CN106225009B - 一种基于电厂sis系统的判断机组变负荷下的给煤量的方法 - Google Patents

一种基于电厂sis系统的判断机组变负荷下的给煤量的方法 Download PDF

Info

Publication number
CN106225009B
CN106225009B CN201610595035.3A CN201610595035A CN106225009B CN 106225009 B CN106225009 B CN 106225009B CN 201610595035 A CN201610595035 A CN 201610595035A CN 106225009 B CN106225009 B CN 106225009B
Authority
CN
China
Prior art keywords
coal
msub
mrow
unit
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610595035.3A
Other languages
English (en)
Other versions
CN106225009A (zh
Inventor
罗睿
王智微
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian TPRI Power Station Information Technology Co Ltd
Original Assignee
Xian TPRI Power Station Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian TPRI Power Station Information Technology Co Ltd filed Critical Xian TPRI Power Station Information Technology Co Ltd
Priority to CN201610595035.3A priority Critical patent/CN106225009B/zh
Publication of CN106225009A publication Critical patent/CN106225009A/zh
Application granted granted Critical
Publication of CN106225009B publication Critical patent/CN106225009B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N1/00Regulating fuel supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23KFEEDING FUEL TO COMBUSTION APPARATUS
    • F23K3/00Feeding or distributing of lump or pulverulent fuel to combustion apparatus
    • F23K3/22Controlling thickness of fuel bed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N5/00Systems for controlling combustion

Abstract

一种基于电厂SIS系统的判断机组变负荷下的给煤量的方法,通过SIS平台对电厂变负荷前一段给煤量与机组负荷的历史值统计,预测当前负荷下实时给煤量的推荐值,可以在入炉煤热值难以确定的情况下,给出机组实时给煤量在变负荷下的计算方法,为电厂变负荷状态的优化和稳定运行提供数据支持,提升电厂燃料精细化管理水平。

Description

一种基于电厂SIS系统的判断机组变负荷下的给煤量的方法
技术领域
本发明属于动力工程行业,具体涉及一种基于电厂SIS系统的判断机组变负荷下的给煤量的方法。
背景技术
我国燃煤发电机组普遍具有煤质多变的问题,并且还要承担一定的电网负荷调峰任务。在变负荷与变煤质情况下如何精准确定燃煤锅炉的给煤量对发电机组的调峰能力和安全稳定运行水平有着至关重要的作用。一般来说,机组发电负荷与设计煤种间有确定的设计对应关系,但电厂入炉煤往往不是设计煤种,热值偏差较大,按照设计关系给煤量运行会导致输入热量与输出能量不匹配。为此,有工程研究人员提出以入炉煤热值折算出给煤量的修正系数,来调整变负荷下不同煤质的给煤量。但入炉煤热值也在实时变化的,离线测量方式难以满足要求,入炉煤热值的计算也会引入相应误差。鉴于火力发电厂信息化建设的大力发展,如何利用火电厂厂级监控信息系统(SIS)分析并实时确定发电机组煤质多变情况下的变负荷给煤量具有十分重要的意义。
发明内容
本发明的目的在于提供一种基于电厂SIS系统的判断机组变负荷下的给煤量的方法。
为达到上述目的,本发明采用的技术方案是:
1)统计当前时刻之前的机组负荷变化与给煤量变化的历史数据
在燃煤发电机组变负荷当前时刻,需要调节的燃煤量以之前的历史数据为参考,设当前时刻为t0,当前机组负荷为N0,当前给煤量为B0,取该机组当前时刻之前的t0-Δt时刻到t0时刻,机组负荷变化ΔN与给煤量变化ΔB的对应历史数据组即ΔNi,ΔBi,其中,ΔNi=Ni-N0,ΔBi=Bi-B0,i=1~n,Ni是i时刻的机组负荷,Bi是i时刻的机组给煤量,ΔNi和ΔBi分别代表当前时刻相比i时刻下机组的负荷变化量与给煤变化量,n为Δt的历史时间段内取样的组数;
2)由历史数据预测当前机组在负荷变化下的燃煤量变化量
对当前时刻之前Δt的历史时段内燃煤变化量与负荷变化量建立实时的对应关系,得出当前时刻最近的实时燃煤量变化随负荷变化的影响系数,将这些历史值平均化处理得到,
当前时刻负荷的变化ΔN0=Ngoal-N0,根据最近历史时段内机组运行的数据,得到当前负荷变化ΔN0时燃煤量变化为ΔB0=k0·ΔN0,即
3)实时确定机组在新负荷下的燃煤量调整目标值
燃煤量调整目标值应为当前燃煤量与负荷调节引起的燃煤变化量的代数和,即Bgoal=B0+ΔB0,最终燃煤量随负荷变化需要调节的目标值为
选择一段历史时间内的机组负荷与给煤量的对应数据,按照如下原则选取历史时段:
1)取当前时刻前1小时或1小时以上的历史数据作为参考;
2)选取历史时段机组负荷有变化的工况数据;
3)对SIS的历史数据每隔若干秒取1次,间隔时间的选取原则为保证2次历史数据中机组负荷之差不小于机组额定负荷的1%。
本发明能够实时准确地得出燃煤发电机组在煤质多变情况下变负荷的实时给煤量。该方法充分利用SIS信息化数据平台,既考虑了煤质多变引发的热值变化影响,又避免了入炉煤热值的繁琐确定程序及带来的相应误差,为电厂的调峰能力和煤质适应性运行管理水平提供数据支持,对提高机组的安全经济运行及燃料的精细化管理具有重要的指导意义。
具体实施方式
本发明包括:
1)统计当前时刻之前的机组负荷变化与给煤量变化的历史数据
在燃煤发电机组变负荷当前时刻,需要调节的燃煤量以之前的历史数据为参考,设当前时刻为t0,当前机组负荷为N0,当前给煤量为B0,取该机组当前时刻之前的t0-Δt时刻到t0时刻,机组负荷变化ΔN与给煤量变化ΔB的对应历史数据组即ΔNi,ΔBi,其中,ΔNi=Ni-N0,ΔBi=Bi-B0,i=1~n,Ni是i时刻的机组负荷,Bi是i时刻的机组给煤量,ΔNi和ΔBi分别代表当前时刻相比i时刻下机组的负荷变化量与给煤变化量,n为Δt的历史时间段内取样的组数;
选择一段历史时间内的机组负荷与给煤量的对应数据,按照如下原则选取历史时段:一般情况取当前时刻前1小时的历史数据作为参考,也可根据实际情况延长;选取历史时段尽量选取机组负荷有一定变化的工况数据;SIS数据一般为秒级采集存储,为数据处理高效,可以对历史数据每隔若干秒取1次(比如间隔600秒),间隔时间的选取原则为尽量保证2次历史数据中机组负荷之差不小于机组额定负荷的1%。
2)由历史数据预测当前机组在负荷变化下的燃煤量变化量
对当前时刻之前Δt的历史时段内燃煤变化量与负荷变化量建立实时的对应关系,得出当前时刻最近的实时燃煤量变化随负荷变化的影响系数,将这些历史值平均化处理得到,
当前时刻负荷的变化ΔN0=Ngoal-N0,根据最近历史时段内机组运行的数据,得到当前负荷变化ΔN0时燃煤量变化为ΔB0=k0·ΔN0,即
3)实时确定机组在新负荷下的燃煤量调整目标值
燃煤量调整目标值应为当前燃煤量与负荷调节引起的燃煤变化量的代数和,即Bgoal=B0+ΔB0,最终燃煤量随负荷变化需要调节的目标值为
本发明基于SIS平台的机组运行历史数据,确定当前时刻变负荷下的给煤量目标值总是实时更新,即机组负荷变化过程中,实际给煤量也在变化,当前时刻之前的历史数据也在相应更新,保证了给煤量信息随机组运行情况及煤质热值变化的及时更新。实现了在当前负荷N0、给煤量B0、及变负荷目标值Ngoal条件下,给煤量目标值的实时更新。煤质变化引起的热值偏差引发的给煤量实时变化会在SIS系统得到的历史数据中体现,并在计算Bgoal的公式中修正。

Claims (2)

1.一种基于电厂SIS系统的判断机组变负荷下的给煤量的方法,其特征在于:包括以下步骤:
1)统计当前时刻之前的机组负荷变化与给煤量变化的历史数据
在燃煤发电机组变负荷当前时刻,需要调节的燃煤量以之前的历史数据为参考,设当前时刻为t0,当前机组负荷为N0,当前给煤量为B0,取该机组当前时刻之前的t0-Δt时刻到t0时刻,机组负荷变化ΔN与给煤量变化ΔB的对应历史数据组即ΔNi,ΔBi,其中,ΔNi=Ni-N0,ΔBi=Bi-B0,i=1~n,Ni是i时刻的机组负荷,Bi是i时刻的机组给煤量,ΔNi和ΔBi分别代表当前时刻相比i时刻下机组的负荷变化量与给煤变化量,n为Δt的历史时间段内取样的组数;
2)由历史数据预测当前机组在负荷变化下的燃煤量变化量
对当前时刻之前Δt的历史时段内燃煤变化量与负荷变化量建立实时的对应关系,得出当前时刻最近的实时燃煤量变化随负荷变化的影响系数,将这些历史值平均化处理得到,
<mrow> <msub> <mi>k</mi> <mn>0</mn> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>&amp;Delta;B</mi> <mi>i</mi> </msub> <mo>/</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>&amp;Delta;N</mi> <mi>i</mi> </msub> </mrow>
当前时刻负荷的变化ΔN0=Ngoal-N0,根据最近历史时段内机组运行的数据,得到当前负荷变化ΔN0时燃煤量变化为ΔB0=k0·ΔN0,即
<mrow> <msub> <mi>&amp;Delta;B</mi> <mn>0</mn> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>&amp;Delta;B</mi> <mi>i</mi> </msub> <mo>/</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>&amp;Delta;N</mi> <mi>i</mi> </msub> <mo>&amp;CenterDot;</mo> <mrow> <mo>(</mo> <msub> <mi>N</mi> <mrow> <mi>g</mi> <mi>o</mi> <mi>a</mi> <mi>l</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>N</mi> <mn>0</mn> </msub> <mo>)</mo> </mrow> </mrow>
3)实时确定机组在新负荷下的燃煤量调整目标值
燃煤量调整目标值应为当前燃煤量与负荷调节引起的燃煤变化量的代数和,即Bgoal=B0+ΔB0,最终燃煤量随负荷变化需要调节的目标值为
<mrow> <msub> <mi>B</mi> <mrow> <mi>g</mi> <mi>o</mi> <mi>a</mi> <mi>l</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>B</mi> <mn>0</mn> </msub> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>&amp;Delta;B</mi> <mi>i</mi> </msub> <mo>/</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>&amp;Delta;N</mi> <mi>i</mi> </msub> <mo>&amp;CenterDot;</mo> <mrow> <mo>(</mo> <msub> <mi>N</mi> <mrow> <mi>g</mi> <mi>o</mi> <mi>a</mi> <mi>l</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>N</mi> <mn>0</mn> </msub> <mo>)</mo> </mrow> <mo>.</mo> </mrow>
2.根据权利要求1所述的基于电厂SIS系统的判断机组变负荷下的给煤量的方法,其特征在于:选择一段历史时间内的机组负荷与给煤量的对应数据,按照如下原则选取历史时段:
1)取当前时刻前1小时或1小时以上的历史数据作为参考;
2)选取历史时段机组负荷有变化的工况数据;
3)对SIS的历史数据每隔若干秒取1次,间隔时间的选取原则为保证2次历史数据中机组负荷之差不小于机组额定负荷的1%。
CN201610595035.3A 2016-07-26 2016-07-26 一种基于电厂sis系统的判断机组变负荷下的给煤量的方法 Active CN106225009B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610595035.3A CN106225009B (zh) 2016-07-26 2016-07-26 一种基于电厂sis系统的判断机组变负荷下的给煤量的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610595035.3A CN106225009B (zh) 2016-07-26 2016-07-26 一种基于电厂sis系统的判断机组变负荷下的给煤量的方法

Publications (2)

Publication Number Publication Date
CN106225009A CN106225009A (zh) 2016-12-14
CN106225009B true CN106225009B (zh) 2018-02-06

Family

ID=57534160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610595035.3A Active CN106225009B (zh) 2016-07-26 2016-07-26 一种基于电厂sis系统的判断机组变负荷下的给煤量的方法

Country Status (1)

Country Link
CN (1) CN106225009B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397951A (zh) * 2019-08-01 2019-11-01 广州发展集团股份有限公司 一种基于数据驱动及智能算法的锅炉燃烧优化系统、方法和装置

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107368049B (zh) * 2017-07-17 2019-11-05 华能海南发电股份有限公司 基于电厂dcs系统的机组变负荷下给煤量的控制方法
CN109442465B (zh) * 2018-09-30 2020-06-26 上海全应科技有限公司 煤粉锅炉瞬时给粉量的拟合样本选取及计量方法
CN109993401B (zh) * 2019-02-14 2021-07-30 国网浙江省电力有限公司电力科学研究院 一种燃煤机组可快速响应的最大出力预测方法和系统
CN112902215A (zh) * 2020-12-11 2021-06-04 中国能源建设集团广东省电力设计研究院有限公司 一种锅炉底层给煤机控制装置及方法
CN113341713B (zh) 2021-05-31 2022-08-30 苏州西热节能环保技术有限公司 一种燃煤机组煤风同步动态协控方法
CN113504767B (zh) * 2021-07-08 2022-11-18 杭州骏踔科技有限公司 一种电厂料耗监测系统
CN116189805B (zh) * 2023-04-19 2023-07-21 北京全应科技有限公司 一种基于氧量预测的煤质变化监测方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799170A (zh) * 2010-03-18 2010-08-11 华北电力大学 燃煤锅炉燃料发热量实时校正方法
CN102914966A (zh) * 2012-10-25 2013-02-06 辽宁省电力有限公司电力科学研究院 基于预给煤控制模型的协调控制系统参数动态整定方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10232016A (ja) * 1997-02-18 1998-09-02 Mitsubishi Heavy Ind Ltd 混焼ボイラの燃料供給制御方法とその装置
ES2321622T3 (es) * 2003-11-27 2009-06-09 Siemens Aktiengesellschaft Procedimiento para la determinacion de las propiedades fluctuantes de un combustible durante el funcionamiento de una instalacion de central electrica.

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799170A (zh) * 2010-03-18 2010-08-11 华北电力大学 燃煤锅炉燃料发热量实时校正方法
CN102914966A (zh) * 2012-10-25 2013-02-06 辽宁省电力有限公司电力科学研究院 基于预给煤控制模型的协调控制系统参数动态整定方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"锅炉入炉煤量预测模型研究";谷俊杰等;《动力工程学报》;20160229;第36卷(第2期);全文 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397951A (zh) * 2019-08-01 2019-11-01 广州发展集团股份有限公司 一种基于数据驱动及智能算法的锅炉燃烧优化系统、方法和装置

Also Published As

Publication number Publication date
CN106225009A (zh) 2016-12-14

Similar Documents

Publication Publication Date Title
CN106225009B (zh) 一种基于电厂sis系统的判断机组变负荷下的给煤量的方法
CN100527025C (zh) 过程控制系统
CN101206754B (zh) 基于多种约束规则的火电厂厂级负荷优化分配方法
CN103023074B (zh) 一种基于模型预测控制的大电网有功实时调度方法
Fang et al. Backstepping-based nonlinear adaptive control for coal-fired utility boiler–turbine units
CN106773669B (zh) 一种燃料热值实时自适应校正的火电机组协调控制方法
Liu et al. Optimal energy flow for integrated energy systems considering gas transients
JP5423357B2 (ja) 電圧無効電力監視システム
CN107368049B (zh) 基于电厂dcs系统的机组变负荷下给煤量的控制方法
KR101674260B1 (ko) 상수관망 수운영 시스템 및 운영방법
CN102566551A (zh) 一种基于数据挖掘的火电厂运行指标最优目标值的分析方法
CN109583141B (zh) 一种计及电转气耦合的电-气互联系统机组组合线性模型及系统
CN105955210A (zh) 余热锅炉与工业锅炉发电协调运行动态优化方法与系统
CN105119288A (zh) 一种多回直流频率限制控制器的协调控制及参数优化方法
CN101709863B (zh) 燃煤锅炉炉膛压力系统混合控制方法
CN104935017B (zh) 基于改进轻鲁棒优化模型的风电与火电机组组合方法
CN102609882A (zh) 一种基于管网计算的蒸汽管网混合调度系统
CN104484749A (zh) 用于燃煤电厂碳排放量预测方法和系统
CN105184474B (zh) 一种考虑不规则限制运行区的水电站厂内经济调度方法
CN107871181B (zh) 一种热电联产机组发电计划制定方法、装置及系统
CN104050300A (zh) 一种电网运行方式的风险评估方法、装置及系统
CN113091088B (zh) 一种基于双阶段神经网络的锅炉燃烧广义预测控制方法
CN104300546B (zh) 一种基于广域量测信息的电压稳定约束无功优化方法
KR20130035115A (ko) Vdcol 제어기
CN107402515A (zh) 一种优化同步发电机励磁系统pid参数的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant