CN106246245A - A kind of method shortening unit starting time and energy conservation starting - Google Patents

A kind of method shortening unit starting time and energy conservation starting Download PDF

Info

Publication number
CN106246245A
CN106246245A CN201610761831.XA CN201610761831A CN106246245A CN 106246245 A CN106246245 A CN 106246245A CN 201610761831 A CN201610761831 A CN 201610761831A CN 106246245 A CN106246245 A CN 106246245A
Authority
CN
China
Prior art keywords
valve
water
steam
unit
pressure cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610761831.XA
Other languages
Chinese (zh)
Inventor
张学海
宋志强
梁永吉
吴宇
黄振鑫
贾光瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng International Power Development Co Tongchuan Zhaojin Power Plant
Original Assignee
Huaneng International Power Development Co Tongchuan Zhaojin Power Plant
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng International Power Development Co Tongchuan Zhaojin Power Plant filed Critical Huaneng International Power Development Co Tongchuan Zhaojin Power Plant
Priority to CN201610761831.XA priority Critical patent/CN106246245A/en
Publication of CN106246245A publication Critical patent/CN106246245A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/08Cooling; Heating; Heat-insulation
    • F01D25/10Heating, e.g. warming-up before starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • F01D17/10Final actuators
    • F01D17/105Final actuators by passing part of the fluid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D21/00Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for

Abstract

The invention discloses a kind of method shortening unit starting time and energy conservation starting, from auxiliary vapour header Yin Jie mono-road jet chimney, jet chimney arranges auxiliary vapour to high pressure cylinder pre-warming steam supply hand-operated valve, steam supply electrodynamic valve, steam supply pneumatic control valve and auxiliary vapour to high pressure cylinder pre-warming steam supply non-return valve, after ignition of the boiler, in advance by auxiliary steam to steam turbine high-pressure cylinder pre-warm, shorten the unit starting time;Two-stage nitration extraction line increases little bypass, before and after being arranged in Electrically operated gate of drawing gas, draw gas bypass electrodynamic valve, two-stage nitration of two-stage nitration is set and draws gas bypass pneumatic control valve;Condensation water is connect from adjacent machine low-pressure heater outlet pass, two-way is set altogether and condenses water stainless steel pipes, two condense water electric gate valve, two condensation water pneumatic control valves, two condense water non-return valve, draw and be connected to the machine and condense water to after oxygen-eliminating device non-return valve, to water on the machine oxygen-eliminating device, substitute auxiliary steam heating oxygen-eliminating device, it is achieved the low-quality energy substitution high-quality energy.

Description

A kind of method shortening unit starting time and energy conservation starting
Technical field
The invention belongs to power plant for energy conservation consumption reduction field, relate to the startup system of a kind of unit, specifically one and be applied to contracting Short unit starting time and the system of energy conservation starting.
Background technology
Whole nation capacity of installed generator quickly increased in recent years, power supply and demand situation totally rich, some areas surplus, thermoelectricity Equipment utilization decimal declines further.Macroeconomy speedup is slow fall situation in totally presenting surely, and macro-forecast judges that electricity consumption needs Ask the lowest.Thermal power plant will frequently be mediated, and Unit Commitment number of times will significantly increase.At present, domestic each greatly Thermal power plant has taken effective scheme and the measure of many shortening startup time the most in the unit starting stage, and successfully realizes Energy conservation starting, but be an eternal problem for shortening the project study of unit starting time and energy conservation starting.
Summary of the invention
It is an object of the invention to provide a kind of method shortening unit starting time and energy conservation starting, be effectively shortened and open The dynamic time.
For reaching this purpose, the technical scheme is that a kind of method shortening unit starting time and energy conservation starting, Including:
(1) during steam turbine cold start, when high pressure cylinder first order cylinder temperature is less than 150 DEG C, it is necessary to high pressure cylinder is carried out pre- Warm, warm cylinder pressure 390~490KPa.Pre-warm operation is carried out after ignition of the boiler.Ignition of the boiler increasing temperature and pressure, opens high pressure turbine by After, when the cold pressure again of pusher side rises to 0.5~0.7MPa, pusher side steam superheat is more than 28 DEG C, i.e. corresponding cold vapor (steam) temperature again When rising to 180 DEG C~208 DEG C, now open the warmest choke valve of high pressure cylinder and stop valve carries out pre-warm to high pressure cylinder.From boiler point Fire to meet high pressure cylinder pre-warming steam parameter need 2.5 hours, high pressure cylinder pre-warming according to steam turbine plant provide vexed cylinder curve and All previous unit starting situation, needs 4.5 hours.I.e. from ignition of the boiler to steam turbine red switch, cold start needs 7 hours altogether.
The present invention proposes from auxiliary vapour header Yin Jie mono-road jet chimney, arranges auxiliary vapour to high pressure cylinder pre-warming on jet chimney Steam supply hand-operated valve, steam supply electrodynamic valve, confession steam control valve and auxiliary vapour, to high pressure cylinder pre-warming steam supply non-return valve, after ignition of the boiler, carry The front auxiliary steam that passes through, to steam turbine high-pressure cylinder pre-warm, shortens 2.5 hours unit starting time.
(2) from the point of view of current #2 high-pressure heater runs present situation, during unit starting, after opening high side, the cold liter that boosts again Wen Hou, #2 high-pressure heater, from system, possesses the condition of putting into operation, hydrophobic from accident hydrophobic inflow steam exhaust device, improves #2 High-pressure heater exit water temperature, and then increase boiler feed temperature.But because the Electrically operated gate of drawing gas on two-stage nitration extraction line is complete Driving fully closed valve, caliber is relatively thick, does not possess the function of low discharge steam regulation;If it addition, too much steam being introduced to #2 high pressure Heater, then the steam flow that reheater passes through reduces, and dry combustion method likely occurs because steam flow is little in reheater.
The present invention proposes increasing little bypass on two-stage nitration extraction line, before and after being arranged in Electrically operated gate of drawing gas, arranges two-stage nitration Draw gas bypass electrodynamic valve, and two-stage nitration draws gas bypass pneumatic control valve, improves boiler feed temperature, reduces giving during ignition of the boiler Coal amount;
(3) the boiler water filling time is 3h, and it is 7h that ignition of the boiler to steam turbine possesses red switch condition, steam turbine medium-speed warming 4h, during this period, adjacent machine auxiliary steam (four take out or cold again) is all the time through during whole unit starting, and consumption is the biggest.
The present invention proposes low to add electronic valve outlet port from adjacent machine #5, condense water to oxygen-eliminating device non-return valve leading and connect a road and condense water Pipeline, arranges the condensation water stainless steel pipes of two-way DN125 altogether, and two condense water electric gate valve, two dynamic regulations of condensation aqueous vapor Valve, two condense water non-return valves, draw and are connected to the machine and condense water to after oxygen-eliminating device non-return valve, to water on the machine oxygen-eliminating device, substitute auxiliary Steam is helped to heat oxygen-eliminating device, it is achieved the low-quality energy substitution high-quality energy.
Use that adjacent machine #5 is low to be added after outlet condenses water, namely squeezed four sections and drawn gas and go successively to steam turbine acting.Depend on The heat balance diagram provided according to steam turbine factory, steam turbine leaving water temperature under 50%~100%THA operating mode is 118.4~140 DEG C, The requirement of boiler water filling temperature can be met completely.
After this scheme of the invention is implemented, it is achieved that condense the purpose of water contact energy conservation starting as the occasion requires, greatly reduce auxiliary The consumption of steam, it is achieved that low-quality steam substitutes high-quality steam.
Accompanying drawing explanation
Fig. 1 is that auxiliary steam is to high pressure cylinder pre-warming system schematic diagram.
Fig. 2 is that two-stage nitration extraction line increases small side road system schematic diagram.
Fig. 3 is that adjacent machine condensation water contact is supplied to oxygen-eliminating device system schematic.
Detailed description of the invention
Describing the present invention below in conjunction with accompanying drawing, the description of this part is only exemplary and explanatory, no Should be regarded as the restriction to presently disclosed techniques content.
In FIG, after ignition of the boiler, it is not necessary to open high pressure cylinder and fall to warm up choke valve 1, the warmest stop valve 2 of high pressure cylinder, open Auxiliary vapour is to high pressure cylinder pre-warming steam supply hand-operated valve 3, steam supply electrodynamic valve 4 and supplies steam control valve 5, and auxiliary vapour enters high pressure cylinder and carries out pre-warm.6 Be auxiliary vapour to high pressure cylinder pre-warming steam supply non-return valve, prevent the steam in high pressure cylinder from flowing backward to auxiliary vapour.High pressure cylinder cylinder temperature shifts to an earlier date pre-warm After, after cylinder temperature rise up to possesses steam turbine red switch condition, close auxiliary vapour electronic to high pressure cylinder pre-warming steam supply hand-operated valve 3, steam supply Valve 4 and confession steam control valve 5.
In fig. 2, during ignition of the boiler increasing temperature and pressure, after cold section of reheater pressure and temperature raise, close two-stage nitration and draw gas Electrodynamic valve 8, opens two-stage nitration extraction check valve 7, and unlatching two-stage nitration draws gas and bypasses electrodynamic valve 9, and unlatching two-stage nitration draws gas and bypasses pneumatic regulation Valve 10, put into operation #2 high-pressure heater, draws gas and enters hydrophobic being dredged to steam exhaust device by accident drain pipe of high-pressure heater generation.? Steam turbine is grid-connected cut cylinder after, close draw gas bypass electrodynamic valve 9, two-stage nitration of two-stage nitration and draw gas bypass pneumatic control valve 10, #2 hyperbaric heating Device puts into operation according to the step of bringing normally into operation.After this scheme of the invention is implemented, not having any impact to unit is properly functioning, #2 is high Pressure heater puts into operation in advance, improves boiler feed temperature, can reduce the coal-supplying amount during ignition of the boiler.
In figure 3,11 condense water to oxygen-eliminating device for #1 unit supplies water non-return valve, and 12 condense water to oxygen-eliminating device confession for #2 unit Water non-return valve.#1 unit operation, during #2 unit starting, by unlatching #1 unit condensation water to #2 unit water supply electrodynamic valve 13, opens Open #1 unit condense water to #2 unit water supply pneumatic control valve 14 and non-return valve 15, by the condensation water that water temperature is 118.4~140 DEG C Mend to #2 unit oxygen-eliminating device;#2 unit operation, during #1 unit starting, supplies water electronic by opening #2 unit condensation water to #1 unit Valve 16, water temperature, to #1 unit water supply pneumatic control valve 17 and non-return valve 18, is 118.4~140 DEG C by unlatching #2 unit condensation water Condensation water mend to #1 unit oxygen-eliminating device.
A kind of being applied to shortens unit starting time and the system of energy conservation starting, and unit single cold start can shorten startup Time 2.5h, saves electricity 100,000 Kwh, saves 100 tons of coal of mark.
Above content is only the technological thought that the present invention is described, it is impossible to limit protection scope of the present invention with this, every presses The technological thought proposed according to the present invention, any change done on the basis of technical scheme, each fall within claims of the present invention Protection domain within.

Claims (1)

1. the method shortening unit starting time and energy conservation starting, it is characterised in that: from auxiliary vapour header Yin Jie mono-road steam Pipeline, arranges auxiliary vapour to high pressure cylinder pre-warming steam supply hand-operated valve (3), steam supply electrodynamic valve (4), confession steam control valve on jet chimney And auxiliary vapour is to high pressure cylinder pre-warming steam supply non-return valve (6) (5), after ignition of the boiler, in advance by auxiliary steam to turbine high-pressure Cylinder pre-warm, shortens the unit starting time;
Two-stage nitration extraction line increases little bypass, before and after being arranged in Electrically operated gate of drawing gas, two-stage nitration is set and draws gas bypass electrodynamic valve (9), two-stage nitration draws gas and bypasses pneumatic control valve (10), improves boiler feed temperature, reduces the coal-supplying amount during ignition of the boiler;
Connecing condensation water from adjacent machine low-pressure heater outlet pass, arrange two-way altogether and condense water stainless steel pipes, #1 unit condenses Water is to #2 unit water supply electrodynamic valve (13), #1 unit condensation water to #2 unit water supply pneumatic control valve (14) and non-return valve (15), # 2 units condense water to #1 unit water supply electrodynamic valve (16), and #2 unit condenses water to #1 unit water supply pneumatic control valve (17) and inverse Only valve (18), draws and is connected to the machine and condenses water to after oxygen-eliminating device non-return valve, to water on the machine oxygen-eliminating device, substitute auxiliary steam and add evanescence of heat Oxygen device, it is achieved the low-quality energy substitution high-quality energy.
CN201610761831.XA 2016-08-29 2016-08-29 A kind of method shortening unit starting time and energy conservation starting Pending CN106246245A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610761831.XA CN106246245A (en) 2016-08-29 2016-08-29 A kind of method shortening unit starting time and energy conservation starting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610761831.XA CN106246245A (en) 2016-08-29 2016-08-29 A kind of method shortening unit starting time and energy conservation starting

Publications (1)

Publication Number Publication Date
CN106246245A true CN106246245A (en) 2016-12-21

Family

ID=57597916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610761831.XA Pending CN106246245A (en) 2016-08-29 2016-08-29 A kind of method shortening unit starting time and energy conservation starting

Country Status (1)

Country Link
CN (1) CN106246245A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060922A (en) * 2017-04-28 2017-08-18 申能股份有限公司 The auxiliary vapour system and its steam supplying method in thermal power plant
CN107150055A (en) * 2017-07-04 2017-09-12 山东中实易通集团有限公司 The auxiliary vapour purging system and method not restricted before a kind of unit starting by steam
CN107202317A (en) * 2017-06-06 2017-09-26 华能国际电力股份有限公司长兴电厂 Pollutant zero surpasses the control method of row during a kind of unit starting
CN108087863A (en) * 2018-02-08 2018-05-29 西安西热节能技术有限公司 A kind of neighbour's machine condensation water interacted system
CN110131003A (en) * 2019-06-10 2019-08-16 西安热工研究院有限公司 A kind of system and method for high temperature gas cooled reactor nuclear power unit secondary circuit start and stop
CN110159360A (en) * 2019-06-11 2019-08-23 中国电力工程顾问集团西北电力设计院有限公司 A kind of Gas-steam Combined Cycle power plant shaft seal steam supply system and steam supplying method
CN110701114A (en) * 2019-10-24 2020-01-17 中国能源建设集团广东省电力设计研究院有限公司 Furnace water circulating pump starting system and control method
CN111706406A (en) * 2020-06-15 2020-09-25 华能罗源发电有限责任公司 Quick medium speed warm-up control system
CN112524596A (en) * 2020-11-18 2021-03-19 神华(福州)罗源湾港电有限公司 Auxiliary heating system of steam extraction regenerative system of steam turbine and control method
CN112761738A (en) * 2021-02-08 2021-05-07 浙江浙能技术研究院有限公司 Novel method for judging tightness of steam extraction check valve of steam turbine
CN112814752A (en) * 2021-01-08 2021-05-18 西安热工研究院有限公司 Rapid starting system and method for thermal generator set in medium pressure cylinder starting mode
CN113623026A (en) * 2021-09-07 2021-11-09 济南奔腾时代电力科技有限公司 Steam turbine high-pressure cylinder warming and cylinder switching control optimization method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56106008A (en) * 1980-01-25 1981-08-24 Toshiba Corp Controlling device for boiler feed water pump driving turbine
CN202209668U (en) * 2011-08-17 2012-05-02 山东源和电站工程技术有限公司 Steam supply system of auxiliary steam source of large thermal generator set
CN203420745U (en) * 2013-07-05 2014-02-05 大唐洛阳首阳山发电有限责任公司 Steam cylinder pre-heating system for turbines
US20140373541A1 (en) * 2013-04-05 2014-12-25 Fuji Electric Co., Ltd. Method and apparatus for safety operation of extraction steam turbine utilized for power generation plant
CN105888741A (en) * 2016-05-26 2016-08-24 国电龙源节能技术有限公司 Back pressure type steam turbine driving system capable of mixing heat exchange condensation with low pressure deaerator

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56106008A (en) * 1980-01-25 1981-08-24 Toshiba Corp Controlling device for boiler feed water pump driving turbine
CN202209668U (en) * 2011-08-17 2012-05-02 山东源和电站工程技术有限公司 Steam supply system of auxiliary steam source of large thermal generator set
US20140373541A1 (en) * 2013-04-05 2014-12-25 Fuji Electric Co., Ltd. Method and apparatus for safety operation of extraction steam turbine utilized for power generation plant
CN203420745U (en) * 2013-07-05 2014-02-05 大唐洛阳首阳山发电有限责任公司 Steam cylinder pre-heating system for turbines
CN105888741A (en) * 2016-05-26 2016-08-24 国电龙源节能技术有限公司 Back pressure type steam turbine driving system capable of mixing heat exchange condensation with low pressure deaerator

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060922A (en) * 2017-04-28 2017-08-18 申能股份有限公司 The auxiliary vapour system and its steam supplying method in thermal power plant
CN107060922B (en) * 2017-04-28 2023-07-25 申能股份有限公司 Auxiliary steam system of thermal power plant and steam supply method thereof
CN107202317A (en) * 2017-06-06 2017-09-26 华能国际电力股份有限公司长兴电厂 Pollutant zero surpasses the control method of row during a kind of unit starting
CN107150055A (en) * 2017-07-04 2017-09-12 山东中实易通集团有限公司 The auxiliary vapour purging system and method not restricted before a kind of unit starting by steam
CN108087863A (en) * 2018-02-08 2018-05-29 西安西热节能技术有限公司 A kind of neighbour's machine condensation water interacted system
CN110131003A (en) * 2019-06-10 2019-08-16 西安热工研究院有限公司 A kind of system and method for high temperature gas cooled reactor nuclear power unit secondary circuit start and stop
CN110131003B (en) * 2019-06-10 2023-06-27 西安热工研究院有限公司 System and method for starting and stopping two loops of high-temperature gas cooled reactor nuclear power unit
CN110159360A (en) * 2019-06-11 2019-08-23 中国电力工程顾问集团西北电力设计院有限公司 A kind of Gas-steam Combined Cycle power plant shaft seal steam supply system and steam supplying method
CN110159360B (en) * 2019-06-11 2023-12-26 中国电力工程顾问集团西北电力设计院有限公司 Shaft seal steam supply system and method for gas-steam combined cycle power plant
CN110701114A (en) * 2019-10-24 2020-01-17 中国能源建设集团广东省电力设计研究院有限公司 Furnace water circulating pump starting system and control method
CN111706406B (en) * 2020-06-15 2022-12-06 华能罗源发电有限责任公司 Quick intermediate speed warm-up control system
CN111706406A (en) * 2020-06-15 2020-09-25 华能罗源发电有限责任公司 Quick medium speed warm-up control system
CN112524596A (en) * 2020-11-18 2021-03-19 神华(福州)罗源湾港电有限公司 Auxiliary heating system of steam extraction regenerative system of steam turbine and control method
CN112814752A (en) * 2021-01-08 2021-05-18 西安热工研究院有限公司 Rapid starting system and method for thermal generator set in medium pressure cylinder starting mode
CN112761738B (en) * 2021-02-08 2022-12-23 浙江浙能技术研究院有限公司 Novel method for judging tightness of steam extraction check valve of steam turbine
CN112761738A (en) * 2021-02-08 2021-05-07 浙江浙能技术研究院有限公司 Novel method for judging tightness of steam extraction check valve of steam turbine
CN113623026A (en) * 2021-09-07 2021-11-09 济南奔腾时代电力科技有限公司 Steam turbine high-pressure cylinder warming and cylinder switching control optimization method

Similar Documents

Publication Publication Date Title
CN106246245A (en) A kind of method shortening unit starting time and energy conservation starting
CN109441575B (en) Method for operating heat supply network system of steam combined cycle generator set in heat supply period
CN104279058B (en) Combined cycle power plant and the method for operating combined cycle power plant
CN105605551A (en) System and method for heating boiler feed water through steam turbine bypass steam
CN103696819B (en) Steam turbine high low pressure two-stage extraction steam for factories heating arrangement
CN106838865B (en) Completely thermoelectric decoupling steam extraction and heat supply power station system and working method
CN203420745U (en) Steam cylinder pre-heating system for turbines
TW201712214A (en) Power generation system and operation method thereof capable of effectively recycling waste heat generated from a low-temperature part of a multi-pressure type waste heat recycling boiler
CN104533554B (en) A kind of new and effective water supply heat back system for single reheat unit
CN108087863A (en) A kind of neighbour's machine condensation water interacted system
CN104018890A (en) Turbine low pressure cylinder end shaft seal steam supply system
CN108425706A (en) A kind of shaft seal steam supply system and its control method for double reheat power generation sets
CN205447710U (en) System for utilize steam turbine bypass steam heating boiler feed water
CN103628937A (en) Method for better utilizing waste gas of turboset
CN109779699A (en) A kind of quick start system and its operation method of energy-efficient Turbo-generator Set
CN206190339U (en) Two branch road heating system of cogeneration steam turbine
CN107504543B (en) Method for improving deep peak regulation of cogeneration unit by utilizing electric boiler heat supply
CN111520205A (en) Recovery system and recovery method for residual pressure waste heat in back pressure heat supply unit
RU2602649C2 (en) Steam turbine npp
CN206755145U (en) Turbine high-pressure bypasses desuperheat water lines
CN209604098U (en) A kind of quick start system of energy-efficient Turbo-generator Set
RU2311542C1 (en) Method of operation of extraction turbine plant
CN203906014U (en) Steam supplying system of turbine low-pressure cylinder end shaft seal
CN203584485U (en) High-pressure and low-pressure two-stage industrial steam extracting and heat supplying device for steam turbine
CN114251139A (en) Quick start system of adjacent machine of unit system thermal generator set

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161221

WD01 Invention patent application deemed withdrawn after publication