CN106283994A - A kind of device for gapless line transportation loading and unloading and construction method - Google Patents

A kind of device for gapless line transportation loading and unloading and construction method Download PDF

Info

Publication number
CN106283994A
CN106283994A CN201610680309.9A CN201610680309A CN106283994A CN 106283994 A CN106283994 A CN 106283994A CN 201610680309 A CN201610680309 A CN 201610680309A CN 106283994 A CN106283994 A CN 106283994A
Authority
CN
China
Prior art keywords
rail
gapless line
gapless
unloading
fortune
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610680309.9A
Other languages
Chinese (zh)
Other versions
CN106283994B (en
Inventor
孙承军
张朋
侯荣贺
刘景超
陈伟
于志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN201610680309.9A priority Critical patent/CN106283994B/en
Publication of CN106283994A publication Critical patent/CN106283994A/en
Application granted granted Critical
Publication of CN106283994B publication Critical patent/CN106283994B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/14Way of locomotion or support

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

A kind of device for gapless line transportation loading and unloading and construction method.Device includes multiple fortune rail dolly and multiple hanger rail frame;The most each fortune rail dolly includes rail support groove, axletree and two wheels;Multiple fortune rail dollies interval is supported on the bottom of gapless line;Hanger rail frame includes two suspension brackets, connecting clamp, Lever Blocks and steel wire rope.The device for gapless line transportation loading and unloading and construction method that the present invention provides have the advantage that 1, apparatus structure is simple, low cost, action required personnel quantity few, therefore, it is possible to reduce cost, reduction of erection time;2, construction method is convenient, economical and practical, applied widely, application of succeeding in engineering construction.

Description

A kind of device for gapless line transportation loading and unloading and construction method
Technical field
The invention belongs to construction of railways technical field, particularly relate to a kind of device for gapless line transportation loading and unloading and execute Work method.
Background technology
Along with the fast development of China's track traffic, use the gapless track of gapless line of length 500m in track engineering Being generally used, in work progress, gapless line dissipates the speed of paving and controls particularly critical to the construction period.Traditional gapless line dissipates Gapless line, for utilizing tool track to be laid to engineering line, is then filled on long rail train by laying method, and will be long by long rail train Rail is transported on engineering line carry out dissipating paving or switching tracks, and the shortcoming of the method is that cost is high, the construction period is long.
Summary of the invention
In order to solve the problems referred to above, it is an object of the invention to provide a kind of device for gapless line transportation loading and unloading and execute Work method.
In order to achieve the above object, the device for gapless line transportation loading and unloading that the present invention provides includes multiple fortune rail dolly With multiple hanger rail framves;The most each fortune rail dolly includes rail support groove, axletree and two wheels;Described rail support groove by base, two Root screw spike and two screw-thread steel compositions, wherein base is made up of top board and biside plate;The lower end of two screw spikes is respectively It is fixed on the surface, both ends of base upper plate;Two screw-thread steels are held within two screw spikes along the transverse horizontal of base The top board surface in outside;Axletree is horizontally fixed in the middle part of the bottom surface of top board along base length direction, and two ends are positioned at the outside of base And it is respectively mounted a wheel;Multiple fortune rail dollies interval is supported on the bottom of gapless line;Hanger rail frame includes two suspension brackets, connections Clamp, Lever Blocks and steel wire rope;Wherein suspension bracket is by the rectangular frame structure of steel-pipe welding, and two suspension brackets set relatively Putting, one of them suspension bracket is as fixing end, and lower end is fixed at slag blocking wall or in embedment roadbed, another suspension bracket is as activity End;Connecting clamp is connected to the top of two suspension brackets, hence in so that the bottom of two suspension brackets can free deciliter;Lever Blocks Upper end is fixed on connecting clamp;Steel wire loop is on gapless line, and upper end hangs on the suspension hook of Lever Blocks lower end;Multiple Steel wire rope spacer sleeve on hanger rail frame is at the different parts of gapless line.
The a length of 400mm of described base, the distance between two screw spikes is 214mm, adjacent screw spike with Distance between screw-thread steel is 45.5mm.
A diameter of 42mm of described axletree, length 700mm.
The external diameter of described wheel is 370mm, wide 110mm.
The construction method utilizing said apparatus to carry out gapless line transportation loading and unloading that the present invention provides includes carrying out in order The following step:
1) utilize press from the traction end of gapless line by gapless line pressure, and set multiple little at the flange of rail separation pad of gapless line Pulley, thus paves gapless line, and the spacing between adjacent truckle is 30m;
2) afterbody at loader utilizes steel wire rope and rail clamp to be connected with the traction end of gapless line, then by gapless line Pulling out from depositing rail field, in the process, the flange of rail at distance rail front end 5m arranges first fortune rail dolly profit Both being fixed with rail fastening, the most often pull-out 20m arranges a fortune rail dolly and fixes with rail fastening;
3) gapless line is transported the roadbed laid or sets up on complete bridge, by several staff during transport Crowbar is utilized to rectify a deviation in time;
4) above-mentioned rail fastening is unclamped after putting in place by gapless line transport, then using on hanger rail frame as under the fixing suspension bracket held End be fixed at slag blocking wall or in embedment roadbed 20cm deep, every 20m arranges a hanger rail frame, afterwards by steel wire loop at gapless line On, and upper end hangs on the suspension hook of Lever Blocks lower end;Then multiple Lever Blocks is utilized to be sling by gapless line together, will fortune Rail dolly is withdrawn from, and is landed by gapless line, deposits to curb position, it is simple to next procedure is constructed;
5) gapless line transport starts to lay on roadbed the end tiny fragments of stone, coal, etc. after putting in place, and the end tiny fragments of stone, coal, etc. is pressed 20cm thickness and laid, smashes after laying Gu, it is ensured that the end tiny fragments of stone, coal, etc. end face discrepancy in elevation is less than 3cm;The end tiny fragments of stone, coal, etc. lays railway sleepers by design pitch after laying;
6) sleeper utilizes the cooperation of multiple hanger rail frame manually to be sling by gapless line after laying, and the most manually moves hanger rail frame On movable end, until stopping after the rail support groove on gapless line alignment sleeper, manually stabilize the movable end of hanger rail frame, with the most at present Put Lever Blocks, until gapless line is put into rail support groove, so far complete the transportation loading and unloading process of whole gapless line.
In step 2) in, described is by length utilizing rail fastening by concrete grammar fixing to gapless line and fortune rail dolly The flange of rail of rail is placed in the middle part of the susceptor surface of fortune rail dolly, then the hole on two blocks of buckles is respectively fitted over a screw spike Outside, now the two ends of buckle contact respectively on the flange of rail outer ledge and screw-thread steel of gapless line, afterwards at screw spike Outer end utilizes plain washer and nut to fix.
The device for gapless line transportation loading and unloading and construction method that the present invention provides have the advantage that
1, apparatus structure is simple, low cost, action required personnel quantity few, therefore, it is possible to reduce cost, reduction of erection time;
2, construction method is convenient, economical and practical, applied widely, application of succeeding in engineering construction.
Accompanying drawing explanation
The rail support groove portion structure longitudinal sectional view in the device of gapless line transportation loading and unloading that Fig. 1 provides for the present invention.
The rail support groove portion structure side view in the device of gapless line transportation loading and unloading that Fig. 2 provides for the present invention.
Rail support groove in the device of gapless line transportation loading and unloading that Fig. 3 provides for the present invention and axle construction side view.
Rail support groove in the device of gapless line transportation loading and unloading that Fig. 4 provides for the present invention and axle construction side view.
Fig. 5 transports rail vehicle structure front view for what the present invention provided in the device of gapless line transportation loading and unloading.
Fig. 6 transports rail vehicle structure side view for what the present invention provided in the device of gapless line transportation loading and unloading.
The hanger rail shelf structure front view in the device of gapless line transportation loading and unloading that Fig. 7 provides for the present invention.
The hanger rail shelf structure side view in the device of gapless line transportation loading and unloading that Fig. 8 provides for the present invention.
The device that Fig. 9 provides for utilizing the present invention carries out gapless line transportation loading and unloading process schematic.
Detailed description of the invention
The device for gapless line transportation loading and unloading with specific embodiment, the present invention provided below in conjunction with the accompanying drawings and construction Method is described in detail.
As shown in Fig. 1 Fig. 9, the present invention provide the device for gapless line transportation loading and unloading include multiple fortune rail dolly and Multiple hanger rail framves;The most each fortune rail dolly includes rail support groove 1, axletree 2 and two wheels 3;Described rail support groove 1 by base 4, Two screw spikes 5 and two screw-thread steels 6 form, and wherein base 4 is made up of top board and biside plate;Two screw spikes 5 times End is separately fixed at the surface, both ends of base 4 upper plate;Two screw-thread steels 6 are held within two along the transverse horizontal of base 4 Top board surface outside root screw spike 5;Axletree 2 is horizontally fixed in the middle part of the bottom surface of top board along base 4 length direction, position, two ends In the outside of base 4 and be respectively mounted a wheel 3;Multiple fortune rail dollies interval is supported on the bottom of gapless line 7;Hanger rail frame bag Include two suspension brackets 8, connecting clamp 9, Lever Blocks 10 and steel wire rope 11;Wherein suspension bracket 8 is by the rectangle frame of steel-pipe welding Shelf structure, two suspension brackets 8 are oppositely arranged, and one of them suspension bracket 8 is as fixing end, and lower end is fixed at slag blocking wall or embedment roadbed In, another suspension bracket 8 is as movable end;Connecting clamp 9 is connected to the top of two suspension brackets 8, hence in so that two suspension brackets 8 times Portion can free deciliter;The upper end of Lever Blocks 10 is fixed on connecting clamp 9;Steel wire rope 11 is enclosed within gapless line 7, and on End hangs on the suspension hook of Lever Blocks 10 lower end;Steel wire rope 11 spacer sleeve on multiple hanger rail framves is at the different parts of gapless line 7.
The a length of 400mm of described base 4, the distance between two screw spikes 5 is 214mm, adjacent screw spike 5 And the distance between screw-thread steel 6 is 45.5mm.
A diameter of 42mm of described axletree 2, length 700mm.
The external diameter of described wheel 3 is 370mm, wide 110mm.
The device utilizing the invention described above to provide carries out what the construction method of gapless line transportation loading and unloading included carrying out in order The following step:
1) utilize gapless line 7 pressed from the traction end of gapless line 7 by press, and set many at the flange of rail separation pad of gapless line 7 Individual truckle, thus paves gapless line 7, and the spacing between adjacent truckle is 30m;
2) afterbody at loader 12 utilizes steel wire rope 13 and rail clamp 14 to be connected, then with the traction end of gapless line 7 Being pulled out from depositing rail field by gapless line 7, in the process, the flange of rail at distance rail 7 front end 5m arranges first fortune Rail dolly also utilizes rail fastening both to be fixed, and the most often pull-out 20m arranges a fortune rail dolly and fixes with rail fastening; Concrete fixing means is base 4 surface middle part that the flange of rail of gapless line 7 is placed on fortune rail dolly, then by two blocks of buckles 15 It is outside that hole is respectively fitted over screw spike 5, now the two ends of buckle 15 contact respectively gapless line 7 flange of rail outer ledge with And on screw-thread steel 6, utilize plain washer 16 and nut 17 to fix afterwards in screw spike 5 outer end;
3) gapless line 7 transported the roadbed laid or sets up on complete bridge, during transport, clearing up both sides in advance Obstacle, straightway ensures at the 1.7m of line midline both sides accessible, in the range of curved section ensures by the inner side of curve to outside 4.5m Without walking disorder, prevent that transportation occurs damage gapless line 7 and fortune rail dolly rollover problem;During it addition, gapless line 7 transports Ensureing that the speed of travel is less than 5km/h, in the range of track route, both sides stop other operations simultaneously, and are utilized by several staff Crowbar is rectified a deviation in time;
4) above-mentioned rail fastening is unclamped after putting in place by gapless line 7 transport, then using on hanger rail frame as the fixing suspension bracket 8 held Lower end be fixed at slag blocking wall or in embedment roadbed 20cm deep, every 20m arranges a hanger rail frame, afterwards steel wire rope 11 is enclosed within length On rail 7, and upper end hangs on the suspension hook of Lever Blocks 10 lower end;Then utilize multiple Lever Blocks 10 together by gapless line 7 sling, and are withdrawn from by fortune rail dolly, are landed by gapless line 7, deposit to curb position, it is simple to next procedure is constructed;
5) gapless line 7 transport starts to lay on roadbed 18 end tiny fragments of stone, coal, etc. 19 after putting in place, and the end tiny fragments of stone, coal, etc. 19 is pressed 20cm thickness and laid, after laying Make firm by ramming, it is ensured that the end tiny fragments of stone, coal, etc. 19 end face discrepancy in elevation is less than 3cm;The end tiny fragments of stone, coal, etc. 19 lays railway sleepers 20 by design pitch after laying;
6) sleeper 20 utilizes the cooperation of multiple hanger rail frame manually to be sling by gapless line 7 after laying, and then artificial movement is hung Movable end in rail gantry, until gapless line 7 stops after being directed at the rail support groove on sleeper 20, manually stabilizes the activity of hanger rail frame End, transfers Lever Blocks 9 simultaneously, until gapless line 7 is put into rail support groove, so far completes the transportation loading and unloading mistake of whole gapless line 7 Journey.

Claims (6)

1. the device for gapless line transportation loading and unloading, it is characterised in that: the described device for gapless line transportation loading and unloading Including multiple fortune rail dollies and multiple hanger rail frame;The most each fortune rail dolly includes rail support groove (1), axletree (2) and two wheels (3);Described rail support groove (1) is made up of base (4), two screw spikes (5) and two screw-thread steels (6), wherein base (4) by Top board and biside plate are constituted;The lower end of two screw spikes (5) is separately fixed at the surface, both ends of base (4) upper plate;Two Root screw-thread steel (6) is held within the top board surface outside two screw spikes (5) along the transverse horizontal of base (4);Axletree (2) Being horizontally fixed in the middle part of the bottom surface of top board along base (4) length direction, two ends are positioned at the outside of base (4) and are respectively mounted one Wheel (3);Multiple fortune rail dollies interval is supported on the bottom of gapless line (7);Hanger rail frame includes two suspension brackets (8), connecting clamps (9), Lever Blocks (10) and steel wire rope (11);Wherein suspension bracket (8) is by the rectangular frame structure of steel-pipe welding, and two are hung Frame (8) is oppositely arranged, and one of them suspension bracket (8) is as fixing end, and lower end is fixed at slag blocking wall or in embedment roadbed, another Suspension bracket (8) is as movable end;Connecting clamp (9) is connected to the top of two suspension brackets (8), hence in so that under two suspension brackets (8) Portion can free deciliter;The upper end of Lever Blocks (10) is fixed on connecting clamp (9);Steel wire rope (11) is enclosed within gapless line (7) On, and upper end hangs on the suspension hook of Lever Blocks (10) lower end;Steel wire rope (11) spacer sleeve on multiple hanger rail framves is at long steel The different parts of rail (7).
Device for gapless line transportation loading and unloading the most according to claim 1, it is characterised in that: described base (4) A length of 400mm, the distance between two screw spikes (5) is 214mm, between adjacent screw spike (5) and screw-thread steel (6) away from From for 45.5mm.
Device for gapless line transportation loading and unloading the most according to claim 1, it is characterised in that: described axletree (2) A diameter of 42mm, length 700mm.
Device for gapless line transportation loading and unloading the most according to claim 1, it is characterised in that: described wheel (3) External diameter is 370mm, wide 110mm.
5. the device utilized described in claim 1 carries out the construction method of gapless line transportation loading and unloading, it is characterised in that: described Construction method include the following step of carrying out in order:
1) utilize gapless line (7) pressed from the traction end of gapless line (7) by press, and set at the flange of rail separation pad of gapless line (7) Multiple truckles, thus pave gapless line (7), and the spacing between adjacent truckle is 30m;
2) afterbody at loader (12) utilizes steel wire rope (13) and rail clamp (14) to be connected with the traction end of gapless line (7), Then being pulled out from depositing rail field by gapless line (7), in the process, the flange of rail at distance rail (7) front end 5m is arranged First fortune rail dolly also utilizes rail fastening both to be fixed, and the most often pull-out 20m arranges a fortune rail dolly and uses rail Fastener is fixed;
3) gapless line (7) transport to the roadbed laid or is set up on complete bridge, by several staff during transport Crowbar is utilized to rectify a deviation in time;
4) above-mentioned rail fastening is unclamped after putting in place by gapless line (7) transport, then using on hanger rail frame as the fixing suspension bracket (8) held Lower end be fixed at slag blocking wall or in embedment roadbed 20cm deep, every 20m arranges a hanger rail frame, is enclosed within by steel wire rope (11) afterwards On gapless line (7), and upper end hangs on the suspension hook of Lever Blocks (10) lower end;Then multiple Lever Blocks (10) is utilized together Gapless line (7) is sling, fortune rail dolly is withdrawn from, gapless line (7) is landed, deposits to curb position, it is simple to next procedure is executed Work;
5) gapless line (7) transport starts at roadbed (18) the upper laying end tiny fragments of stone, coal, etc. (19) after putting in place, and the end tiny fragments of stone, coal, etc. (19) is pressed 20cm thickness and laid, paving Make firm by ramming after if, it is ensured that the end tiny fragments of stone, coal, etc. (19) the end face discrepancy in elevation is less than 3cm;The end tiny fragments of stone, coal, etc. (19) lays railway sleepers by design pitch after laying (20);
6) sleeper (20) utilizes the cooperation of multiple hanger rail frame manually to be sling by gapless line (7) after laying, and then artificial movement is hung Movable end in rail gantry, until stopping after the rail support groove on gapless line (7) alignment sleeper (20), manually stabilizes the work of hanger rail frame Moved end, transfers Lever Blocks (9) simultaneously, until gapless line (7) is put into rail support groove, so far completes the fortune of whole gapless line (7) Defeated cargo handling process.
Construction method the most according to claim 5, it is characterised in that: in step 2) in, described is utilizing rail fastening It is base (4) table that the flange of rail of gapless line (7) is placed on fortune rail dolly by concrete grammar fixing to gapless line (7) and fortune rail dolly Middle face, is then respectively fitted over a screw spike (5) outside, the now two ends of buckle (15) by the hole on two pieces of buckles (15) Contact respectively on the flange of rail outer ledge and screw-thread steel (6) of gapless line (7), utilize in screw spike (5) outer end flat afterwards Packing ring (16) and nut (17) are fixed.
CN201610680309.9A 2016-08-16 2016-08-16 A kind of device and construction method for gapless line transportation loading and unloading Active CN106283994B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610680309.9A CN106283994B (en) 2016-08-16 2016-08-16 A kind of device and construction method for gapless line transportation loading and unloading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610680309.9A CN106283994B (en) 2016-08-16 2016-08-16 A kind of device and construction method for gapless line transportation loading and unloading

Publications (2)

Publication Number Publication Date
CN106283994A true CN106283994A (en) 2017-01-04
CN106283994B CN106283994B (en) 2017-11-17

Family

ID=57679094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610680309.9A Active CN106283994B (en) 2016-08-16 2016-08-16 A kind of device and construction method for gapless line transportation loading and unloading

Country Status (1)

Country Link
CN (1) CN106283994B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006037693A (en) * 2004-07-26 2006-02-09 Sinco Metal:Kk Leg expanding and contracting function of rail hoisting machine
KR20120114106A (en) * 2011-04-06 2012-10-16 현대중공업 주식회사 Zig for moving cart rail
CN202987169U (en) * 2012-11-30 2013-06-12 中国铁道科学研究院运输及经济研究所 Railway long steel rail transportation seat frame
GB2499464A (en) * 2012-02-14 2013-08-21 John Sewell Apparatus for transporting railway track sleeper panels
CN105730316A (en) * 2016-01-28 2016-07-06 中铁十七局集团第二工程有限公司 Highway safety transporting method and device for railway high-speed turnout overlong components

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006037693A (en) * 2004-07-26 2006-02-09 Sinco Metal:Kk Leg expanding and contracting function of rail hoisting machine
KR20120114106A (en) * 2011-04-06 2012-10-16 현대중공업 주식회사 Zig for moving cart rail
GB2499464A (en) * 2012-02-14 2013-08-21 John Sewell Apparatus for transporting railway track sleeper panels
CN202987169U (en) * 2012-11-30 2013-06-12 中国铁道科学研究院运输及经济研究所 Railway long steel rail transportation seat frame
CN105730316A (en) * 2016-01-28 2016-07-06 中铁十七局集团第二工程有限公司 Highway safety transporting method and device for railway high-speed turnout overlong components

Also Published As

Publication number Publication date
CN106283994B (en) 2017-11-17

Similar Documents

Publication Publication Date Title
CN203284165U (en) Side slope material transporting system
CN109811603A (en) The transfer device and conveyer method of newly built railway gapless track steel rail laying
US3633513A (en) Method for replacing an old track by a new track
AU2011260627A1 (en) A vehicle combination for transporting rails
US20130206031A1 (en) Railway track construction method
CN108797235A (en) A kind of continuous towed of 25 meters of standard gauges is laid a railway track construction technology
CN212531167U (en) Simple material conveying device under mountain abrupt slope condition
CN202542382U (en) Mountain high-slope construction material conveying device
KR102040602B1 (en) Construct Method of Subway Rail Track Panel
CZ273487A3 (en) Mobile device for removing or lying, as well as transport of track panels
CN206986640U (en) A kind of travelling bridge device for being used for track slab pavement and removing
CN108946467A (en) A kind of cart for 7.65m four-cart track installation
CN106283994B (en) A kind of device and construction method for gapless line transportation loading and unloading
JP2013104217A (en) Method and device for installing turnout of track rail
CN104790271A (en) Method for finishing long rail of ballast track before straight laying
CN208235240U (en) Laying of welded long rails traction device
CN106939536B (en) A kind of coal mine inclined shaft assembled is laid a railway track construction method
CN102828773B (en) Method and device for transporting steeply inclined fully-mechanized top coal caving working face equipment
CN202865707U (en) Equipment for erecting and constructing beam and vertical beam on existing line
CN206034300U (en) Move liangping car and with moving large -tonnage precast beam sideslip device that liangping car was made
CN108842541A (en) The long rail of Ballast track draws method laying construction method and Ballast track construction method
CN105735065B (en) Sliding device and transferring method for turnout switch rail and stock rail assembly on bridge
US11124923B2 (en) Method and track-building machine for renewing sleepers of a track formed from rails and the sleepers
CN105064216A (en) Method for preventing existing line from transversely moving during jacking super-long framed bridge
CN204751331U (en) Conveyer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant