CN108331580A - A kind of coal-mining method of clean and effective - Google Patents

A kind of coal-mining method of clean and effective Download PDF

Info

Publication number
CN108331580A
CN108331580A CN201711290893.8A CN201711290893A CN108331580A CN 108331580 A CN108331580 A CN 108331580A CN 201711290893 A CN201711290893 A CN 201711290893A CN 108331580 A CN108331580 A CN 108331580A
Authority
CN
China
Prior art keywords
working face
section working
short section
face
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711290893.8A
Other languages
Chinese (zh)
Other versions
CN108331580B (en
Inventor
张农
谢正正
周俊瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201711290893.8A priority Critical patent/CN108331580B/en
Priority to PCT/CN2018/078771 priority patent/WO2019109535A1/en
Priority to AU2018208634A priority patent/AU2018208634B2/en
Priority to JP2018539320A priority patent/JP6688397B2/en
Priority to US16/080,250 priority patent/US20210189876A1/en
Publication of CN108331580A publication Critical patent/CN108331580A/en
Application granted granted Critical
Publication of CN108331580B publication Critical patent/CN108331580B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/06Filling-up mechanically

Abstract

The present invention is a kind of coal-mining method of clean and effective, is suitable for mine field of solid waste treatment.According to the solid waste discharge amount that mine generates, including underground gangue and ground flyash, the width of short section working face is designed;The first two adjacent short section working faces of filling mining carry out suspension roof support along filling face edge and entity coal side and retain tunnel;The system that the tunnel that two short section working faces retain constitutes long section working face with intermediate coal body;Long section working face is exploited, while jumping both sides short section filling operation face of adopting, the spoil that long section working face generates also is transported to short section working face simultaneously and is filled, to realize the continuous mining system of short face filling mining, long face high winning technology.The present invention can handle all solid waste of grass and underground, reduce the cost of gangue treatment, alleviate the damage to ecological environment, while forming tunnel using solid waste bashing, eliminate coal column, improve the rate of recovery of resource.

Description

A kind of coal-mining method of clean and effective
Technical field
The present invention relates to a kind of coal-mining methods of clean and effective, are particularly suitable for mine field of solid waste treatment.
Background technology
With the continuous integration of national resources, produces ten million ton of large-scale mine per year and be on the increase so that mine generated consolidates The growth of explosion type is presented in body waste, and coal mine solid waste is most importantly gangue, washing spoil, flyash, now The mode of processing is to concentrate air storage mostly, is not only damaged to mining area ecological environment, but also to mining area personnel existence ring It causes to seriously threaten in border.
According to the overall planning of country and requirement, the construction of new-modernization coal mine is China's Dissertation of Development of Coal Industry from now on Direction promotes the target of safety of coal mines low-carbon operation and sustainable development, and therefore, mine solid waste processing mode has to Change, the new model of mining area solid wastes recycling comprehensive utilization need to be explored.In recent years, coal mining enterprise is it is also proposed that the way comprehensively utilized Diameter, for example, solid waste power generation, production construction material, recycling beneficial to mineral products, produce chemical products, improvement soil, production fertilizer, Backfill (including building backfills, fills out low-lying land and wasteland, fills mine goaf, Subsidence Land in Coal Mining Area is reclaimed) is built the road, but not It can thoroughly solve the problems, such as fixed-end forces, still lack a kind of not only quick processing ground solid waste at present but also realize downhole solid The coal-mining method of waste not gug.
Invention content
Technical problem:The purpose of the present invention is overcoming the shortcomings of in prior art, it is solid to provide a kind of both quick processing ground Body waste realizes the coal-mining method of the downhole solid waste not clean and effective of gug again.
Technical solution:To realize the above-mentioned technical purpose, the coal-mining method of clean and effective of the invention, it is characterized in that including such as Lower step:
A. the volume for the solid waste that existing mine generates is calculated, solid waste includes underground gangue and ground Gangue, flyash;
B. the length section working face for filling mine solid waste is arranged in mine field with "nine squares" coal seam, in long section working face Both sides are respectively arranged short section working face I and short section working face II, arrange that the width of shortwall is w, I He of debugging short section working face Coalcutter, hydraulic support in short section working face II and belt-conveying machine equipment, while exploiting short section working face I and short section work Face II fills the gangue generated in the solid waste of existing mine and exploitation in exploitation, to filling face side What edge and entity coal side carried out that suspension roof support retains filling face both sides stays lane;
C. after short section working face I and short section working face II are exploited, using development machine in short section working face I and short section work Make to tunnel out open-off cut between face II, to make what short section working face I, short section working face II retained lane and open-off cut is stayed to constitute Long section working face mining system;
D. exploit long section working face I, at the same shift the winning apparatus of short section working face I to left side short section working face III into The short section working face IV of row exploitation, winning apparatus to the right side of transfer short section working face II is exploited, long section working face mining The gangue of middle generation is also transported in short section working face III and short section working face IV and is filled, after long section working face I is exploited Goaf is formed, goaf is directly caving.
E. after short section working face III and short section working face IV have been exploited, then open-off cut is tunneled respectively, be respectively arranged long section Working face II and long section working face III repeat step d, to realize that short section working face filling mining, long section working face efficiently return The continuous exploitation adopted, and so on, complete the exploitation in entire field with "nine squares" coal seam.
All short section face widths are identical, and using formula w=Q/ (2l*h), w≤60m determines that specific size is by solid Discarded object amount Q is determined, in formula, l is short section face length, and h is short section working face mining height.
All long section face widths are 150m~300m.
The span length retained after the short section working face filling is 4~6m.
Advantageous effect:By adopting the above-described technical solution, the present invention has the following advantages that compared with prior art:
(1) solid waste of mine can be all filled in short section working face, solved ground solid waste stacking and asked Topic, while having reached the not upper well requirement of downhole solid waste again, the cost of gangue treatment is reduced, is alleviated to ecological environment Damage, be conducive to the sustainable development of mine.
(2) after long section working face extraction, the short section working faces of both sides filling mining simultaneously, realize short face filling mining, The continuous mining system of long face high winning technology.
(3) it utilizes solid waste filling short section work face goaf to form tunnel, eliminates coal column, improve returning for resource Yield.
Description of the drawings
Fig. 1 is a kind of short section working face mining schematic diagram of the coal-mining method of clean and effective of the present invention;
Fig. 2 is a kind of length section working face mining schematic diagram of the coal-mining method of clean and effective of the present invention;
Fig. 3 is that grow section working face efficient for the short section working face filling mining of the coal-mining method of clean and effective of the present invention a kind of Back production schematic diagram.
In figure:11- short sections working face I;12- short sections working face II;13- short sections working face III;14- short sections working face IV; 21- long sections working face I;22- long sections working face II;23- long sections working face III;3- stays lane;4- open-off cuts;The goafs 5-.
Specific implementation mode
1-3 is further described one embodiment of the present of invention below in conjunction with the accompanying drawings:
The coal-mining method of the clean and effective of the present invention as shown in Figure 1, Figure 2 and Figure 3, includes the following steps:
A. the volume for the solid waste that existing mine generates is calculated, solid waste includes underground gangue and ground Gangue, flyash;
B. the length section working face 21 for filling mine solid waste, the length section work are arranged in mine field with "nine squares" coal seam It is 150m~300m to make face width, and short section working face I 11 and short section working face II are respectively arranged in the both sides of long section working face 21 12, arrange that the width of shortwall is w, all short section face widths are identical, and using formula w=Q/ (2l*h), w≤60m is true Fixed, specific size is determined by solid waste object amount Q, and in formula, l is short section face length, and h is short section working face mining height; Short section working face I 11 and the coalcutter in short section working face II 12, hydraulic support and belt-conveying machine equipment are debugged, is exploited simultaneously Short section working face I and short section working face II, the bastard coal that will be generated in the solid waste of existing mine and exploitation in exploitation Stone is filled, and lane 3 is stayed to what filling face edge and entity coal side carried out that suspension roof support retains filling face both sides, and described two 3 width of tunnel retained after a short section working face filling is 4~6m;
C. after short section working face I 11 and short section working face II 12 are exploited, using development machine in I 11 He of short section working face Open-off cut 4 is tunneled out between short section working face II 12, to make what short section working face I 11, short section working face II 12 retained to stay Lane and open-off cut 4 constitute long section working face mining system;
D. long section working face I 21 is exploited, while shifting the winning apparatus of short section working face I 11 to the short section working face in left side III 14 are exploited, and the short section working face IV 13 on winning apparatus to the right side of transfer short section working face II 12 is exploited, long section The gangue that working face 21 generates in exploiting, which is also transported in short section working face III 14 and short section working face IV 13, to be filled, long Section working face I 21 forms goaf 5 after exploiting, and goaf is directly caving.
E. after short section working face III 14 and short section working face IV 13 have been exploited, then open-off cut is tunneled respectively, be respectively arranged Long section working face II 22 and long section working face III 23 repeat step d, to realize short section working face filling mining, the work of long section The continuous exploitation of face high winning technology, and so on, complete the exploitation in entire field with "nine squares" coal seam.

Claims (4)

1. a kind of coal-mining method of clean and effective, it is characterized in that including the following steps:
A. the volume for the solid waste that existing mine generates is calculated, solid waste includes underground gangue and ground bastard coal Stone, flyash;
B. the length section working face I (21) for filling mine solid waste is arranged in mine field with "nine squares" coal seam, in long section working face I (21) both sides are respectively arranged short section working face I (11) and short section working face II (12), arrange that the width of shortwall is w, adjust Short section working face I (11) and coalcutter, hydraulic support and belt-conveying machine equipment in short section working face II (12) are tried, is opened simultaneously Short section working face I and short section working face II are adopted, the coal that will be generated in the solid waste of existing mine and exploitation in exploitation Spoil is filled, and carries out suspension roof support to filling face edge and entity coal side and retain filling face both sides to stay lane (3);
C. after short section working face I (11) and short section working face II (12) are exploited, using development machine in short section working face I (11) Open-off cut (4) is tunneled out between short section working face II (12), to make short section working face I (11), short section working face II (12) What is retained stays lane (3) and open-off cut (4) to constitute long section working face mining system;
D. long section working face I (21) is exploited, while shifting the winning apparatus of short section working face I (11) to the short section working face in left side III (14) are exploited, and the short section working face IV (13) on winning apparatus to the right side of transfer short section working face II (12) is opened It adopts, the gangue generated in long section working face I (21) exploitation is also transported to short section working face III (14) and short section working face IV (13) it is filled in, forms goaf (5) after long section working face I (21) exploitation, goaf is directly caving.
E. after short section working face III (14) and short section working face IV (13) have been exploited, then driving open-off cut (4) respectively, difference cloth Long section working face II (22) and long section working face III (23) are set, step d is repeated, to realize short section working face filling mining, length The continuous exploitation of section working face high winning technology, and so on, complete the exploitation in entire field with "nine squares" coal seam.
2. a kind of coal-mining method of clean and effective according to claim 1, it is characterized in that:All short section face width phases Together, using formula w=Q/ (2l*h), w≤60m determines that specific size is determined by solid waste object amount Q, and in formula, l is short section work Make face length, h is short section working face mining height.
3. a kind of coal-mining method of clean and effective according to claim 1, it is characterized in that:The length section face width For 150m~300m.
4. a kind of coal-mining method of clean and effective according to claim 1, it is characterized in that:Two short section working faces Tunnel (3) width retained after filling is 4~6m.
CN201711290893.8A 2017-12-08 2017-12-08 Clean and efficient coal mining method Active CN108331580B (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201711290893.8A CN108331580B (en) 2017-12-08 2017-12-08 Clean and efficient coal mining method
PCT/CN2018/078771 WO2019109535A1 (en) 2017-12-08 2018-03-13 Clean and efficient coal mining method
AU2018208634A AU2018208634B2 (en) 2017-12-08 2018-03-13 Clean and efficient coal mining method
JP2018539320A JP6688397B2 (en) 2017-12-08 2018-03-13 Clean and efficient mining method
US16/080,250 US20210189876A1 (en) 2017-12-08 2018-03-13 Clean and efficient coal mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711290893.8A CN108331580B (en) 2017-12-08 2017-12-08 Clean and efficient coal mining method

Publications (2)

Publication Number Publication Date
CN108331580A true CN108331580A (en) 2018-07-27
CN108331580B CN108331580B (en) 2020-01-10

Family

ID=62923209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711290893.8A Active CN108331580B (en) 2017-12-08 2017-12-08 Clean and efficient coal mining method

Country Status (5)

Country Link
US (1) US20210189876A1 (en)
JP (1) JP6688397B2 (en)
CN (1) CN108331580B (en)
AU (1) AU2018208634B2 (en)
WO (1) WO2019109535A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707380A (en) * 2018-11-09 2019-05-03 内蒙古福城矿业有限公司 A kind of coal anaerobic recovery method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622916B (en) * 2021-07-12 2024-04-09 山东黄金矿业(莱州)有限公司三山岛金矿 Stope point column supporting and reinforcing and recycling method
CN114215591A (en) * 2021-11-30 2022-03-22 中国矿业大学 Method for filling gob-side entry retaining by mixing filling working face roadside gangue and ultrahigh water material

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102230396A (en) * 2011-05-31 2011-11-02 大连大学 Filling method capable of exploring while filling coal mine goaf
CN103437765A (en) * 2013-07-19 2013-12-11 中国矿业大学(北京) Coal mine rock stratum mobile control mining-filling-preserving coupled coordination mining method
CN104775819A (en) * 2015-03-27 2015-07-15 中国矿业大学 Deep inclined coal seam mining roadway mine pressure control mining method
CN104775816A (en) * 2015-02-27 2015-07-15 中国矿业大学 Isolated grouting-filling mining method for overburden rock without village migration under cut-side local pressed-coal conditions
CN105298496A (en) * 2015-12-17 2016-02-03 冀中能源集团有限责任公司 Full-mining and full-filling coal mining method with reserved working face coal pillar

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1145135A1 (en) * 1983-10-31 1985-03-15 Донецкий Ордена Трудового Красного Знамени Политехнический Институт Scraper-planer unit
CN100567703C (en) * 2005-05-19 2009-12-09 兖矿集团有限公司 Comprehensive coal-mining process by using long wall mining method
CN101372891B (en) * 2008-06-10 2010-08-11 沈阳市华祥矿山机械厂 Strip filling integral backstopping coal mining method
CN101737049B (en) * 2008-11-25 2012-06-20 宝钢集团上海梅山有限公司 Multi-working face circulating development driving production organization method
CN101749020A (en) * 2010-01-26 2010-06-23 淄博市王庄煤矿 Forward coal mining by filling method
CN102996131B (en) * 2012-12-10 2014-10-29 中国矿业大学 Solid-filling coal mining method with two pre-excavating tunnels for advancing
CN103993881A (en) * 2014-05-21 2014-08-20 中国矿业大学 Long-wall roadway type cemented filling mining method
CN106522948A (en) * 2016-11-25 2017-03-22 山东科技大学 Short-wall waste rock gluing continuous mining and continuous filling mining method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102230396A (en) * 2011-05-31 2011-11-02 大连大学 Filling method capable of exploring while filling coal mine goaf
CN103437765A (en) * 2013-07-19 2013-12-11 中国矿业大学(北京) Coal mine rock stratum mobile control mining-filling-preserving coupled coordination mining method
CN104775816A (en) * 2015-02-27 2015-07-15 中国矿业大学 Isolated grouting-filling mining method for overburden rock without village migration under cut-side local pressed-coal conditions
CN104775819A (en) * 2015-03-27 2015-07-15 中国矿业大学 Deep inclined coal seam mining roadway mine pressure control mining method
CN105298496A (en) * 2015-12-17 2016-02-03 冀中能源集团有限责任公司 Full-mining and full-filling coal mining method with reserved working face coal pillar

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707380A (en) * 2018-11-09 2019-05-03 内蒙古福城矿业有限公司 A kind of coal anaerobic recovery method

Also Published As

Publication number Publication date
WO2019109535A1 (en) 2019-06-13
JP2020506309A (en) 2020-02-27
AU2018208634A1 (en) 2019-06-27
JP6688397B2 (en) 2020-04-28
AU2018208634B2 (en) 2020-01-02
CN108331580B (en) 2020-01-10
US20210189876A1 (en) 2021-06-24

Similar Documents

Publication Publication Date Title
Zhang et al. Green coal mining technique integrating mining-dressing-gas draining-backfilling-mining
CN108643911B (en) It is a kind of inclination or Steeply dipping narrow deposits boom-type roadheader fall mine success mining method
CN107893658B (en) Big thick ore body stage open stope afterwards filling mining methods in pole under strong ground pressure ring border
CN104775819B (en) Deep inclined coal seam mining roadway mine pressure control mining method
CN105298496B (en) Complete adopt of reserved working face coal column is set to fill coal-mining method entirely
CN102086765B (en) High-sublevel multi-layer mining method of ultrathin copper ore body
CN104863592B (en) A kind of big structure sublevel drill and benching ore removal afterwards filling mining method
CN102587914A (en) Strip-type Wongawilli mining method of coal buried under building
CN104389606A (en) Novel mine mining technical scheme based on environment protection
CN101915100B (en) Loess-filling coal-mining method in a coal mine
CN101749020A (en) Forward coal mining by filling method
CN106930763A (en) A kind of method for filling the residual mining area roadway support coal column of second mining super high seam
CN108756882A (en) A kind of district sublevel entry adopts recovery method without the short length of filling of driving formula
CN105178961A (en) Open-stope subsequent filling mining method in wide stope borehole drilling phase
CA2924919A1 (en) Waste-free comprehensive mining process, wfcm
CN103527196A (en) Method for recovery of room-type coal pillar through loess filling
CN108331580A (en) A kind of coal-mining method of clean and effective
CN102733809B (en) Coal mining method for recovering open-pit coal mine end slope coal
CN110410076A (en) A kind of filling mining method for leaving Pillar Recovery for old pillars of a house goaf
CN103953346A (en) Non-chain-pillar exploitation method
CN109899070A (en) Gently inclined medium thick orebody based on spheroid Ore drawing structure is without the solid waste method of mining by the way of filling
CN109973094B (en) Mine resource same-face full-mining local-filling mining method
CN101158285A (en) Underground mining method of copper mine
CN107237635B (en) A kind of thick solid potassium salt mine recovery method of spy for once adopting full thickness
CN114183140B (en) Mining and filling method for advanced replacement section coal pillar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant