CN106284101A - A kind of Novel rhombus false work - Google Patents

A kind of Novel rhombus false work Download PDF

Info

Publication number
CN106284101A
CN106284101A CN201610677525.8A CN201610677525A CN106284101A CN 106284101 A CN106284101 A CN 106284101A CN 201610677525 A CN201610677525 A CN 201610677525A CN 106284101 A CN106284101 A CN 106284101A
Authority
CN
China
Prior art keywords
iron
steel
side plate
plate
metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610677525.8A
Other languages
Chinese (zh)
Inventor
金少平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610677525.8A priority Critical patent/CN106284101A/en
Publication of CN106284101A publication Critical patent/CN106284101A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Abstract

The invention discloses a kind of Novel rhombus false work, including connecting box, connecting rod, described connection box includes the first connection box, second connects box, 3rd connects box and the 4th connects box, described connecting rod includes head rod, second connecting rod, 3rd connecting rod, 4th connecting rod and the 5th connecting rod, described head rod two end is respectively arranged on the first connection box and the 4th and connects on box, the second described connecting rod two end is respectively arranged on the first connection box and second and connects on box, the 3rd described connecting rod two end is respectively arranged on the first connection box and the 3rd and connects on box, the 4th described connecting rod two end is respectively arranged on the 3rd connection box and the 4th and connects on box, the 5th described connecting rod two end is respectively arranged on the second connection box and the 3rd and connects on box.

Description

A kind of Novel rhombus false work
Technical field
The present invention relates to a kind of rhombus false work, a kind of main truss cradle rhombus for bridge construction is built Build frame.
Technical background
The main truss cradle of bridge construction is to connect box by rhombus false work to form with connecting casing connecting rod, but Some rhombus false works on existing market are with connecting box at present, design unreasonable, after being used for connecting each parts of main truss cradle, as Fruit disassembles if re-using, and its connecting hole (through hole) can destroy, and rhombus false work connection box mostly is one Steel body structure, Heavy Weight, cost is high, time fixing, multiple workmans to lift, and assembles inconvenience, and is installing Hanging Basket master When purlin, it is all in high-altitude, the parts of Heavy Weight, cause the workman of installation abnormally dangerous, imprudence falls down, and will result in weight Big safe thing.
Summary of the invention
The invention provides a kind of Novel rhombus false work.
Present invention aim to address some the rhombus false works on existing market, design unreasonable, be used for connecting Hanging Basket After each parts of main truss, to utilize from new if disassembled, its connecting hole (through hole) can destroy, and rhombus false work is used Connecting box and mostly be a steel body structure, Heavy Weight, cost is high, time fixing, multiple workmans to lift, assembles inconvenience, and And when installing main truss cradle, be all in high-altitude, the parts of Heavy Weight, cause the workman of installation abnormally dangerous, imprudence is fallen Go down, the problem that will result in serious accident.
The technical solution adopted for the present invention to solve the technical problems is: the present invention includes connecting box, connecting rod, described Connecting box and include that the first connection box, the second connection box, the 3rd connection box and the 4th connect box, described connecting rod includes first even Extension bar, the second connecting rod, the 3rd connecting rod, the 4th connecting rod and the 5th connecting rod, described head rod two end sets respectively Connecting box and the 4th in first and connect on box, the second described connecting rod two end is respectively arranged on the first connection box and second and connects box On, the 3rd described connecting rod two end is respectively arranged on the first connection box and the 3rd and connects on box, the 4th described connecting rod two end Being respectively arranged on the 3rd connection box and the 4th to connect on box, the 5th described connecting rod two end is respectively arranged on the second connection box and the 3rd Connecting on box, the first described connection box includes that side plate, base plate, reinforcing plate, reinforced sheet and dividing plate, described side plate include first Side plate and the second side plate, described reinforcing plate include the first reinforcing plate, the second reinforcing plate, the 3rd reinforcing plate, the 4th reinforcing plate, Five reinforcing plates and the 6th reinforcing plate, the first described side plate and the second side plate be located on base plate dual side-edge, the first described reinforcement Plate, the second reinforcing plate and the 3rd reinforcing plate are respectively arranged between the first side plate outside and base plate;Described the 4th reinforcing plate, the 5th Reinforcing plate and the 6th reinforcing plate are respectively arranged on that the second side plate is outside and between base plate, described reinforced sheet include the first reinforced sheet, Second reinforced sheet, the 3rd reinforced sheet, the 4th reinforced sheet, the 5th reinforced sheet, the 6th reinforced sheet, the 7th reinforced sheet and the 8th strengthen Sheet, described the first reinforced sheet, the second reinforced sheet, the 3rd reinforced sheet and the 4th reinforced sheet are respectively arranged on outside the first side plate, institute The 5th reinforced sheet, the 6th reinforced sheet, the 7th reinforced sheet and the 8th reinforced sheet stated are respectively arranged on outside the second side plate, described every Plate includes the first dividing plate, second partition, the 3rd dividing plate, the 4th dividing plate and the 5th dividing plate, described the first dividing plate, second partition, 3rd dividing plate, the 4th dividing plate and the 5th dividing plate are respectively arranged between the first side plate and the second side plate, the first described dividing plate and Longitudinally vertical being located between the first side plate and the second side plate of two dividing plates, the 3rd described dividing plate transverse horizontal is located at the first dividing plate Left side, the 4th described dividing plate transverse horizontal is located on the right side of second partition, the 5th described dividing plate be the most vertically located at the 3rd every Between plate horizontal stroke and base plate;The 4th described connection box includes metal side plate, metal base plate, metal reinforcement strip and metal partion (metp), institute The metal side plate stated includes that the first metal side plate and the second metal side plate, the first described metal side plate and the second metal side plate set On metal base plate dual side-edge, described metal reinforcement strip includes the first metal reinforcement strip, the second metal reinforcement strip, the 3rd metal Reinforced sheet, the 4th metal reinforcement strip, fifth metal reinforced sheet and the 6th metal reinforcement strip, described the first metal reinforcement strip, Two metal reinforcement strip, the 3rd metal reinforcement strip are respectively arranged on outside the first metal side plate, described the 4th metal reinforcement strip, the 5th Metal reinforcement strip, the 6th metal reinforcement strip are respectively arranged on outside the second metal side plate, and described metal partion (metp) includes the first metal Dividing plate, the second metal partion (metp) and the 3rd metal partion (metp), described the first metal partion (metp), the second metal partion (metp) and the 3rd metal partion (metp) Being respectively arranged between the first metal side plate and the second metal side plate, the first described metal partion (metp) transverse horizontal is located at the first metal Between side plate and the second metal side plate, the second described metal partion (metp) and the 3rd metal partion (metp) is the most longitudinally perpendicular is located at the first gold medal Belong between the first metal side plate and second metal side plate on dividing plate top;Described the first metal reinforcement strip, the second metal are strengthened It is respectively equipped with one on sheet, the 3rd metal reinforcement strip, the 4th metal reinforcement strip, fifth metal reinforced sheet and the 6th metal reinforcement strip Through hole, the first metal side plate of its correspondence position is provided with the corresponding through hole connected with the second metal side plate;The first described gold medal Belong to side plate and the second metal side plate top is provided with cover plate;Described metal base plate be shorter in length than the first metal side plate and the second gold medal Belong to the length of side plate;The second described connection box includes iron and steel side plate, iron and steel top board, iron and steel reinforcing plate, iron and steel reinforced sheet and steel Ferrum dividing plate, described iron and steel side plate includes the first iron and steel side plate and the second iron and steel side plate, and described iron and steel reinforcing plate includes first Iron and steel reinforcing plate and the second iron and steel reinforcing plate, iron and steel dividing plate dual side-edge is located at by the first described iron and steel side plate and the second iron and steel side plate On outside, described the first iron and steel reinforcing plate, the second iron and steel reinforcing plate are respectively arranged on iron and steel the lower partition, and described iron and steel is strengthened Sheet include the first iron and steel reinforced sheet, second add the strong sheet of iron and steel, the 3rd iron and steel reinforced sheet, the 4th iron and steel reinforced sheet, the 5th iron and steel add Strong sheet, the 6th iron and steel reinforced sheet and the 7th iron and steel reinforced sheet, described the first iron and steel reinforced sheet, the second iron and steel reinforced sheet and the 3rd Iron and steel reinforced sheet is respectively arranged on outside the first iron and steel side plate, described the 4th iron and steel reinforced sheet, the 5th iron and steel reinforced sheet and the 6th Iron and steel reinforced sheet is respectively arranged on outside the second iron and steel side plate, and the 7th described iron and steel reinforced sheet is located at the one of the first iron and steel reinforcing plate On side, described iron and steel top board is located at the first iron and steel side plate and the second iron and steel side plate top;The first described iron and steel side plate and Two iron and steel lateral plate structures are identical;Described first adds the strong sheet of iron and steel, the second iron and steel reinforced sheet, the 3rd iron and steel reinforced sheet, the 4th steel Being respectively equipped with a through hole on ferrum reinforced sheet, the 5th iron and steel reinforced sheet, the 6th iron and steel reinforced sheet and the 7th iron and steel reinforced sheet, it is right The first iron and steel side plate of position, the second iron and steel side plate and the first iron and steel reinforcing plate is answered to be provided with the through hole of corresponding connection.
The first described side plate and the second lateral plate structure are identical, set respectively at the first described side plate and the second side plate top Having the first angle of chamfer and the second angle of chamfer, be provided with the 3rd angle of chamfer on the right side of the first described side plate bottom, described second is cut sth. askew Angle and the 3rd angle of chamfer constitute an obtuse angle.
Described the first reinforced sheet, the second reinforced sheet, the 3rd reinforced sheet, the 4th reinforced sheet, the 5th reinforced sheet, the 6th strengthen It is respectively equipped with a through hole, on the first side plate of its correspondence position and the second side plate on sheet, the 7th reinforced sheet and the 8th reinforced sheet It is provided with the through hole of corresponding connection.
The invention has the beneficial effects as follows: present configuration is reasonable in design, be particularly suitable for each parts of bridge hanging basket main truss Connection, recycling rate of waterused is high.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram.
Fig. 2 is the structural representation that the present invention first connects box.
Fig. 3 is the plan structure schematic diagram of Fig. 2.
Fig. 4 is the A-A structural representation of Fig. 2.
Fig. 5 is that the present invention the 4th connects box structural representation.
Fig. 6 is the A-A structural representation of Fig. 5.
Fig. 7 is the B-B structural representation of Fig. 5.
Fig. 8 is that the present invention second connects box structural representation.
Fig. 9 is the A-A structural representation of Fig. 8.
Figure 10 is the B-B structural representation of Fig. 8.
Figure 11 is the C-C structural representation of Fig. 8.
Figure 12 is the D-D structural representation of Fig. 8.
Detailed description of the invention
The present invention is further described with embodiment below in conjunction with the accompanying drawings:
As it can be seen, the present invention includes connecting box, connecting rod, described connection box includes that the first connection box 211, second connects box 212, the 3rd connects box 213 and the 4th and connects box 214, described connecting rod include head rod the 311, second connecting rod 312, 3rd connecting rod the 313, the 4th connecting rod 314 and the 5th connecting rod 315, described head rod 311 2 end is respectively arranged on One connects box 211 and the 4th connects on box 214, and the second described connecting rod 312 2 end is respectively arranged on the first connection box 211 and the Two connect on box 212, and the 3rd described connecting rod 313 2 end is respectively arranged on the first connection box 211 and the 3rd and connects on box 213, The 4th described connecting rod 314 2 end is respectively arranged on the 3rd connection box 213 and the 4th and connects on box 214, the 5th described connection Bar 315 2 end is respectively arranged on the second connection box 212 and the 3rd and connects on box 213, the first described connection box 211 include side plate, Base plate 16, reinforcing plate, reinforced sheet and dividing plate, described side plate includes the first side plate 1 and the second side plate 15, described reinforcing plate bag Include the first reinforcing plate the 12, second reinforcing plate the 10, the 3rd reinforcing plate the 8, the 4th reinforcing plate the 22, the 5th reinforcing plate 20 and the 6th reinforcing plate 18, the first described side plate 1 and the second side plate 15 are located on base plate 16 dual side-edge, and the first described reinforcing plate 12, second is strengthened Plate 10 and the 3rd reinforcing plate 8 are respectively arranged between the first side plate 1 outside and base plate 16;Described the 4th reinforcing plate 22, slender acanthopanax Strong plate 20 and the 6th reinforcing plate 18 are respectively arranged between the second side plate 15 outside and base plate 16, and described reinforced sheet includes that first adds Strong sheet the 11, second reinforced sheet the 3, the 3rd reinforced sheet the 9, the 4th reinforced sheet the 5, the 5th reinforced sheet the 21, the 6th reinforced sheet the 19, the 7th is strengthened Sheet and the 8th reinforced sheet 17, first described reinforced sheet the 11, second reinforced sheet the 3, the 3rd reinforced sheet 9 and the 4th reinforced sheet 5 are respectively It is located at the first side plate 1 outside, the 5th described reinforced sheet the 21, the 6th reinforced sheet the 19, the 7th reinforced sheet and the 8th reinforced sheet 17 points Not being located at the second side plate 15 outside, described dividing plate includes the first dividing plate 3, second partition the 4, the 3rd dividing plate the 13, the 4th dividing plate 6 and 5th dividing plate 7, described the first dividing plate 3, second partition 4, the 3rd dividing plate 13, the 4th dividing plate 6 and the 5th dividing plate 7 is respectively arranged on Between side plate 1 and the second side plate 15, what the first described dividing plate 3 and second partition 4 were the most vertical be located at the first side plate 1 and the Between two side plates 15, the 3rd described dividing plate 13 transverse horizontal is located on the left of the first dividing plate 3, the 4th described horizontal water of dividing plate 6 Putting down is located on the right side of second partition 4, and the 5th described dividing plate horizontal stroke 7 is to being vertically located between the 3rd dividing plate horizontal 6 and base plate 16.Described 4th connects box 214 includes that metal side plate, metal base plate 118, metal reinforcement strip and metal partion (metp), described metal side plate include First metal side plate 111 and the second metal side plate 121, the first described metal side plate 111 and the second metal side plate 121 are located at gold Belong on base plate 118 dual side-edge, described metal reinforcement strip include first metal reinforcement strip the 117, second metal reinforcement strip 119, the Three metal reinforcement strip the 116, the 4th metal reinforcement strip 120, fifth metal reinforced sheet 123 and the 6th metal reinforcement strip 125, described First metal reinforcement strip the 117, second metal reinforcement strip the 119, the 3rd metal reinforcement strip 116 is respectively arranged on the first metal side plate 111 Outside, described the 4th metal reinforcement strip 120, fifth metal reinforced sheet the 123, the 6th metal reinforcement strip 125 are respectively arranged on second Metal side plate 121 is outside, described metal partion (metp) include first metal partion (metp) the 114, second metal partion (metp) 113 and the 3rd metal every Plate 115, first described metal partion (metp) the 114, second metal partion (metp) 113 and the 3rd metal partion (metp) 115 are respectively arranged on the first metal Between side plate 111 and the second metal side plate 121, the first described metal partion (metp) 114 transverse horizontal is located at the first metal side plate 111 With second between metal side plate 121, the second described metal partion (metp) 113 and the 3rd metal partion (metp) 114 is the most longitudinally perpendicular is located at Between first metal side plate 111 and second metal side plate 121 on the first metal partion (metp) 114 top.The first described metal is strengthened Sheet the 117, second metal reinforcement strip the 119, the 3rd metal reinforcement strip the 116, the 4th metal reinforcement strip 120, fifth metal reinforced sheet 123 Be respectively equipped with a through hole 122 on the 6th metal reinforcement strip 125, the first metal side plate 111 and the second gold medal of its correspondence position Belong to side plate 121 and be provided with the through hole 122 of corresponding connection.The first described metal side plate 111 and the second metal side plate 121 top set There is cover plate 112.Described metal base plate 118 be shorter in length than the first metal side plate 111 and length of the second metal side plate 121; The second described connection box includes iron and steel side plate, iron and steel top board 132, iron and steel reinforcing plate, iron and steel reinforced sheet and iron and steel dividing plate 135, Described iron and steel side plate includes the first iron and steel side plate 131 and the second iron and steel side plate 1313, and described iron and steel reinforcing plate includes first Iron and steel reinforcing plate 138 and the second iron and steel reinforcing plate 136, the first described iron and steel side plate 131 and the second iron and steel side plate 1313 are located at On iron and steel dividing plate 135 dual side-edge outside, first described iron and steel reinforcing plate the 138, second iron and steel reinforcing plate 136 is respectively arranged on iron and steel Dividing plate 135 bottom, described iron and steel reinforced sheet includes the first iron and steel reinforced sheet 139, second adds the strong sheet of iron and steel the 133, the 3rd iron and steel Reinforced sheet the 134, the 4th iron and steel reinforced sheet the 1314, the 5th iron and steel reinforced sheet the 1310, the 6th iron and steel reinforced sheet 1312 and the 7th iron and steel Reinforced sheet 137, first described iron and steel reinforced sheet the 139, second iron and steel reinforced sheet 133 and the 3rd iron and steel reinforced sheet 134 set respectively Outside in the first iron and steel side plate 131, the 4th described iron and steel reinforced sheet the 1314, the 5th iron and steel reinforced sheet 1310 and the 6th iron and steel add It is outside that strong sheet 1312 is respectively arranged on the second iron and steel side plate 1313, and the 7th described iron and steel reinforced sheet 137 is located at the first iron and steel and is strengthened On the side of plate 138, described iron and steel top board 132 is located on the first iron and steel side plate 131 and the second iron and steel side plate 1313;Described The first iron and steel side plate 131 identical with the second iron and steel side plate 1313 structure;Described first adds the strong sheet of iron and steel, the second iron and steel is strengthened Sheet, the 3rd iron and steel reinforced sheet, the 4th iron and steel reinforced sheet, the 5th iron and steel reinforced sheet, the 6th iron and steel reinforced sheet and the 7th iron and steel are strengthened Being respectively equipped with a through hole 1311 on sheet, the first iron and steel side plate of its correspondence position, the second iron and steel side plate and the first iron and steel are strengthened Plate is provided with the through hole 1311 of corresponding connection.
The first described side plate 1 is identical with the second side plate 16 structure, on the first described side plate 1 and the second side plate 16 top It is respectively equipped with the first angle of chamfer and the second angle of chamfer, on the right side of the first described side plate bottom, is provided with the 3rd angle of chamfer, described Two angles of chamfer and the 3rd angle of chamfer constitute an obtuse angle.
Described first reinforced sheet the 11, second reinforced sheet the 3, the 3rd reinforced sheet the 9, the 4th reinforced sheet the 5, the 5th reinforced sheet 21, It is respectively equipped with a through hole 14, the first side of its correspondence position on 6th reinforced sheet the 19, the 7th reinforced sheet and the 8th reinforced sheet 17 Plate 1 is provided with the corresponding through hole 14 connected with the second side plate 15.

Claims (1)

1. a Novel rhombus false work, it is characterised in that including connecting box, connecting rod, described connection box includes the first connection Box, second connect box, the 3rd connect box and the 4th and connect box, described connecting rod include head rod, the second connecting rod, the Three connecting rods, the 4th connecting rod and the 5th connecting rod, described head rod two end is respectively arranged on the first connection box and the 4th Connecting on box, the second described connecting rod two end is respectively arranged on the first connection box and second and connects on box, the 3rd described connection Bar two end is respectively arranged on the first connection box and the 3rd and connects on box, and the 4th described connecting rod two end is respectively arranged on the 3rd connection box Connecting on box with the 4th, the 5th described connecting rod two end is respectively arranged on the second connection box and the 3rd and connects on box, and described the One connects box includes that side plate, base plate, reinforcing plate, reinforced sheet and dividing plate, described side plate include the first side plate and the second side plate, institute The reinforcing plate stated includes that the first reinforcing plate, the second reinforcing plate, the 3rd reinforcing plate, the 4th reinforcing plate, the 5th reinforcing plate and the 6th add Strong plate, the first described side plate and the second side plate be located on base plate dual side-edge, described the first reinforcing plate, the second reinforcing plate and the Three reinforcing plates are respectively arranged between the first side plate outside and base plate;Described the 4th reinforcing plate, the 5th reinforcing plate and the 6th strengthen Plate is respectively arranged between the second side plate outside and base plate, and described reinforced sheet includes the first reinforced sheet, the second reinforced sheet, Acanthopanan trifoliatus (L.) Merr. Strong sheet, the 4th reinforced sheet, the 5th reinforced sheet, the 6th reinforced sheet, the 7th reinforced sheet and the 8th reinforced sheet, the first described reinforcement Sheet, the second reinforced sheet, the 3rd reinforced sheet and the 4th reinforced sheet are respectively arranged on outside the first side plate, described the 5th reinforced sheet, Six reinforced sheets, the 7th reinforced sheet and the 8th reinforced sheet are respectively arranged on outside the second side plate, described dividing plate include the first dividing plate, Two dividing plates, the 3rd dividing plate, the 4th dividing plate and the 5th dividing plate, described the first dividing plate, second partition, the 3rd dividing plate, the 4th dividing plate And the 5th dividing plate be respectively arranged between the first side plate and the second side plate, longitudinally vertical the setting of the first described dividing plate and second partition Between the first side plate and the second side plate, the 3rd described dividing plate transverse horizontal is located on the left of the first dividing plate, described the 4th every Plate transverse horizontal is located on the right side of second partition, and the 5th described dividing plate is the most vertically located between the 3rd dividing plate horizontal stroke and base plate;Institute The 4th connection box stated includes that metal side plate, metal base plate, metal reinforcement strip and metal partion (metp), described metal side plate include the One metal side plate and the second metal side plate, the first described metal side plate and the second metal side plate are located at metal base plate dual side-edge On, described metal reinforcement strip includes the first metal reinforcement strip, the second metal reinforcement strip, the 3rd metal reinforcement strip, the 4th metal Reinforced sheet, fifth metal reinforced sheet and the 6th metal reinforcement strip, described the first metal reinforcement strip, the second metal reinforcement strip, Three metal reinforcement strip are respectively arranged on outside the first metal side plate, described the 4th metal reinforcement strip, fifth metal reinforced sheet, the 6th Metal reinforcement strip is respectively arranged on outside the second metal side plate, described metal partion (metp) include the first metal partion (metp), the second metal every Plate and the 3rd metal partion (metp), described the first metal partion (metp), the second metal partion (metp) and the 3rd metal partion (metp) are respectively arranged on the first gold medal Belonging between side plate and the second metal side plate, the first described metal partion (metp) transverse horizontal is located at the first metal side plate and the second metal Between side plate, the second described metal partion (metp) and the 3rd metal partion (metp) is the most longitudinally perpendicular is located at the of the first metal partion (metp) top Between one metal side plate and the second metal side plate;Described the first metal reinforcement strip, the second metal reinforcement strip, the 3rd metal are strengthened It is respectively equipped with a through hole, its correspondence position on sheet, the 4th metal reinforcement strip, fifth metal reinforced sheet and the 6th metal reinforcement strip The first metal side plate be provided with the corresponding through hole connected with the second metal side plate;The first described metal side plate and the second metal Side plate top is provided with cover plate;Described metal base plate be shorter in length than the first metal side plate and the length of the second metal side plate;Institute The the second connection box stated includes iron and steel side plate, iron and steel top board, iron and steel reinforcing plate, iron and steel reinforced sheet and iron and steel dividing plate, described steel Ferrum side plate includes the first iron and steel side plate and the second iron and steel side plate, and described iron and steel reinforcing plate includes the first iron and steel reinforcing plate and second Iron and steel reinforcing plate, the first described iron and steel side plate and the second iron and steel side plate be located on iron and steel dividing plate dual side-edge outside, described One iron and steel reinforcing plate, the second iron and steel reinforcing plate are respectively arranged on iron and steel the lower partition, and described iron and steel reinforced sheet includes the first iron and steel Reinforced sheet, second add the strong sheet of iron and steel, the 3rd iron and steel reinforced sheet, the 4th iron and steel reinforced sheet, the 5th iron and steel reinforced sheet, the 6th iron and steel add Strong sheet and the 7th iron and steel reinforced sheet, described the first iron and steel reinforced sheet, the second iron and steel reinforced sheet and the 3rd iron and steel reinforced sheet are respectively Being located at outside the first iron and steel side plate, described the 4th iron and steel reinforced sheet, the 5th iron and steel reinforced sheet and the 6th iron and steel reinforced sheet are respectively Being located at outside the second iron and steel side plate, the 7th described iron and steel reinforced sheet is located on the side of the first iron and steel reinforcing plate, described steel Ferrum top board is located at the first iron and steel side plate and the second iron and steel side plate top;The first described iron and steel side plate and the second iron and steel lateral plate structure Identical;Described first adds the strong sheet of iron and steel, the second iron and steel reinforced sheet, the 3rd iron and steel reinforced sheet, the 4th iron and steel reinforced sheet, the 5th steel It is respectively equipped with a through hole, the first steel of its correspondence position on ferrum reinforced sheet, the 6th iron and steel reinforced sheet and the 7th iron and steel reinforced sheet Ferrum side plate, the second iron and steel side plate and the first iron and steel reinforcing plate are provided with the through hole of corresponding connection;
The first described side plate and the second lateral plate structure are identical, are respectively equipped with at the first described side plate and the second side plate top One angle of chamfer and the second angle of chamfer, be provided with the 3rd angle of chamfer on the right side of the first described side plate bottom, the second described angle of chamfer with 3rd angle of chamfer constitutes an obtuse angle;
Described the first reinforced sheet, the second reinforced sheet, the 3rd reinforced sheet, the 4th reinforced sheet, the 5th reinforced sheet, the 6th reinforced sheet, Being respectively equipped with a through hole on 7th reinforced sheet and the 8th reinforced sheet, the first side plate and second side plate of its correspondence position are provided with The through hole of corresponding connection.
CN201610677525.8A 2015-07-03 2015-07-03 A kind of Novel rhombus false work Pending CN106284101A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610677525.8A CN106284101A (en) 2015-07-03 2015-07-03 A kind of Novel rhombus false work

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510384143.1A CN104947602B (en) 2015-07-03 2015-07-03 A kind of Novel rhombus false work
CN201610677525.8A CN106284101A (en) 2015-07-03 2015-07-03 A kind of Novel rhombus false work

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510384143.1A Division CN104947602B (en) 2015-07-03 2015-07-03 A kind of Novel rhombus false work

Publications (1)

Publication Number Publication Date
CN106284101A true CN106284101A (en) 2017-01-04

Family

ID=54162627

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510384143.1A Active CN104947602B (en) 2015-07-03 2015-07-03 A kind of Novel rhombus false work
CN201610677525.8A Pending CN106284101A (en) 2015-07-03 2015-07-03 A kind of Novel rhombus false work

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201510384143.1A Active CN104947602B (en) 2015-07-03 2015-07-03 A kind of Novel rhombus false work

Country Status (1)

Country Link
CN (2) CN104947602B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586330A (en) * 2008-05-22 2009-11-25 中铁十一局集团第一工程有限公司 Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN201695346U (en) * 2010-06-25 2011-01-05 中铁五局(集团)有限公司 Combination device adopting hydraulic jack mobile walking suspended cradle
CN202595625U (en) * 2012-03-30 2012-12-12 浙江兴土桥梁建设有限公司 Hanging basket main truss for bridge
CN203065974U (en) * 2012-12-18 2013-07-17 中国建筑第七工程局有限公司 Walking device of cantilever suspended basket
JP2015055131A (en) * 2013-09-13 2015-03-23 株式会社安部日鋼工業 Cure method of concrete bridge girder

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4928342B2 (en) * 2007-04-27 2012-05-09 株式会社ピーエス三菱 Corrugated steel web bridge erection device and corrugated steel web bridge erection method
CN201990949U (en) * 2011-03-15 2011-09-28 中国建筑股份有限公司 Axle type advancing device for hanging basket formwork
CN202132663U (en) * 2011-05-20 2012-02-01 陈耀兴 Metal support
CN102352604B (en) * 2011-08-05 2014-01-15 中铁大桥局股份有限公司 Truss sheet unit of steel truss girder, steel truss girder structure and mounting method thereof
JP5546598B2 (en) * 2012-08-31 2014-07-09 今治造船株式会社 Floating body unit, floating body structure assembled by floating body unit, and assembling method of floating body structure
CN204780636U (en) * 2015-07-03 2015-11-18 金少平 Novel rhombus false work

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586330A (en) * 2008-05-22 2009-11-25 中铁十一局集团第一工程有限公司 Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN201695346U (en) * 2010-06-25 2011-01-05 中铁五局(集团)有限公司 Combination device adopting hydraulic jack mobile walking suspended cradle
CN202595625U (en) * 2012-03-30 2012-12-12 浙江兴土桥梁建设有限公司 Hanging basket main truss for bridge
CN203065974U (en) * 2012-12-18 2013-07-17 中国建筑第七工程局有限公司 Walking device of cantilever suspended basket
JP2015055131A (en) * 2013-09-13 2015-03-23 株式会社安部日鋼工業 Cure method of concrete bridge girder

Also Published As

Publication number Publication date
CN104947602A (en) 2015-09-30
CN104947602B (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN104088227A (en) Rear pull rod
CN202012071U (en) Work platform for boring in water
CN106284101A (en) A kind of Novel rhombus false work
CN204780636U (en) Novel rhombus false work
CN205935282U (en) Novel energy dissipation attenuator
CN204753401U (en) Rhombus is connecting box for false work
CN204780637U (en) Novel rhombus false work
CN106245615A (en) A kind of block assembly auxiliary mould
CN207499592U (en) A kind of construction place bounding wall guardrail structure
CN208732444U (en) A kind of molten copper adds copper suspender
CN204662926U (en) A kind of operating platform for steel pipe column top construction operation
CN207121349U (en) Shell ring upset lifting performs device
CN208284524U (en) A kind of lifting lug mounting structure of battery case
CN206957253U (en) A kind of alloy safety net
CN204754238U (en) Movable type hangs handling frame
CN205953424U (en) Jacking stock
CN104963297A (en) Novel rhombic building rack
CN209585653U (en) A kind of detachable c-type assembly unit hoisting structure
CN205034948U (en) Rack formula hanging beam device
CN204475606U (en) A kind of aluminum plate curtain wall system with lightning protection function
CN204571255U (en) Simple and easy hanging basket
CN205590111U (en) Construction elevator attaches wall structure
CN206987192U (en) A kind of crossbeam provided with hoisting structure
CN105002827A (en) Connecting box for rhombic construction frame
CN204847843U (en) Hoist traveling carriage bearing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104