CN106240579A - 一种架空乘人缆车上绳专用工具 - Google Patents
一种架空乘人缆车上绳专用工具 Download PDFInfo
- Publication number
- CN106240579A CN106240579A CN201610890692.0A CN201610890692A CN106240579A CN 106240579 A CN106240579 A CN 106240579A CN 201610890692 A CN201610890692 A CN 201610890692A CN 106240579 A CN106240579 A CN 106240579A
- Authority
- CN
- China
- Prior art keywords
- pop
- drop
- shaped groove
- type groove
- cable car
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B12/00—Component parts, details or accessories not provided for in groups B61B7/00 - B61B11/00
Landscapes
- Engineering & Computer Science (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Emergency Lowering Means (AREA)
Abstract
本发明公开了一种架空乘人缆车上绳专用工具,包括管体、上托U型槽、下拉杆,管体一端与上托U型槽连接,管体与上托U型槽之间采用焊接连接,管体一侧设有下拉u型槽,管体与下拉u型槽之间同样采用焊接连接,下拉u型槽设置在上托U型槽的下方,管体另一端与托杆连接,管体一侧上还设有下拉杆,管体采用直径12.5mm、长度1.5m的镀锌钢管制作而成,下拉杆设置在距离托杆20cm处的管体上。本架空乘人缆车上绳专用工具实现了上托、下拉的功能,实现了人员站在地面轻松达到理想的上绳工作。简化了人员在高度不够的情况下巷道中上绳难的问题,有效的减少了上绳所用的时间,提高了职工的安全系数,成本低,而且使用效率很高。
Description
技术领域
本发明涉及一种架空乘人缆车上绳专用工具。
背景技术
井下架空乘人缆车,担负着全矿井人员上下的斜巷运输任务,在实际运行过程中,由于托绳轮的磨损、巷道变形、托绳轮的安装位置不合适,致使架空乘人缆车在人员运输过程中落绳现象经常发生,且经常出现多架绳轮同时落绳,需要将由托绳轮落下的钢丝绳重新上绳复位,缆车方可恢复运行,现在各缆车在使用运行过程中落绳时常用方法为:停机后用手直接上绳法,采用手上绳的方法,特别是巷道高的地方,人员上绳时需登高作业,人力消耗大,不利于人员作业安全,费时费力,人员上绳的恢复过程时间较长,严重制约了人员运输系统的正常运行。
发明内容
本发明的目的在于提供一种架空乘人缆车上绳专用工具,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:一种架空乘人缆车上绳专用工具,包括管体、上托U型槽、下拉u型槽、托杆、下拉杆,所述管体一端与上托U型槽连接,管体与上托U型槽之间采用焊接连接,管体一侧设有下拉u型槽,管体与下拉u型槽之间同样采用焊接连接,下拉u型槽设置在上托U型槽的下方,管体另一端与托杆连接,管体一侧上还设有下拉杆。
优选的,所述管体采用直径12.5mm、长度1.5m的镀锌钢管制作而成。
优选的,所述下拉杆设置在距离托杆20cm处的管体上。
优选的, 所述上托U型槽直径为60mm,下拉u型槽直径为40mm,上托U型槽和下拉u型槽均采用直径为10mm的圆管制作而成。
优选的,所述下拉杆长度为110mm,托杆长度为184mm。
与现有技术相比,本发明的有益效果是:本架空乘人缆车上绳专用工具实现了上托、下拉的功能,实现了人员站在地面轻松达到理想的上绳工作;简化了人员在高度不够的情况下巷道中上绳难的问题,有效的减少了上绳所用的时间,提高了职工的安全系数;成本低,使用效率很高;同时减小了施工人员的劳动强度。
附图说明
图1为本发明结构示意图。
图中:1-管体,2- 上托U型槽,3-下拉u型槽,4-下拉杆,5-托杆。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1,本发明提供的一种实施例:一种架空乘人缆车上绳专用工具,包括管体1、上托U型槽2、下拉u型槽3、托杆5、下拉杆4,所述管体1一端与上托U型槽2连接,管体1与上托U型槽2之间采用焊接连接,管体1一侧设有下拉u型槽3,管体1与下拉u型槽3之间同样采用焊接连接,下拉u型槽3设置在上托U型槽2的下方,管体1另一端与托杆5连接,管体1一侧上还设有下拉杆4,管体1采用直径12.5mm、长度1.5m的镀锌钢管制作而成,下拉杆4设置在距离托杆5 20cm处的管体1上,上托U型槽2直径为60mm,下拉u型槽3直径为40mm,上托U型槽2和下拉u型槽3均采用直径为10mm的圆管制作而成,下拉杆4长度为110mm,托杆5长度为184mm。
具体使用方式:本发明中,通过管体1、上托U型槽2、下拉u型槽3、托杆5、下拉杆4构成了本装置,上托U型槽2设置在管体1的一端,上托U型槽2下方设置下拉u型槽3,管体1的另一端设有托杆5,下拉杆4设置在距离托杆5上表面20cm处的管体1上,管体1采用直径12.5mm、长度1.5m的镀锌钢管制作而成,上托U型槽2直径为60mm,下拉u型槽3直径为40mm,上托U型槽2和下拉u型槽3均采用直径为10mm的圆管制作而成,通过本装置实现了上托、下拉的功能,轻松达到理想的上绳效果。
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。
Claims (5)
1.一种架空乘人缆车上绳专用工具,包括管体(1)、上托U型槽(2)、下拉u型槽(3)、托杆(5)、下拉杆(4),其特征在于:所述管体(1)一端与上托U型槽(2)连接,管体(1)与上托U型槽(2)之间采用焊接连接,管体(1)一侧设有下拉u型槽(3),管体(1)与下拉u型槽(3)之间同样采用焊接连接,下拉u型槽(3)设置在上托U型槽(2)的下方,管体(1)另一端与托杆(5)连接,管体(1)一侧上还设有下拉杆(4)。
2.根据权利要求1所述的一种架空乘人缆车上绳专用工具,其特征在于,所述管体(1)采用直径12.5mm、长度1.5m的镀锌钢管制作而成。
3.根据权利要求1所述的一种架空乘人缆车上绳专用工具,其特征在于,所述下拉杆(4)设置在距离托杆(5)20cm处的管体(1)上。
4.根据权利要求1所述的一种架空乘人缆车上绳专用工具,其特征在于,所述上托U型槽(2)直径为60mm,下拉u型槽(3)直径为40mm,上托U型槽(2)和下拉u型槽(3)均采用直径为10mm的圆管制作而成。
5.根据权利要求1所述的一种架空乘人缆车上绳专用工具,其特征在于,所述下拉杆(4)长度为110mm,托杆(5)长度为184mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610890692.0A CN106240579A (zh) | 2016-10-13 | 2016-10-13 | 一种架空乘人缆车上绳专用工具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610890692.0A CN106240579A (zh) | 2016-10-13 | 2016-10-13 | 一种架空乘人缆车上绳专用工具 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106240579A true CN106240579A (zh) | 2016-12-21 |
Family
ID=57612405
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610890692.0A Pending CN106240579A (zh) | 2016-10-13 | 2016-10-13 | 一种架空乘人缆车上绳专用工具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106240579A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1297772A (zh) * | 1969-05-13 | 1972-11-29 | ||
EP0612675A1 (de) * | 1993-02-20 | 1994-08-31 | Helmut Dipl.-Ing. Sudhop | Zug- und Tragseil für Förderer |
CN103693047A (zh) * | 2013-12-25 | 2014-04-02 | 枣庄矿业集团高庄煤业有限公司 | 矿井斜巷提升自动拾绳装置 |
CN203666649U (zh) * | 2013-11-19 | 2014-06-25 | 滕州市东大矿业有限责任公司 | 一种矿用索道钢丝绳手动复位器 |
CN203713871U (zh) * | 2014-01-21 | 2014-07-16 | 济宁矿业集团有限公司 | 一种架空乘人装置的钢丝绳脱绳复位器 |
CN206141543U (zh) * | 2016-10-13 | 2017-05-03 | 枣庄矿业集团新安煤业有限公司 | 一种架空乘人缆车上绳专用工具 |
-
2016
- 2016-10-13 CN CN201610890692.0A patent/CN106240579A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1297772A (zh) * | 1969-05-13 | 1972-11-29 | ||
EP0612675A1 (de) * | 1993-02-20 | 1994-08-31 | Helmut Dipl.-Ing. Sudhop | Zug- und Tragseil für Förderer |
CN203666649U (zh) * | 2013-11-19 | 2014-06-25 | 滕州市东大矿业有限责任公司 | 一种矿用索道钢丝绳手动复位器 |
CN103693047A (zh) * | 2013-12-25 | 2014-04-02 | 枣庄矿业集团高庄煤业有限公司 | 矿井斜巷提升自动拾绳装置 |
CN203713871U (zh) * | 2014-01-21 | 2014-07-16 | 济宁矿业集团有限公司 | 一种架空乘人装置的钢丝绳脱绳复位器 |
CN206141543U (zh) * | 2016-10-13 | 2017-05-03 | 枣庄矿业集团新安煤业有限公司 | 一种架空乘人缆车上绳专用工具 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104195948B (zh) | 桥梁悬吊管道顶推安装施工方法 | |
CN201753244U (zh) | 装修多用途微型升降机 | |
CN206141543U (zh) | 一种架空乘人缆车上绳专用工具 | |
CN206530076U (zh) | 一种施工安全防护栏 | |
CN106240579A (zh) | 一种架空乘人缆车上绳专用工具 | |
CN204212390U (zh) | 一种钢结构施工用载人吊篮 | |
CN205789412U (zh) | 一种变压呼吸器延长管 | |
CN204081536U (zh) | 一种建筑施工中用于钢结构安装的可拆卸安全装置 | |
CN101435270A (zh) | 高层柱子分段对接作业方法 | |
CN204001927U (zh) | 输电钢管塔横担跨步拉手 | |
CN103231993A (zh) | 室内gis运输就位装置及使用方法 | |
CN205132152U (zh) | 一种空气炮用喷嘴及空气炮 | |
CN104876165A (zh) | 光伏组件移动式安装检修平台 | |
CN205477697U (zh) | 一种可伸缩模拟支架 | |
CN204859074U (zh) | 光伏组件移动式安装检修平台 | |
CN204368977U (zh) | 一种皮带架耳子装置 | |
CN108749890A (zh) | 一种机械加工多用推车 | |
CN202711644U (zh) | 一种横幅升降悬挂装置 | |
CN201169922Y (zh) | 高层柱子分段对接作业的安全装置 | |
CN206419063U (zh) | 充填平台悬吊工具 | |
CN201989801U (zh) | 应用在矿井中的安全打运连杆 | |
CN202936997U (zh) | 防护翻板 | |
CN108458162A (zh) | 一种市政管道组装的平移器 | |
CN108978467B (zh) | 一种城市轨道交通工程桥梁支座检修专用工具 | |
CN208915190U (zh) | 一种用于施工现场二次倒运大口径管道的运输装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161221 |