CN106284363B - High-efficiency dangerous rock mass artificial excavation method - Google Patents
High-efficiency dangerous rock mass artificial excavation method Download PDFInfo
- Publication number
- CN106284363B CN106284363B CN201610784006.1A CN201610784006A CN106284363B CN 106284363 B CN106284363 B CN 106284363B CN 201610784006 A CN201610784006 A CN 201610784006A CN 106284363 B CN106284363 B CN 106284363B
- Authority
- CN
- China
- Prior art keywords
- dangerous rock
- rock body
- slag
- subregion
- explosion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011435 rock Substances 0.000 title claims abstract description 59
- 238000009412 basement excavation Methods 0.000 title claims abstract description 24
- 238000000034 method Methods 0.000 title claims abstract description 19
- 239000002893 slag Substances 0.000 claims abstract description 63
- 238000010276 construction Methods 0.000 claims abstract description 22
- 238000005422 blasting Methods 0.000 claims abstract description 8
- 238000004880 explosion Methods 0.000 claims description 25
- 239000000945 filler Substances 0.000 claims description 5
- 238000010079 rubber tapping Methods 0.000 claims description 5
- 238000011144 upstream manufacturing Methods 0.000 claims description 5
- 238000012544 monitoring process Methods 0.000 claims description 4
- 238000013459 approach Methods 0.000 claims description 2
- 230000009514 concussion Effects 0.000 claims description 2
- 238000007599 discharging Methods 0.000 abstract 1
- 238000005192 partition Methods 0.000 abstract 1
- 238000012545 processing Methods 0.000 description 3
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The invention discloses a high-efficiency dangerous rock mass manual excavation method which comprises the steps of constructing a pedestrian path, carrying construction equipment, arranging a slag collecting platform, carrying out partition sequence blasting construction, collecting slag, discharging slag and the like. The method promotes most of the excavation slag to directly roll to the slag collecting platform, effectively reduces the slag collection of the excavation area, greatly reduces the workload of manual slag removal, and further shortens the construction period.
Description
Technical field
The present invention relates to hydraulic and hydroelectric engineering Dangerous Rock Body Treatment process fields, and in particular to a kind of high efficiency Dangerous Rock Body is artificial
Excavation method.
Background technique
Currently, Dangerous Rock Body adverse geological condition is very common, almost during the development & construction of hydraulic and hydroelectric engineering
Each project more or less can be related to the improvement of Dangerous Rock Body.Currently, the improvement about Dangerous Rock Body, resolution is more,
But macroscopic destruction is still a kind of very common resolution.For excavation, current Mechanization Level is higher, rock excavation
Mechanized construction technique also comparative maturity, but Dangerous Rock Body a kind of so is also encountered in engineering, they have following feature:
High, steep, processing project amount and work surface less, can not build Transportation Highway to excavate region, mechanical equipment is difficult to be transported to construction
Work surface.Such Dangerous Rock Body is although small, but since work surface is little, traffic difficult arrangement, mechanical equipment is difficult to transport
To operation side, and in operation side it is difficult to keep away quick-fried, and do mechanization operation is caused to be difficult to carry out, in such cases, adopted
Manually operation be have to using method, however, traditional artificial construction method general work efficiency is lower, consumption of manually slagging tap
Time-consuming more, the construction period is longer, encounters geographical location locating for Dangerous Rock Body to the influential situation of major project construction, then endangers
The processing duration of rock mass will directly influence the time of completion of engineering.
Summary of the invention
The present invention is intended to provide a kind of high efficiency Dangerous Rock Body hand excavation's method, with solve that work surface is small and mechanical equipment without
Method working efficiency existing when being transported to the small-sized Dangerous Rock Body of operation side using hand excavation's operation is low, consumption of manually slagging tap
The problems such as duration, long construction period.
The present invention is achieved by following technical solution:
A kind of high efficiency Dangerous Rock Body hand excavation's method, this approach includes the following steps:
(1) compare the upstream side of Dangerous Rock Body and the topographic and geologic situation in downstream side, in the side that topographic and geologic condition is excellent
To excavating at the top of work surface, scaffold is built when can not build sidewalk in local sharp regions for sidewalk;
(2) quick-fried and slag-tapping device will be bored using sidewalk be carried to operation side;
(3) slag charge collection slag platform is set in the lower part shoulder of Dangerous Rock Body;
(4) Dangerous Rock Body is divided into several layers subregion, includes several piecemeals in each subregion, according to sequence from top to bottom
The blast working of subregion is carried out, the slag charge generated after explosion falls into slag charge collection slag platform, and collection slag platform discontinuity is slagged tap;
(5) supporting is carried out after excavating one layer of subregion, using riding track as foot after the completion of the work surface for being equipped with riding track is excavated
The supporting of hand cradle set up basis and excavate region;
(6) collection slag is carried out to the slag charge hoarded in Dangerous Rock Body lower part slope surface pocket;
(7) after the completion of excavating, Dangerous Rock Body lower part slope surface is thoroughly cleared up.
The step (4) is divided into following steps:
Dangerous Rock Body is divided into the piecemeal of several quadrangles according to horizontal direction and upper left inclined direction by (4-1), towards bottom right
All piecemeals in the same plane of side are divided into a subregion;
Piecemeal in (4-2) same layer subregion buries explosion filler, with subregion explosion order from the bottom to top;
(4-3) same layer by stages drops down onto region of slagging tap along natural grade every blast working, slag charge, and same layer subregion explosion is complete
At rear collection slag and slag tap;
(4-4) repeats step (4-2)-(4-3) until all subregions are fully completed construction.
Dangerous Rock Body construction period carries out the concussion of blasting safety monitoring and slope stability safety monitoring of construction period.
The height and the width of every layer of piecemeal in the step (4) are 2-8m.
The width for the sidewalk being arranged in the step (1) is 1-2m.
Interval blasting time in the step (4-3) is 1-5s.
The beneficial effects of the invention are as follows:
Compared with prior art, high efficiency Dangerous Rock Body hand excavation's method provided by the invention, for " high, steep, processing work
Journey amount and work surface less, without traffic, mechanical equipment are difficult to be transported to operation side " Dangerous Rock Body, dexterously according to " from outer
It is interior, from outward appearance to inner essence, successively remove " principle, carry out subregion and sequence explosion divided to plan, with batch blast area, and reasonable arrangement is quick-fried
Broken interval time and explosion order, explosion order consider successively explosion from the bottom to top, are conducive to excavated material after explosion
It is tumbled naturally along natural grade to region of slagging tap, it is flat to collection slag that this method promotes most excavation slag charge directly to tumble
Platform is effectively reduced the collection slag for excavating region, greatly reduces workload of manually skimming, and then shorten the duration.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention of the invention;
In figure:Serial number 1-18 is the excavation in zones and sequence of excavation of Dangerous Rock Body.
Specific embodiment
Technical solution of the present invention is described further with reference to the accompanying drawings and embodiments, but required protection scope
It is not limited to described;
Embodiment 1:
Compare the upstream side of Dangerous Rock Body and the topographic and geologic situation in downstream side first before excavating, it is excellent in topographic and geologic condition
Side build the sidewalk of wide 2m to excavating at the top of work surface, foot is built when can not build sidewalk in local sharp regions
Hand cradle;Quick-fried and slag-tapping device, which will be bored, using sidewalk is carried to operation side;It is arranged in the lower part shoulder of Dangerous Rock Body
Slag charge collection slag platform;Dangerous Rock Body is divided into several layers subregion, includes several piecemeals in each subregion, is in shape body as shown in Figure 1,
The height and the width of piecemeal are 8m, are constructed according to the principle of " from outer to inner, from outward appearance to inner essence, successively remove ", by up to
Under sequence carry out the blast working of subregion, the slag charge generated after explosion falls into slag charge collection slag platform, and collection slag platform discontinuity goes out
Slag, specially:Dangerous Rock Body is divided into the piecemeal of several quadrangles according to horizontal direction and upper left inclined direction, towards bottom right side
Same plane in all piecemeals be divided into a subregion, Dangerous Rock Body is divided into subregion 1- subregion 18 as shown in Figure 1;Together
Layer subregion in piecemeal bury explosion filler, with subregion explosion order from the bottom to top;Same layer by stages is every blast working, interval
Blasting time is 5s, and slag charge drops down onto region of slagging tap along natural grade, and slag is collected after the completion of the explosion of same layer subregion and is slagged tap;Weight
Multiple construction is until all subregions are fully completed construction;Supporting is carried out after excavating one layer of subregion, when the work surface for being equipped with riding track is excavated
The supporting set up basis and excavate region using riding track as scaffold after the completion;It is low in Dangerous Rock Body lower part slope surface to hoarding
The slag charge of recess carries out collection slag;After the completion of excavation, Dangerous Rock Body lower part slope surface is thoroughly cleared up.
Embodiment 2:
Compare the upstream side of Dangerous Rock Body and the topographic and geologic situation in downstream side first before excavating, it is excellent in topographic and geologic condition
Side build the sidewalk of wide 1m to excavating at the top of work surface, foot is built when can not build sidewalk in local sharp regions
Hand cradle;Quick-fried and slag-tapping device, which will be bored, using sidewalk is carried to operation side;It is arranged in the lower part shoulder of Dangerous Rock Body
Slag charge collection slag platform;Dangerous Rock Body is divided into several layers subregion, includes several piecemeals in each subregion, is in shape body as shown in Figure 1,
The height and the width of piecemeal are 2m, are constructed according to the principle of " from outer to inner, from outward appearance to inner essence, successively remove ", by up to
Under sequence carry out the blast working of subregion, the slag charge generated after explosion falls into slag charge collection slag platform, and collection slag platform discontinuity goes out
Slag, specially:Dangerous Rock Body is divided into the piecemeal of several quadrangles according to horizontal direction and upper left inclined direction, towards bottom right side
Same plane in all piecemeals be divided into a subregion, Dangerous Rock Body is divided into subregion 1- subregion 18 as shown in Figure 1;Together
Layer subregion in piecemeal bury explosion filler, with subregion explosion order from the bottom to top;Same layer by stages is every blast working, interval
Blasting time is 1s, and slag charge drops down onto region of slagging tap along natural grade, and slag is collected after the completion of the explosion of same layer subregion and is slagged tap;Weight
Multiple construction is until all subregions are fully completed construction;Supporting is carried out after excavating one layer of subregion, when the work surface for being equipped with riding track is excavated
The supporting set up basis and excavate region using riding track as scaffold after the completion;It is low in Dangerous Rock Body lower part slope surface to hoarding
The slag charge of recess carries out collection slag;After the completion of excavation, Dangerous Rock Body lower part slope surface is thoroughly cleared up.
Embodiment 3:
Compare the upstream side of Dangerous Rock Body and the topographic and geologic situation in downstream side first before excavating, it is excellent in topographic and geologic condition
Side build the sidewalk of wide 1.5m to excavating at the top of work surface, local sharp regions are built when can not build sidewalk
Scaffold;Quick-fried and slag-tapping device, which will be bored, using sidewalk is carried to operation side;It is set in the lower part shoulder of Dangerous Rock Body
Set slag charge collection slag platform;Dangerous Rock Body is divided into several layers subregion, includes several piecemeals in each subregion, is in shape as shown in Figure 1
Body, the height and the width of piecemeal are 5m, it constructs according to the principle of " from outer to inner, from outward appearance to inner essence, successively removing ", by
Sequence under carries out the blast working of subregion, and the slag charge generated after explosion falls into slag charge collection slag platform, collection slag platform interruption
Property is slagged tap, specially:Dangerous Rock Body is divided into the piecemeal of several quadrangles according to horizontal direction and upper left inclined direction, towards bottom right
All piecemeals in the same plane of side are divided into a subregion, and Dangerous Rock Body is divided into subregion 1- subregion as shown in Figure 1
18;Piecemeal in same layer subregion buries explosion filler, with subregion explosion order from the bottom to top;Same layer by stages flame proof is broken to be applied
Work, interval blasting time are 3.5s, and slag charge drops down onto region of slagging tap along natural grade, collects slag after the completion of the explosion of same layer subregion and go forward side by side
Row is slagged tap;Construction is repeated until all subregions are fully completed construction;Supporting is carried out after excavating one layer of subregion, when the work for being equipped with riding track
The supporting set up basis and excavate region after the completion of the excavation of industry face using riding track as scaffold;To hoarding under Dangerous Rock Body
The slag charge of portion's slope surface pocket carries out collection slag;After the completion of excavation, Dangerous Rock Body lower part slope surface is thoroughly cleared up.
Claims (5)
1. a kind of high efficiency Dangerous Rock Body hand excavation's method, it is characterised in that:This approach includes the following steps:
(1) compare the upstream side of Dangerous Rock Body and the topographic and geologic situation in downstream side, built in the excellent side of topographic and geologic condition
To excavating at the top of work surface, scaffold is built when can not build sidewalk in local sharp regions for sidewalk;
(2) quick-fried and slag-tapping device will be bored using sidewalk be carried to operation side;
(3) slag charge collection slag platform is set in the lower part shoulder of Dangerous Rock Body;
(4) Dangerous Rock Body is divided into several layers subregion, includes several piecemeals in each subregion, is carried out according to sequence from top to bottom
The blast working of subregion, the slag charge generated after explosion fall into slag charge collection slag platform, and collection slag platform discontinuity is slagged tap;
(5) supporting is carried out after excavating one layer of subregion, using riding track as scaffold after the completion of the work surface for being equipped with riding track is excavated
Set up basis carry out excavate region supporting;
(6) collection slag is carried out to the slag charge hoarded in Dangerous Rock Body lower part slope surface pocket;
(7) after the completion of excavating, Dangerous Rock Body lower part slope surface is thoroughly cleared up;
The step (4) is divided into following steps:
(4-1) is incited somebody to action according to the principle from outer to inner, from outward appearance to inner essence, successively removed, and according to horizontal direction and upper left inclined direction
Dangerous Rock Body is divided into the piecemeal of several quadrangles, and from left top, bottom end direction will be in the division of all piecemeals in same plane to the right
For a subregion;
Piecemeal in (4-2) same layer subregion buries explosion filler, with subregion explosion order from the bottom to top;
(4-3) same layer by stages is every blast working, and slag charge drops down onto region of slagging tap along natural grade, after the completion of same layer subregion explosion
Collection slag is simultaneously slagged tap;
(4-4) repeats step (4-2)-(4-3) until all subregions are fully completed construction.
2. high efficiency Dangerous Rock Body hand excavation's method according to claim 1, it is characterised in that:Dangerous Rock Body construction period does
The concussion of blasting safety monitoring and slope stability safety monitoring of good construction period.
3. high efficiency Dangerous Rock Body hand excavation's method according to claim 1, it is characterised in that:In the step (4)
The height and the width of every layer of piecemeal are 2-8m.
4. high efficiency Dangerous Rock Body hand excavation's method according to claim 1, it is characterised in that:It is set in the step (1)
The width for the sidewalk set is 1-2m.
5. high efficiency Dangerous Rock Body hand excavation's method according to claim 1, it is characterised in that:In the step (4-3)
Interval blasting time be 1-5s.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610784006.1A CN106284363B (en) | 2016-08-31 | 2016-08-31 | High-efficiency dangerous rock mass artificial excavation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610784006.1A CN106284363B (en) | 2016-08-31 | 2016-08-31 | High-efficiency dangerous rock mass artificial excavation method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106284363A CN106284363A (en) | 2017-01-04 |
| CN106284363B true CN106284363B (en) | 2018-11-27 |
Family
ID=57673232
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610784006.1A Active CN106284363B (en) | 2016-08-31 | 2016-08-31 | High-efficiency dangerous rock mass artificial excavation method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106284363B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108842781A (en) * | 2018-08-06 | 2018-11-20 | 中国电建集团华东勘测设计研究院有限公司 | A kind of Excavation of High And Steep Slopes tap cinder construction method |
| CN111981922A (en) * | 2020-08-24 | 2020-11-24 | 中国葛洲坝集团第一工程有限公司 | Construction method for converting dangerous rock control blasting material into dam filling grade ingredient |
| CN112459076A (en) * | 2020-11-17 | 2021-03-09 | 中铁二局集团有限公司 | Excavation method for arranging slag discharge access roads in steep cliff arch support slope area |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101148882A (en) * | 2007-10-29 | 2008-03-26 | 中铁二院工程集团有限责任公司 | Stable excavating method for cracked weak rock road cutting high slope |
| JP2009150084A (en) * | 2007-12-19 | 2009-07-09 | Nishimatsu Constr Co Ltd | Method of reinforcing slope and method of building frame |
| JP5619659B2 (en) * | 2011-03-24 | 2014-11-05 | 株式会社熊谷組 | How to excavate the ground slope |
| CN102979103A (en) * | 2012-12-13 | 2013-03-20 | 中国水电顾问集团成都勘测设计研究院 | Step type excavating method for large unloading loose rocky side slope |
| CN103850257B (en) * | 2014-03-21 | 2015-12-30 | 中国电建集团成都勘测设计研究院有限公司 | For excavation slope body structure and the excavation construction method thereof of rock side slope |
| CN105089058A (en) * | 2015-06-18 | 2015-11-25 | 中国电建集团贵阳勘测设计研究院有限公司 | Method and device for quickly forming slag collecting platform on high and steep slope |
-
2016
- 2016-08-31 CN CN201610784006.1A patent/CN106284363B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN106284363A (en) | 2017-01-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103216238B (en) | A kind of Opencut coal mine mining technique | |
| CN106284363B (en) | High-efficiency dangerous rock mass artificial excavation method | |
| CN109931065B (en) | Open pit coal mine throwing blasting-loosening blasting partition mining method | |
| CN103726848B (en) | Be applicable to the mining methods of recovery of gentle-inclined/inclthin thin ore body | |
| CN109630121B (en) | Steering, developing and transporting system for strip mining area | |
| CN103527196A (en) | Method for recovery of room-type coal pillar through loess filling | |
| CN109931064B (en) | An independent dumping operation method of a dragline in an open-pit coal mine | |
| JP6653493B2 (en) | Rapid tunnel construction method | |
| CN103388478B (en) | Forming method for transportation road of bucket shovel applied to open pit coal mine | |
| CN104541650A (en) | Dynamic reclamation method for open pit mine stope | |
| CN104143284A (en) | A mining model system for deep concave open-pit mines | |
| CN105626068B (en) | Help the method for dismounting of bridge in open coal mine end | |
| RU2011149407A (en) | METHOD FOR OPEN DEVELOPMENT OF MINERAL DEPOSITS DEPOSITS WITH CREATION OF DUMP OF LARGE CAPACITY AND HEIGHT IN DIFFICULT CONDITIONS | |
| CN106089220A (en) | In a kind of water, shield machine arrives and receives structure and method of reseptance | |
| DK2761088T3 (en) | PROCEDURE FOR REMOVAL OF A BALLAST BEARING ON A TRACK | |
| CN118640013B (en) | Multi-directional coordinated ore-dropping mining method for thin ore vein segmented medium-deep holes | |
| JP2020506309A (en) | Clean and efficient coal mining | |
| CN113187502A (en) | Slag discharging method for tunnel construction by drilling and blasting method | |
| CN216342165U (en) | Drilling and blasting method tunnel construction slag device | |
| RU2278261C1 (en) | Method of combined open-cut and underground steeply pitching deposit development | |
| CN108343438B (en) | A mining method for inclined ore body with variable angle cutting trench | |
| RU2118456C1 (en) | Quarry development method | |
| RU2597237C1 (en) | Method of sludge dump location on the territory of future salt dumps | |
| CN107676131A (en) | A kind of solid waste packs filling coal mining method | |
| SU685752A1 (en) | Method of forming dumps |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |