CN106284363A - High-efficiency dangerous rock mass artificial excavation method - Google Patents
High-efficiency dangerous rock mass artificial excavation method Download PDFInfo
- Publication number
- CN106284363A CN106284363A CN201610784006.1A CN201610784006A CN106284363A CN 106284363 A CN106284363 A CN 106284363A CN 201610784006 A CN201610784006 A CN 201610784006A CN 106284363 A CN106284363 A CN 106284363A
- Authority
- CN
- China
- Prior art keywords
- dangerous rock
- rock body
- slag
- subregion
- excavation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000011435 rock Substances 0.000 title claims abstract description 60
- 238000009412 basement excavation Methods 0.000 title claims abstract description 32
- 238000000034 method Methods 0.000 title claims abstract description 23
- 239000002893 slag Substances 0.000 claims abstract description 66
- 238000010276 construction Methods 0.000 claims abstract description 21
- 238000005422 blasting Methods 0.000 claims abstract description 8
- 238000004880 explosion Methods 0.000 claims description 25
- 241001074085 Scophthalmus aquosus Species 0.000 claims description 5
- 239000000945 filler Substances 0.000 claims description 5
- 238000010079 rubber tapping Methods 0.000 claims description 5
- 238000011144 upstream manufacturing Methods 0.000 claims description 5
- 238000012544 monitoring process Methods 0.000 claims description 4
- 230000009514 concussion Effects 0.000 claims description 2
- 238000007599 discharging Methods 0.000 abstract 1
- 238000005192 partition Methods 0.000 abstract 1
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Earth Drilling (AREA)
Abstract
The invention discloses a high-efficiency dangerous rock mass manual excavation method which comprises the steps of constructing a pedestrian path, carrying construction equipment, arranging a slag collecting platform, carrying out partition sequence blasting construction, collecting slag, discharging slag and the like. The method promotes most of the excavation slag to directly roll to the slag collecting platform, effectively reduces the slag collection of the excavation area, greatly reduces the workload of manual slag removal, and further shortens the construction period.
Description
Technical field
The present invention relates to Hydraulic and Hydro-Power Engineering Dangerous Rock Body Treatment process field, be specifically related to a kind of high efficiency Dangerous Rock Body artificial
Excavation method.
Background technology
At present, during the development & construction of Hydraulic and Hydro-Power Engineering, Dangerous Rock Body adverse geological condition is the most common, almost
Each project can more or less relate to the improvement of Dangerous Rock Body.Currently, with respect to the improvement of Dangerous Rock Body, resolution is more,
But macroscopic destruction is still very conventional a kind of resolution.For excavation, current Mechanization Level is higher, rock excavation
Mechanized construction technique also comparative maturity, but engineering also encounters such class Dangerous Rock Body, and they have the feature that
High, steep, process quantities and the scope of operation is little, cannot build Transportation Highway to excavating region, plant equipment is difficult to be transported to construction
The scope of operation.Although this type of Dangerous Rock Body is small, but owing to the scope of operation is little, traffic difficult arrangement, plant equipment is difficult to transport
To operation side, and it is difficult to keep away at operation side quick-fried, and causes do mechanization operation to be difficult to carry out, in such cases, adopt
It is the method having to use by manual work, but, Traditional Man construction method general work is inefficient, consumption of manually slagging tap
Time-consuming more, the construction period is longer, run into geographical position residing for Dangerous Rock Body on major project construct influential situation, then endanger
The duration that processes of rock mass will directly influence the time of completion of engineering.
Summary of the invention
It is desirable to provide a kind of high efficiency Dangerous Rock Body hand excavation's method, with solve that the scope of operation is little and plant equipment without
Method is transported to existing inefficiency when the small-sized Dangerous Rock Body of operation side uses hand excavation's operation, manually slags tap consumption
The problems such as duration, construction period length.
The present invention is achieved by following technical solution:
A kind of high efficiency Dangerous Rock Body hand excavation's method, the method comprises the following steps:
(1) upstream side of Dangerous Rock Body and the topographic and geologic situation in downstream are compared, in the side that topographic and geologic condition is excellent
Sidewalk is to excavation scope of operation top, and locally scaffold is built when cannot build sidewalk in sharp regions;
(2) utilize sidewalk that quick-fried for brill and slag-tapping device are carried to operation side;
(3) shoulder, bottom at Dangerous Rock Body arranges slag charge collection slag platform;
(4) if Dangerous Rock Body to be divided into dried layer subregion, some piecemeals are included in each subregion, according to order from top to bottom
Carrying out the blast working of subregion, the slag charge produced after explosion falls into slag charge collection slag platform, and collection slag platform discontinuity is slagged tap;
(5) carry out supporting after one layer of subregion of excavation, utilize packway as foot after the scope of operation being provided with packway has been excavated
The basis of setting up of hand cradle carries out excavating the supporting in region;
(6) carry out collecting slag at the slag charge of the domatic pocket in Dangerous Rock Body bottom to hoarding;
(7), after having excavated, clear up thoroughly Dangerous Rock Body bottom is domatic.
Described step (4) is divided into following steps:
(4-1) according to horizontal direction and upper left incline direction, Dangerous Rock Body is divided into the piecemeal of some tetragons, towards bottom right
All piecemeals in the same plane of side are divided into a subregion;
(4-2) bury explosion filler underground with the piecemeal in layer subregion, with subregion explosion order from the bottom to top;
(4-3) drop down onto, along natural grade, region of slagging tap every blast working, slag charge with layer by stages, complete with layer subregion explosion
Collect slag after one-tenth and slag tap;
(4-4) step (4-2)-(4-3) is repeated until all subregions are fully completed construction.
Dangerous Rock Body construction period carries out concussion of blasting safety monitoring and the slope stability safety monitoring of construction period.
The height and the width of every layer of piecemeal in described step (4) are 2-8m.
The width of the sidewalk arranged in described step (1) is 1-2m.
Interval blasting time in described step (4-3) is 1-5s.
The invention has the beneficial effects as follows:
Compared with prior art, high efficiency Dangerous Rock Body hand excavation's method that the present invention provides, for " high, steep, place's science and engineering
Journey amount and the scope of operation are little, be difficult to be transported to operation side without traffic, plant equipment " Dangerous Rock Body, dexterously according to " from outward
In, from outward appearance to inner essence, successively peel off " principle, carry out subregion point sequence explosion planning, with batch blast area, reasonable arrangement is quick-fried again
Broken interval time and explosion order, explosion order considers that explosion the most successively, beneficially excavated material are the most permissible after explosion
Naturally tumbling to region of slagging tap along natural grade, it is flat that this method promotes most excavation slag charge directly to tumble to collection slag
Platform, is effectively reduced the collection slag in excavation region, greatly reduces workload of manually skimming, and then shorten the duration.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention of the present invention;
In figure: sequence number 1-18 is excavation in zones and the sequence of excavation of Dangerous Rock Body.
Detailed description of the invention
Below in conjunction with drawings and Examples, technical scheme is described further, but required protection domain
It is not limited to described;
Embodiment 1:
First the upstream side of Dangerous Rock Body and the topographic and geologic situation in downstream is compared before excavation, excellent in topographic and geologic condition
Side build the sidewalk of wide 2m to excavation scope of operation top, locally foot is built when cannot build sidewalk in sharp regions
Hand cradle;Utilize sidewalk that quick-fried for brill and slag-tapping device are carried to operation side;Arrange in the shoulder, bottom of Dangerous Rock Body
Slag charge collection slag platform;If Dangerous Rock Body to be divided into dried layer subregion, in each subregion, include some piecemeals, in shape body as shown in Figure 1,
The height and the width of piecemeal are 8m, construct, by up to according to the principle of " from outer to inner, from outward appearance to inner essence, successively peeling off "
Under order carry out the blast working of subregion, the slag charge produced after explosion falls into slag charge collection slag platform, and collection slag platform discontinuity goes out
Slag, particularly as follows: be divided into the piecemeal of some tetragons, towards side, bottom right according to horizontal direction and upper left incline direction by Dangerous Rock Body
Same plane in all piecemeals be divided into a subregion, Dangerous Rock Body is divided into subregion 1-subregion 18 as shown in Figure 1;With
Layer subregion in piecemeal bury explosion filler underground, with subregion explosion order from the bottom to top;With layer by stages every blast working, interval
Blasting time is 5s, and slag charge drops down onto, along natural grade, region of slagging tap, and collects slag and slag tap after completing with layer subregion explosion;Weight
Multiple construction is until all subregions are fully completed construction;Supporting is carried out, when the scope of operation being provided with packway is excavated after excavating one layer of subregion
Packway is utilized to carry out excavating the supporting in region as the basis of setting up of scaffold after completing;Domatic low to hoarding in Dangerous Rock Body bottom
The slag charge of recess carries out collecting slag;After having excavated, clear up thoroughly Dangerous Rock Body bottom is domatic.
Embodiment 2:
First the upstream side of Dangerous Rock Body and the topographic and geologic situation in downstream is compared before excavation, excellent in topographic and geologic condition
Side build the sidewalk of wide 1m to excavation scope of operation top, locally foot is built when cannot build sidewalk in sharp regions
Hand cradle;Utilize sidewalk that quick-fried for brill and slag-tapping device are carried to operation side;Arrange in the shoulder, bottom of Dangerous Rock Body
Slag charge collection slag platform;If Dangerous Rock Body to be divided into dried layer subregion, in each subregion, include some piecemeals, in shape body as shown in Figure 1,
The height and the width of piecemeal are 2m, construct, by up to according to the principle of " from outer to inner, from outward appearance to inner essence, successively peeling off "
Under order carry out the blast working of subregion, the slag charge produced after explosion falls into slag charge collection slag platform, and collection slag platform discontinuity goes out
Slag, particularly as follows: be divided into the piecemeal of some tetragons, towards side, bottom right according to horizontal direction and upper left incline direction by Dangerous Rock Body
Same plane in all piecemeals be divided into a subregion, Dangerous Rock Body is divided into subregion 1-subregion 18 as shown in Figure 1;With
Layer subregion in piecemeal bury explosion filler underground, with subregion explosion order from the bottom to top;With layer by stages every blast working, interval
Blasting time is 1s, and slag charge drops down onto, along natural grade, region of slagging tap, and collects slag and slag tap after completing with layer subregion explosion;Weight
Multiple construction is until all subregions are fully completed construction;Supporting is carried out, when the scope of operation being provided with packway is excavated after excavating one layer of subregion
Packway is utilized to carry out excavating the supporting in region as the basis of setting up of scaffold after completing;Domatic low to hoarding in Dangerous Rock Body bottom
The slag charge of recess carries out collecting slag;After having excavated, clear up thoroughly Dangerous Rock Body bottom is domatic.
Embodiment 3:
First the upstream side of Dangerous Rock Body and the topographic and geologic situation in downstream is compared before excavation, excellent in topographic and geologic condition
Side build the sidewalk of wide 1.5m to excavation scope of operation top, locally sharp regions is built when cannot build sidewalk
Scaffold;Utilize sidewalk that quick-fried for brill and slag-tapping device are carried to operation side;Set in the shoulder, bottom of Dangerous Rock Body
Put slag charge collection slag platform;If Dangerous Rock Body to be divided into dried layer subregion, include some piecemeals in each subregion, in shape as shown in Figure 1
Body, the height and the width of piecemeal are 5m, according to " from outer to inner, from outward appearance to inner essence, successively peel off " principle construct, by
Order under up to carries out the blast working of subregion, and the slag charge produced after explosion falls into slag charge collection slag platform, and collection slag platform is interrupted
Property is slagged tap, particularly as follows: Dangerous Rock Body is divided into the piecemeal of some tetragons according to horizontal direction and upper left incline direction, towards bottom right
All piecemeals in the same plane of side are divided into a subregion, and Dangerous Rock Body is divided into subregion 1-subregion as shown in Figure 1
18;Bury explosion filler underground with the piecemeal in layer subregion, with subregion explosion order from the bottom to top;Execute with layer by stages flame proof is broken
Work, interval blasting time is 3.5s, and slag charge drops down onto, along natural grade, region of slagging tap, and collects slag and go forward side by side after completing with layer subregion explosion
Row is slagged tap;Repeat construction until all subregions are fully completed construction;Supporting is carried out, when the work being provided with packway after excavating one layer of subregion
Industry face utilizes packway to carry out excavating the supporting in region as the basis of setting up of scaffold after having excavated;To hoarding under Dangerous Rock Body
The slag charge of the domatic pocket in portion carries out collecting slag;After having excavated, clear up thoroughly Dangerous Rock Body bottom is domatic.
Claims (6)
1. high efficiency Dangerous Rock Body hand excavation's method, it is characterised in that: the method comprises the following steps:
(1) comparing the upstream side of Dangerous Rock Body and the topographic and geologic situation in downstream, the side excellent in topographic and geologic condition is built
Sidewalk is to excavation scope of operation top, and locally scaffold is built when cannot build sidewalk in sharp regions;
(2) utilize sidewalk that quick-fried for brill and slag-tapping device are carried to operation side;
(3) shoulder, bottom at Dangerous Rock Body arranges slag charge collection slag platform;
(4) if Dangerous Rock Body to be divided into dried layer subregion, including some piecemeals in each subregion, carrying out according to order from top to bottom
The blast working of subregion, the slag charge produced after explosion falls into slag charge collection slag platform, and collection slag platform discontinuity is slagged tap;
(5) carry out supporting after one layer of subregion of excavation, utilize packway as scaffold after the scope of operation being provided with packway has been excavated
Set up basis carry out excavate region supporting;
(6) carry out collecting slag at the slag charge of the domatic pocket in Dangerous Rock Body bottom to hoarding;
(7), after having excavated, clear up thoroughly Dangerous Rock Body bottom is domatic.
High efficiency Dangerous Rock Body hand excavation's method the most according to claim 1, it is characterised in that: described step (4) is divided into
Following steps:
(4-1) according to horizontal direction and upper left incline direction, Dangerous Rock Body is divided into the piecemeal of some tetragons, towards side, bottom right
Same plane in all piecemeals be divided into a subregion;
(4-2) bury explosion filler underground with the piecemeal in layer subregion, with subregion explosion order from the bottom to top;
(4-3) drop down onto, along natural grade, region of slagging tap every blast working, slag charge with layer by stages, after completing with layer subregion explosion
Collection slag is also slagged tap;
(4-4) step (4-2)-(4-3) is repeated until all subregions are fully completed construction.
High efficiency Dangerous Rock Body hand excavation's method the most according to claim 1, it is characterised in that: Dangerous Rock Body construction period does
The concussion of blasting safety monitoring of good construction period and slope stability safety monitoring.
High efficiency Dangerous Rock Body hand excavation's method the most according to claim 1, it is characterised in that: in described step (4)
The height and the width of every layer of piecemeal are 2-8m.
High efficiency Dangerous Rock Body hand excavation's method the most according to claim 1, it is characterised in that: described step sets in (1)
The width of the sidewalk put is 1-2m.
High efficiency Dangerous Rock Body hand excavation's method the most according to claim 2, it is characterised in that: in described step (4-3)
Interval blasting time be 1-5s.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610784006.1A CN106284363B (en) | 2016-08-31 | 2016-08-31 | High-efficiency dangerous rock mass artificial excavation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610784006.1A CN106284363B (en) | 2016-08-31 | 2016-08-31 | High-efficiency dangerous rock mass artificial excavation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106284363A true CN106284363A (en) | 2017-01-04 |
CN106284363B CN106284363B (en) | 2018-11-27 |
Family
ID=57673232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610784006.1A Active CN106284363B (en) | 2016-08-31 | 2016-08-31 | High-efficiency dangerous rock mass artificial excavation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284363B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108842781A (en) * | 2018-08-06 | 2018-11-20 | 中国电建集团华东勘测设计研究院有限公司 | A kind of Excavation of High And Steep Slopes tap cinder construction method |
CN111981922A (en) * | 2020-08-24 | 2020-11-24 | 中国葛洲坝集团第一工程有限公司 | Construction method for converting dangerous rock control blasting material into dam filling grade ingredient |
CN112459076A (en) * | 2020-11-17 | 2021-03-09 | 中铁二局集团有限公司 | Excavation method for arranging slag discharge access roads in steep cliff arch support slope area |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101148882A (en) * | 2007-10-29 | 2008-03-26 | 中铁二院工程集团有限责任公司 | Stable excavating method for cracked weak rock road cutting high slope |
JP2009150084A (en) * | 2007-12-19 | 2009-07-09 | Nishimatsu Constr Co Ltd | Method of reinforcing slope and method of constructing frame for slope |
JP2012202043A (en) * | 2011-03-24 | 2012-10-22 | Kumagai Gumi Co Ltd | Method for excavating slope of ground |
CN102979103A (en) * | 2012-12-13 | 2013-03-20 | 中国水电顾问集团成都勘测设计研究院 | Step type excavating method for large unloading loose rocky side slope |
CN103850257A (en) * | 2014-03-21 | 2014-06-11 | 中国水电顾问集团成都勘测设计研究院有限公司 | Digging slope body structure used for rock side slope and digging construction method of digging slope body structure |
CN105089058A (en) * | 2015-06-18 | 2015-11-25 | 中国电建集团贵阳勘测设计研究院有限公司 | Method and device for quickly forming slag collecting platform on high and steep slope |
-
2016
- 2016-08-31 CN CN201610784006.1A patent/CN106284363B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101148882A (en) * | 2007-10-29 | 2008-03-26 | 中铁二院工程集团有限责任公司 | Stable excavating method for cracked weak rock road cutting high slope |
JP2009150084A (en) * | 2007-12-19 | 2009-07-09 | Nishimatsu Constr Co Ltd | Method of reinforcing slope and method of constructing frame for slope |
JP2012202043A (en) * | 2011-03-24 | 2012-10-22 | Kumagai Gumi Co Ltd | Method for excavating slope of ground |
CN102979103A (en) * | 2012-12-13 | 2013-03-20 | 中国水电顾问集团成都勘测设计研究院 | Step type excavating method for large unloading loose rocky side slope |
CN103850257A (en) * | 2014-03-21 | 2014-06-11 | 中国水电顾问集团成都勘测设计研究院有限公司 | Digging slope body structure used for rock side slope and digging construction method of digging slope body structure |
CN105089058A (en) * | 2015-06-18 | 2015-11-25 | 中国电建集团贵阳勘测设计研究院有限公司 | Method and device for quickly forming slag collecting platform on high and steep slope |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108842781A (en) * | 2018-08-06 | 2018-11-20 | 中国电建集团华东勘测设计研究院有限公司 | A kind of Excavation of High And Steep Slopes tap cinder construction method |
CN111981922A (en) * | 2020-08-24 | 2020-11-24 | 中国葛洲坝集团第一工程有限公司 | Construction method for converting dangerous rock control blasting material into dam filling grade ingredient |
CN112459076A (en) * | 2020-11-17 | 2021-03-09 | 中铁二局集团有限公司 | Excavation method for arranging slag discharge access roads in steep cliff arch support slope area |
Also Published As
Publication number | Publication date |
---|---|
CN106284363B (en) | 2018-11-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lewis et al. | Roman gold-mining in north-west Spain | |
WO2016045440A1 (en) | Mining method | |
CN102278115A (en) | High-efficiency safe environment-friendly mining method for rare shallow-buried ore layer in irregular strip-shaped distribution | |
CN107013217B (en) | A kind of open coal mine casting bridge-type Pull shovel handling operational method | |
CN103470262A (en) | Mining method of nearly horizontal mineral deposit of opencast coal field by casting and internally dumping | |
CN106284363A (en) | High-efficiency dangerous rock mass artificial excavation method | |
CN104541650B (en) | A kind of open-pit mine stope dynamic reclamation method | |
CN106869936A (en) | It is a kind of to be suitable to the surface mining new method of steep slope topography | |
CN102261249B (en) | Creasing-type sill-pillar-free stage caving stopping method based on steel structured artificial top | |
CN106150509A (en) | A kind of double track tunnel is non-bores quick-fried mechanized construction method | |
CN107237636B (en) | Precious metal inclined ore body mining structure and method | |
CN110159296A (en) | Structural system for controlling deformation of subway shield tunnel and construction method thereof | |
CN103388478B (en) | Forming method for transportation road of bucket shovel applied to open pit coal mine | |
CN104143284A (en) | Deep-concave strip mine production model system | |
CN103726848B (en) | Be applicable to the mining methods of recovery of gentle-inclined/inclthin thin ore body | |
CN112431594A (en) | Green mine construction process | |
CN106089220A (en) | In a kind of water, shield machine arrives and receives structure and method of reseptance | |
CN110080774A (en) | Mine Dry-placed fill mining is fallen based on the vertical medium-length hole retrusive of high-dipping ore block | |
CN109931064A (en) | A kind of independent casting operational method of open coal mine drawing bucket shovel | |
Shaw et al. | Amethyst mining in the Eastern Desert: a preliminary survey at Wadi el-Hudi | |
CN107654232B (en) | The moat ditch collection mine mining methods of inclined orebody | |
CN101158285A (en) | Underground mining method of copper mine | |
CN108331580A (en) | A kind of coal-mining method of clean and effective | |
RU2011149407A (en) | METHOD FOR OPEN DEVELOPMENT OF MINERAL DEPOSITS DEPOSITS WITH CREATION OF DUMP OF LARGE CAPACITY AND HEIGHT IN DIFFICULT CONDITIONS | |
Marinin et al. | State-of-Art of mine engineering reclamation while developing of steep-dipping ore fields |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |