage be more clearly understood, below in conjunction with attached drawing and reality
Example is applied, the present invention will be further described in detail.It should be understood that specific embodiment described herein is only used for
It explains the utility model, is not used to limit the utility model.
Embodiment one:
As shown in Figure 1, the bicycle occupation bridge pillarwork of the utility model includes cushion cap 100, for carrying steel case
The pier stud 200 and at least one footing 300 of beam P, the pier stud 200 are arranged in 100 top of the cushion cap, the footing 300
It is arranged in 100 lower part of the cushion cap.
Specifically, as shown in Fig. 2, the pier stud 100 includes:Variable cross-section portion 101 and bottom with the variable cross-section portion 101
The cross-section portion 102 of portion's connection;In the present embodiment, the cross section 102 in the variable cross-section portion 101 and cross-section portion is ellipse
Shape, and the shape all same of 101 each cross section of the variable cross-section portion, meanwhile, the cross-sectional area in the variable cross-section portion 101 from
It is gradually reduced under, up big and down small structure is consequently formed, thus increased and the contact of 100 structure of pier stud (such as steel box-girder P)
Area increases load-bearing capacity.
Further, as shown in figure 3, the variable cross-section portion 101 includes:First semicircle pipeline section 1011, the first web 1012,
Second semicircle pipeline section 1013 and the second web 1014;The first semicircle pipeline section 1011, the first web 1012, the second semi-circular tube
Section 1013 and the second web 1014 are sequentially connected and (such as weld), to surround the variable cross-section portion 101;And first semicircle
The top of pipeline section 1011 and the second semicircle pipeline section 1013 is bent outwards.Corresponding, the cross-section portion 102 includes:
Third semicircle pipeline section 1021 positioned at the first semicircle pipeline section bottom, the third web positioned at first web bottom
1022, the 4th positioned at the 4th semicircle pipeline section 1023 of the second semicircle pipeline section bottom and positioned at second web bottom
Web 1024.
As shown in figure 4, the first semicircle pipeline section 1011 and the second semicircle pipeline section 1013 include from top to bottom successively
Several straightways of connection, in the present embodiment, the straightway has 4, is L1-L4, and the interconnecting piece of each straightway gives phase
Transversal, and each straightway, the first web 1012 and the second web 1014 with a hook at the end repair cut surplus (surplus 8-12mm, it is excellent
It is selected as 10mm).
As shown in Fig. 5 a-5b, the footing 300 includes:Anchoring base 301 and setting are on the anchoring base 301
Support portion 302 (can be cylindrical steel structure).Add specifically, being provided with several outsides around 302 peripheral surface of the support portion
Strength plate 303, and inside stiffener 304 arranged in a crossed manner is arranged in 302 inside of the support portion.Further, it is that enhancing structure is strong
Degree, 301 lower surface of the anchoring base are provided with several anchor ribs 305, it is preferred that the anchor rib 305 can form several
Concentric structure, so that uniform force.
Embodiment two:
The present embodiment additionally provides a kind of construction method of above-mentioned bicycle occupation bridge pillarwork comprising following step
Suddenly:
S1, straight-seam pipes are cut in half as two semicircles, obtaining several straightways, (each straightway is a semicircle
Pipe is straightway in each semicircle length of tube), third semicircle pipeline section and the 4th semicircle pipeline section, semicircle after incision can be by
The effect of material internal stress in coiling process and flick, cause half circular diameter after cutting to become larger or lose circle, it is therefore necessary into
Row flame straightening is handled, by the control of tube coupling out-of-roundness in the regular claimed range of manufacture;First semicircle pipeline section, the second semicircle pipeline section
With a hook at the end to ask to repair when blanking and cuts surplus (surplus 8-12mm, preferably 10mm);Again by several straightways on moulding bed spelling
(such as Fig. 6), docking site give intersection coordinate, and adjust it is linear after progress positioning welding, to form described the first half
Pipe section and the second semicircle pipeline section;When welding, using CO2Gas shielded welding is completed, the first semicircle pipeline section after welding, the
Two semicircle pipeline sections must carry out linear repetition measurement, and must be polished on the outside of butt weld, to ensure impression quality, if repetition measurement is unqualified
Then carry out flame straightening processing;Finally, the first semicircle pipeline section, the second semicircle pipeline section completing to weld are carried out non-destructive testing, is closed
It is for use after lattice;In addition, the first semicircle pipeline section and the second semicircle pipeline section welding groove are the bilateral V-butt of single side, can use
It after the cutting of hand handle cutter, polishes according to the requirement of manufacture rule, reaches the given bevel angle of qualification of welding procedure and root face ruler
It is very little;
S2, cutting form first web, the second web, third web and the 4th web;Likewise, the first web
And second with a hook at the end to repair at the top of web and cut surplus (surplus 8-12mm, preferably 10mm);Likewise, each web welds slope
Mouth is also the bilateral V-butt of single side, after can using the cutting of hand handle cutter, polishes according to the requirement of manufacture rule, reaches welding procedure
The given bevel angle of evaluation and root face size;
S3, welding the first semicircle pipeline section, the second semicircle pipeline section, the first web and the second web, form the change
Cross-section;
S4, the welding third semicircle pipeline section, the 4th semicircle pipeline section, third web and the 4th web, form described etc.
Cross-section;
S5, variable cross-section section and cross-section section are crouched on platform and spelled, carry out tunneling boring docking, the variable cross-section section after spelling with
Cross-section section should check that each portion's size, especially intermediate diagonal line are poor;Positioning welding is carried out after each dimensional gaughing qualification;Welding is made
CO is used when industry2Gas shielded arc welding carries out variable cross-section section and the intersegmental welding of cross-section;Each portion's size is checked after welding, to deformation
Position is corrected, and is carried out non-destructive testing;
S6, cutting form the external stiffener and internal stiffener;The internal stiffener blanking gives tolerance -6
~-4mm (as shown in Figure 7), and internal stiffener is first welded as entirety, it is being welded to inside the support portion;
When external stiffener welding, bisector and external stiffener bars position line first are marked in support portion peripheral surface,
Then external stiffener spelling and positioning welding are carried out, thus will the external stiffener be welded to the support portion peripheral surface with
And on anchoring base;
And the external stiffener positioning welding it is complete after, check bottom plane, such as external stiffener is not same flat
In face, then external stiffener must be reinstalled, external stiffener out of plumb must then polish or mechanical process;
S7, the anchor rib is fixed in the anchoring base lower surface, forms the footing;
And S8, top and lower part that the pier stud, footing are correspondingly arranged to the cushion cap respectively.
It should be noted that the technical characteristic in above-described embodiment one, two can carry out arbitrary combination, and the skill being composed
Art scheme belongs to the scope of protection of the utility model.
In conclusion the bicycle occupation bridge pillarwork and its construction method of the utility model can segmentation groups at the scene
Dress, welding, convenience in transport, construction efficiency are high;And multi-point welding technique is used, structure is slim and graceful, solid reliable.
Claims (8)
1. a kind of bicycle occupation bridge pillarwork comprising cushion cap, pier stud and footing, the pier stud setting are held described
Platform top, the footing are arranged in the cushion cap lower part, which is characterized in that the pier stud includes:Variable cross-section portion and with it is described
The cross-section portion of the bottom connection in variable cross-section portion, and the shape all same of each cross section in variable cross-section portion.
2. bicycle occupation bridge pillarwork as described in claim 1, which is characterized in that the variable cross-section portion and wait cut
The cross section of face is ellipse, and the cross-sectional area in the variable cross-section portion is gradually reduced from top to bottom.
3. bicycle occupation bridge pillarwork as described in claim 1, which is characterized in that the variable cross-section portion includes:The
One semi-circular tube section, the first web, the second semicircle pipeline section and the second web;The first semicircle pipeline section, the first web, the second half
Pipe section and the second web are sequentially connected, to surround the variable cross-section portion;And the first semicircle pipeline section and the second semicircle
The top of pipeline section is bent outwards.
4. bicycle occupation bridge pillarwork as claimed in claim 3, which is characterized in that the first semicircle pipeline section and
Second semicircle pipeline section is including sequentially connected several straightways from top to bottom.
5. bicycle occupation bridge pillarwork as claimed in claim 4, which is characterized in that the cross-section portion includes:Position
Third semicircle pipeline section in the first semicircle pipeline section bottom, the third web positioned at first web bottom, be located at it is described
4th semicircle pipeline section of the second semicircle pipeline section bottom and the 4th web positioned at second web bottom.
6. bicycle occupation bridge pillarwork as claimed in claim 5, which is characterized in that the footing includes:Anchor bottom
Seat and the support portion being arranged on the anchoring base.
7. bicycle occupation bridge pillarwork as claimed in claim 6, which is characterized in that around the support portion peripheral surface
Several external stiffeners are provided with, and inside stiffener arranged in a crossed manner is set inside the support portion.
8. bicycle occupation bridge pillarwork as claimed in claim 7, which is characterized in that the anchoring base lower surface is set
It is equipped with several anchor ribs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721781393.XU CN207919322U (en) | 2017-12-19 | 2017-12-19 | Bicycle occupation bridge pillarwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721781393.XU CN207919322U (en) | 2017-12-19 | 2017-12-19 | Bicycle occupation bridge pillarwork |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207919322U true CN207919322U (en) | 2018-09-28 |
Family
ID=63606799
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721781393.XU Expired - Fee Related CN207919322U (en) | 2017-12-19 | 2017-12-19 | Bicycle occupation bridge pillarwork |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207919322U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035243A (en) * | 2017-12-19 | 2018-05-15 | 中交三航(厦门)工程有限公司 | Bicycle occupation bridge pillarwork and its construction method |
-
2017
- 2017-12-19 CN CN201721781393.XU patent/CN207919322U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035243A (en) * | 2017-12-19 | 2018-05-15 | 中交三航(厦门)工程有限公司 | Bicycle occupation bridge pillarwork and its construction method |
CN108035243B (en) * | 2017-12-19 | 2024-02-06 | 中交三航局第六工程(厦门)有限公司 | Bridge pier column structure special for bicycle and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104439740B (en) | A kind of welding method for blast furnace top flange | |
CN108146578A (en) | A kind of manufacturing method of two phase stainless steel chemical tanker topside segmentation | |
CN107988908A (en) | The total assembling method of tubular arch | |
CN110185138A (en) | A kind of welding ball grid and its method for assembling and welding | |
CN102839747A (en) | Construction method for steel structure truss of super high-rise special structure | |
CN103523168B (en) | CSS platform connecting bridge area segmentation manufacturing process and special skew moulding bed | |
CN102601498A (en) | Welding method for U-shaped ribs of orthotropic plate of bridge girder | |
CN108103938A (en) | A kind of double deck module solid trial assembly method of large steel girder | |
CN105445434A (en) | Pipeline steel pipe on-site girth welding evaluation method | |
CN104763156A (en) | Assembling method of steel safety housing bottom seal head of nuclear power plant | |
CN105290573A (en) | Welding method of medium-sized storage tank of 1000m<3>00Cr14Ni14Si4 steel | |
CN109079437A (en) | Large size liquefied gas storage multilayer limb end socket arrangement and method for construction peculiar to vessel | |
CN207919322U (en) | Bicycle occupation bridge pillarwork | |
CN102995553B (en) | Arch rib of reinforced concrete arch bridge and erection support and manufacture method of arch rib | |
CN206917026U (en) | A kind of steel disc shape node component for special-shaped Curtain wall frame | |
CN105905261A (en) | Vertical general assembly jig frame for container ship lashing bridge | |
CN108894580B (en) | Construction process of flare tower | |
CN205100572U (en) | A support is adjusted in space pipe truss structure high altitude butt joint | |
CN107165317A (en) | It is a kind of to be used for the steel disc shape node component and application process of special-shaped Curtain wall frame | |
CN106323169A (en) | Sphere center coordinate positioning method | |
CN113714674A (en) | Batch welding method for steel structure TKY nodes | |
CN108035243A (en) | Bicycle occupation bridge pillarwork and its construction method | |
CN100366855C (en) | Inclined triangular pyramid truss type frame construction and method for making, mounting and measuring the same | |
CN116275909A (en) | Manufacturing method of heavy round square variable diameter node | |
CN209256164U (en) | A kind of moulding bed device built for flare tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180928 Termination date: 20201219 |