CN108331580A - A kind of coal-mining method of clean and effective - Google Patents
A kind of coal-mining method of clean and effective Download PDFInfo
- Publication number
- CN108331580A CN108331580A CN201711290893.8A CN201711290893A CN108331580A CN 108331580 A CN108331580 A CN 108331580A CN 201711290893 A CN201711290893 A CN 201711290893A CN 108331580 A CN108331580 A CN 108331580A
- Authority
- CN
- China
- Prior art keywords
- working face
- section working
- short section
- face
- coal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/005—Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/06—Filling-up mechanically
Abstract
The present invention is a kind of coal-mining method of clean and effective, is suitable for mine field of solid waste treatment.According to the solid waste discharge amount that mine generates, including underground gangue and ground flyash, the width of short section working face is designed;The first two adjacent short section working faces of filling mining carry out suspension roof support along filling face edge and entity coal side and retain tunnel;The system that the tunnel that two short section working faces retain constitutes long section working face with intermediate coal body;Long section working face is exploited, while jumping both sides short section filling operation face of adopting, the spoil that long section working face generates also is transported to short section working face simultaneously and is filled, to realize the continuous mining system of short face filling mining, long face high winning technology.The present invention can handle all solid waste of grass and underground, reduce the cost of gangue treatment, alleviate the damage to ecological environment, while forming tunnel using solid waste bashing, eliminate coal column, improve the rate of recovery of resource.
Description
Technical field
The present invention relates to a kind of coal-mining methods of clean and effective, are particularly suitable for mine field of solid waste treatment.
Background technology
With the continuous integration of national resources, produces ten million ton of large-scale mine per year and be on the increase so that mine generated consolidates
The growth of explosion type is presented in body waste, and coal mine solid waste is most importantly gangue, washing spoil, flyash, now
The mode of processing is to concentrate air storage mostly, is not only damaged to mining area ecological environment, but also to mining area personnel existence ring
It causes to seriously threaten in border.
According to the overall planning of country and requirement, the construction of new-modernization coal mine is China's Dissertation of Development of Coal Industry from now on
Direction promotes the target of safety of coal mines low-carbon operation and sustainable development, and therefore, mine solid waste processing mode has to
Change, the new model of mining area solid wastes recycling comprehensive utilization need to be explored.In recent years, coal mining enterprise is it is also proposed that the way comprehensively utilized
Diameter, for example, solid waste power generation, production construction material, recycling beneficial to mineral products, produce chemical products, improvement soil, production fertilizer,
Backfill (including building backfills, fills out low-lying land and wasteland, fills mine goaf, Subsidence Land in Coal Mining Area is reclaimed) is built the road, but not
It can thoroughly solve the problems, such as fixed-end forces, still lack a kind of not only quick processing ground solid waste at present but also realize downhole solid
The coal-mining method of waste not gug.
Invention content
Technical problem:The purpose of the present invention is overcoming the shortcomings of in prior art, it is solid to provide a kind of both quick processing ground
Body waste realizes the coal-mining method of the downhole solid waste not clean and effective of gug again.
Technical solution:To realize the above-mentioned technical purpose, the coal-mining method of clean and effective of the invention, it is characterized in that including such as
Lower step:
A. the volume for the solid waste that existing mine generates is calculated, solid waste includes underground gangue and ground
Gangue, flyash;
B. the length section working face for filling mine solid waste is arranged in mine field with "nine squares" coal seam, in long section working face
Both sides are respectively arranged short section working face I and short section working face II, arrange that the width of shortwall is w, I He of debugging short section working face
Coalcutter, hydraulic support in short section working face II and belt-conveying machine equipment, while exploiting short section working face I and short section work
Face II fills the gangue generated in the solid waste of existing mine and exploitation in exploitation, to filling face side
What edge and entity coal side carried out that suspension roof support retains filling face both sides stays lane;
C. after short section working face I and short section working face II are exploited, using development machine in short section working face I and short section work
Make to tunnel out open-off cut between face II, to make what short section working face I, short section working face II retained lane and open-off cut is stayed to constitute
Long section working face mining system;
D. exploit long section working face I, at the same shift the winning apparatus of short section working face I to left side short section working face III into
The short section working face IV of row exploitation, winning apparatus to the right side of transfer short section working face II is exploited, long section working face mining
The gangue of middle generation is also transported in short section working face III and short section working face IV and is filled, after long section working face I is exploited
Goaf is formed, goaf is directly caving.
E. after short section working face III and short section working face IV have been exploited, then open-off cut is tunneled respectively, be respectively arranged long section
Working face II and long section working face III repeat step d, to realize that short section working face filling mining, long section working face efficiently return
The continuous exploitation adopted, and so on, complete the exploitation in entire field with "nine squares" coal seam.
All short section face widths are identical, and using formula w=Q/ (2l*h), w≤60m determines that specific size is by solid
Discarded object amount Q is determined, in formula, l is short section face length, and h is short section working face mining height.
All long section face widths are 150m~300m.
The span length retained after the short section working face filling is 4~6m.
Advantageous effect:By adopting the above-described technical solution, the present invention has the following advantages that compared with prior art:
(1) solid waste of mine can be all filled in short section working face, solved ground solid waste stacking and asked
Topic, while having reached the not upper well requirement of downhole solid waste again, the cost of gangue treatment is reduced, is alleviated to ecological environment
Damage, be conducive to the sustainable development of mine.
(2) after long section working face extraction, the short section working faces of both sides filling mining simultaneously, realize short face filling mining,
The continuous mining system of long face high winning technology.
(3) it utilizes solid waste filling short section work face goaf to form tunnel, eliminates coal column, improve returning for resource
Yield.
Description of the drawings
Fig. 1 is a kind of short section working face mining schematic diagram of the coal-mining method of clean and effective of the present invention;
Fig. 2 is a kind of length section working face mining schematic diagram of the coal-mining method of clean and effective of the present invention;
Fig. 3 is that grow section working face efficient for the short section working face filling mining of the coal-mining method of clean and effective of the present invention a kind of
Back production schematic diagram.
In figure:11- short sections working face I;12- short sections working face II;13- short sections working face III;14- short sections working face IV;
21- long sections working face I;22- long sections working face II;23- long sections working face III;3- stays lane;4- open-off cuts;The goafs 5-.
Specific implementation mode
1-3 is further described one embodiment of the present of invention below in conjunction with the accompanying drawings:
The coal-mining method of the clean and effective of the present invention as shown in Figure 1, Figure 2 and Figure 3, includes the following steps:
A. the volume for the solid waste that existing mine generates is calculated, solid waste includes underground gangue and ground
Gangue, flyash;
B. the length section working face 21 for filling mine solid waste, the length section work are arranged in mine field with "nine squares" coal seam
It is 150m~300m to make face width, and short section working face I 11 and short section working face II are respectively arranged in the both sides of long section working face 21
12, arrange that the width of shortwall is w, all short section face widths are identical, and using formula w=Q/ (2l*h), w≤60m is true
Fixed, specific size is determined by solid waste object amount Q, and in formula, l is short section face length, and h is short section working face mining height;
Short section working face I 11 and the coalcutter in short section working face II 12, hydraulic support and belt-conveying machine equipment are debugged, is exploited simultaneously
Short section working face I and short section working face II, the bastard coal that will be generated in the solid waste of existing mine and exploitation in exploitation
Stone is filled, and lane 3 is stayed to what filling face edge and entity coal side carried out that suspension roof support retains filling face both sides, and described two
3 width of tunnel retained after a short section working face filling is 4~6m;
C. after short section working face I 11 and short section working face II 12 are exploited, using development machine in I 11 He of short section working face
Open-off cut 4 is tunneled out between short section working face II 12, to make what short section working face I 11, short section working face II 12 retained to stay
Lane and open-off cut 4 constitute long section working face mining system;
D. long section working face I 21 is exploited, while shifting the winning apparatus of short section working face I 11 to the short section working face in left side
III 14 are exploited, and the short section working face IV 13 on winning apparatus to the right side of transfer short section working face II 12 is exploited, long section
The gangue that working face 21 generates in exploiting, which is also transported in short section working face III 14 and short section working face IV 13, to be filled, long
Section working face I 21 forms goaf 5 after exploiting, and goaf is directly caving.
E. after short section working face III 14 and short section working face IV 13 have been exploited, then open-off cut is tunneled respectively, be respectively arranged
Long section working face II 22 and long section working face III 23 repeat step d, to realize short section working face filling mining, the work of long section
The continuous exploitation of face high winning technology, and so on, complete the exploitation in entire field with "nine squares" coal seam.
Claims (4)
1. a kind of coal-mining method of clean and effective, it is characterized in that including the following steps:
A. the volume for the solid waste that existing mine generates is calculated, solid waste includes underground gangue and ground bastard coal
Stone, flyash;
B. the length section working face I (21) for filling mine solid waste is arranged in mine field with "nine squares" coal seam, in long section working face I
(21) both sides are respectively arranged short section working face I (11) and short section working face II (12), arrange that the width of shortwall is w, adjust
Short section working face I (11) and coalcutter, hydraulic support and belt-conveying machine equipment in short section working face II (12) are tried, is opened simultaneously
Short section working face I and short section working face II are adopted, the coal that will be generated in the solid waste of existing mine and exploitation in exploitation
Spoil is filled, and carries out suspension roof support to filling face edge and entity coal side and retain filling face both sides to stay lane (3);
C. after short section working face I (11) and short section working face II (12) are exploited, using development machine in short section working face I (11)
Open-off cut (4) is tunneled out between short section working face II (12), to make short section working face I (11), short section working face II (12)
What is retained stays lane (3) and open-off cut (4) to constitute long section working face mining system;
D. long section working face I (21) is exploited, while shifting the winning apparatus of short section working face I (11) to the short section working face in left side
III (14) are exploited, and the short section working face IV (13) on winning apparatus to the right side of transfer short section working face II (12) is opened
It adopts, the gangue generated in long section working face I (21) exploitation is also transported to short section working face III (14) and short section working face IV
(13) it is filled in, forms goaf (5) after long section working face I (21) exploitation, goaf is directly caving.
E. after short section working face III (14) and short section working face IV (13) have been exploited, then driving open-off cut (4) respectively, difference cloth
Long section working face II (22) and long section working face III (23) are set, step d is repeated, to realize short section working face filling mining, length
The continuous exploitation of section working face high winning technology, and so on, complete the exploitation in entire field with "nine squares" coal seam.
2. a kind of coal-mining method of clean and effective according to claim 1, it is characterized in that:All short section face width phases
Together, using formula w=Q/ (2l*h), w≤60m determines that specific size is determined by solid waste object amount Q, and in formula, l is short section work
Make face length, h is short section working face mining height.
3. a kind of coal-mining method of clean and effective according to claim 1, it is characterized in that:The length section face width
For 150m~300m.
4. a kind of coal-mining method of clean and effective according to claim 1, it is characterized in that:Two short section working faces
Tunnel (3) width retained after filling is 4~6m.
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711290893.8A CN108331580B (en) | 2017-12-08 | 2017-12-08 | Clean and efficient coal mining method |
PCT/CN2018/078771 WO2019109535A1 (en) | 2017-12-08 | 2018-03-13 | Clean and efficient coal mining method |
AU2018208634A AU2018208634B2 (en) | 2017-12-08 | 2018-03-13 | Clean and efficient coal mining method |
JP2018539320A JP6688397B2 (en) | 2017-12-08 | 2018-03-13 | Clean and efficient mining method |
US16/080,250 US20210189876A1 (en) | 2017-12-08 | 2018-03-13 | Clean and efficient coal mining method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711290893.8A CN108331580B (en) | 2017-12-08 | 2017-12-08 | Clean and efficient coal mining method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108331580A true CN108331580A (en) | 2018-07-27 |
CN108331580B CN108331580B (en) | 2020-01-10 |
Family
ID=62923209
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711290893.8A Active CN108331580B (en) | 2017-12-08 | 2017-12-08 | Clean and efficient coal mining method |
Country Status (5)
Country | Link |
---|---|
US (1) | US20210189876A1 (en) |
JP (1) | JP6688397B2 (en) |
CN (1) | CN108331580B (en) |
AU (1) | AU2018208634B2 (en) |
WO (1) | WO2019109535A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109707380A (en) * | 2018-11-09 | 2019-05-03 | 内蒙古福城矿业有限公司 | A kind of coal anaerobic recovery method |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113622916B (en) * | 2021-07-12 | 2024-04-09 | 山东黄金矿业(莱州)有限公司三山岛金矿 | Stope point column supporting and reinforcing and recycling method |
CN114215591A (en) * | 2021-11-30 | 2022-03-22 | 中国矿业大学 | Method for filling gob-side entry retaining by mixing filling working face roadside gangue and ultrahigh water material |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102230396A (en) * | 2011-05-31 | 2011-11-02 | 大连大学 | Filling method capable of exploring while filling coal mine goaf |
CN103437765A (en) * | 2013-07-19 | 2013-12-11 | 中国矿业大学(北京) | Coal mine rock stratum mobile control mining-filling-preserving coupled coordination mining method |
CN104775819A (en) * | 2015-03-27 | 2015-07-15 | 中国矿业大学 | Deep inclined coal seam mining roadway mine pressure control mining method |
CN104775816A (en) * | 2015-02-27 | 2015-07-15 | 中国矿业大学 | Isolated grouting-filling mining method for overburden rock without village migration under cut-side local pressed-coal conditions |
CN105298496A (en) * | 2015-12-17 | 2016-02-03 | 冀中能源集团有限责任公司 | Full-mining and full-filling coal mining method with reserved working face coal pillar |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1145135A1 (en) * | 1983-10-31 | 1985-03-15 | Донецкий Ордена Трудового Красного Знамени Политехнический Институт | Scraper-planer unit |
CN100567703C (en) * | 2005-05-19 | 2009-12-09 | 兖矿集团有限公司 | Comprehensive coal-mining process by using long wall mining method |
CN101372891B (en) * | 2008-06-10 | 2010-08-11 | 沈阳市华祥矿山机械厂 | Strip filling integral backstopping coal mining method |
CN101737049B (en) * | 2008-11-25 | 2012-06-20 | 宝钢集团上海梅山有限公司 | Multi-working face circulating development driving production organization method |
CN101749020A (en) * | 2010-01-26 | 2010-06-23 | 淄博市王庄煤矿 | Forward coal mining by filling method |
CN102996131B (en) * | 2012-12-10 | 2014-10-29 | 中国矿业大学 | Solid-filling coal mining method with two pre-excavating tunnels for advancing |
CN103993881A (en) * | 2014-05-21 | 2014-08-20 | 中国矿业大学 | Long-wall roadway type cemented filling mining method |
CN106522948A (en) * | 2016-11-25 | 2017-03-22 | 山东科技大学 | Short-wall waste rock gluing continuous mining and continuous filling mining method |
-
2017
- 2017-12-08 CN CN201711290893.8A patent/CN108331580B/en active Active
-
2018
- 2018-03-13 JP JP2018539320A patent/JP6688397B2/en not_active Expired - Fee Related
- 2018-03-13 US US16/080,250 patent/US20210189876A1/en not_active Abandoned
- 2018-03-13 WO PCT/CN2018/078771 patent/WO2019109535A1/en active Application Filing
- 2018-03-13 AU AU2018208634A patent/AU2018208634B2/en not_active Ceased
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102230396A (en) * | 2011-05-31 | 2011-11-02 | 大连大学 | Filling method capable of exploring while filling coal mine goaf |
CN103437765A (en) * | 2013-07-19 | 2013-12-11 | 中国矿业大学(北京) | Coal mine rock stratum mobile control mining-filling-preserving coupled coordination mining method |
CN104775816A (en) * | 2015-02-27 | 2015-07-15 | 中国矿业大学 | Isolated grouting-filling mining method for overburden rock without village migration under cut-side local pressed-coal conditions |
CN104775819A (en) * | 2015-03-27 | 2015-07-15 | 中国矿业大学 | Deep inclined coal seam mining roadway mine pressure control mining method |
CN105298496A (en) * | 2015-12-17 | 2016-02-03 | 冀中能源集团有限责任公司 | Full-mining and full-filling coal mining method with reserved working face coal pillar |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109707380A (en) * | 2018-11-09 | 2019-05-03 | 内蒙古福城矿业有限公司 | A kind of coal anaerobic recovery method |
Also Published As
Publication number | Publication date |
---|---|
WO2019109535A1 (en) | 2019-06-13 |
JP2020506309A (en) | 2020-02-27 |
AU2018208634A1 (en) | 2019-06-27 |
JP6688397B2 (en) | 2020-04-28 |
AU2018208634B2 (en) | 2020-01-02 |
CN108331580B (en) | 2020-01-10 |
US20210189876A1 (en) | 2021-06-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhang et al. | Green coal mining technique integrating mining-dressing-gas draining-backfilling-mining | |
CN108643911B (en) | It is a kind of inclination or Steeply dipping narrow deposits boom-type roadheader fall mine success mining method | |
CN107893658B (en) | Big thick ore body stage open stope afterwards filling mining methods in pole under strong ground pressure ring border | |
CN104775819B (en) | Deep inclined coal seam mining roadway mine pressure control mining method | |
CN105298496B (en) | Complete adopt of reserved working face coal column is set to fill coal-mining method entirely | |
CN102086765B (en) | High-sublevel multi-layer mining method of ultrathin copper ore body | |
CN104863592B (en) | A kind of big structure sublevel drill and benching ore removal afterwards filling mining method | |
CN102587914A (en) | Strip-type Wongawilli mining method of coal buried under building | |
CN104389606A (en) | Novel mine mining technical scheme based on environment protection | |
CN101915100B (en) | Loess-filling coal-mining method in a coal mine | |
CN101749020A (en) | Forward coal mining by filling method | |
CN106930763A (en) | A kind of method for filling the residual mining area roadway support coal column of second mining super high seam | |
CN108756882A (en) | A kind of district sublevel entry adopts recovery method without the short length of filling of driving formula | |
CN105178961A (en) | Open-stope subsequent filling mining method in wide stope borehole drilling phase | |
CA2924919A1 (en) | Waste-free comprehensive mining process, wfcm | |
CN103527196A (en) | Method for recovery of room-type coal pillar through loess filling | |
CN108331580A (en) | A kind of coal-mining method of clean and effective | |
CN102733809B (en) | Coal mining method for recovering open-pit coal mine end slope coal | |
CN110410076A (en) | A kind of filling mining method for leaving Pillar Recovery for old pillars of a house goaf | |
CN103953346A (en) | Non-chain-pillar exploitation method | |
CN109899070A (en) | Gently inclined medium thick orebody based on spheroid Ore drawing structure is without the solid waste method of mining by the way of filling | |
CN109973094B (en) | Mine resource same-face full-mining local-filling mining method | |
CN101158285A (en) | Underground mining method of copper mine | |
CN107237635B (en) | A kind of thick solid potassium salt mine recovery method of spy for once adopting full thickness | |
CN114183140B (en) | Mining and filling method for advanced replacement section coal pillar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||