CN106274991A - Railway fail analysis device and method - Google Patents

Railway fail analysis device and method Download PDF

Info

Publication number
CN106274991A
CN106274991A CN201610711660.XA CN201610711660A CN106274991A CN 106274991 A CN106274991 A CN 106274991A CN 201610711660 A CN201610711660 A CN 201610711660A CN 106274991 A CN106274991 A CN 106274991A
Authority
CN
China
Prior art keywords
voltage
failure cause
railway
magnitude
alarm content
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610711660.XA
Other languages
Chinese (zh)
Inventor
邓永亮
尤龙
杨可
尤刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Network Technology Co Ltd
Original Assignee
Sichuan Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Network Technology Co Ltd filed Critical Sichuan Network Technology Co Ltd
Priority to CN201610711660.XA priority Critical patent/CN106274991A/en
Publication of CN106274991A publication Critical patent/CN106274991A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention provides a kind of railway fail analysis device and method, relate to traffic and transport field.This railway fail analysis device and method, by receiving the alarm content that a warning device sends;And find out failure cause and troubleshooting mode according to the failure cause look-up table preset;Again described failure cause and troubleshooting mode are sent to an intelligent terminal.This railway fail analysis device and method can automatically generate failure cause and troubleshooting mode, save substantial amounts of human cost, and can feed back failure cause and processing mode in time, and alarm content utilization rate is high.

Description

Railway fail analysis device and method
Technical field
The present invention relates to traffic and transport field, in particular to a kind of railway fail analysis device and method.
Background technology
Railway signal centralized monitoring system is to strengthen the management of signalling arrangement joint portion, monitoring signalling arrangement state, raising electricity The signal of interest equipment of business department maintenance levels and maintenance efficiency.
Railway signal centralized monitoring system, as the integrated monitoring platform of signalling arrangement, has been achieved with track circuit, signal The Real-time Collection monitoring of the equipment such as machine, track switch, obturation, and possess and computer, train control system, zpw2000 naked track Circuit, CTC/TDCS system, intelligent power supply panel etc. possess the equipment real time information access capability of self-monitoring function.Monitoring Data is led to Crossing monitoring network to concentrate in data center, collect, Monitoring Data centers at different levels summarize a large amount of monitoring system railway signal and concentrate The alert data that monitoring system sends.
In prior art, railway signal centralized monitoring system can be used for judging the most whether equipment exists fault, if There is fault, then generate alarm content, and alarm content is sent to monitoring center.When monitoring center receives railway signal collection During the alarm content that middle monitoring system sends, by the personnel of analysis according to the content reported to the police, by have access to the Monitoring Data be correlated with and Statistical report form, it is judged that failure cause also notifies that related personnel repairs problem, after repairing, is processed knot by analyzing personnel record Really.The process of above-mentioned analysis needs to waste substantial amounts of human cost, and artificially judges that the time of warning reason is bigger, it is impossible to and Time feedback failure cause and processing mode, and alarm content utilization rate is the highest, type of alarm is the most intelligent.
Summary of the invention
In view of this, the purpose of the embodiment of the present invention is to provide a kind of railway fail analysis device and method.
First aspect, embodiments provides a kind of railway fail analysis device, described railway fail analysis device Including:
Information receiving unit, for receiving the alarm content that a warning device sends;
Trouble shoot unit, for finding out failure cause according to described alarm content and default failure cause look-up table And troubleshooting mode;
Information transmitting unit, for sending described failure cause and troubleshooting mode to an intelligent terminal.
Second aspect, the embodiment of the present invention additionally provides a kind of railway failure analysis methods, described railway accident analysis side Method includes:
Receive the alarm content that a warning device sends;
Failure cause and troubleshooting mode is found out according to described alarm content and default failure cause look-up table;
Described failure cause and troubleshooting mode are sent to an intelligent terminal.
Compared with prior art, a kind of railway fail analysis device of embodiment of the present invention offer and method, by receiving The alarm content that one warning device sends;And find out failure cause and troubleshooting side according to the failure cause look-up table preset Formula;Again described failure cause and troubleshooting mode are sent to an intelligent terminal.This railway fail analysis device and method Failure cause and troubleshooting mode can be automatically generated, save substantial amounts of human cost, and failure cause can be fed back in time And processing mode, and alarm content utilization rate is high.
For making the above-mentioned purpose of the present invention, feature and advantage to become apparent, preferred embodiment cited below particularly, and coordinate Appended accompanying drawing, is described in detail below.
Accompanying drawing explanation
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The a part of embodiment of the present invention rather than whole embodiments.Generally implement with the present invention illustrated described in accompanying drawing herein The assembly of example can be arranged with various different configurations and design.Therefore, reality to the present invention provided in the accompanying drawings below The detailed description executing example is not intended to limit the scope of claimed invention, but is merely representative of the selected enforcement of the present invention Example.Based on the embodiment in the present invention, those of ordinary skill in the art are obtained under not making creative work premise Every other embodiment, broadly falls into the scope of protection of the invention.
Fig. 1 embodiment of the present invention provide server respectively with warning device, the mutual schematic diagram of intelligent terminal;
The structured flowchart of the server that Fig. 2 provides for the embodiment of the present invention;
The functional unit schematic diagram of the railway fail analysis device that Fig. 3 embodiment of the present invention provides;
The flow chart of the first embodiment of the railway failure analysis methods that Fig. 4 provides for the embodiment of the present invention;
The flow chart of the second embodiment of the railway failure analysis methods that Fig. 5 provides for the embodiment of the present invention.
Wherein, the corresponding relation between reference and component names is as follows: railway fail analysis device 100, memorizer 101, storage control 102, processor 103, Peripheral Interface 104, server 105, warning device 106, intelligent terminal 107, net Network 108, information receiving unit 301, trouble shoot unit 302, information transmitting unit 303, failure trend prediction unit 304, report Alert process state signal generating unit 305, record purge unit 306, memory element 307, computing unit 308, warning statistical report form is raw Become unit 309.
Detailed description of the invention
Below in conjunction with accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Ground describes, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments.Generally exist Can arrange and design with various different configurations with the assembly of the embodiment of the present invention that illustrates described in accompanying drawing herein.Cause This, be not intended to limit claimed invention to the detailed description of the embodiments of the invention provided in the accompanying drawings below Scope, but it is merely representative of the selected embodiment of the present invention.Based on embodiments of the invention, those skilled in the art are not doing The every other embodiment obtained on the premise of going out creative work, broadly falls into the scope of protection of the invention.
Railway fail analysis device that the embodiment of the present invention proposes and method, it is provided that a kind of railway fail analysis device with Method, this railway failure analysis methods is applicable to server 105.As it is shown in figure 1, be the service of present pre-ferred embodiments offer The schematic diagram that device 105 interacts with warning device 106 and intelligent terminal 107 respectively.Described server 105 passes through network 108 set up communication connection with warning device 106 and intelligent terminal 107 respectively, to carry out data communication or mutual.Described service Device 105 can be the webserver, database server etc..
As in figure 2 it is shown, described server 105 includes railway fail analysis device 100, memorizer 101, storage control 102, processor 103 and Peripheral Interface 104.
Described memorizer 101, storage control 102, processor 103, each element of Peripheral Interface 104 each other directly or Indirectly it is electrically connected with, to realize the transmission of data or mutual.Such as, these elements each other can be by one or more Communication bus or holding wire realize being electrically connected with.Described railway fail analysis device 100 includes that at least one can be with software or solid The form of part (firmware) is stored in described memorizer 101 or is solidificated in the software function module in described server 105. Described processor 103 is for performing the executable module of storage in memorizer, and such as, described railway fail analysis device 100 wraps The software function module included or computer program.
Wherein, memorizer 101 may be, but not limited to, random access memory (Random Access Memory, RAM), read only memory (Read Only Memory, ROM), programmable read only memory (Programmable Read-Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only Memory, EPROM), Electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only Memory, EEPROM) etc.. Wherein, memorizer 101 is used for storing program, and described processor 103, after receiving execution instruction, performs described program, aforementioned The method performed by server 105 flowing through Cheng Dingyi that embodiment of the present invention any embodiment discloses can apply to processor In 103, or realized by processor 103.
Processor 103 is probably a kind of IC chip, has the disposal ability of signal.Above-mentioned processor 103 can To be general processor, including central processing unit (Central Processing Unit is called for short CPU), network processing unit (Network Processor is called for short NP) etc.;Can also is that digital signal processor (DSP), special IC (ASIC), Ready-made programmable gate array (FPGA) or other PLDs, discrete gate or transistor logic, discrete firmly Part assembly.Can realize or perform disclosed each method, step and the logic diagram in the embodiment of the present invention.General processor Can be microprocessor or this processor 103 can also be the processor 103 etc. of any routine.
Various input/output devices are coupled to processor 103 and memorizer 101 by described Peripheral Interface 104.At some In embodiment, Peripheral Interface 104, processor 103 and storage control 102 can realize in one single chip.Other one In a little examples, they can be realized by independent chip respectively.
Refer to Fig. 3, a kind of railway fail analysis device 100 that the embodiment of the present invention provides, it is applied to a server 105, described railway fail analysis device 100 includes information receiving unit 301, trouble shoot unit 302, information transmitting unit 303, failure trend prediction unit 304, alarm logging signal generating unit, record purge unit 306, memory element 307, computing unit 308 and warning statistical report form signal generating unit 309.
Described information receiving unit 301 is for receiving the alarm content that a warning device 106 sends.
In the present embodiment, warning device 106 uses station machine, the machine of station include switch acquisition mechanical, electrical source screen harvester, half from Dynamic inaccessible harvester etc..The machine of station can be used for master data (such as magnitude of voltage, current value, resistance to the electronic equipment on railway Value etc.) whether exception occurs, if occur abnormal, then the master data collected is sent to information receiving unit 301.
Described alert process state signal generating unit 305 is for receiving described alarm content one alert process shape of generation State record.
Described trouble shoot unit 302 is for finding out event according to described alarm content and default failure cause look-up table Barrier reason and troubleshooting mode.
Wherein, every kind of alarm content is all associated with the processing mode of failure cause and fault by failure cause look-up table, Therefore trouble shoot unit 302 can find the processing mode of failure cause and fault according to the alarm content received.Specifically Ground, alarm content can be the magnitude of voltage between two rails, and described magnitude of voltage is not in default normal voltage range, institute State trouble shoot unit 302 for belonging to the described magnitude of voltage according to alarm content and the storage of described failure cause look-up table Voltage range finds out failure cause and troubleshooting mode.Such as, described default voltage normal range is 18V~22V, If described trouble shoot unit 302 is 14V~18V for the voltage range belonging to described magnitude of voltage or is more than 22V, search Go out that slide rheostat is bad, failure cause that traction current interference, backflow are the most smooth, if the voltage range belonging to described magnitude of voltage is Less than 14V, then find out Ballast leakage, work business fastener touches clamping plate, current limiter is bad failure cause.
If described failure trend prediction unit 304 less than 0 and is less than the threshold preset for the difference of described magnitude of voltage with 22V The difference of value or described magnitude of voltage and 18V more than 0 and less than the threshold value preset, then generates that slide rheostat is bad, traction current Disturb, reflux the most smooth fault trend information, if the difference of described magnitude of voltage and 14V is more than 0 and less than default threshold value, then gives birth to Ballast leakage, work business fastener is become to touch the fault trend information that clamping plate, current limiter are bad.When failure trend prediction unit 304 can be When magnitude of voltage is close to the upper limit of normal range or lower limit, it will be apparent that, the threshold value preset should be the least, in the present embodiment, on State default threshold value less than 1V.Failure trend prediction unit 304 generates above-mentioned fault trend information according to current magnitude of voltage, Thus dope hidden danger or the fault of rail appearance in future.
In the present embodiment, described alarm content can also be that the magnitude of voltage between two rails is at default normal voltage model Enclosing interior fluctuation, described trouble shoot unit 302 is additionally operable to look into according to this alarm content and described failure cause look-up table Find out the corrosion of plug pin hole, plug pin head loose contact, the failure cause of power line loose contact.Of course, alarm content is not only Can be above-mentioned mode, be merely illustrative at this.
In the present embodiment, if the alarm content received is searched former less than corresponding fault at preset failure cause investigation table Cause and troubleshooting mode, can have staff to be first analyzed fault equipment occur according to alarm content, is dividing Separate out failure cause and by fault discharge after, staff can failure cause look-up table add this alarm content and with this report The failure cause of alert relevance and troubleshooting mode, when information receiving unit 301 receives this alarm content again, therefore Barrier searches unit 302 can find out failure cause and fault according to this alarm content and amended failure cause look-up table Processing mode.
Described information transmitting unit 303 is for by described failure cause, troubleshooting mode or closing with fault trend information The hidden danger processing mode of connection sends to an intelligent terminal 107.
Staff can view failure cause and troubleshooting mode or fault trend information intelligent terminal 107 The hidden danger processing mode of association, and according to troubleshooting mode, the equipment broken down is overhauled.When after fault restoration, then Result in intelligent terminal 107 input processing result, and can be sent to information receiving unit 301, information by staff After reception unit 301 receives result, the alert process state generated i.e. is carried out clearly by described record purge unit 306 Remove.After alert process state is removed, alarm content with and described in the essential information that associates with this alarm content is stored in Memory element 307, wherein, the essential information associated with this alarm content includes that (alert levels is divided into for time of fire alarming, alert levels One-level warning, secondary alarm, three grades report to the police and early warning), produce report to the police station information, failure cause, troubleshooting mode And the information such as alert process result, facilitate staff that warning message is carried out follow-up checking.
Described alarm content also includes the responsibility object belonging to the equipment of fault, and described railway fail analysis device 100 is also Including computing unit 308 and warning statistical report form signal generating unit 309, described computing unit 308 is for receiving alarm content Afterwards the responsibility object associated with this alarm content carried out an alarm count and obtains warning quantitative value, and calculating each duty Appoint the alarm rate of object.
In the present embodiment, responsibility object can be multistage subsidiary unit, such as, by the partition of the level of constituent parts: place, electricity business Section, workshop, work area and station.Wherein, locating to administer multiple electricity business section for highest level unit, place, each electricity business section is divided into many Individual workshop, workshop divides into several work area, and each work area is made up of multiple stations.The responsibility object associated with alarm content is report Alert content is i.e. with which responsibility object associating of sending of which responsibility object.Computing unit 308 is in receiving warning The responsibility object associated with this alarm content carries out after appearance an alarm count detailed description of the invention can be: such as one car Between one, station machine have sent 10 alarm content, then the warning quantity in this workshop is 10 times, and also can calculate this car Between warning quantity at the accounting of the warning quantity in all workshops, i.e. alarm rate.
Described report generation unit is for according to described responsibility object, warning quantitative value, alarm rate, failure cause and fault Processing mode generates warning statistical report form.
Described information transmitting unit 303 is additionally operable to send to described intelligent terminal 107 described warning statistical report form.
Staff can according to the warning statistical report form generated is checked each at, electricity is engaged in section, workshop, work area and car The alarm condition stood, various electronic equipments produce the essential information reported to the police, and make corresponding solution and preventive measure, Thus in production afterwards, reduce warning quantity, reduce the alarm rate of equipment.
Referring to Fig. 4, the embodiment of the present invention additionally provides a kind of railway failure analysis methods, it should be noted that this reality Executing the railway failure analysis methods that example is provided, the technique effect of its ultimate principle and generation is identical with above-described embodiment, for letter Describe, the not mentioned part of the present embodiment part, refer to the corresponding contents in above-described embodiment.Described railway accident analysis side Method includes:
Step S401: receive the alarm content that a warning device 106 sends.
The alarm content that a warning device 106 sends is received by information receiving unit 301.
Step S402: find out failure cause and fault according to described alarm content and default failure cause look-up table Processing mode.
Fault is found out according to described alarm content and default failure cause look-up table former by trouble shoot unit 302 Cause and troubleshooting mode.
Specifically, step S402 can include according to magnitude of voltage and described failure cause look-up table find out failure cause with And troubleshooting mode.Such as, described default voltage normal range is 18V~22V, as the first embodiment step S402 may include that
Step 4021: if the voltage range belonging to described magnitude of voltage is 14V~18V or is more than 22V, finding out slip and becoming The failure cause that device is bad in resistance, traction current interference, backflow are the most smooth.
Step 4022: if the voltage range belonging to described magnitude of voltage is less than 14V, finds out Ballast leakage, work business fastener Touch the failure cause that clamping plate, current limiter are bad.
Can also include as the second embodiment step S402:
Step 4023: find out the corrosion of plug pin hole, plug according to this alarm content and described failure cause look-up table Ailhead loose contact, the failure cause of power line loose contact, wherein, described alarm content is the magnitude of voltage between two rails Fluctuate in default normal voltage range.
Described railway failure analysis methods also includes:
Step 403: if the difference of described magnitude of voltage and 22V less than 0 and is less than the threshold value or described magnitude of voltage and 18V preset Difference more than 0 and less than the threshold value preset time, generate that slide rheostat is bad, fault that traction current interference, backflow are the most smooth Tendency information.
Step 404: if the difference of described magnitude of voltage and 14V is more than 0 and less than the threshold value preset, then generate Ballast leakage, Work business fastener touches the fault trend information that clamping plate, current limiter are bad.
Described alarm content also includes that the responsibility object belonging to the equipment of fault, described railway failure analysis methods also wrap Include:
Step S405: meter of after receiving alarm content, the responsibility object associated with this alarm content once being reported to the police Count and obtain warning quantitative value, and calculate the alarm rate of each responsibility object.
The responsibility object associated with this alarm content is carried out once after receiving alarm content by computing unit 308 Alarm count also obtains warning quantitative value, and calculate the alarm rate of each responsibility object.
Step S406: raw according to described responsibility object, warning quantitative value, alarm rate, failure cause and troubleshooting mode Become warning statistical report form.
Former according to described responsibility object, warning quantitative value, alarm rate, fault by warning statistical report form signal generating unit 309 Cause and troubleshooting mode generate warning statistical report form.
Step S407: by warning statistical report form, described failure cause, troubleshooting mode and pre-stored with described therefore The hidden danger processing mode of barrier tendency information association sends to an intelligent terminal 107.
By information transmitting unit 303 by warning statistical report form, described failure cause, troubleshooting mode and pre-stored Send to an intelligent terminal 107 with the hidden danger processing mode of described fault trend information association.
It should be noted that in the present embodiment, step S4021, step S4022, step S403, step S404 and step Sequencing is not had between S405~step S406.
To sum up, a kind of railway fail analysis device of embodiment of the present invention offer and method, by receiving a warning device 106 alarm content sent;And find out failure cause and troubleshooting mode according to the failure cause look-up table preset;Again will Described failure cause and troubleshooting mode send to an intelligent terminal 107.This railway fail analysis device can be certainly with method Dynamic generation failure cause and troubleshooting mode, save substantial amounts of human cost, and can feed back failure cause and place in time Reason mode, it is also possible to be predicted fault trend, discharges hidden danger, thus avoids the generation of fault to a certain extent, report Alert content utilization rate is high.
In several embodiments provided herein, it should be understood that disclosed apparatus and method, it is also possible to pass through Other mode realizes.Device embodiment described above is only schematically, such as, and the flow chart in accompanying drawing and block diagram Show the device of multiple embodiments according to the present invention, the architectural framework in the cards of method and computer program product, Function and operation.In this, each square frame in flow chart or block diagram can represent a module, program segment or the one of code Part, a part for described module, program segment or code comprises holding of one or more logic function for realizing regulation Row instruction.It should also be noted that at some as in the implementation replaced, the function marked in square frame can also be to be different from The order marked in accompanying drawing occurs.Such as, two continuous print square frames can essentially perform substantially in parallel, and they are the most also Can perform in the opposite order, this is depending on involved function.It is also noted that every in block diagram and/or flow chart The combination of the square frame in individual square frame and block diagram and/or flow chart, can be with function or the special base of action performing regulation System in hardware realizes, or can realize with the combination of specialized hardware with computer instruction.
It addition, each functional module in each embodiment of the present invention can integrate one independent portion of formation Point, it is also possible to it is modules individualism, it is also possible to two or more modules are integrated to form an independent part.
If described function is using the form realization of software function module and as independent production marketing or use, permissible It is stored in a computer read/write memory medium.Based on such understanding, technical scheme is the most in other words The part contributing prior art or the part of this technical scheme can embody with the form of software product, this meter Calculation machine software product is stored in a storage medium, including some instructions with so that a computer equipment (can be individual People's computer, server, or the network equipment etc.) perform all or part of step of method described in each embodiment of the present invention. And aforesaid storage medium includes: USB flash disk, portable hard drive, read only memory (ROM, Read-Only Memory), random access memory are deposited The various media that can store program code such as reservoir (RAM, Random Access Memory), magnetic disc or CD.Need Illustrate, in this article, the relational terms of such as first and second or the like be used merely to by an entity or operation with Another entity or operating space separate, and there is any this reality between not necessarily requiring or imply these entities or operating The relation on border or order.And, term " includes ", " comprising " or its any other variant are intended to the bag of nonexcludability Contain, so that include that the process of a series of key element, method, article or equipment not only include those key elements, but also include Other key elements being not expressly set out, or also include the key element intrinsic for this process, method, article or equipment. In the case of there is no more restriction, statement " including ... " key element limited, it is not excluded that including described key element Process, method, article or equipment in there is also other identical element.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, that is made any repaiies Change, equivalent, improvement etc., should be included within the scope of the present invention.It should also be noted that similar label and letter exist Figure below represents similar terms, therefore, the most a certain Xiang Yi accompanying drawing is defined, is then not required in accompanying drawing subsequently It is defined further and explains.
The above, the only detailed description of the invention of the present invention, but protection scope of the present invention is not limited thereto, and any Those familiar with the art, in the technical scope that the invention discloses, can readily occur in change or replace, should contain Cover within protection scope of the present invention.Therefore, protection scope of the present invention should described be as the criterion with scope of the claims.
It should be noted that in this article, the relational terms of such as first and second or the like is used merely to a reality Body or operation separate with another entity or operating space, and deposit between not necessarily requiring or imply these entities or operating Relation or order in any this reality.And, term " includes ", " comprising " or its any other variant are intended to Comprising of nonexcludability, so that include that the process of a series of key element, method, article or equipment not only include that those are wanted Element, but also include other key elements being not expressly set out, or also include for this process, method, article or equipment Intrinsic key element.In the case of there is no more restriction, statement " including ... " key element limited, it is not excluded that Including process, method, article or the equipment of described key element there is also other identical element.

Claims (10)

1. a railway fail analysis device, it is characterised in that described railway fail analysis device includes:
Information receiving unit, for receiving the alarm content that a warning device sends;
Trouble shoot unit, for according to described alarm content and default failure cause look-up table find out failure cause and Troubleshooting mode;
Information transmitting unit, for sending described failure cause and troubleshooting mode to an intelligent terminal.
Railway fail analysis device the most according to claim 1, it is characterised in that described alarm content be two rails it Between magnitude of voltage, and described magnitude of voltage is not in default normal voltage range, and described trouble shoot unit is for according to described Magnitude of voltage and described failure cause look-up table find out failure cause and troubleshooting mode.
Railway fail analysis device the most according to claim 2, it is characterised in that described default voltage is normal range 18V~22V, if described trouble shoot unit is 14V~18V for the voltage range belonging to described magnitude of voltage or is more than 22V, Find out that slide rheostat is bad, failure cause that traction current interference, backflow are the most smooth, if the voltage zone belonging to described magnitude of voltage Between be less than 14V, then find out Ballast leakage, work business fastener touches clamping plate, current limiter is bad failure cause.
Railway fail analysis device the most according to claim 3, it is characterised in that described railway fail analysis device also wraps Include failure trend prediction unit, if described failure trend prediction unit and is less than less than 0 for the difference of described magnitude of voltage with 22V The threshold value preset or the difference of described magnitude of voltage and 18V more than 0 and less than the threshold value preset, then generate slide rheostat bad, Traction current interference, the most smooth fault trend information of backflow, if the difference of described magnitude of voltage and 14V is more than 0 and less than presetting Threshold value, then generate Ballast leakage, work business fastener touches the fault trend information that clamping plate, current limiter are bad;
Described information transmitting unit is additionally operable to send the hidden danger processing mode with described fault trend information association of pre-stored To described intelligent terminal.
Railway fail analysis device the most according to claim 1, it is characterised in that described alarm content be two rails it Between magnitude of voltage fluctuate in default normal voltage range, described trouble shoot unit is for according to this alarm content and institute State described failure cause look-up table and find out the corrosion of plug pin hole, plug pin head loose contact, the failure cause of power line loose contact.
Railway fail analysis device the most according to claim 1, it is characterised in that described alarm content also includes fault Responsibility object belonging to equipment, described railway fail analysis device also includes computing unit and warning statistical report form signal generating unit, Described computing unit is by once reporting to the police to the responsibility object associated with this alarm content based on after receiving alarm content Count and obtain warning quantitative value, and calculate the alarm rate of each responsibility object;
Described report generation unit is for according to described responsibility object, warning quantitative value, alarm rate, failure cause and troubleshooting Mode generates warning statistical report form;
Described information transmitting unit is additionally operable to send to described intelligent terminal described warning statistical report form.
7. a railway failure analysis methods, it is characterised in that described railway failure analysis methods includes:
Receive the alarm content that a warning device sends;
Failure cause and troubleshooting mode is found out according to described alarm content and default failure cause look-up table;
Described failure cause and troubleshooting mode are sent to an intelligent terminal.
Railway failure analysis methods the most according to claim 7, it is characterised in that described alarm content be two rails it Between magnitude of voltage, and in the normal voltage range preset of described magnitude of voltage, described according to described alarm content and default therefore Barrier cause investigation table is found out the step of failure cause and troubleshooting mode and is included:
Failure cause and troubleshooting mode is found out according to described magnitude of voltage and described failure cause look-up table.
Railway failure analysis methods the most according to claim 8, it is characterised in that described default voltage is normal range 18V~22V, described finds out failure cause and troubleshooting side according to described magnitude of voltage and described failure cause look-up table The step of formula includes:
If the voltage range belonging to described magnitude of voltage be 14V~18V or more than 22V, find out slide rheostat bad, traction Current interference, the most smooth failure cause of backflow;
If the voltage range belonging to described magnitude of voltage is less than 14V, then find out Ballast leakage, work business fastener touch clamping plate, current limliting The failure cause that device is bad.
Railway failure analysis methods the most according to claim 9, it is characterised in that described railway failure analysis methods is also Including:
If described magnitude of voltage less than 0 and is less than the threshold value preset or the described magnitude of voltage difference with 18V more than 0 with the difference of 22V And less than the threshold value preset, then generate that slide rheostat is bad, fault trend information that traction current interference, backflow are the most smooth;
If the difference of described magnitude of voltage and 14V is more than 0 and less than the threshold value preset, then generate Ballast leakage, work business fastener touches folder The fault trend information that plate, current limiter are bad;
The hidden danger processing mode with described fault trend information association of pre-stored is sent to described intelligent terminal.
CN201610711660.XA 2016-08-23 2016-08-23 Railway fail analysis device and method Pending CN106274991A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610711660.XA CN106274991A (en) 2016-08-23 2016-08-23 Railway fail analysis device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610711660.XA CN106274991A (en) 2016-08-23 2016-08-23 Railway fail analysis device and method

Publications (1)

Publication Number Publication Date
CN106274991A true CN106274991A (en) 2017-01-04

Family

ID=57614885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610711660.XA Pending CN106274991A (en) 2016-08-23 2016-08-23 Railway fail analysis device and method

Country Status (1)

Country Link
CN (1) CN106274991A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107424626A (en) * 2017-08-04 2017-12-01 上海振华重工电气有限公司 A kind of gantry crane trolley track sound monitoring and fault finding system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0522207A (en) * 1991-07-12 1993-01-29 Mitsubishi Electric Corp Protection radio system
CN101209714A (en) * 2006-12-28 2008-07-02 上海轨道交通设备发展有限公司 Track traffic synthetic monitoring system and method
CN101420638A (en) * 2007-10-24 2009-04-29 株洲南车时代电气股份有限公司 Method, apparatus and system for automatically processing engine failure
CN102248955A (en) * 2011-05-25 2011-11-23 苏州博远容天信息科技有限公司 Automatic alarm receiving method
CN102381340A (en) * 2010-08-27 2012-03-21 卡斯柯信号有限公司 Power curve-based speed-raising turnout fault information processing method and device
CN103745229A (en) * 2013-12-31 2014-04-23 北京泰乐德信息技术有限公司 Method and system of fault diagnosis of rail transit based on SVM (Support Vector Machine)
CN104228882A (en) * 2014-09-09 2014-12-24 宁波思高信通科技有限公司 Outdoor track circuit integrated monitoring system and method
CN104908781A (en) * 2015-05-27 2015-09-16 中国铁路总公司 Integrated electricity monitoring and maintaining system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0522207A (en) * 1991-07-12 1993-01-29 Mitsubishi Electric Corp Protection radio system
CN101209714A (en) * 2006-12-28 2008-07-02 上海轨道交通设备发展有限公司 Track traffic synthetic monitoring system and method
CN101420638A (en) * 2007-10-24 2009-04-29 株洲南车时代电气股份有限公司 Method, apparatus and system for automatically processing engine failure
CN102381340A (en) * 2010-08-27 2012-03-21 卡斯柯信号有限公司 Power curve-based speed-raising turnout fault information processing method and device
CN102248955A (en) * 2011-05-25 2011-11-23 苏州博远容天信息科技有限公司 Automatic alarm receiving method
CN103745229A (en) * 2013-12-31 2014-04-23 北京泰乐德信息技术有限公司 Method and system of fault diagnosis of rail transit based on SVM (Support Vector Machine)
CN104228882A (en) * 2014-09-09 2014-12-24 宁波思高信通科技有限公司 Outdoor track circuit integrated monitoring system and method
CN104908781A (en) * 2015-05-27 2015-09-16 中国铁路总公司 Integrated electricity monitoring and maintaining system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107424626A (en) * 2017-08-04 2017-12-01 上海振华重工电气有限公司 A kind of gantry crane trolley track sound monitoring and fault finding system

Similar Documents

Publication Publication Date Title
CN110505102B (en) Power information communication fusion monitoring and service standardization management platform system and method
CN106651161A (en) Acquisition operation and maintenance and dynamic tasking method
CN106504367B (en) Vehicle trouble method for early warning and device
CN105678467A (en) Regulation and control integrated data analysis and aid decision making system and method under ultrahigh-voltage alternating current and direct current networking
CN109948877B (en) Power consumption anomaly accurate analysis method based on anomaly event combination
CN107426013A (en) Facility information monitoring method, apparatus and system
CN101925039A (en) Prewarning method and device of billing ticket
KR20080070543A (en) Early warning method for estimating inferiority in automatic production line
CN114167156A (en) System and method for managing voltage event alerts in an electrical system
CN107272583A (en) A kind of motor welds networked system
CN107658980A (en) A kind of analysis method and system for being used to check power system monitor warning information
CN110930000A (en) Intelligent power supply system data comprehensive management system for power industry
CN108985963A (en) It is a kind of for electrical integrated monitoring device
KR101420769B1 (en) Factory State Management System Using Factory Management Index
CN106274991A (en) Railway fail analysis device and method
CN103888300B (en) Network failure analysis system and method in Web service system
CN109754094A (en) Electromechanical equipment intelligence O&M method, system, equipment and storage medium
Rajagopal et al. Health of California’s loop detector system
CN104714205A (en) Electricity meter misplacement detection system and method thereof
CN111123855A (en) Construction site management and control system and method
CN111383445A (en) System and method for realizing data inspection control of urban traffic intersection
CN101673472A (en) Method for monitoring operating system, device and system therefor
DE102019212065A1 (en) Method for logging a usage history of a battery system as well as battery system and motor vehicle
Nakayama et al. Energy management systems with intelligent anomaly detection and prediction
CN106293630B (en) Railway signal fault analyzes logic rules generating means and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104