CN106245531A - 双侧吊杆式下挂钢结构桥安装方法 - Google Patents
双侧吊杆式下挂钢结构桥安装方法 Download PDFInfo
- Publication number
- CN106245531A CN106245531A CN201610749637.XA CN201610749637A CN106245531A CN 106245531 A CN106245531 A CN 106245531A CN 201610749637 A CN201610749637 A CN 201610749637A CN 106245531 A CN106245531 A CN 106245531A
- Authority
- CN
- China
- Prior art keywords
- suspension rod
- binder
- crab
- installation
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 74
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 48
- 239000010959 steel Substances 0.000 title claims abstract description 48
- 230000002146 bilateral Effects 0.000 title claims abstract description 33
- 239000000725 suspension Substances 0.000 claims abstract description 73
- 239000011230 binding agent Substances 0.000 claims abstract description 48
- 238000010276 construction Methods 0.000 claims abstract description 27
- 239000004567 concrete Substances 0.000 claims description 12
- 238000003466 welding Methods 0.000 claims description 11
- 238000007906 compression Methods 0.000 claims description 8
- 210000004209 Hair Anatomy 0.000 claims description 6
- 230000000875 corresponding Effects 0.000 claims description 4
- 238000003032 molecular docking Methods 0.000 claims description 4
- 230000003019 stabilising Effects 0.000 claims description 4
- 238000004140 cleaning Methods 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 230000011664 signaling Effects 0.000 claims description 3
- 239000002390 adhesive tape Substances 0.000 claims description 2
- 230000005611 electricity Effects 0.000 claims 1
- 239000003643 water by type Substances 0.000 claims 1
- 238000004804 winding Methods 0.000 claims 1
- 238000004080 punching Methods 0.000 description 7
- 239000000463 material Substances 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000003014 reinforcing Effects 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610749637.XA CN106245531B (zh) | 2016-08-29 | 2016-08-29 | 双侧吊杆式下挂钢结构桥安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610749637.XA CN106245531B (zh) | 2016-08-29 | 2016-08-29 | 双侧吊杆式下挂钢结构桥安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106245531A true CN106245531A (zh) | 2016-12-21 |
CN106245531B CN106245531B (zh) | 2018-01-30 |
Family
ID=57597538
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610749637.XA Expired - Fee Related CN106245531B (zh) | 2016-08-29 | 2016-08-29 | 双侧吊杆式下挂钢结构桥安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106245531B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106894639A (zh) * | 2017-04-27 | 2017-06-27 | 中国建筑第八工程局有限公司 | 一种下挂式钢结构逆向安装施工方法 |
CN111877194A (zh) * | 2020-09-08 | 2020-11-03 | 浙江世润建创科技发展有限公司 | 新旧桥梁的拼接夹具的制作使用方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5119731A (en) * | 1989-10-24 | 1992-06-09 | Jean Muller International | Station on a railway or other line, situated on a viaduct |
CN203393596U (zh) * | 2013-08-02 | 2014-01-15 | 江苏中设工程咨询集团有限公司 | 跨越高速公路或高等级航道的城市桥梁结构 |
CN103882814A (zh) * | 2014-04-02 | 2014-06-25 | 南京工业大学 | 一种桥梁拓宽用复合材料结构体系 |
CN104514198A (zh) * | 2014-12-22 | 2015-04-15 | 盈都桥梁钢构工程有限公司 | 一种下挂式钢桥竖吊杆及其铅垂度控制方法 |
CN204370314U (zh) * | 2014-12-22 | 2015-06-03 | 盈都桥梁钢构工程有限公司 | 一种下挂式钢桥竖吊杆 |
-
2016
- 2016-08-29 CN CN201610749637.XA patent/CN106245531B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5119731A (en) * | 1989-10-24 | 1992-06-09 | Jean Muller International | Station on a railway or other line, situated on a viaduct |
CN203393596U (zh) * | 2013-08-02 | 2014-01-15 | 江苏中设工程咨询集团有限公司 | 跨越高速公路或高等级航道的城市桥梁结构 |
CN103882814A (zh) * | 2014-04-02 | 2014-06-25 | 南京工业大学 | 一种桥梁拓宽用复合材料结构体系 |
CN104514198A (zh) * | 2014-12-22 | 2015-04-15 | 盈都桥梁钢构工程有限公司 | 一种下挂式钢桥竖吊杆及其铅垂度控制方法 |
CN204370314U (zh) * | 2014-12-22 | 2015-06-03 | 盈都桥梁钢构工程有限公司 | 一种下挂式钢桥竖吊杆 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106894639A (zh) * | 2017-04-27 | 2017-06-27 | 中国建筑第八工程局有限公司 | 一种下挂式钢结构逆向安装施工方法 |
CN111877194A (zh) * | 2020-09-08 | 2020-11-03 | 浙江世润建创科技发展有限公司 | 新旧桥梁的拼接夹具的制作使用方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106245531B (zh) | 2018-01-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105421248B (zh) | 大跨度连续梁跨既有车站转体及合龙施工方法 | |
CN103291076B (zh) | 弧形框架内多层次钢桁架分片逆向吊装施工方法 | |
CN101781879B (zh) | 独塔无背索斜拉桥施工方法 | |
CN104695337B (zh) | 自提升滑翻施工系统及施工方法 | |
CN105442459A (zh) | 大跨度连续梁跨既有车站转体施工用转体系统及施工方法 | |
CN105648926B (zh) | 大跨度连续梁跨既有车站转体施工方法 | |
CN205329560U (zh) | 一种大跨度连续梁跨既有车站转体施工用转体系统 | |
CN104562936A (zh) | 一种连续系杆钢管拱桥施工方法 | |
CN103161126A (zh) | 路桥变截面空心高墩滑模施工方法 | |
CN102296542B (zh) | 一种高墩盖梁施工方法 | |
CN106087752A (zh) | 多跨提篮拱桥施工方法 | |
CN105239510A (zh) | 用于高墩小半径曲线现浇箱梁的拆装梁支架及其施工方法 | |
CN101781878B (zh) | 独塔无背索斜拉桥主塔整体提升模板及其提升施工方法 | |
CN107013038A (zh) | 一种大型建筑物屋顶采光中庭的钢结构滑移换柱施工方法 | |
CN205025086U (zh) | 一种劲性骨架混凝土梁施工的悬吊模板 | |
CN203947771U (zh) | 一种贝雷梁悬吊模板支撑体系 | |
CN106592962A (zh) | 一种大高差、大跨度劲性骨架外包混凝土模板施工方法及施工设备 | |
CN106245531B (zh) | 双侧吊杆式下挂钢结构桥安装方法 | |
CN105952133A (zh) | 悬空大跨度钢筋砼结构施工钢平台及施工方法 | |
CN105018115B (zh) | 干熄焦一次除尘器分片吊装方法 | |
CN104532746B (zh) | 一种钢混叠合梁上部结构施工方法 | |
CN107130521B (zh) | 一种深坑崖壁段大截面梁贝雷支架吊模施工方法 | |
CN205529915U (zh) | 一种梯型桅杆式悬拼吊机 | |
CN212479255U (zh) | 一种用于悬索桥隧道锚锚室拱顶二衬施工设备 | |
CN104060838A (zh) | 一种通廊分组空中组对安装法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Ma Ke Inventor after: Dong Quanqing Inventor after: Feng Baosu Inventor after: Zhang Ce Inventor after: Yan Lifeng Inventor after: Liu Yu Inventor before: Dong Quanqing Inventor before: Feng Baosu Inventor before: Ma Ke Inventor before: Zhang Ce Inventor before: Liu Yu |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200108 Address after: 441003 No.18, Chunyuan East Road, Fancheng District, Xiangyang City, Hubei Province Patentee after: Zhongtian Communications Construction Investment Group Co.,Ltd. Address before: 264000 No. 29 North Haiyang Road, Zhifu District, Shandong, Yantai Patentee before: SHANDONG ZHONGHONG ROAD AND BRIDGE CONSTRUCTION Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180130 Termination date: 20210829 |