CN219412135U - Workshop isolation fence - Google Patents

Workshop isolation fence Download PDF

Info

Publication number
CN219412135U
CN219412135U CN202320515888.7U CN202320515888U CN219412135U CN 219412135 U CN219412135 U CN 219412135U CN 202320515888 U CN202320515888 U CN 202320515888U CN 219412135 U CN219412135 U CN 219412135U
Authority
CN
China
Prior art keywords
fence
frame body
blocks
coaming
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320515888.7U
Other languages
Chinese (zh)
Inventor
王宏祥
魏士强
吴笛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Pinsheng Guardrail Co ltd
Original Assignee
Shandong Pinsheng Guardrail Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Pinsheng Guardrail Co ltd filed Critical Shandong Pinsheng Guardrail Co ltd
Priority to CN202320515888.7U priority Critical patent/CN219412135U/en
Application granted granted Critical
Publication of CN219412135U publication Critical patent/CN219412135U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fencing (AREA)

Abstract

The utility model relates to a workshop isolation fence, which comprises a frame body, rotating blocks and clamping blocks, wherein a fence net is arranged in the frame body, foot plates are arranged at the bottoms of vertical rods at two sides of the frame body, coaming frames are arranged at the tops of the foot plates, a space is reserved between each coaming frame and the bottoms of the vertical rods of the frame body, notches are formed in two sides of each foot plate, the rotating blocks are rotatably arranged in the notches, the clamping blocks are rotatably arranged at the bottoms of the rotating blocks, and rollers are arranged below the clamping blocks; when the fence is isolated, the idler wheels are positioned above the foot plates, and four bricks are placed in the coaming frame. According to the utility model, the fences can be spliced with each other and stably placed on the ground of a factory building, so that the isolation function is realized, the ground of the factory building is not damaged, the fences can be moved back and forth, the fixing is convenient, the isolation areas can be divided again conveniently, the operation by a single person is finished, the structure of the existing fence is improved slightly, the upgrading iteration cost is low, the method can be used in most factory building workshops, and the industrialization prospect is good.

Description

Workshop isolation fence
Technical Field
The utility model relates to the field of workshop fences, in particular to a workshop isolation fence.
Background
The workshop isolation fence is used for dividing a factory building space into different functional areas, such as a production area and a material storage area, and also encloses some automatic production equipment production lines, so that personnel are prevented from entering and being bumped by automatic equipment, a flat mounting plate is welded at the bottom of the existing workshop isolation fence mostly, screw holes are formed in the mounting plate, when the workshop fence is installed, a plurality of holes are drilled in the factory building ground, the screw holes of the fence mounting plate are aligned with drilled holes in the ground, expansion screws are used for penetrating the screw holes and the drilled holes, the fence is fixed on the factory building ground, and then the plurality of fences are spliced one by one to divide different areas.
But the division in different regions can be adjusted according to factory building production conditions, if the materials are more, the storage area is larger, the production equipment is more, the production area is larger, and aiming at the conditions that the fence needs to be detached and reinstalled at different positions, the above-mentioned fixed connection mode is more troublesome in detachment, the fence is inconvenient to carry back and forth during reinstallation, new holes are required to be drilled, holes are reserved on the ground after the fence is detached, and the ground of the factory building is greatly damaged, so that the attractiveness is greatly influenced.
Therefore, there is a need to design a shop isolation fence.
Disclosure of Invention
The utility model aims to provide a workshop isolation fence, which mainly solves the problems in the background art.
The utility model provides a workshop isolation fence which comprises a frame body, rotating blocks and clamping blocks, wherein a fence net is arranged in the frame body, foot plates are arranged at the bottoms of vertical rods at two sides of the frame body, coaming frames are arranged at the tops of the foot plates, a space is reserved between the coaming frames and the bottoms of the vertical rods of the frame body, notches are formed in two sides of the foot plates, the rotating blocks are rotatably arranged in the notches, the clamping blocks are rotatably arranged at the bottoms of the rotating blocks, and idler wheels are arranged below the clamping blocks;
when the fence is isolated, the idler wheels are positioned above the foot plates, and four bricks are placed in the coaming frame.
In a preferred embodiment, the direction of rotation of the clamping blocks is parallel to the foot plate.
In a preferred embodiment, the outer side surfaces of the vertical rods at two sides of the frame body are provided with edge blocks, and round holes are formed in the edge blocks.
In a preferred embodiment, the respective faces of the coaming frame are spaced apart from the bottom of the vertical bars of the frame body.
In a preferred embodiment, the bottom surface of the foot plate is provided with a rubber cleat.
The utility model has the technical effects and advantages that:
the rail can splice each other, more firm place subaerial at the factory building, realize keeping apart the function, do not lead to the fact the destruction to factory building ground, rail round trip movement, fixed convenient, be convenient for divide again and keep apart the region, single operation can, on current rail structure slightly improve can, the upgrading iteration cost is lower, all can use in most factory building workshops, the industrialization prospect is good.
Drawings
Fig. 1 is a front view of an integrated pen;
FIG. 2 is a side view of the foot plate, shroud frame and roller;
FIG. 3 is a side cross-sectional view of the foot plate and the coaming frame;
FIG. 4 is a side cross-sectional view of the foot plate and the coaming frame with the roller rotated up;
FIG. 5 is a top view of the foot plate and the coaming frame;
fig. 6 is a front view of several pens after they are spliced.
Reference numerals illustrate: 1. a frame; 11. edge blocks; 12. a round hole; 13. a fence net; 2. foot plates; 21. a coaming frame; 22. a notch; 23. a rotating block; 24. clamping blocks; 25. a roller; 3. an anti-slip mat.
Detailed Description
The utility model will be described in further detail with reference to the drawings and the detailed description. The embodiments of the utility model have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the utility model in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, and to enable others of ordinary skill in the art to understand the utility model for various embodiments with various modifications as are suited to the particular use contemplated.
1-6, a workshop isolation fence, which comprises a frame body 1, rotating blocks 23 and clamping blocks 24, wherein a fence 13 is arranged in the frame body 1, foot plates 2 are arranged at the bottoms of vertical rods at two sides of the frame body 1, coaming frames 21 are arranged at the tops of the foot plates 2, a space is reserved between the coaming frames 21 and the bottoms of the vertical rods of the frame body 1, notches 22 are arranged at two sides of the foot plates 2, the rotating blocks 23 are rotatably arranged in the notches 22, certain damping sense exists in rotation of the rotating blocks 23, the clamping blocks 24 are rotatably arranged at the bottoms of the rotating blocks 23, and rollers 25 are arranged below the clamping blocks 24;
when the fence is isolated, the roller 25 is positioned above the foot plate 2, four bricks are placed in the coaming frame 21, the bricks play roles of increasing weight and stabilizing the whole fence, the bricks are easy to obtain, and the additional cost and the practicability are high.
The rotation direction of the clamping blocks 24 is parallel to the foot plate 2, and the rollers 25 can move towards any direction below the foot plate 2, so that the universal wheels function, and the whole fence is convenient to move.
The lateral surface of the montant of framework 1 both sides is provided with limit piece 11, is provided with round hole 12 on the limit piece 11, and limit piece 11 plays the effect of butt joint a plurality of frameworks 1, uses the bolt to pass round hole 12, realizes the concatenation with a plurality of frameworks 1.
The spacing between each face of the coaming frame 21 and the bottom of the vertical rod of the frame body 1 is consistent with the thickness of one brick, and four bricks are vertically arranged between the four faces of the coaming frame 21 and the vertical rod of the frame body 1.
The bottom surface of sole 2 is provided with rubber material's slipmat 3, and slipmat 3 plays the effect of increase friction force, makes whole rail can comparatively firm fix subaerial.
When the novel combined type fence is used, a plurality of fences are spliced with each other to divide a factory building area, at the moment, the rollers 25 face upwards, four bricks are placed in the coaming frame 21, and under the combined action of the dead weight of the fences, the weight of the bricks and the anti-slip pad 3, the whole fence is stable, so that the area dividing function is realized;
when the area needs to be adjusted, the fences are separated, the bricks are taken down, the roller 25 is rotated to the lower side, and the fences are moved and adjusted by a single person, so that ground drilling is avoided.
It will be apparent that the described embodiments are only some, but not all, embodiments of the utility model. All other embodiments, which can be made by those skilled in the art and which are included in the embodiments of the present utility model without the inventive step, are intended to be within the scope of the present utility model. Structures, devices and methods of operation not specifically described and illustrated herein, unless otherwise indicated and limited, are implemented according to conventional means in the art.

Claims (5)

1. The workshop isolation fence is characterized by comprising a frame body, rotating blocks and clamping blocks, wherein a fence net is arranged in the frame body, foot plates are arranged at the bottoms of vertical rods at two sides of the frame body, coaming frames are arranged at the tops of the foot plates, a space is reserved between each coaming frame and the bottom of each vertical rod of the frame body, notches are formed in two sides of each foot plate, the rotating blocks are rotatably arranged in the notches, the clamping blocks are rotatably arranged at the bottoms of the rotating blocks, and rollers are arranged below the clamping blocks;
when the fence is isolated, the idler wheels are positioned above the foot plates, and four bricks are placed in the coaming frame.
2. A plant isolation fence according to claim 1 wherein the direction of rotation of the clamp blocks is parallel to the foot plate.
3. The workshop isolation fence according to claim 2, wherein side blocks are arranged on the outer side faces of the vertical rods on two sides of the frame body, and round holes are formed in the side blocks.
4. A workshop isolation fence according to claim 3 wherein each face of the coaming frame is spaced from the bottom of the vertical bar of the frame.
5. The plant-isolation fence of claim 4 wherein the bottom surface of the foot plate is provided with a rubber-made skid-proof pad.
CN202320515888.7U 2023-03-16 2023-03-16 Workshop isolation fence Active CN219412135U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320515888.7U CN219412135U (en) 2023-03-16 2023-03-16 Workshop isolation fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320515888.7U CN219412135U (en) 2023-03-16 2023-03-16 Workshop isolation fence

Publications (1)

Publication Number Publication Date
CN219412135U true CN219412135U (en) 2023-07-25

Family

ID=87240764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320515888.7U Active CN219412135U (en) 2023-03-16 2023-03-16 Workshop isolation fence

Country Status (1)

Country Link
CN (1) CN219412135U (en)

Similar Documents

Publication Publication Date Title
CN210597997U (en) Overhead floor
CN212224316U (en) Assembled building wall
CN219412135U (en) Workshop isolation fence
CN212078601U (en) Scaffold with safety device
CN211895693U (en) A hoist device for roofing panel removes installation
CN116717011A (en) Assembled building and assembling method thereof
CN217076793U (en) Tower crane installation adjusting base
CN216196009U (en) Construction locking device for building steel structure
CN216406362U (en) Supporting and reinforcing device for telegraph pole
CN213927497U (en) Stair template supporting structure
CN213233478U (en) Foundation pit supporting structure
CN213868857U (en) Scaffold frame for building easy to disassemble
CN113756606A (en) Environment-friendly supporting device for installing steel structure for building construction
CN217517903U (en) High-performance early-strength prefabricated part
CN220766196U (en) Cage rail at bottom of construction elevator
CN220226326U (en) Building construction faces limit protection architecture
CN221567987U (en) Building anti-seismic device
CN215803042U (en) Intelligent combined mounting frame for building
CN214143790U (en) Column bottom steel structure component
CN221799153U (en) Civil engineering building pillar
CN218508179U (en) Collapse-preventing supporting device
CN221321905U (en) Basement post-cast strip bearing structure
CN221408355U (en) High stable aluminum alloy bridge
CN206972147U (en) A kind of construction site climbing device
CN216921497U (en) Basement is consolidated and is used unable adjustment base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant