CN106223361B - Gravity type retaining wall structure with culvert and construction method thereof - Google Patents

Gravity type retaining wall structure with culvert and construction method thereof Download PDF

Info

Publication number
CN106223361B
CN106223361B CN201610780442.1A CN201610780442A CN106223361B CN 106223361 B CN106223361 B CN 106223361B CN 201610780442 A CN201610780442 A CN 201610780442A CN 106223361 B CN106223361 B CN 106223361B
Authority
CN
China
Prior art keywords
culvert
retaining wall
barricade
ground
gravity retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610780442.1A
Other languages
Chinese (zh)
Other versions
CN106223361A (en
Inventor
郑克勋
明成涛
姚良铸
胡政
郭果
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201610780442.1A priority Critical patent/CN106223361B/en
Publication of CN106223361A publication Critical patent/CN106223361A/en
Application granted granted Critical
Publication of CN106223361B publication Critical patent/CN106223361B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
    • E01F5/005Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0275Retaining or protecting walls characterised by constructional features cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a gravity type retaining wall structure with a culvert and a construction method thereof, wherein the gravity type retaining wall (1) and a culvert concrete body (15) form an integral structure through a retaining wall culvert below the ground (13), a culvert body formed by culvert space (9) in a prefabricated culvert pipe (14) and the culvert concrete body (15) is arranged in parallel with the gravity type retaining wall (1), and the culvert concrete body (15) is positioned below wall feet outside a wall body of the gravity type retaining wall (1); the retaining wall foundation (6) and the culvert foundation (7) are used together as the foundation of a combined structure. The gravity retaining wall and the ditch or pipe culvert required to be arranged at the bottom of the side slope are taken as a whole, so that the structural systematicness is enhanced, the requirement on plane space is reduced, the foundation excavation depth is reduced, the retaining effect of the retaining wall on the side slope is enhanced, the anti-overturning capability is improved, and the problems of space required by side slope bottom drainage or pipeline laying and stable side slope support are solved.

Description

Gravity Retaining Wall structure with culvert and its construction method
Technical field
The invention belongs to slope support engineering technical fields, more particularly, to a kind of Gravity Retaining Wall knot with culvert Structure and its construction method.
Background technology
Barricade is a kind of common slope retaining measure, mainly there is Gravity Retaining Wall and counterfort wall etc..Gravity type is kept off Wall can be divided into inclined barricade of bowing, inclined retaining wall, vertical type barricade and pH-static method.The material of barricade mainly have concrete and Stone masonry etc., based on construction method is to pile up, formwork erection pours etc..
General side slope bottom outside is required for the irrigation canals and ditches or pipe culvert building the draining parallel with side slope or lay the line. Irrigation canals and ditches or pipe culvert are generally required keeps certain safe distance with barricade, but often space is limited for side slope lower part, is its plane Arrangement brings problem.According to existing Slope Design specification and design method, irrigation canals and ditches or pipe culvert are detached with Gravity Retaining Wall, ditch Canal or pipe culvert are unfavorable to stablizing for Gravity Retaining Wall in side slope bottom slot, and barricade ground must be deep-cut, and increase excavated volume and fill out The amount of building, and high steep interim side slope is formed, influence construction safety.
Through inquiring and searching at present only utility model《A kind of base of dam powerhouse of hydropower station barrier wall structure》(application number 201320140788.7), patent of invention《The construction method and structure of base of dam powerhouse of hydropower station barricade》(application number 201310099041.6), (Co., Ltd of Kweiyang survey and design research institute of application artificial Chinese electric construction group, old of inventor Dragon etc.) transport channel inside barricade is related to, see Fig. 2.The barricade is steady in order to solve dam base of dam powerhouse of hydropower station abutment wall Determine problem, barricade shape pattern is but pH-static method, and load retaining wall is only suitable for supporting and retaining system artificial earth fill's side slope, and barricade scale is big, channel It is spatially located inside barricade weight platform 2, the channel 3 in barricade alleviates the weight of weight platform, the stabilization to barricade and antidumping Effect is unfavorable, in order to remove adverse effect of the inner void to barricade integrality and Stress relief, need increase hole where Weight stage body accumulates, and channel is gateway opening type, need to found internal model and pour.
To general nature side slope and the Artificial Side-slope formed is excavated, has no that barricade combines the patent and text of one with culvert It offers;It has no that culvert close parallel is arranged in the patent and document of foundation on the outside of Gravity Retaining Wall, has no band culvert barricade concrete It pours using finished product pipeline as the patent of internal model and document.
Invention content
According to the prior art, irrigation canals and ditches or pipe culvert are detached with Gravity Retaining Wall, and the irrigation canals and ditches or pipe culvert of side slope bottom are general It needs to keep certain safe distance with barricade, if the two distance is closer, according to《Technique Code for Building Slope Engineering》(GB The basis of 50330-2002) Section 10.3 of requirement, Gravity Retaining Wall should have certain buried depth, buried depth should be from slope foot The bottom plate of gutter or culvert starts to calculate, this will increase considerably the cutting depth of retaining wall foundation, increase barricade height and Area of section causes the increase of slope support engineering amount, investment to increase, and influences the arrangement of irrigation canals and ditches, pipe culvert or barricade, or even influence The establishment of slope retaining scheme.
The purpose of the present invention is the irrigation canals and ditches that Gravity Retaining Wall and side slope bottom need to be arranged or pipe culverts as a whole, i.e., With a kind of Gravity Retaining Wall structure with culvert, enhancing structure systematicness reduces plane space demand, reduces ground and excavates deeply Degree reinforces the supporting and retaining system effect of barricade side slope, improves resistance to capsizing, while meeting side slope bottom discharge or laying the line required Space and stability of slope support issues, meanwhile, it creates the culvert concrete supported as internal model using prefabricated culvert pipe or finished product pipeline and pours Building method avoids complicated formwork erection process of irrigation canals and ditches or box culvert construct, is molded with barricade one-time-concreting, simplifies construction stream to reach Journey puies forward efficient purpose.
The present invention is achieved through the following technical solutions above-mentioned purpose:
First, this Gravity Retaining Wall structure with culvert of the invention is such, it is to pass through Gravity Retaining Wall Barricade culvert below ground position constitutes an overall structure with culvert concrete bodies, and culvert space is formed with culvert concrete bodies Culvert body and Gravity Retaining Wall be arranged in parallel, culvert concrete bodies are located under Gravity Retaining Wall wall outer side foundation;Gravity The ground of formula barricade is with culvert foundation together as the ground of co-ordinative construction.
Wherein, culvert spatial form is circle, and culvert ground is flushed with side slope slope foot ground, the ground of Gravity Retaining Wall Elevation is excavated to be located on the excavation elevation of culvert foundation;Prefabricated culvert pipe uses prefabricated reinforced concrete culvert pipe or finished product pipeline; Culvert space should use prefabricated culvert pipe or finished product according to drainning off floodwaters area of passage or the space requirement laid the line determines size The standard size of pipeline;Culvert ground cap rock need to have enough intensity, meet the additional stress that upper load and barricade generate and want It asks;The culvert below ground position of culvert concrete bodies and barricade uses cast-in-place conventional concrete, other positions of Gravity Retaining Wall Conventional concrete or cyclopean concrete can be used in concrete.
The construction method of this Gravity Retaining Wall structure with culvert includes the following steps:
Step 1:It is primary excavate form barricade after interim side slope, the ground of barricade and culvert concrete bodies ground;
Step 2:Set up and bind culvert lower part arrangement of reinforcement;
Step 3:Prefabricated culvert pipe is hung in, and is positioned;
Step 4:Culvert top arrangement of reinforcement is set up and bound, and connects culvert top arrangement of reinforcement and culvert lower part arrangement of reinforcement;
Step 5:The concrete at the culvert below ground position of culvert concrete bodies and Gravity Retaining Wall is poured simultaneously;
Step 6:Set up the outboard template of Gravity Retaining Wall;
Step 7:Gravity Retaining Wall culvert ground is poured with the concrete of upper bit.
The present invention has the following technical effects:The present invention can be used for bowing inclined barricade, inclined retaining wall, vertical type barricade and All Gravity Retaining Walls such as pH-static method, can be used at the supporting of natural slope, hand excavation's side slope and artificial earth fill's side slope Reason;
The culvert of the present invention need not reserve the spacing distance of culvert and barricade located immediately at barricade underfooting, characteristics of compact layout, Culvert ground is flushed with side slope foot ground, can make full use of culvert ground space;
The ground of the Gravity Retaining Wall of the present invention increases the width of retaining wall foundation together with culvert foundation, is similarly keeping off Under wall gravity, substrate frictional force increases, and can provide the supporting and retaining system active force of bigger;
The culvert concrete bodies of the present invention are located at the outside of barricade, improve the resistance to capsizing of barricade;
The excavation elevation of the ground of the Gravity Retaining Wall of the present invention is located on the elevation of culvert foundation, reduces excavated volume, Barricade reclamation work amount is saved, the height of interim side slope after barricade is reduced, mitigates construction time safety problem;
The prefabricated culvert pipe of the present invention uses prefabricated reinforced concrete culvert pipe or commodity pipeline, increases the rigidity of culvert, simultaneously The internal model that culvert pours is also served as, the complicated formwork erection process for avoiding culvert concreting from needing.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention;
Fig. 2 is the schematic diagram of the base of dam powerhouse of hydropower station barricade of the prior art.
1 description of symbols of attached drawing:1- Gravity Retaining Walls, 2- barricade internal drainages hole, anti-filter packet after 3- barricades, 4- side slopes ground, Interim side slope after 5- barricades, 6- barricade grounds, 7- culvert foundations, 8- side slope slope foots ground, 9- culverts space, 10- culverts ground Cap rock, 11- culverts top arrangement of reinforcement, 12- culverts lower part arrangement of reinforcement, 13- barricade culvert below grounds position, the prefabricated culvert pipe of 14-, 15- Culvert concrete bodies, 16- slope ground bodies.
2 description of symbols of attached drawing:1- sloping cores, 2- weights platform, 3- transport channels, 4- workshops bottom plate, 5- construction joints, 6- sealings Piece, 7- workshops floor, 8- rock ballasts, 9- earth and rockfill dams, the road surfaces 10-.
Specific implementation mode
The present invention is described in further detail with reference to the accompanying drawings and examples.
Closest to the prior art of the invention as shown in Fig. 2, the barricade is to solve dam base of dam powerhouse of hydropower station side Wall stable problem, barricade shape pattern are but pH-static method, and load retaining wall is only suitable for supporting and retaining system artificial earth fill's side slope, and barricade scale is big, Channel space is located inside barricade weight platform 2, and the channel 3 in barricade alleviates the weight of weight platform, stabilization to barricade and anti- Effect of toppling is unfavorable, in order to remove adverse effect of the inner void to barricade integrality and Stress relief, needs to increase hole institute Weight stage body product, channel be gateway opening type, internal model need to be found and poured.
As shown in Figure 1, Fig. 1 illustrates the overall structure of the present invention.It will be seen from figure 1 that the agent structure packet of the present invention Gravity Retaining Wall 1 is included, barricade internal drainage hole 2 is equipped in Gravity Retaining Wall 1, interim side after barricade is arranged in 1 rear of Gravity Retaining Wall Anti-filter packet 3 behind slope 5 and barricade, and be connected in slope ground body 16,16 top of slope ground body is side slope ground 4.
Gravity Retaining Wall 1 constitutes an entirety knot by barricade culvert below ground position 13 and culvert concrete bodies 15 Structure, the culvert body that culvert space 9 is formed with culvert concrete bodies 15 are arranged in parallel with Gravity Retaining Wall 1, culvert concrete bodies 15 Under 1 wall outer side foundation of Gravity Retaining Wall;Barricade ground 6 is with culvert foundation 7 together as the ground of co-ordinative construction.Contain Hole space 9 refers to the circular cavity in prefabricated culvert pipe 14.Prefabricated culvert pipe 14 uses prefabricated reinforced concrete culvert pipe or finished product pipeline.
When implementation, the construction method of the structure includes the following steps:
Step 1:Primary excavation forms interim side slope 5, barricade ground 6 and culvert foundation 7 after barricade;
Step 2:Set up and bind culvert lower part arrangement of reinforcement 12;
Step 3:Prefabricated culvert pipe 14 is hung in, and is positioned;
Step 4:Culvert top arrangement of reinforcement 11 is set up and bound, and connects culvert top arrangement of reinforcement 11 and culvert lower part arrangement of reinforcement 12;
Step 5:The concrete of culvert concrete bodies 15 and barricade culvert below ground position 13 is poured simultaneously;
Step 6:Set up the outboard template of Gravity Retaining Wall 1;
Step 7:1 culvert ground of Gravity Retaining Wall is poured with the concrete of upper bit.
Certainly, the specific application example of the above only present invention, the present invention also has other embodiments, all using equivalent The technical solution that replacement or equivalent transformation are formed, all falls within protection domain of the presently claimed invention.

Claims (5)

1. a kind of Gravity Retaining Wall structure with culvert, it is characterised in that:It is by Gravity Retaining Wall(1)By barricade culvert Face is with lower portion(13)With culvert concrete bodies(15)Constitute an overall structure, prefabricated culvert pipe(14)In culvert space(9) With culvert concrete bodies(15)The culvert body and Gravity Retaining Wall of composition(1)Parallel arrangement, culvert concrete bodies(15)Positioned at weight Power formula barricade(1)Under wall outer side foundation;Barricade ground(6)With culvert foundation(7)Together as the ground of co-ordinative construction.
2. the Gravity Retaining Wall structure according to claim 1 with culvert, it is characterised in that:The culvert space(9)Shape Shape is circle.
3. the Gravity Retaining Wall structure according to claim 1 with culvert, it is characterised in that:Culvert ground and side slope slope foot Ground(8)It flushes.
4. the Gravity Retaining Wall structure according to claim 1 with culvert, it is characterised in that:The prefabricated culvert pipe(14)It adopts With prefabricated reinforced concrete culvert pipe.
5. a kind of construction method of the Gravity Retaining Wall structure with culvert as described in claim 1, it is characterised in that this method Include the following steps:
Step 1:Primary excavate forms interim side slope after barricade(5), barricade ground(6)And culvert foundation(7);
Step 2:Set up and bind culvert lower part arrangement of reinforcement(12);
Step 3:Hang in prefabricated culvert pipe(14), and position;
Step 4:Set up and bind culvert top arrangement of reinforcement(11), and connect culvert top arrangement of reinforcement(11)With culvert lower part arrangement of reinforcement (12);
Step 5:Pour culvert concrete bodies simultaneously(15)With barricade culvert below ground position(13)Concrete;
Step 6:Set up Gravity Retaining Wall(1)Outboard template;
Step 7:Pour Gravity Retaining Wall(1)Culvert ground is with the concrete of upper bit.
CN201610780442.1A 2016-08-31 2016-08-31 Gravity type retaining wall structure with culvert and construction method thereof Active CN106223361B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610780442.1A CN106223361B (en) 2016-08-31 2016-08-31 Gravity type retaining wall structure with culvert and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610780442.1A CN106223361B (en) 2016-08-31 2016-08-31 Gravity type retaining wall structure with culvert and construction method thereof

Publications (2)

Publication Number Publication Date
CN106223361A CN106223361A (en) 2016-12-14
CN106223361B true CN106223361B (en) 2018-10-30

Family

ID=58071696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610780442.1A Active CN106223361B (en) 2016-08-31 2016-08-31 Gravity type retaining wall structure with culvert and construction method thereof

Country Status (1)

Country Link
CN (1) CN106223361B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107964881B (en) * 2017-12-26 2019-09-24 中铁第四勘察设计院集团有限公司 A kind of method for arranging that peg board formula barricade is combined with culvert
CN108331013A (en) * 2018-03-21 2018-07-27 中铁第四勘察设计院集团有限公司 Gear mud wall composite structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09158223A (en) * 1995-12-05 1997-06-17 Sekisui Chem Co Ltd Draining structure of banking or cut earth
CN104074176A (en) * 2013-03-26 2014-10-01 中国水电顾问集团贵阳勘测设计研究院 Construction method and structure of dam toe hydropower station workshop retaining wall
CN204728359U (en) * 2015-06-12 2015-10-28 中国电建集团贵阳勘测设计研究院有限公司 Tooth-shaped retaining wall
CN206052771U (en) * 2016-08-31 2017-03-29 中国电建集团贵阳勘测设计研究院有限公司 Gravity type retaining wall structure with culvert

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003082693A (en) * 2001-09-12 2003-03-19 Kato Masayuki Obtuse-angled retaining wall and construction method therefor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09158223A (en) * 1995-12-05 1997-06-17 Sekisui Chem Co Ltd Draining structure of banking or cut earth
CN104074176A (en) * 2013-03-26 2014-10-01 中国水电顾问集团贵阳勘测设计研究院 Construction method and structure of dam toe hydropower station workshop retaining wall
CN204728359U (en) * 2015-06-12 2015-10-28 中国电建集团贵阳勘测设计研究院有限公司 Tooth-shaped retaining wall
CN206052771U (en) * 2016-08-31 2017-03-29 中国电建集团贵阳勘测设计研究院有限公司 Gravity type retaining wall structure with culvert

Also Published As

Publication number Publication date
CN106223361A (en) 2016-12-14

Similar Documents

Publication Publication Date Title
CN203308470U (en) Cover arch structure suitable for large-section unsymmetrical loading tunnel portal section
CN202899165U (en) T-shaped wallboard type retaining wall structure of highway subgrade
CN103806464B (en) Large-scale high ferro station and subway cross top-down construction method up and down
CN105804119A (en) Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
CN104846781A (en) Ecological interlocking block and ecological interlocking block type slope protection construction method
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN104389320A (en) Construction method of pile foundation anchor rope prestress high retaining wall
CN106223361B (en) Gravity type retaining wall structure with culvert and construction method thereof
CN101824825B (en) Deep foundation pit open cutting construction method
CN105625420A (en) Extension type manual hole digging pile support structure and construction method thereof
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN102425175B (en) Reinforcement protective structure of large spoil disposal area in mountainous area
CN206052771U (en) Gravity type retaining wall structure with culvert
CN210013191U (en) Connecting structure of dam abutment impact drilling groove thin impervious wall and grouted stone dam body
CN107700434A (en) A kind of dome grating formula armored concrete mud-rock flow blocking dam and its construction process
CN204491683U (en) A kind of ruggedized construction to municipal piping lane existing within the scope of deep pit digging
CN202945618U (en) Steel plate column joint of underground diaphragm wall
CN108104112B (en) A kind of underground wall body construction method based on the slurrying of original soil original position
CN105696701A (en) Along-slope shear wall building development platform and construction method thereof
CN112962534B (en) Large-area dredging dredger fill foundation structure and treatment method thereof
CN202055261U (en) Landslide-proofing retaining wall
CN205502070U (en) A dual -purpose underground gallery structure
CN210395432U (en) A gravity type retaining wall for cutting slope
CN209816896U (en) Collapsible loess area utility tunnel foundation structure
CN104047273A (en) Energy dissipation anti-flushing wall for hydropower station and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant