CN106245656A - A kind of construction method of the supporting improving sidesway for master and slave type foundation ditch group - Google Patents

A kind of construction method of the supporting improving sidesway for master and slave type foundation ditch group Download PDF

Info

Publication number
CN106245656A
CN106245656A CN201610626109.5A CN201610626109A CN106245656A CN 106245656 A CN106245656 A CN 106245656A CN 201610626109 A CN201610626109 A CN 201610626109A CN 106245656 A CN106245656 A CN 106245656A
Authority
CN
China
Prior art keywords
hole
foundation ditch
retaining structure
supporting
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610626109.5A
Other languages
Chinese (zh)
Other versions
CN106245656B (en
Inventor
王述红
李晓冬
赵文
许春兴
贾蓬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University China
Original Assignee
Northeastern University China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeastern University China filed Critical Northeastern University China
Priority to CN201610626109.5A priority Critical patent/CN106245656B/en
Publication of CN106245656A publication Critical patent/CN106245656A/en
Application granted granted Critical
Publication of CN106245656B publication Critical patent/CN106245656B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)
  • Foundations (AREA)

Abstract

The invention discloses the construction method of a kind of supporting improving sidesway for master and slave type foundation ditch group, relate to civil construction pattern foundation pit supporting structure field.The present invention is by increasing supporting water-retaining structure plate in the building enclosure of Zi Keng side, and carry out relevant parameter optimization, make to have between master and slave type foundation ditch firmer support system, avoid female hole and lateral displacement occurs to Zi Keng side, and play the effect of water proof, and then avoid the disasters such as surrounding soil generation sedimentation.Meanwhile, the working condition requirement of construction is the highest, and construction costs is low, and can realize recycling, and suits the green engineering theory of sustainable development.

Description

A kind of construction method of the supporting improving sidesway for master and slave type foundation ditch group
Technical field
The present invention relates to civil construction pattern foundation pit supporting structure field, be specifically related to a kind of improve sidesway for master and slave type foundation ditch group The construction method of supporting.
Background technology
Along with the intensive development in soft soil foundation building city, deep-foundation pit engineering gets more and more, owing to town site is got over Coming the most nervous, cause and build more crypto set in a large number, around foundation ditch, underground installation is more intricate.More and more combined, many The regional super-giant foundation pit planting city function has become the complicated foundation ditch group cheated in even hole, hole, hole to occur, including novel Master and slave type foundation ditch, it refers to the foundation ditch group of the adjacent type of small one and large one foundation ditch, and this structure is built at city foundation ditch now In relatively conventional, but, adjacent multiple deep big foundation pits in succession or synchronize excavation can to surrounding enviroment produce than single excavation of foundation pit More complicated impact, the foundation pit construction harm of master and slave type colony is two foundation ditch hydraulic pressure blood pressure lowering constructions: execute for meeting deep pit monitor Work requirement, certainly will require a large amount of precipitation, and precipitation over a long time, necessarily cause lateral displacement of pit, to neighboring buildings, road, pipeline band Endanger.Multi-level complicated foundation ditch group, in work progress, there is also significantly interaction, as rear between the foundation ditch of master and slave type Construction foundation pit to construction foundation pit enclosure wall, support system, complete structure produce harm, and structure complete after sedimentation speed The uneven problem of Cracking caused of rate.
At present, China uses campshed to add suspension roof support system for the processing method that this lateral displacement of pit is main, and off-load is also Anchored pile supporting is carried out reasonably optimizing.Owing to level of ground water is higher, and the degree of depth of mollisol is relatively deep, props up if carried out piled anchor If protecting, it is impossible to stablizing of effective guarantee foundation ditch, thus cause the infiltration of soft soil foundation, lack the effectiveness of engineering, exist Certain potential safety hazard.
Summary of the invention
Embodiments provide the construction method of a kind of supporting improving sidesway for master and slave type foundation ditch group, in order to solve The problem that certainly there is lateral displacement of pit in prior art.
Embodiments provide the construction method of a kind of supporting improving sidesway for master and slave type foundation ditch group, including:
According to engineering mother's foundation ditch size, in the construction operation region specified, use making ruler mark position;At labelling Position is arranged around campshed and enclosure wall, earth excavation, digs out square hole one, arranges one week baffle plate one inside square hole one, Injecting the uniform concrete of a layer thickness between square hole one and baffle plate one, described concrete layer is female hole;
Cheat size according to engineering subbase, in the construction operation region specified, use making ruler mark position;At labelling Position is arranged around campshed and enclosure wall, earth excavation, digs out square hole two, arranges one week baffle plate two inside square hole two, Injecting the uniform concrete of a layer thickness between square hole two and baffle plate two, described concrete layer is sub-hole;
According to described subbase hole size, select to measure in the left side in sub-hole, and according to the concrete slice width in son hole Degree, is marked at the buried depth of one times of distance of the concrete layer width in distance hole, disposes in mark position simultaneously Supporting water-retaining structure plate.
Preferably, in digging process, mother hole, the surrounding building in sub-hole are monitored in real time, it is ensured that work progress Safety.
Preferably, the upper surface of described supporting water-retaining structure plate is positioned at same level with the upper surface in son hole, a bib The lower surface of water-bound plate is positioned at the lower section 1.5m of the plane at place bottom sub-hole, the width of supporting water-retaining structure plate and son hole Concrete layer width is equal.
Preferably, described supporting water-retaining structure plate includes rubber layer and reinforcing bar, and described steel-bar arrangement is in rubber layer.
In the embodiment of the present invention, combine the principle of diaphragm wall secondary supporting, make between master and slave type foundation ditch, there be firmer propping up Watch box system, it is to avoid female hole occurs lateral displacement and infiltration to Zi Keng side, and then avoids the disasters such as surrounding soil generation sedimentation; By increasing supporting water-retaining structure plate, improve the comprcssive strength of foundation ditch, thus improve the stability in the large of foundation ditch;The present invention Reinforcing for complicated soft foundation and have significant advantage, technique is simple, and effect is obvious, and saving material, construction costs are low.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to Other accompanying drawing is obtained according to these accompanying drawings.
Fig. 1 is master and slave type foundation ditch site plan;
Fig. 2 is supporting water-retaining structure plate schematic diagram.
Description of reference numerals:
The square hole of 1-1-one, 1-2-baffle plate one, mother 1-3-cheats, the square hole of 2-1-two, 2-2-baffle plate two, and 2-3-is cheated, 3- Supporting water-retaining structure plate, 4-rubber layer, 5-reinforcing bar.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
The construction method of a kind of supporting improving sidesway for master and slave type foundation ditch group that the embodiment of the present invention provides, including with Lower step:
Step 1, the stage excavation of master and slave type foundation ditch group:
1) female foundation ditch size: according to engineering mother's foundation ditch size, uses making ruler labelling in the construction operation region specified Position;It is arranged around campshed and enclosure wall, earth excavation in the position of labelling, digs out square hole one 1-1, at square hole one 1-1 Inner side arranges one week baffle plate one 1-2, injects the uniform concrete of a layer thickness, institute between square hole one 1-1 and baffle plate one 1-2 State concrete layer and be female hole 1-3;
2) sub-hole size: cheat size according to engineering subbase, uses making ruler marker bit in the construction operation region specified Put;It is arranged around campshed and enclosure wall, earth excavation in the position of labelling, digs out square hole two 2-1, in square hole two 2-1 Side arranges one week baffle plate two 2-2, injects the uniform concrete of a layer thickness between square hole two 2-1 and baffle plate two 2-2, described Concrete layer is sub-hole 2-3;
It should be noted that in digging process, buildings around foundation pit is monitored in real time, it is ensured that in work progress Safety.
Step 2, the increase of supporting water-retaining structure plate 3:
Select to measure in the left side of sub-hole 2-3, and according to the concrete layer width of son hole 2-3, at distance hole 2-3 Concrete layer width one times of distance buried depth at be marked, simultaneously carry out disposing supporting water-retaining structure plate in mark position 3;
It should be noted that the upper surface that the upper surface of described supporting water-retaining structure plate 3 and son cheat 2-3 is positioned at same level Face, the lower surface of supporting water-retaining structure plate 3 is positioned at the lower section 1.5m of the plane at place bottom sub-hole 2-3, supporting water-retaining structure plate 3 Width equal with the concrete layer width of son hole 2-3, thus prevent female hole from seeping water to sub-hole.
It should be noted that supporting water-retaining structure plate 3 includes rubber layer 4 and reinforcing bar 5, reinforcing bar 5 is arranged on rubber layer 4 In.
It should be noted that rubber layer 4 is macromolecule material, reinforcing bar 5 is stainless steel, and this supporting water-retaining structure plate is The reinforcing bar of Φ 108@0.4m is carried out the colligation of triangular matrix form, more regular is combined, will make meanwhile Steelframe be put in prefabricated mould, the rubber of liquid is injected in mould, carries out emptying gap and process;The supporting construction of reinforcing bar is protected Stability in card foundation pit construction, will not occur sidesway, and the rubber of macromolecular material ensure that the water-resisting property of structure, it is to avoid execute The generation of the infiltration accident in work.
The present invention is by increasing the supporting water-retaining structure plate that a row is appropriate in the building enclosure of Zi Keng side, and is correlated with Parameter optimization, make to have between master and slave type foundation ditch firmer support system, it is to avoid female hole occurs lateral displacement to Zi Keng side, and And play the effect of water proof, and then avoid the disasters such as surrounding soil generation sedimentation.Meanwhile, this supporting water-retaining structure plate, is profit With the combination of water proof rubber material Yu reinforcing bar, in quality of rubber materials, regular addition reinforcing bar, both can guarantee that the water proof of himself Property, pliability can be strengthened again, play a supporting role in the foundation ditch of stage excavation, convenient operation, practical.
Although preferred embodiments of the present invention have been described, but those skilled in the art once know basic creation Property concept, then can make other change and amendment to these embodiments.So, claims are intended to be construed to include excellent Select embodiment and fall into all changes and the amendment of the scope of the invention.
Obviously, those skilled in the art can carry out various change and the modification essence without deviating from the present invention to the present invention God and scope.So, if these amendments of the present invention and modification belong to the scope of the claims in the present invention and equivalent technologies thereof Within, then the present invention is also intended to comprise these change and modification.

Claims (4)

1. the construction method of the supporting improving sidesway for master and slave type foundation ditch group, it is characterised in that including:
According to engineering mother's foundation ditch size, in the construction operation region specified, use making ruler mark position;Position at labelling It is arranged around campshed and enclosure wall, earth excavation, digs out square hole one (1-1), one week gear is set in square hole one (1-1) inner side Plate one (1-2), injects the uniform concrete of a layer thickness, described concrete between square hole one (1-1) and baffle plate one (1-2) Layer is female hole (1-3);
Cheat size according to engineering subbase, in the construction operation region specified, use making ruler mark position;Position at labelling It is arranged around campshed and enclosure wall, earth excavation, digs out square hole two (2-1), one week gear is set in square hole two (2-1) inner side Plate two (2-2), injects the uniform concrete of a layer thickness, described concrete between square hole two (2-1) and baffle plate two (2-2) Layer is sub-hole (2-3);
According to described subbase hole size, select to measure in the left side of Zi Keng (2-3), and according to the coagulation of son hole (2-3) Soil layer width, is marked, simultaneously at marker bit at the buried depth of one times of distance of the concrete layer width of distance son hole (2-3) Put and carry out disposing supporting water-retaining structure plate (3).
2. construction method as claimed in claim 1, it is characterised in that in digging process, mother is cheated (1-3), sub-hole (2-3) Surrounding building monitor in real time, it is ensured that the safety of work progress.
3. construction method as claimed in claim 1, it is characterised in that the upper surface of described supporting water-retaining structure plate (3) and son The upper surface in hole (2-3) is positioned at same level, and the lower surface of supporting water-retaining structure plate (3) is positioned at place, bottom, sub-hole (2-3) The lower section 1.5m of plane, the width of supporting water-retaining structure plate (3) is equal with the concrete layer width of Zi Keng (2-3).
4. construction method as claimed in claim 1, it is characterised in that described supporting water-retaining structure plate (3) includes rubber layer (4) in and reinforcing bar (5), described reinforcing bar (5) is arranged on rubber layer (4).
CN201610626109.5A 2016-08-02 2016-08-02 A kind of construction method for the supporting improving sidesway for master and slave type foundation pit group Active CN106245656B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610626109.5A CN106245656B (en) 2016-08-02 2016-08-02 A kind of construction method for the supporting improving sidesway for master and slave type foundation pit group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610626109.5A CN106245656B (en) 2016-08-02 2016-08-02 A kind of construction method for the supporting improving sidesway for master and slave type foundation pit group

Publications (2)

Publication Number Publication Date
CN106245656A true CN106245656A (en) 2016-12-21
CN106245656B CN106245656B (en) 2018-12-18

Family

ID=57606371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610626109.5A Active CN106245656B (en) 2016-08-02 2016-08-02 A kind of construction method for the supporting improving sidesway for master and slave type foundation pit group

Country Status (1)

Country Link
CN (1) CN106245656B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476315A (en) * 2017-09-07 2017-12-15 东北大学 A kind of prefabricated component and its construction method being directed to close to type foundation ditch

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100313720B1 (en) * 1999-01-13 2001-11-15 김징완 Composite Underground Structure Construction Method
CN1690317A (en) * 2004-04-29 2005-11-02 宝山钢铁股份有限公司 Method for measuring pipe pile swing resulted from foundation ditch digging
CN101545260A (en) * 2008-03-27 2009-09-30 中国二十冶建设有限公司 Method for supporting bored filling pile driven by stirring pile in foundation pit, group pit and middle pit
CN201865127U (en) * 2010-10-18 2011-06-15 中冶成工上海五冶建设有限公司 Reinforced waterproof late poured band of basement bottom plate
CN104775447A (en) * 2015-04-13 2015-07-15 中国电力工程顾问集团中南电力设计院有限公司 Composite base framework used for power transmission tower in steep mountainous area and construction technology thereof
CN105568959A (en) * 2015-12-28 2016-05-11 上海市机械施工集团有限公司 Prefabricated assembly type blocking wall device and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100313720B1 (en) * 1999-01-13 2001-11-15 김징완 Composite Underground Structure Construction Method
CN1690317A (en) * 2004-04-29 2005-11-02 宝山钢铁股份有限公司 Method for measuring pipe pile swing resulted from foundation ditch digging
CN101545260A (en) * 2008-03-27 2009-09-30 中国二十冶建设有限公司 Method for supporting bored filling pile driven by stirring pile in foundation pit, group pit and middle pit
CN201865127U (en) * 2010-10-18 2011-06-15 中冶成工上海五冶建设有限公司 Reinforced waterproof late poured band of basement bottom plate
CN104775447A (en) * 2015-04-13 2015-07-15 中国电力工程顾问集团中南电力设计院有限公司 Composite base framework used for power transmission tower in steep mountainous area and construction technology thereof
CN105568959A (en) * 2015-12-28 2016-05-11 上海市机械施工集团有限公司 Prefabricated assembly type blocking wall device and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵彤: "特大型基坑群工程基坑支护方案分析与比选", 《岩土工程学报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476315A (en) * 2017-09-07 2017-12-15 东北大学 A kind of prefabricated component and its construction method being directed to close to type foundation ditch

Also Published As

Publication number Publication date
CN106245656B (en) 2018-12-18

Similar Documents

Publication Publication Date Title
CN106759104B (en) Ecological slope protection structure and construction method
CN103669398B (en) A kind of monoblock type cutting retaining wall
CN105464056A (en) Anti-seepage structure capable of adapting to settlement of earth and rockfill dam
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN110306586A (en) A kind of foundation reinforcement method for traditional architecture
CN105951712A (en) Underground diaphragm wall construction method for cutting through underground structure under ground limitation condition
CN108661073A (en) A kind of barrier wall structure and its construction method
CN204780938U (en) Novel recoverable anchor formula double row pile supporting construction that draws
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN207143981U (en) 3rd is rich water half diagenesis Sandstone Section Metro station excavation discharge structure
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN103104021A (en) Xigeda stratum cut slope waterproof and drainage system
CN105239530A (en) Externally bonded landscape flood prevention wall structure
CN207047796U (en) A kind of light-duty mud-rock flow arch blocking dam
CN101748735A (en) Foundation ditch excavation method for reducing pile deflection in soft soil area
CN107700434A (en) A kind of dome grating formula armored concrete mud-rock flow blocking dam and its construction process
CN204715364U (en) A kind of foundation pit support device
CN204225069U (en) Bank protection work unfavorable geology shallow underground drainage system
CN106245656A (en) A kind of construction method of the supporting improving sidesway for master and slave type foundation ditch group
CN109826201A (en) A kind of weak soil foundation pit step method for protecting support
Emiroglu Influences on selection of the type of dam
CN202689032U (en) Retaining wall for supporting side slope
CN105350544A (en) Waterproof curtain used for stone-contained area and construction method thereof
CN216275518U (en) Reinforcing and reinforcing structure of clay core rockfill dam
CN106149631B (en) High mountain strid arch dam avalanche type Slope Treatment method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20161221

Assignee: SHEN KAN ENGINEERING & TECHNOLOGY CORPORATION, MCC

Assignor: Northeastern University

Contract record no.: X2021210000041