CN106283996A - 一种换轨列车作业方法 - Google Patents
一种换轨列车作业方法 Download PDFInfo
- Publication number
- CN106283996A CN106283996A CN201610900655.3A CN201610900655A CN106283996A CN 106283996 A CN106283996 A CN 106283996A CN 201610900655 A CN201610900655 A CN 201610900655A CN 106283996 A CN106283996 A CN 106283996A
- Authority
- CN
- China
- Prior art keywords
- rail
- module
- train
- tracks
- new
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/16—Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/14—Way of locomotion or support
- E01B2203/141—Way of locomotion or support on the track to be treated
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610900655.3A CN106283996B (zh) | 2016-10-17 | 2016-10-17 | 一种换轨列车作业方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610900655.3A CN106283996B (zh) | 2016-10-17 | 2016-10-17 | 一种换轨列车作业方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106283996A true CN106283996A (zh) | 2017-01-04 |
CN106283996B CN106283996B (zh) | 2018-06-01 |
Family
ID=57717280
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610900655.3A Active CN106283996B (zh) | 2016-10-17 | 2016-10-17 | 一种换轨列车作业方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106283996B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111501442A (zh) * | 2020-05-07 | 2020-08-07 | 中铁十四局集团第五工程有限公司 | 新型长轨换轨作业方法 |
CN112900168A (zh) * | 2021-01-22 | 2021-06-04 | 金鹰重型工程机械股份有限公司 | 一体化换轨作业方法 |
CN113073503A (zh) * | 2021-04-06 | 2021-07-06 | 华夏高铁运营维护有限公司 | 一种换焊作业车组和换轨方法 |
CN114892457A (zh) * | 2022-06-28 | 2022-08-12 | 金鹰重型工程机械股份有限公司 | 一体化不切轨更换回收轨枕作业车的施工方法 |
CN117721675A (zh) * | 2023-12-19 | 2024-03-19 | 中铁一局集团有限公司 | 一种大桥上护轨同基本轨换铺入槽的方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5520497A (en) * | 1993-04-21 | 1996-05-28 | Georg Robel G.M.B.H. & Co. | Rail loading train for transporting as well as loading and unloading long rails |
US5630365A (en) * | 1994-05-26 | 1997-05-20 | Georg Robel Gmbh & Co. | Rail loading train for transporting as well as loading and unloading long rails |
CN201678917U (zh) * | 2009-11-23 | 2010-12-22 | 株洲新通铁路装备有限公司 | 一种无缝线路快速换轨作业车 |
CN105155370A (zh) * | 2015-09-30 | 2015-12-16 | 株洲时代电子技术有限公司 | 一种连续换轨作业列车及其作业方法 |
-
2016
- 2016-10-17 CN CN201610900655.3A patent/CN106283996B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5520497A (en) * | 1993-04-21 | 1996-05-28 | Georg Robel G.M.B.H. & Co. | Rail loading train for transporting as well as loading and unloading long rails |
US5630365A (en) * | 1994-05-26 | 1997-05-20 | Georg Robel Gmbh & Co. | Rail loading train for transporting as well as loading and unloading long rails |
CN201678917U (zh) * | 2009-11-23 | 2010-12-22 | 株洲新通铁路装备有限公司 | 一种无缝线路快速换轨作业车 |
CN105155370A (zh) * | 2015-09-30 | 2015-12-16 | 株洲时代电子技术有限公司 | 一种连续换轨作业列车及其作业方法 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111501442A (zh) * | 2020-05-07 | 2020-08-07 | 中铁十四局集团第五工程有限公司 | 新型长轨换轨作业方法 |
CN112900168A (zh) * | 2021-01-22 | 2021-06-04 | 金鹰重型工程机械股份有限公司 | 一体化换轨作业方法 |
CN112900168B (zh) * | 2021-01-22 | 2022-04-22 | 金鹰重型工程机械股份有限公司 | 一体化换轨作业方法 |
CN113073503A (zh) * | 2021-04-06 | 2021-07-06 | 华夏高铁运营维护有限公司 | 一种换焊作业车组和换轨方法 |
CN114892457A (zh) * | 2022-06-28 | 2022-08-12 | 金鹰重型工程机械股份有限公司 | 一体化不切轨更换回收轨枕作业车的施工方法 |
CN117721675A (zh) * | 2023-12-19 | 2024-03-19 | 中铁一局集团有限公司 | 一种大桥上护轨同基本轨换铺入槽的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106283996B (zh) | 2018-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106283996A (zh) | 一种换轨列车作业方法 | |
CN105155370A (zh) | 一种连续换轨作业列车及其作业方法 | |
CN106761808A (zh) | 一种轨道交通暗挖隧道电动有轨运输配套系统 | |
CN101293521A (zh) | 一种集装箱运输方法 | |
CN107226094A (zh) | 一种重载铁路车场“2线夹1机走”线束结构设计 | |
CN102060201B (zh) | 由迁车台侧进出列车的翻车机卸煤装置的布置方法 | |
CN108861641A (zh) | 铁水联运铁路港湾站与港区交换货物的作业系统及方法 | |
CN107338690A (zh) | 一种换轨作业车 | |
CN105314408B (zh) | 一种集装箱码头自动化轨道运输系统及运行方法 | |
CN201024361Y (zh) | 煤矿井下浮放道岔 | |
CN202081913U (zh) | 矿山地下运输车场 | |
CN111501442B (zh) | 新型长轨换轨作业方法 | |
CN206409240U (zh) | 一种轨道交通暗挖隧道电动有轨运输配套系统 | |
CN201633814U (zh) | 车体传送生产线 | |
CN209875170U (zh) | 用于大坡度斜井初期支护的轨行式喷浆料矿车 | |
CN209351393U (zh) | 一种集装箱输送系统 | |
CN111734446A (zh) | 一种用于狭小工作井小直径隧道的混凝土运输方法 | |
CN102718035B (zh) | 一种带自动脱挂缓冲床的取料机 | |
CN207405422U (zh) | 一种用于地铁运营线百米长轨运输固定装置 | |
CN201209232Y (zh) | 长钢轨倒运专用卡 | |
CN111894622A (zh) | 钻爆法施工出碴系统 | |
CN220909701U (zh) | 一种小断面tbm施工组合式出渣系统 | |
CN105668120B (zh) | 隧道掘进长距离胶带机 | |
CN109606097A (zh) | 矿用履带式风动运料车 | |
CN215329079U (zh) | 轨道卸砟车防侵限装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Shiping Inventor after: Yang Guotao Inventor after: Xiang Yong Inventor after: Wang Yan Inventor after: Liu Sha Inventor before: Li Shiping Inventor before: Xiang Yong Inventor before: Wang Yan Inventor before: Liu Sha |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170503 Address after: 412000 the Yellow River South Road, Tianyuan District, Hunan 199, Zhuzhou Applicant after: Zhuzhou Shidi Electronic Technology Co., Ltd. Applicant after: CHINA RAILWAY CORPORATION Address before: 412000 the Yellow River South Road, Tianyuan District, Hunan, No. 199, No. Applicant before: Zhuzhou Shidi Electronic Technology Co., Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |