- CN106273582B CN106273582B CN201510242414.XA CN201510242414A CN106273582B CN 106273582 B CN106273582 B CN 106273582B CN 201510242414 A CN201510242414 A CN 201510242414A CN 106273582 B CN106273582 B CN 106273582B
- Authority
- CN
- China
- Prior art keywords
- support frame
- cylinder
- frame
- interlocking bar
- delivery wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Treatment Of Fiber Materials (AREA)
Abstract
The invention discloses a kind of full-automatic heat welded seams for strainer to close shearing lantern ring production line, including raw material frame, heat sewing machine, tension adjustment conveying mechanism, shear, fixed length carriage, falsework, sleeve joint device and controller, hot melt sewing machine is set to the left of raw material frame, the tension adjustment conveying mechanism is set to the left of the hot melt sewing machine, the shear is fixedly installed in the top surface of the tension adjustment conveying mechanism, the fixed length carriage is set to the left of tension adjustment conveying mechanism, the falsework is set to the rear of the fixed length carriage, the sleeve joint device is fixedly installed on the table top of the falsework, it is low that the controller solves existing artificial strainer processing efficiency, processing quality is difficult to ensure, the high problem of processing cost.
Description
Technical field
The present invention relates to strainer technical field of processing equipment, and in particular to a kind of molten stitch scissors of the full-automatic heat for strainer
Cut lantern ring production line.
Background technique
Textile fabric strainer is primarily adapted for use in filtering, dedusting and separation requirement, is suitable for each rows such as chemical industry, food and pharmacy
The filtering of each industry.Textile fabric strainer is directly to filter, and with simple process, good permeability, uniform precision is stable, does not let out
Leakage, the characteristics of regenerability is good, reproduction speed is fast, easy for installation, high-efficient and long service life.
Being generally manual suture's strainer, shearing strainer in existing strainer production process and depositing is strainer lantern ring by hand, with
The development of society, cost of labor is higher and higher, and processing quality, the requirement of processing efficiency are also higher and higher, for labor-intensive
Enterprise brings new challenge, and there are processing efficiencies for existing artificial strainer lowly, processing quality is difficult to ensure, processing cost
High problem.
Summary of the invention
In order to solve the above technical problems, we have proposed a kind of full-automatic heat welded seams for strainer to close shearing lantern ring production
Line solves the problems, such as that existing artificial strainer processing efficiency is low, processing quality is difficult to ensure, processing cost is high.
To solve the above problems, technical scheme is as follows:
A kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer, including raw material frame, hot melt sewing machine, tension
Adjusting conveying mechanism, shear, fixed length carriage, falsework, sleeve joint device and controller, the raw material frame includes support frame
One, shaft, adjusting rod, one-pass molding frame and post forming frame, the shaft bearing are installed on the top of one right end of support frame as described above
Portion, the middle part that the adjusting rod is installed on support frame as described above one is top, and the one-pass molding frame is installed on support frame as described above one
Left part, the post forming frame are installed on the right end of support frame as described above one, the top of the one-pass molding frame and post forming frame
It is provided with the forming tank of U-shaped structure, the forming tank of the one-pass molding frame is greater than the forming tank of post forming frame;
The hot melt sewing machine is set to the left of support frame as described above one, and the hot melt sewing machine includes support frame two, machine
Head and at cylinder mechanism, the head is installed on support frame as described above two, it is described at cylinder mechanism socket be installed under the head
Portion;
The tension adjustment conveying mechanism is set to the left of the hot melt sewing machine, the tension adjustment conveying mechanism packet
Support frame three, feeding mechanism and governing mechanism of tension are included, the feeding mechanism is installed at the top of the right end of support frame as described above three, institute
Governing mechanism of tension is stated to be installed in support frame as described above three;
The shear is fixedly installed in the left end of three top surface of support frame as described above, and the shear includes cutter
Structure, feeding pressure mechanism and material pulling mechanism, the material pulling mechanism are installed on the bottom right inside the shear, the feeding pressure mechanism peace
Loaded on the middle part inside the shear, the cutting mechanism is installed on the left part inside the shear;
Fixed length carriage is set to the left side of the tension adjustment conveying mechanism, and the fixed length carriage includes support frame
Four, support rod, interlocking bar, cylinder, swing rod, broom head, delivery wheel, conveyer belt, servo motor and fixed length mechanism, support frame as described above
The front side left and right directionss on four tops are equipped with support rod described in a row, and the rear portion on the top of support frame as described above four is mounted on axis
Seat is held, the interlocking bar includes interlocking bar one and interlocking bar two, and one bearing of interlocking bar is installed on four left side of support frame as described above
Bearing block in, two bearing of interlocking bar is installed in the bearing block on the right side of support frame as described above four;The swing rod is installed respectively
In in the interlocking bar one and interlocking bar two, the cylinder includes cylinder one and cylinder two, the tail of the cylinder one and cylinder two
Portion is respectively arranged in the front in the middle part of two support rods, is separately installed with swing arm one in the interlocking bar one and interlocking bar two
With swing arm two, the piston rod of the cylinder one and cylinder two is hinged with the swing arm one and swing arm two respectively, the broom head peace
Bottom loaded on the swing rod, the delivery wheel include delivery wheel one and delivery wheel two, and the delivery wheel one and delivery wheel two divide
Other bearing is installed on the left and right ends at four top of support frame as described above, and the conveyer belt is installed on delivery wheel one and delivery wheel two,
The servo motor is installed on the right side of four front of support frame as described above, and the servo motor is respectively at the delivery wheel two and draws material
Mechanism driving connection, the fixed length mechanism include scale plate, bracket and distance-sensor, and the scale plate is horizontally installed to described
The middle part of support rod, the scale plate run through the left and right directions of support frame as described above four, and the bracket is installed on the scale plate,
The distance-sensor is installed on the bracket;
The falsework is set to the rear of support frame as described above four, and the top surface of the falsework is provided with panel, the set
Connection device is installed on the panel, and the sleeve joint device includes support frame five, hydraulic cylinder, fixed link and elevating lever, the liquid
Cylinder pressure is installed on support frame five, and the fixed link is provided with two, and two described fixed links or so are mounted side by side in support frame
Five rear end face, the front end of the elevating lever are fixedly installed on the piston rod of the hydraulic cylinder, and the elevating lever is located at two
Between the fixed link;
The controller respectively with the distance-sensor, hot melt sewing machine feeding mechanism, governing mechanism of tension, draw material machine
Structure, feeding pressure mechanism, cutting mechanism and cylinder electrical connection.
Preferably, the bottom between support frame as described above one and the tension adjustment conveying mechanism is connected with a connecting plate.
Preferably, the shaft, adjusting rod, one-pass molding frame, post forming frame and at cylinder mechanism be located at same level height
Degree.
Preferably, the rear end of four top surface of support frame as described above is equipped with buffer board.
Through the above technical solutions, a kind of full-automatic heat welded seam for strainer proposed by the present invention closes shearing lantern ring production
Line passes through setting raw material frame, hot melt sewing machine, tension adjustment conveying mechanism, shear, fixed length carriage, falsework, socket
Device and controller, solve that existing artificial strainer processing efficiency is low, processing quality is difficult to ensure, processing cost is high
Problem.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is a kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer disclosed in the embodiment of the present invention
Schematic diagram;
Fig. 2 is a kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer disclosed in the embodiment of the present invention
Schematic diagram;
Fig. 3 is a kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer disclosed in the embodiment of the present invention
Schematic diagram;
Fig. 4 is a kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer disclosed in the embodiment of the present invention
Schematic diagram;
Fig. 5 is a kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer disclosed in the embodiment of the present invention
Schematic diagram;
Fig. 6 is a kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer disclosed in the embodiment of the present invention
Schematic diagram;
Fig. 7 is a kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer disclosed in the embodiment of the present invention
Schematic diagram;
Fig. 8 is a kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer disclosed in the embodiment of the present invention
Schematic diagram;
Fig. 9 is a kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer disclosed in the embodiment of the present invention
Schematic diagram.
Number and corresponding component title represented by letter in figure:
1. raw material frame 2. heats 3. tension adjustment conveying device of sewing machine
4. 5. fixed length carriage of shear, 6. falsework
7. 8. controller of sleeve joint device, 11. support frame one
12. 13. adjusting rod of shaft, 14. one-pass molding frame
15. 16. forming tank of post forming frame, 21. support frame two
22. head 23. is at 31. support frame three of cylinder mechanism
32. 33. regulating mechanism of feeding mechanism, 34. connecting plate
41. 42. feeding pressure mechanism of cutting mechanism, 43 material pulling mechanism
51. 4 52. support rod of support frame, 53. interlocking bar
54. 55. swing rod of cylinder, 56. broom head
57. 58. conveyer belt of delivery wheel, 59. servo motor
5a. fixed length mechanism 5b. bearing block 5c. swing arm one
Two 5e. buffer board of 5d. swing arm, 531. interlocking bar one
532. interlocking bar, 2 541. cylinder, one 542. cylinder one
571. delivery wheel, one 572. delivery wheel, two 5a1. scale plate
61. panel of 5a2. bracket 5a3. distance-sensor
71. 5 72. hydraulic cylinder of support frame, 73. fixed link
74. elevating lever.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Below with reference to embodiment and specific embodiment, the present invention is described in further detail.
Embodiment
As shown in figs 1-9, a kind of full-automatic heat welded seam for strainer closes shearing lantern ring production line, including raw material frame 1, heat
Molten sewing machine 2, tension adjustment conveying device 3, shear 4, fixed length carriage 5, falsework 6, sleeve joint device 7 and controller 8,
The raw material frame 1 includes support frame 1, shaft 12, adjusting rod 13, one-pass molding frame 14 and post forming frame 15, the shaft
12 bearings are installed on the top of one 11 right end of support frame as described above, and the middle part that the adjusting rod 13 is installed on support frame as described above 1 is leaned on
On, the one-pass molding frame 14 is installed on the left part of support frame as described above 1, and the post forming frame 15 is installed on the support
The top of the right end of frame 1, the one-pass molding frame 14 and post forming frame 15 is provided with the forming tank 16 of U-shaped structure, institute
The forming tank 16 for stating one-pass molding frame 14 is greater than the forming tank 16 of post forming frame 15.
The hot melt sewing machine 2 is set to the left of support frame as described above 1, and the hot melt sewing machine 2 includes support frame two
21, head 22 and at cylinder mechanism 23, the head 22 is installed on support frame as described above 2 21, and described be socketed at cylinder mechanism 23 is installed
In the lower part of the head 22;The shaft 12, adjusting rod 13, one-pass molding frame 14, post forming frame 15 and at cylinder mechanism 23
Positioned at same level height.
The tension adjustment conveying device 3 is set to the left of the hot melt sewing machine 2, the tension adjustment conveying device
3 include support frame 3 31, feeding mechanism 32 and governing mechanism of tension 33, and the feeding mechanism 32 is installed on support frame as described above 3 31
Right end at the top of, the governing mechanism of tension 33 is installed in support frame as described above 3 31;Support frame as described above 1 and the tension
The bottom adjusted between conveying device 3 is connected with a connecting plate 34.
The shear 4 is fixedly installed in the left end of 3 31 top surface of support frame as described above, and the shear 4 includes shearing
Mechanism 41, feeding pressure mechanism 42 and material pulling mechanism 43, the material pulling mechanism 43 are installed on the bottom right inside the shear 4, institute
The middle part that feeding pressure mechanism 42 is installed on inside the shear 4 is stated, the cutting mechanism 41 is installed in the shear 4
The left part in portion.
Fixed length carriage 5 is set to the left side of the tension adjustment conveying device 3, and the fixed length carriage 5 includes support
Frame 4 51, support rod 52, interlocking bar 53, cylinder 54, swing rod 55, broom head 56, delivery wheel 57, conveyer belt 58, servo motor 59
With fixed length mechanism 5a, the front side left and right directionss on 4 51 top of support frame as described above are equipped with support rod 52 described in a row, the branch
The rear portion on the top of support 4 51 is mounted on bearing block 5b, and the interlocking bar 53 includes interlocking bar 1 and interlocking bar two
532, one 531 bearing of interlocking bar is installed in the bearing block 5b in 4 51 left side of support frame as described above, 2 532 axis of interlocking bar
It holds described in being installed on
In the bearing block 5b on 4 51 right side of support frame;The swing rod 55 is respectively arranged in the interlocking bar 1 and linkage
On bar 2 532, the cylinder 54 includes cylinder 1 and cylinder 2 542, the portion of the cylinder 1 and cylinder 2 542
It is not installed on the front at two 52 middle parts of support rod, is separately installed with pendulum in the interlocking bar 1 and interlocking bar 2 532
The piston rod of two 5d of one 5c of arm and swing arm, the cylinder 1 and cylinder 2 542 respectively with one 5c of swing arm and two 5d of swing arm
Hingedly, the broom head 56 is installed on the bottom of the swing rod 55, and the delivery wheel 57 includes delivery wheel 1 and delivery wheel two
572, bearing is installed on the left and right ends at the top of support frame as described above 4 51, institute respectively for the delivery wheel 1 and delivery wheel 2 572
It states conveyer belt 58 to be installed on delivery wheel 1 and delivery wheel 2 572, the servo motor 59 is installed on support frame as described above 4 51
The right side of front, the servo motor 59 are sequentially connected respectively at the delivery wheel 2 572 and material pulling mechanism 43, the fixed length machine
Structure 5a includes that scale plate 5a1, bracket 5a2 and distance-sensor 5a3, the scale plate 5a1 are horizontally installed to the support rod 52
Middle part, the scale plate 5a1 runs through the left and right directions of support frame as described above 4 51, and the bracket 5a2 is installed on the scale plate
On 5a1, the distance-sensor 5a3 is installed on the bracket 5a2;The rear end of 4 51 top surface of support frame as described above is equipped with buffering
Plate 5e.
The falsework 6 is set to the rear of support frame as described above 4 51, and the top surface of the falsework 6 is provided with panel 61,
The sleeve joint device 7 is installed on the panel 61, and the sleeve joint device 7 includes support frame 5 71, hydraulic cylinder 72, fixed link 73
With elevating lever 74, the hydraulic cylinder 72 is installed on support frame 5 71, and the fixed link 73 is provided with two, two fixations
Bar 73 or so is mounted side by side in the rear end face of support frame 5 71, and the front end of the elevating lever 74 is fixedly installed in the hydraulic cylinder 72
Piston rod on, the elevating lever 74 is located between two fixed links 73.
The controller 8 respectively with the distance-sensor 5a3, hot melt 2 feeding mechanism 32 of sewing machine, governing mechanism of tension
33, material pulling mechanism 43, feeding pressure mechanism 42, cutting mechanism 41 and cylinder 54 are electrically connected.
Working principle: the support of support frame 11 turns 12, raw material is installed in shaft 12, raw material is on adjusting rod after zigzag conveying
Enter after one-pass molding frame 14, post forming frame 15 are formed into cylinder mechanism 23, enters after hot melt sewing machine 2 is stitched into cylinder and send
Expect mechanism 31, feeding mechanism 31 provides conveying power, material pulling mechanism 43 is then entered after 33 adjustment barrel material tension of regulating mechanism,
Material pulling mechanism 43 also provides conveying power, and cylinder material is transported to distance perception through conveyer belt 58 across feeding pressure mechanism 42 and cutting mechanism 43
It answers at device 5a3, distance-sensor 5a3 delivers a signal to controller 8, and controller 8 controls 42 clamping cylinder material of feeding pressure mechanism and then controls
Cutting mechanism 41 processed starts to shear, and controller 8 controls cylinder 54 and pushes one 5c of swing arm and two 5d of swing arm movement, pendulum after shearing
One 5c of arm and two 5d of swing arm movement drives interlocking bar 1 and interlocking bar 2 532 to rotate respectively, interlocking bar 1 and interlocking bar
2 532 drive swing rod 55 to swing forward respectively, and swing rod 55 drives broom head 56 to shift the cylinder material of well cutting on panel 61 onto, then
Controller control broom head 56, interlocking bar 1, interlocking bar 2 53, one 5c of swing arm, two 5d of swing arm, cylinder 54, is cut swing rod 55
It cuts mechanism 41 and feeding pressure mechanism 42 carries out homing action, a process-cycle completes, and processing repeats this period, then by the people that works
Member using sleeve joint device 7 by cylinder expect on be socketed steel loop and rubber ring.
Through the above technical solutions, a kind of full-automatic heat welded seam for strainer proposed by the present invention closes shearing lantern ring production
Line passes through setting raw material frame 1, hot melt sewing machine 2, tension adjustment conveying device 3, shear 4, fixed length carriage 5, falsework
6, sleeve joint device 7 and controller 8, solve that existing artificial strainer processing efficiency is low, processing quality is difficult to ensure, processes
Problem at high cost.
Above-described is only that a kind of full-automatic heat welded seam for strainer of the present invention closes the preferred of shearing lantern ring production line
Embodiment, it is noted that for those of ordinary skill in the art, in the premise for not departing from the invention design
Under, various modifications and improvements can be made, and these are all within the scope of protection of the present invention.
Claims (4)
1. a kind of full-automatic heat welded seam for strainer closes shearing lantern ring production line, which is characterized in that including raw material frame, hot melt seam
Conjunction machine, tension adjustment conveying mechanism, shear, fixed length carriage, falsework, sleeve joint device and controller, the raw material frame
Including support frame one, shaft, adjusting rod, one-pass molding frame and post forming frame, the shaft bearing is installed on support frame as described above
The top of one right end, the middle part that the adjusting rod is installed on support frame as described above one is top, and the one-pass molding frame is installed on described
The left part of support frame one, the post forming frame are installed on the right end of support frame as described above one, the one-pass molding frame and it is secondary at
The forming tank of U-shaped structure is provided at the top of type frame, the forming tank of the one-pass molding frame is greater than the molding of post forming frame
Slot;
The hot melt sewing machine is set to the left of support frame as described above one, the hot melt sewing machine include support frame two, head and
At cylinder mechanism, the head is installed on support frame as described above two, the lower part that the head is installed at the socket of cylinder mechanism;
The tension adjustment conveying mechanism is set to the left of the hot melt sewing machine, and the tension adjustment conveying mechanism includes branch
Support three, feeding mechanism and governing mechanism of tension, the feeding mechanism are installed at the top of the right end of support frame as described above three, and described
Power regulating mechanism is installed in support frame as described above three;
The shear is fixedly installed in the left end of three top surface of support frame as described above, and the shear includes cutting mechanism, pressure
Material mechanism and material pulling mechanism, the material pulling mechanism are installed on the bottom right inside the shear, and the feeding pressure mechanism is installed on
Middle part inside the shear, the cutting mechanism are installed on the left part inside the shear;
Fixed length carriage is set to the left side of the tension adjustment conveying mechanism, and the fixed length carriage includes support frame four, branch
Strut, interlocking bar, cylinder, swing rod, broom head, delivery wheel, conveyer belt, servo motor and fixed length mechanism, support frame as described above four push up
The front side left and right directionss at end are equipped with support rod described in a row, and the rear portion on the top of support frame as described above four is mounted on bearing
Seat, the interlocking bar include interlocking bar one and interlocking bar two, and one bearing of interlocking bar is installed on four left side of support frame as described above
In bearing block, two bearing of interlocking bar is installed in the bearing block on four right side of support frame as described above;The swing rod is respectively arranged in
In the interlocking bar one and interlocking bar two, the cylinder includes cylinder one and cylinder two, the tail portion of the cylinder one and cylinder two
It is respectively arranged in the front in the middle part of two support rods, one He of swing arm is separately installed in the interlocking bar one and interlocking bar two
The piston rod of swing arm two, the cylinder one and cylinder two is hinged with the swing arm one and swing arm two respectively, the broom head installation
In the bottom of the swing rod, the delivery wheel includes delivery wheel one and delivery wheel two, and the delivery wheel one and delivery wheel two are distinguished
Bearing is installed on the left and right ends at four top of support frame as described above, and the conveyer belt is installed on delivery wheel one and delivery wheel two, institute
The right side that servo motor is installed on four front of support frame as described above is stated, the servo motor is respectively at the delivery wheel two and draws material machine
Structure transmission connection, the fixed length mechanism includes scale plate, bracket and distance-sensor, and the scale plate is horizontally installed to the branch
The middle part of strut, the scale plate run through the left and right directions of support frame as described above four, and the bracket is installed on the scale plate, institute
Distance-sensor is stated to be installed on the bracket;
The falsework is set to the rear of support frame as described above four, and the top surface of the falsework is provided with panel, the set tipping
It sets and is installed on the panel, the sleeve joint device includes support frame five, hydraulic cylinder, fixed link and elevating lever, the hydraulic cylinder
It is installed on support frame five, the fixed link is provided with two, and two described fixed links or so are mounted side by side in support frame five
Rear end face, the front end of the elevating lever are fixedly installed on the piston rod of the hydraulic cylinder, and the elevating lever is located at described in two
Between fixed link;
The controller respectively with the distance-sensor, hot melt sewing machine feeding mechanism, governing mechanism of tension, material pulling mechanism,
Feeding pressure mechanism, cutting mechanism and cylinder electrical connection.
2. a kind of full-automatic heat welded seam for strainer according to claim 1 closes shearing lantern ring production line, feature exists
In the bottom between support frame as described above one and the tension adjustment conveying mechanism is connected with a connecting plate.
3. a kind of full-automatic heat welded seam for strainer according to claim 1 closes shearing lantern ring production line, feature exists
In the shaft, adjusting rod, one-pass molding frame, post forming frame and being located at same level height at cylinder mechanism.
4. a kind of full-automatic heat welded seam for strainer according to claim 1 closes shearing lantern ring production line, feature exists
In the rear end of four top surface of support frame as described above is equipped with buffer board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510242414.XA CN106273582B (en) | 2015-05-13 | 2015-05-13 | A kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510242414.XA CN106273582B (en) | 2015-05-13 | 2015-05-13 | A kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106273582A CN106273582A (en) | 2017-01-04 |
CN106273582B true CN106273582B (en) | 2019-04-23 |
Family
ID=57631307
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510242414.XA Active CN106273582B (en) | 2015-05-13 | 2015-05-13 | A kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106273582B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109514615A (en) * | 2018-12-29 | 2019-03-26 | 安徽原野滤材有限公司 | A kind of strainer automatic-shearing device |
CN112659563A (en) * | 2020-11-27 | 2021-04-16 | 常州安一智能科技有限公司 | Barrel filter screen hot-pressing splicing equipment and working method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3834969A (en) * | 1972-02-03 | 1974-09-10 | Cellu Prod Co | Apparatus for forming a stretchable tubular packaging material |
CN1156664A (en) * | 1996-02-07 | 1997-08-13 | 西马股份有限公司 | Machine for preparing net bags |
CN201261263Y (en) * | 2008-09-28 | 2009-06-24 | 张延青 | Heat seal apparatus for polyphenyl thioether fibre dust removing bag |
CN202895685U (en) * | 2012-07-20 | 2013-04-24 | 上海索盈缝制机械有限公司 | Hot melt stitching automatic production device |
CN204674047U (en) * | 2015-05-13 | 2015-09-30 | 安徽原野滤材有限公司 | A kind of full-automatic heat welded seam for filter screen closes shears collar production line |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3571399B2 (en) * | 1995-02-24 | 2004-09-29 | 株式会社ニフコ | Filter manufacturing method and its manufacturing apparatus |
-
2015
- 2015-05-13 CN CN201510242414.XA patent/CN106273582B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3834969A (en) * | 1972-02-03 | 1974-09-10 | Cellu Prod Co | Apparatus for forming a stretchable tubular packaging material |
CN1156664A (en) * | 1996-02-07 | 1997-08-13 | 西马股份有限公司 | Machine for preparing net bags |
CN201261263Y (en) * | 2008-09-28 | 2009-06-24 | 张延青 | Heat seal apparatus for polyphenyl thioether fibre dust removing bag |
CN202895685U (en) * | 2012-07-20 | 2013-04-24 | 上海索盈缝制机械有限公司 | Hot melt stitching automatic production device |
CN204674047U (en) * | 2015-05-13 | 2015-09-30 | 安徽原野滤材有限公司 | A kind of full-automatic heat welded seam for filter screen closes shears collar production line |
Also Published As
Publication number | Publication date |
---|---|
CN106273582A (en) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101041240B (en) | Cutter for cutting band material, particularly textile- or steel-cord bands | |
CN104960717B (en) | Automatic and continuous bag-breaking and unloading device | |
CN104495486B (en) | Automatic cotton cutting machine | |
CN105059896A (en) | Lifting type belt plate fetching machine | |
CN106273582B (en) | A kind of full-automatic heat welded seam conjunction shearing lantern ring production line for strainer | |
CN105690504B (en) | A kind of new automatic middle plate plate joggling apparatus anyhow | |
CN205024422U (en) | Ultrasonic edge cutting machine | |
CN209035362U (en) | A kind of lighting apparatus production LED foot cut device | |
CN102771253A (en) | Double-ridge sugarcane reaping and tip-cutting device | |
CN104233643B (en) | A kind of manual imitation pushes the sewing machine of material | |
CN109250560A (en) | A kind of no-station pole canopy towel banding machine | |
CN106283591B (en) | A kind of automatic cutting device with governing mechanism of tension | |
CN204674047U (en) | A kind of full-automatic heat welded seam for filter screen closes shears collar production line | |
CN209095636U (en) | Paper jam lock angle cutting device | |
CN204662018U (en) | Auricularia auriculajudae automatic processing device | |
CN106145662B (en) | The fluting disconnecting device of glass fibre umbrella frame | |
CN211076587U (en) | Full-automatic sack closer | |
CN210910217U (en) | Six-shaft type dicer | |
CN207290192U (en) | Bai Liao mechanisms | |
CN204873069U (en) | Connect defeated work or material rest of cloth machine | |
CN204568742U (en) | Self-propelled material transporter after a kind of reclaimed rubber kneading | |
CN207991268U (en) | A kind of liquefied gas sintering system | |
CN213624667U (en) | Braided bag production is with automatic hot joint seam limit system | |
CN218711711U (en) | Full-automatic shearing machine for producing full cotton cloth | |
CN217678286U (en) | Fabric cutting table and cutting device with same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |