CN106284370B - Build inner support list column joist system - Google Patents

Build inner support list column joist system Download PDF

Info

Publication number
CN106284370B
CN106284370B CN201610698796.1A CN201610698796A CN106284370B CN 106284370 B CN106284370 B CN 106284370B CN 201610698796 A CN201610698796 A CN 201610698796A CN 106284370 B CN106284370 B CN 106284370B
Authority
CN
China
Prior art keywords
column
crossbeam
inner support
vertical guide
support list
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610698796.1A
Other languages
Chinese (zh)
Other versions
CN106284370A (en
Inventor
胡焕
胡琦
宋康
唐登
温娘后
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongtong Geotechnical Science And Technology Inc
Original Assignee
DONGTONG GEOTECHNICAL TECHNOLOGY (HANGZHOU) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGTONG GEOTECHNICAL TECHNOLOGY (HANGZHOU) Co Ltd filed Critical DONGTONG GEOTECHNICAL TECHNOLOGY (HANGZHOU) Co Ltd
Priority to CN201610698796.1A priority Critical patent/CN106284370B/en
Publication of CN106284370A publication Critical patent/CN106284370A/en
Application granted granted Critical
Publication of CN106284370B publication Critical patent/CN106284370B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The invention discloses a kind of building inner support list column joist systems, be intended to provide it is a kind of can be under the premise of ensureing to carry out secure support to the shaped steel inner support of foundation pit, shorten crossbeam across distance, reduce the range rung to foundation pit construction face, and saves the building inner support list column joist system of the usage amount of crossbeam.It includes a root post, the column top is set there are two bracket part, and two bracket parts are located at sustained height, and two bracket parts are distributed in the opposite sides of column, a horizontally disposed crossbeam is respectively equipped on two bracket parts, and the crossbeam on two bracket parts is mutually parallel.

Description

Build inner support list column joist system
Technical field
The present invention relates to building foundation pit fields, and in particular to a kind of building inner support list column joist system.
Background technology
It often needs to set up inner support in building foundation pit construction(The supporting beam of horizontal direction)Supporting is carried out for foundation pit, then After excavating to bottom plate, side wall, the top plate of construct bottom plate and building complete the construction of foundation pit.Building foundation pit is when using in shaped steel When support, it usually needs use vertical load-bearing and confining part of the stand column and beam system as shaped steel inner support, shaped steel inner support Level is erected on the crossbeam of stand column and beam system.
As shown in figure 8, column 1 is respectively set using 3 both ends of single crossbeam in the stand column and beam system of traditional shaped steel inner support, And in two columns bracket part 2 is arranged at specified absolute altitude, beam erection is on the bracket part of two columns.Current is this vertical The crossbeam of column crossbeam system across distance it is longer, crossbeam length up to 12m, this not only makes the usage amount of crossbeam big, and And crossbeam across distance it is longer have a certain impact to construction operations such as excavation of foundation pit, be unfavorable for the constructions such as excavation of foundation pit work Industry.
Invention content
It can ensure to foundation pit the purpose of the present invention is to overcome the shortcomings in the prior art and to provide a kind of Under the premise of shaped steel inner support carries out secure support, shorten crossbeam across distance, reduce the range rung to foundation pit construction face, And save the building inner support list column joist system of the usage amount of crossbeam.
The technical scheme is that:
A kind of building inner support list column joist system includes a root post, and the column top is set there are two bracket part, Two bracket parts are located at sustained height, and two bracket parts are distributed in the opposite sides of column, are respectively equipped on two bracket parts A piece horizontally disposed crossbeam, and the crossbeam on two bracket parts is mutually parallel.
The building inner support list column joist system of this programme is improved existing stand column and beam system, by a cross Beam is set up by two root posts support changes into a root post two crossbeams of erection;Due to using a root post thus can effectively contract Tail trimmer across distance, reduce the range rung to foundation pit construction face, and save the usage amount of crossbeam;A root post is matched simultaneously The vertical load-bearing and confining part that two crossbeams can be as shaped steel inner support are closed, ensureing to carry out the shaped steel inner support of foundation pit can By support.
Preferably, any one end of each crossbeam and the spacing all same of column.Due to each crossbeam any one end with it is vertical The spacing all same of column, the so vertical bearing capacity in beam effect on column are symmetrically distributed in the both sides of column, favorably In the enabling capabilities and stability that improve column.
Preferably, the both ends of crossbeam, which are respectively equipped with one, holds out against limit component, the limit component that holds out against is located at crossbeam Top, hold out against limit component top surface be equipped with toward column direction extend upper limit plate.
This programme crossbeam both ends hold out against limit component and can provide horizontal direction for the shaped steel inner support being erected on crossbeam Constraint, limit, enhance building inner support list column joist system and shaped steel combination inner support stability.
Preferably, crossbeam is made of H profile steel, the wing plate for constituting the H profile steel of crossbeam is horizontally disposed, and it is logical to hold out against limit component It crosses bolt with the wing plate for the H profile steel for constituting crossbeam to be connected, the upper limit plate is equal with the wing plate of H profile steel of crossbeam is constituted Row.Due to upper limit plate with constitute the wing plate of H profile steel of crossbeam it is parallel, upper limit plate, constitute crossbeam H profile steel wing plate with The limiting slot for forming the shaped steel for limiting shaped steel inner support between limit component is held out against, while the upper limit can be bolted Position plate and shaped steel inner support, to ensure the stability of shaped steel combination inner support.
It is bolted between limit component and crossbeam preferably, holding out against.
Preferably, bracket part is connected by bolt with column.
Preferably, further including being set on column and can existing along the installation body that column slides, the bracket part setting It installs on body, the lower face of the installation body is equipped with installation gap, and it is anti-that unidirectional automatic fastening is equipped in installation gap Dropping mechanism, the unidirectional automatic fastening anti-shedding mechanism include be rotatably provided in by horizontal rotating shaft it is inclined in installation gap Heart wheel and the telescopic resilience jacking mechanism being arranged in installation gap;The telescopic resilience jacking mechanism is located under eccentric wheel Side, telescopic resilience jacking mechanism include be fixed at installation body on vertical guide sleeve, can up and down slideway setting vertical Vertical guide rod in guide sleeve and idler wheel in vertical lower end of the guide rod is set, the axis of the vertical guide rod be located at horizontal rotating shaft with it is vertical Between column, on the lateral surface of the vertical guide rod and positioned at vertical guide sleeve top be equipped with upper limit position block, the vertical guide sleeve with Preload compressed spring is arranged on vertical guide rod between upper limit position block, the idler wheel is resisted against on the surface of eccentric wheel, described The surface of eccentric wheel is resisted against on column lateral surface, and the contact position between eccentric surfaces and column lateral surface is less than level Shaft.
Preferably, the surface of eccentric wheel is equipped with one layer of rubber antiskid layer, and the thickness of rubber antiskid layer is less than 1 millimeter.
Preferably, being equipped with lower position block on the lateral surface of vertical guide rod and positioned at the lower section of vertical guide sleeve.
Preferably, column top is equipped with several column mounting holes being equally spaced from top to bottom, the installation body is set There is body mounting hole corresponding with column mounting holes.
The beneficial effects of the invention are as follows:Can under the premise of ensureing to carry out secure support to the shaped steel inner support of foundation pit, Shorten crossbeam across distance, reduce the range rung to foundation pit construction face, and save the usage amount of crossbeam.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of the building inner support list column joist system of the embodiment of the present invention 1.
Fig. 2 is the side view of Fig. 1.
Fig. 3 is the one kind of the building inner support list column joist system of the embodiment of the present invention 1 in actual application Structural schematic diagram.
Fig. 4 is the vertical view of Fig. 3.
Fig. 5 is a kind of structural schematic diagram of the building inner support list column joist system of the embodiment of the present invention 2.
Fig. 6 is the partial enlarged view at A in Fig. 5.
Fig. 7 is the partial enlarged view at B in Fig. 6.
Fig. 8 is a kind of structural schematic diagram of the stand column and beam system of shaped steel inner support in the prior art.
In figure:Column 1, bracket part 2, crossbeam 3 hold out against limit component 4, upper limit plate 41, shaped steel inner support 5, installation set Body 6, unidirectional automatic fastening anti-shedding mechanism 7, horizontal rotating shaft 71, eccentric wheel 72, telescopic resilience jacking mechanism 73, lower position block 731, vertical guide sleeve 732, vertical guide rod 733, preload compressed spring 734, upper limit position block 735, idler wheel 736, installation gap 8.
Specific implementation mode
Present invention is further described in detail with specific implementation mode below in conjunction with the accompanying drawings:
Embodiment 1:As shown in Figure 1 and Figure 2, a kind of building inner support list column joist system includes a root post 1.Column Top is set there are two bracket part 2.The bracket part of the present embodiment is connected by bolt with column.Two bracket parts are located at same height Degree, and two bracket parts are symmetrically distributed in the opposite sides of column.Be respectively equipped on two bracket parts one it is horizontally disposed Crossbeam 3.Crossbeam is located above bracket part.It is bolted between crossbeam and bracket part.Crossbeam is made of H profile steel, is constituted horizontal The wing plate of the H profile steel of beam is horizontally disposed.Crossbeam on two bracket parts is mutually parallel.Between any one end and column of each crossbeam Away from all same.
The both ends of crossbeam are respectively equipped with one and hold out against limit component 4.Hold out against the top that limit component is located at crossbeam.Hold out against limit It is bolted between position component and crossbeam, specifically, holds out against limit component and pass through bolt and the H profile steel for constituting crossbeam Wing plate is connected.The top surface for holding out against limit component is equipped with the upper limit plate 41 extended toward column direction.Upper limit plate is horizontal with composition The wing plate of the H profile steel of beam is parallel.Upper limit plate, which is equipped with, runs through upper limit plate bolt mounting holes upper and lower surfaces of.
Build the specifically used as follows of inner support list column joist system:
As shown in Figure 3, Figure 4, it is erected on crossbeam between the shaped steel inner support 5 being made of several shaped steel arranged side by side. Column is located at the middle part below shaped steel inner support and is used to support crossbeam and shaped steel inner support.Shaped steel inner support is located at crossbeam both ends Between holding out against limit component, upper limit plate is located at the top of shaped steel inner support, and can be between upper limit plate and shaped steel inner support It is bolted, to enhance the stability of building inner support list column joist system and shaped steel combination inner support.
Embodiment 2, remaining structure reference embodiment 1 of the present embodiment, the difference is that:
As shown in figure 5, a kind of building inner support list column joist system further includes being set on column and being slided along column Dynamic installation body 6.The setting of bracket part 2 of the present embodiment is on installation body.Bracket part is welded as a whole with installation body.
As shown in Fig. 5, Fig. 6, Fig. 7, the lower face for installing body is equipped with installation gap 8, the installation gap of the present embodiment It it is two, and two installation gaps are symmetrically distributed in the opposite sides of column.Unidirectional automatic fastening is equipped in each installation gap Anti-shedding mechanism 7.Unidirectional automatic fastening anti-shedding mechanism includes being rotatably provided in installation gap by horizontal rotating shaft 71 Eccentric wheel 72 and the telescopic resilience jacking mechanism 73 being arranged in installation gap.The surface of eccentric wheel is equipped with one layer of rubber antiskid Layer.The thickness of rubber antiskid layer is 1 millimeter or 0.8 millimeter or 0.5 millimeter.
Telescopic resilience jacking mechanism is located at the lower section of eccentric wheel.Telescopic resilience jacking mechanism includes being fixed at installation set Vertical guide sleeve 732 on body, can up and down slideway the vertical guide rod 733 being arranged in vertical guide sleeve and be arranged on vertical guide rod The idler wheel 736 at end.The axis of vertical guide rod is between horizontal rotating shaft and column.On the lateral surface of vertical guide rod and positioned at vertical The top of guide sleeve is equipped with upper limit position block 735.It is equipped with lower position block on the lateral surface of vertical guide rod and positioned at the lower section of vertical guide sleeve 731.It is arranged on the vertical guide rod between guide sleeve and upper limit position block vertically and pre-tightens compressed spring 734.Idler wheel is resisted against eccentric wheel Surface on.Idler wheel up pushes away eccentric wheel, so that eccentric wheel is up rotated around horizontal rotating shaft and is resisted against on column lateral surface.Partially The surface of heart wheel is resisted against on column lateral surface.Contact position between eccentric surfaces and column lateral surface turns less than horizontal Axis.
Column top is equipped with several column mounting holes being equally spaced from top to bottom.Installation body is equipped with and column mounting holes Corresponding body mounting hole.
This programme can install the height of body come holder for regulating seat piece and horizontal depth of beam, to make this implementation by adjusting The building inner support list column joist system of example can be adapted for being supported the shaped steel inner support of various different heights, specifically Operation is as follows:
When installation body needs to move up:Installation body directly up can be moved to required height i.e. by operator It can.
When installation body needs to move down:First, operator holds the lower end of vertical guide rod, by vertical guide rod toward drop-down, Idler wheel is set to be detached with eccentric wheel.After idler wheel is detached with eccentric wheel, eccentric wheel rotates under Gravitative Loads around horizontal rotating shaft down, Eccentric wheel is set to be detached with column.Then, installation body can be moved down into desired position by operator along column.Followed by behaviour Author discharges vertical guide rod.After operator discharges vertical guide rod, under the action of pre-tightening compressed spring, idler wheel will be against It is up pushed away on the surface of eccentric wheel and by eccentric wheel, eccentric wheel is made up to be rotated around horizontal rotating shaft and is resisted against column lateral surface On.
Since the idler wheel for the vertical guide rod of effect for pre-tightening compressed spring will be resisted against on the surface of eccentric wheel, make eccentric wheel table Face abuts against on column;And since the surface of eccentric wheel is equipped with one layer of rubber antiskid layer, to avoid eccentric wheel and can stand in this way Sliding is generated between column;Thus when installing body by pressure down, the eccentric wheel of unidirectional automatic fastening anti-shedding mechanism It can prevent installation body from moving down, and install that body is bigger by pressure down, then the clamping between eccentric wheel and column Power is also bigger, will not be moved down to ensure to install body, installing body, bracket part and crossbeam in this way can reliable support type The vertical load of steel inner support.On the other hand, the step-less adjustment of installation body may be implemented in unidirectional automatic fastening anti-shedding mechanism, And it is easy to adjust.
In addition, in order to further ensure installing the connection reliability of body and column, it can also be by bolt by installation set Body is mounted on column, i.e., passes through body mounting hole and corresponding column mounting holes by bolt, installation body is mounted on vertical On column(Certainly it can not needed by bolt by the step for body is mounted on column is installed, directly by unidirectional automatic tight Both may be used Gu anti-shedding mechanism prevents installation body from moving down).

Claims (9)

1. a kind of building inner support list column joist system, characterized in that including a root post, there are two the column top is set Bracket part, two bracket parts are located at sustained height, and two bracket parts are distributed in the opposite sides of column, divide on two bracket parts Not She You a horizontally disposed crossbeam, and the crossbeam on two bracket parts is mutually parallel;
Further include being set on column and being arranged on installation body along the installation body that column slides, the bracket part, institute The lower face for stating installation body is equipped with installation gap, and unidirectional automatic fastening anti-shedding mechanism is equipped in installation gap, described Unidirectional automatic fastening anti-shedding mechanism includes that the eccentric wheel being rotatably provided in installation gap by horizontal rotating shaft and setting exist Telescopic resilience jacking mechanism in installation gap,
The telescopic resilience jacking mechanism is located at the lower section of eccentric wheel, and telescopic resilience jacking mechanism includes being fixed at installation set Vertical guide sleeve on body, can slide up and down the vertical guide rod being arranged in vertical guide sleeve and is arranged rolling in vertical guide rod upper end Wheel, the axis of the vertical guide rod is between horizontal rotating shaft and column, on the lateral surface of the vertical guide rod and positioned at vertical The top of guide sleeve is equipped with upper limit position block, and preload compression bullet is arranged on the vertical guide rod between the vertical guide sleeve and upper limit position block Spring, the idler wheel are resisted against on the surface of eccentric wheel, and the surface of the eccentric wheel is resisted against on column lateral surface, and eccentric wheel table Contact position between face and column lateral surface is less than horizontal rotating shaft.
2. building inner support list column joist system according to claim 1, characterized in that any one end of each crossbeam with The spacing all same of column.
3. building inner support list column joist system according to claim 1, characterized in that distinguish at the both ends of the crossbeam If there are one limit component is held out against, the top for holding out against limit component and being located at crossbeam holds out against the top surface of limit component equipped with past The upper limit plate that column direction extends.
4. building inner support list column joist system according to claim 3, characterized in that the crossbeam is by H profile steel structure At the wing plate for constituting the H profile steel of crossbeam is horizontally disposed, holds out against wing plate of the limit component by bolt and the H profile steel for constituting crossbeam It is connected, the upper limit plate is parallel with the wing plate of H profile steel of crossbeam is constituted.
5. building inner support list column joist system according to claim 1 or 2 or 3 or 4, characterized in that described to hold out against It is bolted between limit component and crossbeam.
6. building inner support list column joist system according to claim 1 or 2 or 3 or 4, characterized in that the bracket Part is connected by bolt with column.
7. building inner support list column joist system according to claim 1, characterized in that the surface of the eccentric wheel is set There is one layer of rubber antiskid layer, and the thickness of rubber antiskid layer is less than 1 millimeter.
8. building inner support list column joist system according to claim 1, characterized in that the outside of the vertical guide rod Lower section on face and positioned at vertical guide sleeve is equipped with lower position block.
9. building inner support list column joist system according to claim 1, characterized in that if the column top is equipped with The dry column mounting holes being equally spaced from top to bottom, the installation body are installed equipped with body corresponding with column mounting holes Hole.
CN201610698796.1A 2016-08-20 2016-08-20 Build inner support list column joist system Active CN106284370B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610698796.1A CN106284370B (en) 2016-08-20 2016-08-20 Build inner support list column joist system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610698796.1A CN106284370B (en) 2016-08-20 2016-08-20 Build inner support list column joist system

Publications (2)

Publication Number Publication Date
CN106284370A CN106284370A (en) 2017-01-04
CN106284370B true CN106284370B (en) 2018-07-13

Family

ID=57660908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610698796.1A Active CN106284370B (en) 2016-08-20 2016-08-20 Build inner support list column joist system

Country Status (1)

Country Link
CN (1) CN106284370B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107588665B (en) * 2017-10-19 2023-07-25 河南理工大学 Column type frame structure for kiln car
CN108755706B (en) * 2018-08-23 2023-12-12 东莞市建筑科学研究院有限公司 Movable foundation pit inner support system and foundation pit construction method
CN112609702B (en) * 2020-12-01 2022-06-28 中国建筑第八工程局有限公司 Early-dismantling enclosure system and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100376589B1 (en) * 1999-10-30 2003-03-26 삼성중공업 주식회사 Underground construction method using permanent reinforced concrete girders as temporary struts
CN203256751U (en) * 2013-05-22 2013-10-30 中国建筑第八工程局有限公司 Deep foundation pit supporting structure for soft soil foundation
CN203361170U (en) * 2013-07-11 2013-12-25 东通岩土科技(杭州)有限公司 Supporting upright column pile for building foundation pit support
CN203403422U (en) * 2013-06-06 2014-01-22 广西建工集团第五建筑工程有限责任公司 Long-span reinforced concrete inner support structure of rectangular deep foundation pit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100376589B1 (en) * 1999-10-30 2003-03-26 삼성중공업 주식회사 Underground construction method using permanent reinforced concrete girders as temporary struts
CN203256751U (en) * 2013-05-22 2013-10-30 中国建筑第八工程局有限公司 Deep foundation pit supporting structure for soft soil foundation
CN203403422U (en) * 2013-06-06 2014-01-22 广西建工集团第五建筑工程有限责任公司 Long-span reinforced concrete inner support structure of rectangular deep foundation pit
CN203361170U (en) * 2013-07-11 2013-12-25 东通岩土科技(杭州)有限公司 Supporting upright column pile for building foundation pit support

Also Published As

Publication number Publication date
CN106284370A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106284370B (en) Build inner support list column joist system
CN206052728U (en) A kind of building inner support list column joist structure
CN209854734U (en) Foundation pit supporting device
CN105442399B (en) Track assembles supporting trolley and track assemble method
CN204899947U (en) Subway station formworking jumbo
CN109610474B (en) Multi-platform enclosure structure for ultra-deep foundation pit
CN110424271A (en) Six-direction positioning and quick adjusting device for realizing prefabricated section beam
CN111058647B (en) Assembled building wall and composite beam integrated supporting structure
CN207363604U (en) A kind of portion of tunnel side anchor cable rig auxiliary stand
CN105114102B (en) Subway station formwork jumbo
CN213063045U (en) Supporting frame of assembled building board of encorbelmenting
CN207749421U (en) A kind of regulating device for controlling prefabricated stand column installation verticality
CN205711790U (en) A kind of sliding support and system
CN206798907U (en) A kind of elevator car top leads boots mounting structure
CN220014404U (en) Triangular support mounting structure
CN105437381B (en) Lifting guide rail rolling mechanism for gantry type multi-group wire saw
CN202992540U (en) Adjustable ground foot structure
CN208034561U (en) Push-pull rod height adjustment device
CN215759053U (en) Crown beam formwork erection construction auxiliary structure
CN106759557B (en) Mining area power transmission tower horizontal deformation recovery device
CN220247175U (en) Bracket for rapid assembly of corridor
CN113309339B (en) Frame beam lower scaffold structure with complex structure
CN205443821U (en) Dolly is supported in track equipment
CN219412135U (en) Workshop isolation fence
CN219119266U (en) Tunnel reinforcing supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 310000 Room 1101, 6 Blocks, Chuangzhi Green Valley Development Center, Jianggan District, Hangzhou City, Zhejiang Province

Patentee after: Dongtong Geotechnical Science and Technology Inc.

Address before: 310000 East Hangzhou Building, 59 Chengxing Road, Jianggan District, Hangzhou City, Zhejiang Province, 27th Floor

Patentee before: Dongtong geotechnical Technology (Hangzhou) Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Supporting single column joist system in building

Effective date of registration: 20211111

Granted publication date: 20180713

Pledgee: Hangzhou branch of Zhejiang Tailong Commercial Bank Co.,Ltd.

Pledgor: Dongtong Geotechnical Science and Technology Inc.

Registration number: Y2021330002214

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220608

Granted publication date: 20180713

Pledgee: Hangzhou branch of Zhejiang Tailong Commercial Bank Co.,Ltd.

Pledgor: Dongtong Geotechnical Science and Technology Inc.

Registration number: Y2021330002214

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Supporting single column joist system in buildings

Effective date of registration: 20221201

Granted publication date: 20180713

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Hangzhou Linping sub branch

Pledgor: Dongtong Geotechnical Science and Technology Inc.

Registration number: Y2022330003353

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20180713

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Hangzhou Linping sub branch

Pledgor: Dongtong Geotechnical Science and Technology Inc.

Registration number: Y2022330003353