CN106256963A - Modularity biology permeable dike and construction method thereof - Google Patents

Modularity biology permeable dike and construction method thereof Download PDF

Info

Publication number
CN106256963A
CN106256963A CN201610539377.3A CN201610539377A CN106256963A CN 106256963 A CN106256963 A CN 106256963A CN 201610539377 A CN201610539377 A CN 201610539377A CN 106256963 A CN106256963 A CN 106256963A
Authority
CN
China
Prior art keywords
net cage
modularity
biology
dam
permeable dike
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610539377.3A
Other languages
Chinese (zh)
Other versions
CN106256963B (en
Inventor
徐志
高彦波
孙百宁
郑冬宇
于田田
王影
高声远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South of the Five Ridges ecological culture brigade Limited by Share Ltd
Original Assignee
South Of Five Ridges Xinke Ecological Science And Technology Research Institute (beijing) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South Of Five Ridges Xinke Ecological Science And Technology Research Institute (beijing) Co Ltd filed Critical South Of Five Ridges Xinke Ecological Science And Technology Research Institute (beijing) Co Ltd
Priority to CN201610539377.3A priority Critical patent/CN106256963B/en
Publication of CN106256963A publication Critical patent/CN106256963A/en
Application granted granted Critical
Publication of CN106256963B publication Critical patent/CN106256963B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/34Biological treatment of water, waste water, or sewage characterised by the microorganisms used

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Microbiology (AREA)
  • Water Supply & Treatment (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)
  • Biological Treatment Of Waste Water (AREA)

Abstract

The present invention relates to a kind of modularity biology permeable dike and construction method thereof, described modularity permeable dike, the dam structure piled up including some net cage monomers, described net cage monomer is the netted body structure that steel wire is worked out by mechanical technology, be filled with dam stone that particle diameter is 8 to 25cm in each described net cage monomer, particle diameter is the microbe carrier of 6 10cm, wherein microbe carrier is filled in the middle part of net cage monomer, filling dam stone around microbe carrier, the packing volume of microbe carrier is 20% the 35% of net cage monomer overall volume.The present invention i.e. possesses the function of dam, can purify quality of river water again, and easy for installation convenient, easily dismounts, sound construction, and range is wide, repeatable recycling.

Description

Modularity biology permeable dike and construction method thereof
Technical field
The present invention relates to a kind of technology for improving non-flood discharge river water ecological environment, a kind of module metaplasia State permeable dike.
Background technology
Increase and the quickening of urbanization process due to China's population in recent years, the excess emitters sewage of cities and towns industry and agriculture With chemical fertilizer, a large amount of uses of pesticide, causing the severe contamination of water quality of river, some areas form black and odorous water, not only give the masses Bring the sensory experience of extreme difference, be also the prominent water environmental problems directly affecting masses' productive life.
2015, house town and country construction portion took the lead, and has worked out " city together with ministries and commissions such as Environmental Protection Department, Ministry of Water Resources, the Ministry of Agriculture City's black and odorous water renovation guide ", the target of city black and odorous water renovation, principle, workflow etc. are made that bright Really regulation, and identification, classification, renovation scheme preparation method and the selection of remedial technology and effect to city black and odorous water is commented Estimate, policies and mechanisms guarantee proposes and clearly requires.According to " guide ", before the end of the year in 2015, region and above city are built up District should complete water body investigation, announces black and odorous water title, person liable and time limit up to standard;Before the end of the year in 2017, region and above city Built-up areas, city should realize river surface without large area floating thing, and riverbank is without rubbish, without illegal sewage draining exit;Municipality directly under the Central Government, provincial capital, plan Built-up areas, single-row city substantially eliminate black and odorous water.
Specify that the concrete technology administering black and odorous water at " city black and odorous water renovation guide ", mainly include control source Cut dirty technology, endogenous Treatment process, ecological reestablishment and other control measures.Ecological permeable dam is river corridor restoration technology One, in engineering, main application is that the runoff of non-flood discharge river or reservoir is retained.
Pollute for river water quality and Ecology destroys situation, the most effectively utilize ecological reestablishment measure, to river Road water quality is improved, and repairs water ecological environment.Actual application needs the problem solved as follows:
(1) dam block clitter builds stability, the convenience problem being.
(2) washed away dam body by water conservancy to pile up stone and easily cave in problem.
(3) permeable dike surface microorganism adhesive ability, i.e. water correction capability problems.
Because above-mentioned defect, the design people's the most in addition research and innovation, to founding the module of a kind of new structure Metaplasia thing permeable dike so that it is have more the value in industry.
Summary of the invention
For solving above-mentioned technical problem, it is an object of the invention to provide a kind of rational in infrastructure, in guaranteed water level early stage
Modularity biology permeable dike of the present invention, the dam structure piled up including some net cage monomers, described net cage monomer The netted body structure worked out by mechanical technology for steel wire, being filled with particle diameter in each described net cage monomer is 8 to 25cm Dam stone, particle diameter be the microbe carrier of 6-10cm, wherein microbe carrier is filled in the middle part of net cage monomer, microorganism carry Filling dam stone around body, the packing volume of microbe carrier is the 20%-35% of net cage monomer overall volume.
Further, described net cage monomer includes first module structure, second unit structure, and wherein first module structure is Right-angled trapezium body, second unit structure is cuboid;With described first module structure, second unit structure in water (flow) direction Be piled into some rows, if being upwards piled into dried layer at river upper and lower, use second unit structure overlapped way from bottom to top to On pile up formation upstream face, use the most successively the successively decrease mode of row of first module structure to pile up formation back side.
Further, described first module structure is by the bottom surface of rectangular configuration, leading flank, front prism, below top cover And seven, the side of two trapezium structures mesh sheet splicing composition, a width of 1m*1m of long * of wherein said bottom surface, described leading flank For 1m*0.6m, the angle of inclination of described front prism is 45 degree, a width of 1m*0.5m of long *, the described a width of 1m*1m of long * below, The a width of 1m*0.7m of long * of described top cover;
Described second unit structure is made up of the square mesh sheet splicing that six length of sides are 1m;
Further, described mesh sheet uses edge line diameter not less than φ 4, the in-house network filament diameter low-carbon (LC) not less than φ 3 The mild steel wire braiding of steel wire or cladding PVC forms, and the mesh of mesh sheet is the regular hexagon of length of side 30mm, and each mesh sheet uses φ 2 Colligation silk is fixed, and the length of the stranded part of its two-wire cannot be less than 50mm.
Further, the steel wire diameter of establishment formation net cage monomer is between 2.0-4.0mm, and the tensile strength of steel wire is not Less than 38kg/m2, coat of metal weight is higher than 245g/m2
Further, described microbe carrier is volcanic rock biologic packing material.
Further, the slope coefficient of trapezium structure dam slope is 1:1-1:2.5.
Further, the packing volume of microbe carrier is the 20%-30% of net cage monomer overall volume.
The construction method of modularity biology permeable dike of the present invention, including:
Selected river course or pond carry out desilting arrangement, and river bed compacting is smooth, then according to the design of ecological permeable dam Parameter carries out heap and builds, and the slope coefficient of trapezium structure dam slope is 1:1-1:2.5, and design parameter includes physical dimension, gravel grating;
Alignment outside base, riverbed: combine actual riverbed geology according to construction drawing and build sideline, island, actual survey sets out base Hemline, substrate sideline should be the most straight.
Substrate is excavated: fluvial sand, empty slag at the bottom of cleaning riverbed, excavation substrate platform also flattens compacting, makes substrate substantially flat Stable, removing be should give by the boulder of bulk;
Set up and form the arbitrary described permeable dike structure of claim 1 to 9: (1) net cage is installed: with excavator or hoisting machine Cooperation is manually laid in place, and layering is placed from one end toward the other end, or starts to place from lowest part, and adjacent net cage connects surely Can rockfill in cage after Gu, and not affect arrangement and the connection of follow-up net cage, rockfill;
(2) rockfill: during construction building stones should selectively placement in layers, every layer near net cage edge artificial selection's block footpath relatively Ratchel code is built, the more internal building stones of backfill, it is necessary to placement in layers is closely knit;
Wherein, described net cage is the net cage monomer in the arbitrary described modularity biology permeable dike of claim 1 to 8, Described building stones are the arbitrary described dam stone of claim 1 to 8, microbe carrier.
By such scheme, the present invention at least has the advantage that
Stone is arranged with in net cage by the present invention, forms modular unit, it is simple to mechanized construction, constructs simple and convenient.
The present invention both can ensure that water storage function, can safeguard and recover again the structural shape of river channel ecology.Fill micro-in net cage Bio-carrier, can be purified river by microbial action.The internal particle diameter filling stone of net is not fixed, can be according to scene Practical situation and relevant hydraulic calculation select voluntarily.
Connect simple between net cage monomer of the present invention, it is simple to later period maintenance and cleaning.First module structure back side has The inclined-plane of certain angle, can be effectively increased the contact area of current and unit, reduces water body simultaneously and folds the potential energy of generation, fall Low bottom of river channel is washed away.
Described above is only the general introduction of technical solutions of the utility model, in order to better understand the technology hands of the present invention Section, and can be practiced according to the content of description, below with presently preferred embodiments of the present invention and coordinate accompanying drawing to describe in detail such as After.
Accompanying drawing explanation
Fig. 1 modularity of the present invention biology permeable dike first module structural system figure;
Fig. 2 modularity of the present invention biology permeable dike first module structure expanded view;
Fig. 3 modularity of the present invention biology permeable dike first module structure is rockfilled figure;
Fig. 4 modularity of the present invention biology permeable dike second unit structural system figure;
Fig. 5 modularity of the present invention biology permeable dike second unit structure expanded view;
Fig. 6 is the structural representation of modularity biology permeable dike embodiment 1 of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment, the detailed description of the invention of the present invention is described in further detail.Hereinafter implement Example is used for illustrating the present invention, but is not limited to the scope of the present invention.
Embodiment 1
As shown in Figures 1 to 6, the present embodiment modularity biology permeable dike, the dam knot piled up including some net cage monomers 1 Structure, described net cage monomer is the netted body structure that steel wire is worked out by mechanical technology, fills in each described net cage monomer The dam stone, the particle diameter that have particle diameter to be 8 to 25cm are the microbe carrier of 6-10cm, and wherein microbe carrier is filled in net cage list In the middle part of body, filling dam stone 21 around microbe carrier, the packing volume of microbe carrier 22 is net cage monomer overall volume 20%.
Described permeable dike cellular construction is by improved corrosion, high intensity, the malleable mild steel wire of tool or cladding PVC Above steel wire use machinery braiding form, use the box-structure that this net is made.The mild steel wire diameter root used Different according to engineering design requirements.Being typically in the range of between 2.0-4.0mm, the tensile strength of steel wire is no less than 38kg/m2, metal-plated Layer weight is generally greater than 245g/m2.The a diameter of φ of edge line 11 4 of mesh sheet, internal twine 12 is directly φ 3.Its two-wire is stranded The length of part cannot be less than 50mm.It is not damaged with the coat of metal and PVC coating ensureing stranded part steel wire.
In this enforcement, ecological permeable dam design is ingenious rationally, easy for installation convenient, easily dismounts, sound construction, uses model Enclose wide, repeatable recycling.In net cage monomer, accommodating dam stone and microbe carrier, efficiently solve dam by water conservancy Wash away dam body and pile up the problem that stone easily caves in.Permeable dike has the pore structure of uniqueness, can be before ensureing design water level Put, make part river through dam.Permeable dike is internal fills microbe carrier, by the purification of microorganism, to river Process, thus reach river water quality and improve, the purpose that water ecological environment is repaired.
Embodiment 2
The present embodiment the present embodiment modularity biology permeable dike, on the basis of embodiment 1, described net cage monomer includes One cellular construction, second unit structure, wherein first module structure is right-angled trapezium body, and second unit structure is cuboid;With Described first module structure, second unit structure are piled into some rows in water (flow) direction, upwards pile up at river upper and lower If becoming dried layer, using second unit structure overlapped way from bottom to top upwards to pile up formation upstream face, using first module structure The mode arranged of the most successively successively decreasing piles up formation back side.
In the present embodiment, ecological permeable dam is installed to use and is successively piled up installation, and wherein upstream face uses form vertically upward to enter Row is installed, and back side uses form of successively successively decreasing, and the most upwards installs, and first module structure is installed on back side, thus increases The contact area of current and permeable dike, strengthens effects of purification quality, does enough to reduce water body simultaneously and folds and rush river course and dam body Brush.Setting height(from bottom) determines according to river course water surface elevation and design.
Described first module structure is by the bottom surface of rectangular configuration, leading flank, front prism, below top cover and two ladders Seven, the side of shape structure mesh sheet splicing composition, a width of 1m*1m of long * of wherein said bottom surface, described leading flank is 1m*0.6m, The angle of inclination of described front prism is 45 degree, a width of 1m*0.5m of long *, the described a width of 1m*1m of long * below, described top cover The a width of 1m*0.7m of long *;
Described second unit structure is made up of the square mesh sheet splicing that six length of sides are 1m;
Described mesh sheet uses edge line diameter not less than φ 4, and in-house network filament diameter is not less than mild steel wire or the cladding of φ 3 The mild steel wire braiding of PVC forms, and the mesh of mesh sheet is the regular hexagon of length of side 30mm, and each mesh sheet uses φ 2 colligation silk to fix, The length of the stranded part of its two-wire cannot be less than 50mm.
Described first module structure is made up of the splicing of seven mesh sheet, including the square mesh sheet (bottom surface that 2 areas are 1m2 Below);2 areas are the pentagon wire side (two sides, left and right) of 0.94m2;Area is the rectangle mesh sheet of 0.5m2;Area is The rectangle mesh sheet of 0.6m2;Area is the rectangle mesh sheet of 0.7m2;The gross area is 5.68m2.By φ's 3 inside described mesh sheet Knit-mesh forms, and mesh is the regular hexagon of length of side 30mm, and each wire side uses φ 2 colligation silk to fix, and forms the casing of opening Structure, provides space for loading stone.Described first module inside configuration loads stone and the 6-10cm particle diameter of 8-25cm particle diameter Microbe carrier, after filling be compacted.Can require that the stone selecting different-grain diameter is filled according to specific design.After stone is filled Cover with the colligation silk of φ 2.
Described second unit structure be the length of side be the cube structure of 1m, be made up of the splicing of six square mesh sheet, total face Amass as 6m2.Being formed by the knit-mesh of φ 3 inside described mesh sheet, mesh is the regular hexagon of length of side 30mm, and each wire side uses φ 2 colligation silks are fixed, and form the body structure of opening, provide space for loading stone.Described box house loads 8-25cm particle diameter Stone and the microbe carrier of 6-10cm particle diameter, after filling be compacted.Can require to select the stone of different-grain diameter according to specific design Block is filled.Stone covers with the colligation silk of φ 2 after filling.
In the various embodiments described above, the slope coefficient of trapezium structure dam slope is 1:1-1:2.5.
In the various embodiments described above, microbe carrier uses high-strength environment-friendly material to constitute, and repeatable utilization is dirty without secondary Dye.Carrier is opening loose structure, has the features such as porosity is high, specific surface area is big.Carrier surface have ion exchange with And absorption retention functions, beneficially attached growth of microorganisms, aerobic and the double good growth ring of oxygen microorganism can be provided simultaneously Border.
Microbe carrier of the present invention uses volcanic rock biologic packing material, not only has that quality is light, chemical stability good, intensity is suitable Preferably, the advantage such as rough surface easy to be filmed, and hole is flourishing, is reasonably distributed, and is especially suitable for the inoculation of microorganism, tames, breeds Growth.Resistance to flushing, do not block, there is good physics, chemistry and hydraulic characteristic(s), be adaptable to the requirement that different sewage purifies. Specific surface area is big, can accumulate the microbial biomass of high concentration, and the microorganism of high concentration makes the volumetric loading of BAF increase, Clearance is high.Unit volume sewage treating efficiency improves 5-7 times than conventional microbiological carrier.Microbe carrier particle diameter is 6- 10cm。
Embodiment 3
The construction method of the present embodiment modularity biology permeable dike, including:
Selected river course or pond carry out desilting arrangement (cofferdam construction), and river bed compacting is smooth, then saturating according to ecology The design parameter (physical dimension, gravel grating) of dam carries out heap and builds, and the slope coefficient of trapezium structure dam slope is 1:1-1:2.5.
(1) alignment outside base, riverbed
Combining actual riverbed geology according to construction drawing and build sideline, island, actual survey sets out substrate sideline.For guaranteeing side slope Protection works are attractive in appearance, and substrate sideline should be the most straight.
(2) substrate excavation
Fluvial sand, empty slag at the bottom of cleaning riverbed, excavation substrate platform also flattens compacting, makes substrate substantially flat stable, bulk Boulder should give removing.
(3) making of net cage
Select more smooth place processing net cage.
(4) net cage is installed
Net cage makes complete, the most qualified after coordinate with excavator or hoisting machine manually lay in place.Layering is from one end Place toward the other end, or start to place from lowest part.Can rockfill in cage after adjacent net cage stable connection, and not affect Arrangement and the connection of follow-up net cage, rockfill.
(6) rockfill
During construction building stones should selectively placement in layers, every layer near net cage edge artificial selection's block footpath relatively ratchel code Build, the more internal stone of backfill, it is necessary to placement in layers is closely knit.
Wherein, described net cage is the net cage monomer in above-described embodiment in modularity biology permeable dike, described building stones For the dam stone described in above-described embodiment, microbe carrier.
The above is only the preferred embodiment of the present invention, is not limited to the present invention, it is noted that for this skill For the those of ordinary skill in art field, on the premise of without departing from the technology of the present invention principle, it is also possible to make some improvement and Modification, these improve and modification also should be regarded as protection scope of the present invention.

Claims (9)

1. a modularity biology permeable dike, it is characterised in that include the dam structure that some net cage monomers are piled up, described net Packing list body is the netted body structure that steel wire is worked out by mechanical technology, and being filled with particle diameter in each described net cage monomer is 8 Dam stone, particle diameter to 25cm are the microbe carrier of 6-10cm, and wherein microbe carrier is filled in the middle part of net cage monomer, micro- Filling dam stone around bio-carrier, the packing volume of microbe carrier is the 20%-35% of net cage monomer overall volume.
Modularity biology permeable dike the most according to claim 1, it is characterised in that described net cage monomer includes first module Structure, second unit structure, wherein first module structure is right-angled trapezium body, and second unit structure is cuboid;With described First module structure, second unit structure are piled into some rows in water (flow) direction, are upwards piled into some at river upper and lower Layer, uses second unit structure overlapped way from bottom to top upwards to pile up formation upstream face, use first module structure by lower to On successively successively decrease row mode pile up formation back side.
Modularity biology permeable dike the most according to claim 2, it is characterised in that described first module structure is by rectangle Seven, the side of the bottom surface of structure, leading flank, front prism, below top cover and two trapezium structures mesh sheet splicing composition, its Described in a width of 1m*1m of long * of bottom surface, described leading flank is 1m*0.6m, and the angle of inclination of described front prism is 45 degree, long * A width of 1m*0.5m, the described a width of 1m*1m of long * below, a width of 1m*0.7m of long * of described top cover;
Described second unit structure is made up of the square mesh sheet splicing that six length of sides are 1m.
Modularity biology permeable dike the most according to claim 3, it is characterised in that described mesh sheet uses edge line diameter not Less than φ 4, the mild steel wire braiding of mild steel wire or cladding PVC that in-house network filament diameter is not less than φ 3 forms, the mesh of mesh sheet For the regular hexagon of length of side 30mm, each mesh sheet uses φ 2 colligation silk to fix, and the length of the stranded part of its two-wire cannot be less than 50mm。
Modularity biology permeable dike the most according to claim 1, it is characterised in that the steel wire that establishment forms net cage monomer is straight Footpath is between 2.0-4.0mm, and the tensile strength of steel wire is no less than 38kg/m2, coat of metal weight is higher than 245g/m2
Modularity biology permeable dike the most according to claim 1, it is characterised in that described microbe carrier is volcano Piper pulicatulum C. D C. Thing filler.
Modularity biology permeable dike the most according to claim 2, it is characterised in that the slope coefficient of trapezium structure dam slope is 1:1-1:2.5。
Modularity biology permeable dike the most according to claim 1, it is characterised in that the packing volume of microbe carrier is net The 20%-30% of packing list body overall volume.
9. the construction method of a modularity biology permeable dike, it is characterised in that including:
Selected river course or pond carry out desilting arrangement, and river bed compacting is smooth, then according to the design parameter of ecological permeable dam Carrying out heap to build, the slope coefficient of trapezium structure dam slope is 1:1-1:2.5, and design parameter includes physical dimension, gravel grating;
Alignment outside base, riverbed: combine actual riverbed geology according to construction drawing and build sideline, island, actual survey sets out substrate limit Line, substrate sideline should be the most straight.
Substrate is excavated: fluvial sand, empty slag at the bottom of cleaning riverbed, and excavation substrate platform also flattens compacting, makes substrate substantially flat stable, Removing be should give by the boulder of bulk;
Set up and form the arbitrary described permeable dike structure of claim 1 to 9: (1) net cage is installed: coordinate with excavator or hoisting machine Manually laying in place, layering is placed from one end toward the other end, or starts to place, after adjacent net cage stable connection from lowest part Can rockfill in cage, and not affect arrangement and the connection of follow-up net cage, rockfill;
(2) rockfill: during construction building stones should selectively placement in layers, every layer near net cage edge artificial selection's block footpath relatively great Shi Block code is built, the more internal building stones of backfill, it is necessary to placement in layers is closely knit;
Wherein, described net cage is the net cage monomer in the arbitrary described modularity biology permeable dike of claim 1 to 8, described Building stones be the arbitrary described dam stone of claim 1 to 8, microbe carrier.
CN201610539377.3A 2016-07-11 2016-07-11 Modularization biology permeable dike and its construction method Active CN106256963B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610539377.3A CN106256963B (en) 2016-07-11 2016-07-11 Modularization biology permeable dike and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610539377.3A CN106256963B (en) 2016-07-11 2016-07-11 Modularization biology permeable dike and its construction method

Publications (2)

Publication Number Publication Date
CN106256963A true CN106256963A (en) 2016-12-28
CN106256963B CN106256963B (en) 2018-12-18

Family

ID=57713706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610539377.3A Active CN106256963B (en) 2016-07-11 2016-07-11 Modularization biology permeable dike and its construction method

Country Status (1)

Country Link
CN (1) CN106256963B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107285483A (en) * 2017-08-08 2017-10-24 苏州克莱尔环保科技有限公司 The device of lifting sewage Effluent criteria
CN107352753A (en) * 2017-08-28 2017-11-17 中国水利水电科学研究院 A kind of more combined ecological water purification weirs of bionic type
CN109574236A (en) * 2019-01-17 2019-04-05 长江水利委员会长江科学院 A kind of ecological dam for being suitable for mountain stream and subtracting the reparation of dehydration section
CN110042806A (en) * 2019-03-29 2019-07-23 浙江融信环保科技有限公司 A kind of modularization deflector type ecological permeable dam and its construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07185580A (en) * 1993-12-27 1995-07-25 Sekisui Chem Co Ltd Purifying device for river
CN1105899A (en) * 1994-11-04 1995-08-02 广西大学 Iron cage dam (or dyke) technology for purification of waste water
CN204570617U (en) * 2015-04-17 2015-08-19 苏州绿世界园林发展有限公司 Groin system filled by absorption type gabion box haydite
CN205804286U (en) * 2016-07-11 2016-12-14 岭南新科生态科技研究院(北京)有限公司 Modularity biology permeable dike

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07185580A (en) * 1993-12-27 1995-07-25 Sekisui Chem Co Ltd Purifying device for river
CN1105899A (en) * 1994-11-04 1995-08-02 广西大学 Iron cage dam (or dyke) technology for purification of waste water
CN204570617U (en) * 2015-04-17 2015-08-19 苏州绿世界园林发展有限公司 Groin system filled by absorption type gabion box haydite
CN205804286U (en) * 2016-07-11 2016-12-14 岭南新科生态科技研究院(北京)有限公司 Modularity biology permeable dike

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
姚宇翔等: "石笼网箱挡墙施工技术", 《城市道桥与防洪》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107285483A (en) * 2017-08-08 2017-10-24 苏州克莱尔环保科技有限公司 The device of lifting sewage Effluent criteria
CN107352753A (en) * 2017-08-28 2017-11-17 中国水利水电科学研究院 A kind of more combined ecological water purification weirs of bionic type
CN107352753B (en) * 2017-08-28 2023-04-07 中国水利水电科学研究院 Bionic multi-combination ecological water purification weir
CN109574236A (en) * 2019-01-17 2019-04-05 长江水利委员会长江科学院 A kind of ecological dam for being suitable for mountain stream and subtracting the reparation of dehydration section
CN110042806A (en) * 2019-03-29 2019-07-23 浙江融信环保科技有限公司 A kind of modularization deflector type ecological permeable dam and its construction method

Also Published As

Publication number Publication date
CN106256963B (en) 2018-12-18

Similar Documents

Publication Publication Date Title
CN102733349B (en) Method for de-silting lake and constructing lake center island
CN106256963A (en) Modularity biology permeable dike and construction method thereof
CN108585212A (en) A kind of gabion construction method of drowned flow artificial wet land
CN206784315U (en) Ecological riverway shore protection
CN112211157A (en) Ecological restoration method for micro-topography of abandoned sand pit of riparian zone in high-altitude area
CN109024458A (en) A kind of coal mine subsidence land landscape revetment and the construction method of water-bed antiseepage
CN205804286U (en) Modularity biology permeable dike
CN206486867U (en) A kind of gabion ecological water body revetment structure
CN208733565U (en) A kind of wetland revetment slope protection construction
CN102433857A (en) Ecological type artificial coast with functions of pollution controlling and coast body self cleaning
CN107761668B (en) Coastal shore reservoir land-building type revetment structure and construction method thereof
CN106567361B (en) Control the system and method for riverway sludge deposition
CN212477620U (en) Structure for building gravity dam on deep and thick covering layer
CN210507006U (en) High-strength steel wire mesh reinforced material filling structure of road embankment
CN210559648U (en) Step multi-section undercurrent artificial wet land treating pool
CN102234995A (en) Ecological overtopping dam and construction method thereof
CN104695379A (en) Ecological river channel revetment structure
CN102995646B (en) Net cage protection pad type revetment structure and construction method thereof
CN216074965U (en) Multifunctional composite spur dike facility
CN212078000U (en) Assembled cistern bottom basis
CN212506106U (en) Stepped ecological revetment structure
CN209053056U (en) A kind of step wetland beach safeguard structure
CN212612893U (en) Landfill repair system
CN212013882U (en) Greening ecological concrete slope protection structure
CN105350637B (en) Urban green space subsurface stormwater is regulated and stored device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180920

Address after: 523007 10 building, 1 building, extension center, Dongcheng cultural center, Dongyuan Road, Dongcheng Street, Dongguan, Guangdong.

Applicant after: South of the Five Ridges ecological culture brigade Limited by Share Ltd

Address before: 100015 2035, two floor, 5 building, 5 hospital, Beijing, Chaoyang District.

Applicant before: South of the Five Ridges Xinke ecological science and Technology Research Institute (Beijing) Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant