CN106284020A - A kind of waterproofing type kerbstone and construction method thereof - Google Patents

A kind of waterproofing type kerbstone and construction method thereof Download PDF

Info

Publication number
CN106284020A
CN106284020A CN201610765057.XA CN201610765057A CN106284020A CN 106284020 A CN106284020 A CN 106284020A CN 201610765057 A CN201610765057 A CN 201610765057A CN 106284020 A CN106284020 A CN 106284020A
Authority
CN
China
Prior art keywords
kerbstone
cement
adjacent
waterproofing type
carry out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610765057.XA
Other languages
Chinese (zh)
Inventor
郑瀚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610765057.XA priority Critical patent/CN106284020A/en
Publication of CN106284020A publication Critical patent/CN106284020A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/222Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of waterproofing type kerbstone, including kerbstone, described kerbstone is respectively arranged at two ends with connection tenon, described kerbstone section shape is made trapezoidal, and it is equipped with stop water at kerbstone two ends, described adjacent two pieces of kerbstones are directly connected to form side slit, this waterproofing type kerbstone, by arranging connection tenon and fixing hole, adjacent kerbstone is fixedly connected, and between adjacent kerbstone, it is additionally provided with side slit, side slit carries out pouring to reach to seal the effect blocked water by expansive mortar, it is provided with stop water on ground, can be sluiced by stop water, sluicing reaches roadbed once, will not road pavement bad student affect, and by fixing hole and the fixing stretching action of connecting rod, fixation and effect are more preferable.

Description

A kind of waterproofing type kerbstone and construction method thereof
Technical field
The present invention relates to road infrastructure technical field, be specially a kind of waterproofing type kerbstone and construction method thereof.
Background technology
Road construction is one of critical facility of modern capital construction, and road drainage is then the most important thing therein, row If water system can not be discharged by water in time or drainage efficiency is low, bring unnecessary trouble all can to society and name.Road Kerb is to ensure that the important infrastructure that drainage system normally works, and due to the defect of existing drainage system itself, causes road surface The hydrops segment distance that typically can flow along link length direction could enter discharge outlet, during flowing, if kerbstone The situation that water flows can not be stoped, it will cause surface gathered water ooze out arrive the footpath of road both sides or greenbelt etc. other Position, and solve it is critical only that of this problem and footpath and greenbelt are carried out infiltration transformation, improvement project is for current Being unpractical for basic market, improvement cost is high and quantities is big, and therefore, design one can waterproofing type kerbstone be urgently Problem to be solved.
Summary of the invention
For problem above, the invention provides a kind of waterproofing type kerbstone and construction method thereof, it is possible to effectively block water, and Can Fast Installation, can effectively solve the problem in background technology.
For achieving the above object, the present invention provides following technical scheme: a kind of waterproofing type kerbstone, including kerbstone, institute Stating kerbstone and be respectively arranged at two ends with connection tenon, described kerbstone section shape is made trapezoidal, and is equipped with at kerbstone two ends Stop water, described adjacent two pieces of kerbstones are directly connected to form side slit.
Preferably, described kerbstone two ends are equipped with fixing hole, pass through connecting rod between described adjacent kerbstone fixing hole Connect.
Additionally the present invention have also been devised the construction method of a kind of waterproofing type kerbstone, comprises the steps:
(1) carrying out grading, flatness cannot be greater than 0.5 centimetre;
(2) roadbed carries out cement and pours, and carries out cement and pour on the basis of carrying out grading;
(3) kerbstone location, uses double line of ink marker to carry out radially kerbstone installation site and positions, in installation process, sternly Lattice are installed the position of double line of ink marker restriction and are installed, and must not deviate double line of ink marker simultaneously, and in the case of allowing, kerbstone side must Must all on a line of ink marker, opposite side can with relative depature, but irrelevance cannot be greater than 0.3 centimetre;
(4) kerbstone connects, and needs the connection tenon being strictly directed between adjacent kerbstone in kerbstone connection procedure, and And need to add neat slurry inside two pieces of connection tenons;
(5) kerbstone jointing, in the side slit of adjacent kerbstone support, needs to carry out jointing with closely knit mortar, Jointing height flushes with kerbstone height, and in top outline less than kerbstone height;
(6) kerbstone compacting, after kerbstone installation connection completes, needs the side to there being trapezoidal shape prominent to carry out Also rammed earth, and grave mound compacting to be carried out inside stop water, complete kerbstone construction;
(7) detection, after completing kerbstone construction, needs to use horizon rule to carry out kerbstone flatness detection, detection Mode is every 20 meters and carries out detecting once, if it exceeds regulation or design to go to be necessary for being adjusted or laying separately.
Preferably, the requirement that cement pours has two: one, part the most smooth during grading is repaiied Multiple, it is desirable to the smooth maximum after water inlet roadbed cement pours cannot be greater than 0.1 centimetre;Its two, carry out roadbed compacting, prevent The immersion depression of kerbstone, cement pour should select 12% limestone and concrete mix pour, and pouring During note compacting, fraction porosity is less than 15%, and during whole pouring, the thickness poured cannot be less than 20 Centimetre.
Preferably, in described step (4), the purity of cement mortar cannot be less than 90%, and viscosity is between 20-50mD.
Compared with prior art, the invention has the beneficial effects as follows: this waterproofing type kerbstone, by arranging connection tenon with solid Determining hole, be fixedly connected by adjacent kerbstone, and be additionally provided with side slit between adjacent kerbstone, side slit leads to Cross expansive mortar to carry out pouring to reach to seal the effect blocked water, be provided with stop water on ground, it is possible to let out by stop water Water, sluices and reaches roadbed once, will not road pavement bad student affect, and by fixing hole and the fixing stretching action of connecting rod, Fixation and effect are more preferable.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram;
Fig. 2 is cross-sectional view of the present invention.
In figure: 1-kerbstone;2-connects tenon;3-stop water;4-side slit;5-fixing hole;6-connecting rod.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
Embodiment:
Referring to Fig. 1 and Fig. 2, the present invention provides a kind of technical scheme: a kind of waterproofing type kerbstone, including kerbstone 1, institute Stating kerbstone 1 and be respectively arranged at two ends with connection tenon 2, described kerbstone 1 section shape is made trapezoidal, and equal at kerbstone 1 two ends Being provided with stop water 3, described adjacent two pieces of kerbstones 1 are directly connected to form side slit 4.
Preferably, described kerbstone 1 two ends are equipped with fixing hole 5, between the fixing hole 5 on described adjacent kerbstone 1 Connected by connecting rod 6.
The construction method of waterproofing type kerbstone of the present invention, comprises the steps:
(1) carrying out grading, flatness cannot be greater than 0.5 centimetre;
(2) roadbed carries out cement and pours, and carries out cement and pour on the basis of carrying out grading, the requirement that cement pours Have two: one, part the most smooth during grading repaired, it is desirable to water inlet roadbed cement pour after flat Whole maximum cannot be greater than 0.1 centimetre;Its two, carry out roadbed compacting, prevent the immersion depression of kerbstone, cement pours and should select Limestone and the concrete mix of 12% pour, and note compacting during pouring, and fraction porosity is little In 15%, during whole pouring, the thickness poured cannot be less than 20 centimetres;
(3) kerbstone location, uses double line of ink marker to carry out radially kerbstone installation site and positions, in installation process, sternly Lattice are installed the position of double line of ink marker restriction and are installed, and must not deviate double line of ink marker simultaneously, and in the case of allowing, kerbstone side must Must all on a line of ink marker, opposite side can with relative depature, but irrelevance cannot be greater than 0.3 centimetre;
(4) kerbstone connects, and needs the connection tenon being strictly directed between adjacent kerbstone in kerbstone connection procedure, and And need to add neat slurry inside two pieces of connection tenons, and the purity of cement mortar cannot be less than 90%, viscosity is at 20-50mD Between;
(5) kerbstone jointing, in the side slit of adjacent kerbstone support, needs to carry out jointing with closely knit mortar, Jointing height flushes with kerbstone height, and in top outline less than kerbstone height;
(6) kerbstone compacting, after kerbstone installation connection completes, needs the side to there being trapezoidal shape prominent to carry out Also rammed earth, and grave mound compacting to be carried out inside stop water, complete kerbstone construction;
(7) detection, after completing kerbstone construction, needs to use horizon rule to carry out kerbstone flatness detection, detection Mode is every 20 meters and carries out detecting once, if it exceeds regulation or design to go to be necessary for being adjusted or laying separately.
It is an advantage of the current invention that: this waterproofing type kerbstone, by arranging connection tenon and fixing hole, by adjacent curb Stone is fixedly connected, and is additionally provided with side slit between adjacent kerbstone, and side slit is watered by expansive mortar Build to reach to seal the effect blocked water, be provided with stop water on ground, it is possible to sluiced by stop water, sluice and reach roadbed one Under, road pavement bad student will not affect, and by fixing hole and the fixing stretching action of connecting rod, fixation and effect are more Good.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention Any amendment, equivalent and the improvement etc. made within god and principle, should be included within the scope of the present invention.

Claims (5)

1. a waterproofing type kerbstone, it is characterised in that: include that kerbstone (1), described kerbstone (1) are respectively arranged at two ends with connection Tenon (2), described kerbstone (1) section shape is made trapezoidal, and is equipped with stop water (3), described phase at kerbstone (1) two ends Adjacent two pieces of kerbstones (1) are directly connected to form side slit (4).
A kind of waterproofing type kerbstone the most according to claim 1, it is characterised in that: described kerbstone (1) two ends are equipped with Fixing hole (5), is connected by connecting rod (6) between the fixing hole (5) on described adjacent kerbstone (1).
3. the construction method of a waterproofing type kerbstone, it is characterised in that: comprise the steps:
(1) carrying out grading, flatness cannot be greater than 0.5 centimetre;
(2) roadbed carries out cement and pours, and carries out cement and pour on the basis of carrying out grading;
(3) kerbstone location, uses double line of ink marker to carry out radially kerbstone installation site and positions, in installation process, strictly pacify The position that the double line of ink marker of dress limits is installed, and must not deviate double line of ink marker simultaneously, and in the case of allowing, kerbstone side must be complete Portion on a line of ink marker, opposite side can with relative depature, but irrelevance cannot be greater than 0.3 centimetre;
(4) kerbstone connects, and needs the connection tenon being strictly directed between adjacent kerbstone in kerbstone connection procedure, and Need inside two pieces of connection tenons to add neat slurry;
(5) kerbstone jointing, in the side slit of adjacent kerbstone support, needs to carry out jointing, jointing with closely knit mortar Height flushes with kerbstone height, and in top outline less than kerbstone height;
(6) kerbstone compacting, after kerbstone installation connection completes, needs the side to there being trapezoidal shape prominent to carry out earth backing Compacting, and grave mound compacting to be carried out inside stop water, complete kerbstone construction;
(7) detection, after completing kerbstone construction, needs to use horizon rule to carry out kerbstone flatness detection, detection mode Carry out detecting once for every 20 meters, if it exceeds regulation or design to go to be necessary for being adjusted or laying separately.
The construction method of a kind of waterproofing type kerbstone the most according to claim 3, it is characterised in that: the requirement that cement pours Have two: one, part the most smooth during grading repaired, it is desirable to water inlet roadbed cement pour after flat Whole maximum cannot be greater than 0.1 centimetre;Its two, carry out roadbed compacting, prevent the immersion depression of kerbstone, cement pours and should select Limestone and the concrete mix of 12% pour, and note compacting during pouring, and fraction porosity is little In 15%, during whole pouring, the thickness poured cannot be less than 20 centimetres.
The construction method of a kind of waterproofing type kerbstone the most according to claim 3, it is characterised in that: in described step (4) The purity of cement mortar cannot be less than 90%, and viscosity is between 20-50mD.
CN201610765057.XA 2016-08-29 2016-08-29 A kind of waterproofing type kerbstone and construction method thereof Pending CN106284020A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610765057.XA CN106284020A (en) 2016-08-29 2016-08-29 A kind of waterproofing type kerbstone and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610765057.XA CN106284020A (en) 2016-08-29 2016-08-29 A kind of waterproofing type kerbstone and construction method thereof

Publications (1)

Publication Number Publication Date
CN106284020A true CN106284020A (en) 2017-01-04

Family

ID=57675523

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610765057.XA Pending CN106284020A (en) 2016-08-29 2016-08-29 A kind of waterproofing type kerbstone and construction method thereof

Country Status (1)

Country Link
CN (1) CN106284020A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424224A (en) * 2019-07-19 2019-11-08 杭州江润科技有限公司 The construction method of kerbstone

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2284262Y (en) * 1997-02-06 1998-06-17 王海波 Interlocking compound road curb stone
KR20070045383A (en) * 2005-10-27 2007-05-02 김태균 The unit block l-shaped ditch of connection style
KR20110029847A (en) * 2009-09-16 2011-03-23 (주)로드스톤 Road stud and method for construction of as the same
CN105155386A (en) * 2015-08-20 2015-12-16 济南城建集团有限公司 Water blocking type kerb and construction method thereof
CN105239485A (en) * 2015-10-09 2016-01-13 中冶南方工程技术有限公司 Drainage curb stone and asphalt road with drainage structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2284262Y (en) * 1997-02-06 1998-06-17 王海波 Interlocking compound road curb stone
KR20070045383A (en) * 2005-10-27 2007-05-02 김태균 The unit block l-shaped ditch of connection style
KR20110029847A (en) * 2009-09-16 2011-03-23 (주)로드스톤 Road stud and method for construction of as the same
CN105155386A (en) * 2015-08-20 2015-12-16 济南城建集团有限公司 Water blocking type kerb and construction method thereof
CN105239485A (en) * 2015-10-09 2016-01-13 中冶南方工程技术有限公司 Drainage curb stone and asphalt road with drainage structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424224A (en) * 2019-07-19 2019-11-08 杭州江润科技有限公司 The construction method of kerbstone
CN110424224B (en) * 2019-07-19 2021-01-15 杭州江润科技有限公司 Construction method of curb

Similar Documents

Publication Publication Date Title
CN105256876A (en) Siphon type draining system of superhigh excavation section of road
CN111042293A (en) Construction process of road central green belt seepage-proofing drainage structure
CN108824240A (en) A kind of pipe culvert construction method and auxiliary device
CN206844275U (en) Mutual buckle type precast concrete cover ditch and its suspender
CN210262555U (en) Light soil road structure
CN205259214U (en) Pin -connected panel rainwater regulation pond of method of sinking construction
CN207484193U (en) Permeable road structure
CN205134481U (en) Highway superelevation excavation highway section hydrocone type drainage system
CN112012763B (en) Construction method of double-layer primary support multi-arch tunnel structure
CN206581379U (en) A kind of garden way tooth drainage system
CN108589459A (en) Sponge city sectional polyurethane eco-landscape road and construction method
CN106284020A (en) A kind of waterproofing type kerbstone and construction method thereof
CN107724201A (en) Novel water permeable brick structure and paving method
CN206859091U (en) A kind of coarse-grained soil high-fill roadbed discharge structure
CN103726514B (en) The anti-leakage structure of diaphragm wall and anti-seepage construction method
CN110056071A (en) A kind of municipal administration storm sewer assembling module and construction method
CN107700301A (en) A kind of ruggedized construction on express highway roadbed
CN105369739B (en) The method and bridge of the assembled connection of bridge prefabrication structure
CN210140780U (en) Anti-clogging ecological permeable box culvert
CN107338700A (en) For strengthening the permeable structure of permeable pavement fastness
CN107178043A (en) A kind of coarse-grained soil high-fill roadbed discharge structure and its construction technology
CN204491431U (en) Boxboard fabricated structure culvert
CN206034382U (en) Cross a river traffic dam
CN207739096U (en) A kind of pavement of road gutter of side wall infiltration
CN207525575U (en) Novel brick structure permeates water

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170104