CN106223304A - The water delivery in a kind of navigation structure is held concurrently energy-dissipating structure and construction method thereof - Google Patents

The water delivery in a kind of navigation structure is held concurrently energy-dissipating structure and construction method thereof Download PDF

Info

Publication number
CN106223304A
CN106223304A CN201610796783.8A CN201610796783A CN106223304A CN 106223304 A CN106223304 A CN 106223304A CN 201610796783 A CN201610796783 A CN 201610796783A CN 106223304 A CN106223304 A CN 106223304A
Authority
CN
China
Prior art keywords
lock head
curtain wall
lock
energy
water delivery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610796783.8A
Other languages
Chinese (zh)
Other versions
CN106223304B (en
Inventor
扈晓雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina East China Engineering Zhengzhou Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201610796783.8A priority Critical patent/CN106223304B/en
Publication of CN106223304A publication Critical patent/CN106223304A/en
Application granted granted Critical
Publication of CN106223304B publication Critical patent/CN106223304B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02CSHIP-LIFTING DEVICES OR MECHANISMS
    • E02C1/00Locks or dry-docks; Shaft locks, i.e. locks of which one front side is formed by a solid wall with an opening in the lower part through which the ships pass
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02CSHIP-LIFTING DEVICES OR MECHANISMS
    • E02C1/00Locks or dry-docks; Shaft locks, i.e. locks of which one front side is formed by a solid wall with an opening in the lower part through which the ships pass
    • E02C1/08Arrangements for dissipating the energy of the water

Landscapes

  • Engineering & Computer Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to the water delivery in a kind of navigation structure hold concurrently energy-dissipating structure and construction method thereof.It is an object of the invention to solve the technical problems such as medium lift lock water-carriage system infall clockwise slope, energy dissipater's layout, ship lock structure simplification.The technical scheme is that this structure has shiplock head floor, lock head curtain wall and is positioned at the lock head abutment pier on lock head curtain wall both sides, the upstream side of lock head curtain wall arranges vertical inlet vertical shaft and arranges the energy dissipating beam of different elevation at shaft wall, the bottom of lock head curtain wall and lock head abutment pier arranges the annular culvert being interconnected, and this annular culvert is connected with vertical inlet vertical shaft simultaneously;The downstream of lock head curtain wall has the outlet connected with annular culvert, is separated by baffle pier and bury the exhaustor towards air underground at outlet top between adjacent two outlets;Described lock head curtain coping is provided with convertible steel China's railway industry.The present invention is applicable to Hydraulic and Hydro-Power Engineering, water transport traffic engineering.

Description

The water delivery in a kind of navigation structure is held concurrently energy-dissipating structure and construction method thereof
Technical field
The present invention relates to Hydraulic and Hydro-Power Engineering, water transport traffic engineering, the water delivery in a kind of navigation structure is held concurrently energy dissipating Structure and construction method thereof.
Background technology
The development history of existing more than 2000 year in navigation structure, nearly 4000 of the built ship lock in the current whole world.China's ship The history that lock is built is the longest, builds nearly 800 of ship lock so far, accounts for the 20% of whole world ship lock sum.Aided Locked Design Middle water-carriage system type selecting is good and bad, is to ensure that ship lock highly effective and safe runs one of technology of most critical.Existing according to China's transportation industry Professional etiquette model, water-carriage system pattern mainly has collection to neutralize the big class of dispersed delivery system two, and design selection is usually according to design head Judge, then verified by hydraulic con-ceptual model.
In recent years, along with the enforcement of strategy to develop western regions, China's inland water transport cause obtains fast development, a collection of large-scale Ship lock puts into operation in succession.As: Changzhou, the Xijiang River three, the four line ship lock that inland water transport hinge is largest in the world, two wires, Guiping Ship lock, Changsha double lock, Jia Lingjiang River Cao Jie ship lock, draws Jiang Jihan navigation lock, overgrown with weeds Yang Jia gulf, canal, Shen ship lock.On a large scale Ship lock is built, and owing to river is different, head is different, applies mechanically type selecting according to specification merely and does not the most adapt to ship lock construction requirements, right In the medium lift lock between centralization and decentralization water-carriage system, it is necessary to break through specification and specify, research and innovation achievement, with Adapt to the service requirement of water head lock at different levels.
Summary of the invention
The technical problem to be solved in the present invention is: the problem existed for prior art, it is proposed that navigation structure defeated Water is held concurrently energy-dissipating structure and construction method thereof, it is preferred that emphasis is solve medium lift lock water-carriage system infall clockwise slope, energy dissipater arranges, The technical problems such as ship lock structure simplification.
The technical solution adopted in the present invention is: the water delivery in navigation structure is held concurrently energy-dissipating structure, has shiplock head floor, lock head Curtain wall and be positioned at the lock head abutment pier on lock head curtain wall both sides, it is characterised in that the upstream side of described lock head curtain wall arranges vertical inlet Vertical shaft also arranges the energy dissipating beam of different elevation at shaft wall, and the bottom of lock head curtain wall and lock head abutment pier arranges the ring being interconnected Shape culvert, this annular culvert is connected with vertical inlet vertical shaft simultaneously;The downstream of described lock head curtain wall have with The outlet of annular culvert connection, is separated by baffle pier between adjacent two outlets and buries underground at outlet top and lead to greatly The exhaustor of gas;Described lock head curtain coping is provided with convertible steel China's railway industry.
The water inlet of described vertical inlet vertical shaft arranges trash rack.
The middle part that described annular culvert is positioned at lock head abutment pier is provided with maintenance valve and service valve.
Described steel China's railway industry is installed by steel hinged-support in top, described lock head curtain wall downstream, pacifies on lock head abutment pier Dress makes the headstock gear cylinder support of steel China's railway industry folding.
Described annular culvert cross dimensions at described maintenance valve and service valve is 2.4m × 2.4m, annular The cross dimensions of the horizontal gallery in downstream of culvert is 2.4m × 3.0m.
Described outlet downstream is provided with concrete river bottom protection.
The water delivery in navigation structure of the present invention is held concurrently the construction method of energy-dissipating structure, and step is as follows:
1, carry out lock head architecture basics excavation, pour shiplock head floor concrete;
2, formwork erection construction vertical inlet vertical shaft, energy dissipating beam of constructing on shaft wall, install at vertical inlet shaft top Trash rack;
3, lock head curtain wall concrete is poured;
4, the baffle pier in formwork erection construction lock head curtain wall downstream, is outlet between two baffle piers, pre-at outlet top Bury exhaustor;
5, lock head abutment pier concrete is poured;
6, formwork erection construction annular culvert, reserved service valve every groove and service valve gate slot;
7, at top, lock head curtain wall downstream pre-buried steel twisted branch seat, fixing steel China's railway industry is installed, on lock head abutment pier The bearing of pre-buried connection headstock gear oil cylinder;
8, the concrete river bottom protection in construction outlet downstream.
The invention has the beneficial effects as follows: the technology of the present invention proposes a kind of water delivery and holds concurrently energy-dissipating structure and construction method.According to Hydraulics of shiplock requirement, water-carriage system centralized arrangement, at lock head position, this invention simplifies lock wall pattern, optimizes lock wall and breaks Face, reduces difficulty of construction, saves construction investment;Water-carriage system is verified through hydraulic model test, and water inlet flow-shape is good Good, high-velocity flow passes through repeatedly energy dissipating, enters lock chamber water flow stationary.The present invention is for solving the choosing of medium lift lock water-carriage system Type, simplification ship lock structure have obvious benefit.
Accompanying drawing explanation
Fig. 1 is the top view of the present invention.
Fig. 2 is the profile that Fig. 1 Parallel to the flow direction crosses centrage.
Fig. 3 is the profile that Fig. 1 is perpendicular to the water outlet of water (flow) direction.
Detailed description of the invention
As Figure 1-3, the water delivery in the present embodiment navigation structure is held concurrently energy-dissipating structure, including centralized arrangement in lock head portion The shiplock head floor 5 of position, lock head curtain wall 6 and be positioned at the lock head abutment pier 9 on lock head curtain wall both sides.
The space utilizing lock head curtain wall 6 arranges vertical inlet vertical shaft 1 at upstream side, and the water inlet at vertical shaft arranges trash rack 3, and energy dissipating beam 2 energy dissipating of different elevation is arranged at shaft wall.Arrange mutually in the bottom of lock head curtain wall 6 and lock head abutment pier 9 The annular culvert 4 of connection, this annular culvert 4 is connected with vertical inlet vertical shaft 1, when water body vertically drops to simultaneously Laterally enter annular culvert 4 after gallery energy dissipating for the first time.
The downstream of described lock head curtain wall 6 has the outlet 14 connected with annular culvert 4, adjacent two outlets 14 Between separated by baffle pier 7, outlet 14 top is embedded with the exhaustor 8 towards outside atmosphere.
Steel China's railway industry 10 is installed, on lock head abutment pier 9 by steel hinged-support 11 in top, described lock head curtain wall 6 downstream Installing headstock gear cylinder support, steel China's railway industry 10 realizes folding by headstock gear oil cylinder 12.When lock chamber (lock head curtain wall 6 times Trip side) interior water level is when flushing with upper pond level, and steel China's railway industry 10 is opened and is lain in lock head curtain wall 6 top, boats and ships entrance upstream Approach channel, is shown in Fig. 2.
The middle part Parallel to the flow direction of described annular culvert 4 (being positioned at lock head abutment pier 9) is sequentially provided with maintenance valve and work Make valve.The annular culvert 4 cross dimensions at maintenance valve and service valve is 2.4m × 2.4m, annular culvert The cross dimensions of the horizontal gallery in downstream of 4 is 2.4m × 3.0m, and water body spreads in the exit of culvert, two strands of current pair Flowed out by the outlet 14 between baffle pier after punching, enter lock chamber or downstream.Described outlet 14 downstream is provided with concrete River bottom protection 13.
The construction procedure of the present embodiment is as follows:
1, carry out lock head architecture basics excavation, pour shiplock head floor 5 concrete;
2, formwork erection construction vertical inlet vertical shaft 1, energy dissipating beam 2 of constructing on shaft wall, pacify at vertical inlet vertical shaft 1 top Dress trash rack 3;
3, lock head curtain wall 6 concrete is poured;
4, the baffle pier 7 in formwork erection construction lock head curtain wall 6 downstream, is outlet 14 between two adjacent two baffle piers, in water outlet The pre-buried exhaustor in mouth top 8;
5, lock head abutment pier 9 concrete is poured;
6, formwork erection construction annular culvert 4, reserved service valve every groove 4a and service valve gate slot 4b;
7, at top, lock head curtain wall 6 downstream pre-buried steel twisted branch seat 11, fixing steel China's railway industry 10 is installed, on lock head limit The bearing of pre-buried connection headstock gear oil cylinder 12 on pier 9;
8, the concrete river bottom protection 13 in construction outlet 14 downstream.

Claims (7)

1. the water delivery in navigation structure is held concurrently an energy-dissipating structure, has shiplock head floor (5), lock head curtain wall (6) and is positioned at lock head The lock head abutment pier (9) on curtain wall both sides, it is characterised in that: the upstream side of described lock head curtain wall (6) arrange vertical inlet vertical shaft (1) and Arrange the energy dissipating beam (2) of different elevation at shaft wall, the bottom of lock head curtain wall (6) and lock head abutment pier (9) arranges and is interconnected Annular culvert (4), this annular culvert (4) is connected with vertical inlet vertical shaft (1) simultaneously;Described lock head curtain wall (6) downstream has the outlet (14) connected with annular culvert (4), by baffle pier between adjacent two outlets (14) (7) separate and bury the exhaustor (8) towards air at outlet (14) top underground;The top of described lock head curtain wall (6) is provided with turns over Rotatable steel China's railway industry (10).
The water delivery in navigation structure the most according to claim 1 is held concurrently energy-dissipating structure, it is characterised in that: described vertical inlet erects The water inlet of well (1) arranges trash rack (3).
The water delivery in navigation structure the most according to claim 1 and 2 is held concurrently energy-dissipating structure, it is characterised in that: described annular is defeated Water gallery (4) is positioned at the middle part of lock head abutment pier (9) and is provided with maintenance valve and service valve.
The water delivery in navigation structure the most according to claim 3 is held concurrently energy-dissipating structure, it is characterised in that: described lock head curtain wall (6) described steel China's railway industry (10) is installed by steel hinged-support (11) in top, downstream, makes steel in the upper installation of lock head abutment pier (9) Headstock gear oil cylinder (12) bearing of matter China's railway industry (10) folding.
The water delivery in navigation structure the most according to claim 3 is held concurrently energy-dissipating structure, it is characterised in that: described annular water delivery corridor The road (4) cross dimensions at described maintenance valve and service valve is 2.4m × 2.4m, the downstream of annular culvert (4) Laterally the cross dimensions of gallery is 2.4m × 3.0m.
The water delivery in navigation structure the most according to claim 4 is held concurrently energy-dissipating structure, it is characterised in that: described outlet (14) Downstream is provided with concrete river bottom protection (13).
7. the water delivery in a navigation structure as claimed in claim 6 is held concurrently the construction method of energy-dissipating structure, it is characterised in that execute Work step is as follows:
7.1, carry out lock head architecture basics excavation, pour shiplock head floor (5) concrete;
7.2, formwork erection construction vertical inlet vertical shaft (1), energy dissipating beam (2) of constructing on shaft wall, pushes up at vertical inlet vertical shaft (1) Trash rack (3) is installed in portion;
7.3, lock head curtain wall (6) concrete is poured;
7.4, the baffle pier (7) in formwork erection construction lock head curtain wall (6) downstream, is outlet (14) between two baffle piers, in water outlet The mouth pre-buried exhaustor in top (8);
7.5, lock head abutment pier (9) concrete is poured;
7.6, formwork erection construction annular culvert (4), reserved service valve every groove (4a) and service valve gate slot (4b);
7.7, at lock head curtain wall (6) top, downstream pre-buried steel twisted branch seat (11), fixing steel China's railway industry (10) is installed, at lock The bearing of upper pre-buried connection headstock gear oil cylinder (12) of first abutment pier (9);
7.8, the concrete river bottom protection (13) in construction outlet (14) downstream.
CN201610796783.8A 2016-08-31 2016-08-31 A kind of water delivery in navigation structure and energy-dissipating structure and its construction method Active CN106223304B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610796783.8A CN106223304B (en) 2016-08-31 2016-08-31 A kind of water delivery in navigation structure and energy-dissipating structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610796783.8A CN106223304B (en) 2016-08-31 2016-08-31 A kind of water delivery in navigation structure and energy-dissipating structure and its construction method

Publications (2)

Publication Number Publication Date
CN106223304A true CN106223304A (en) 2016-12-14
CN106223304B CN106223304B (en) 2018-08-07

Family

ID=58073954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610796783.8A Active CN106223304B (en) 2016-08-31 2016-08-31 A kind of water delivery in navigation structure and energy-dissipating structure and its construction method

Country Status (1)

Country Link
CN (1) CN106223304B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677150A (en) * 2017-02-07 2017-05-17 中国电建集团华东勘测设计研究院有限公司 Under-sill water delivery energy dissipation structure and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2304660C1 (en) * 2006-04-28 2007-08-20 Общество с ограниченной ответственностью "СНПО Экогидротехника" Sluice
CN200978414Y (en) * 2006-12-09 2007-11-21 王成耀 Dam window type navigation lock
CN101525876A (en) * 2009-04-02 2009-09-09 水利部交通部电力工业部南京水利科学研究院 Ship lock concentration and dispersion delivery system without calm section
CN101608444A (en) * 2009-07-27 2009-12-23 中国水电顾问集团华东勘测设计研究院 A kind of water adding system of ship lock and job practices thereof
CN206157701U (en) * 2016-08-31 2017-05-10 中国电建集团华东勘测设计研究院有限公司 Navigation construction's water delivery and dissipation structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2304660C1 (en) * 2006-04-28 2007-08-20 Общество с ограниченной ответственностью "СНПО Экогидротехника" Sluice
CN200978414Y (en) * 2006-12-09 2007-11-21 王成耀 Dam window type navigation lock
CN101525876A (en) * 2009-04-02 2009-09-09 水利部交通部电力工业部南京水利科学研究院 Ship lock concentration and dispersion delivery system without calm section
CN101608444A (en) * 2009-07-27 2009-12-23 中国水电顾问集团华东勘测设计研究院 A kind of water adding system of ship lock and job practices thereof
CN206157701U (en) * 2016-08-31 2017-05-10 中国电建集团华东勘测设计研究院有限公司 Navigation construction's water delivery and dissipation structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677150A (en) * 2017-02-07 2017-05-17 中国电建集团华东勘测设计研究院有限公司 Under-sill water delivery energy dissipation structure and construction method thereof

Also Published As

Publication number Publication date
CN106223304B (en) 2018-08-07

Similar Documents

Publication Publication Date Title
CN105113543B (en) 0815 type underground pipe gallery assembling combination cabin concrete structure of shallow embedding
CN109868838B (en) A kind of rail traffic of underground utilities close quarters is without column station construction method
CN101608444B (en) Water adding system of ship lock and construction method thereof
CN105386464B (en) Inlet and outlet part for maintenance of intelligent urban underground comprehensive pipe gallery
CN106759833A (en) A kind of combined type fairing for improving urban rainwater pumping plant Inlet flow pattern
CN206157701U (en) Navigation construction's water delivery and dissipation structure
CN202324058U (en) Double-layered pump and gate layout structure
CN105781613A (en) Local dynamic dry-type waste water pump house for large-scale shield tunnel
CN106223304A (en) The water delivery in a kind of navigation structure is held concurrently energy-dissipating structure and construction method thereof
CN108118690A (en) A kind of integral hoisting formula coercion underground continuous wall structure and its prefabricated and construction method
CN110685256B (en) Structure using hydropower station pressure pipeline construction branch tunnel as maintenance channel and construction method
KR102004140B1 (en) Water turning method and stom water pipe overflow device
CN204456047U (en) A kind of water-carriage system with base plate gallery road, middle energy dissipating room
CN102505733A (en) Double-layered pump gate arrangement structure
CN206581242U (en) Water delivery energy-dissipating structure under a kind of sill
CN203096813U (en) Seawater intake facility for liquefied natural gas receiving station
CN206554930U (en) It is a kind of it is round overlap joint shape shield machine construction interflow regulate and store moldeed depth layer tunnel
CN109183851A (en) A kind of underwater installation method of shell-type immersed tube
CN108265616A (en) Piping lane builds structure jointly with overhead
CN103643665B (en) A kind of have the ship lock drainage system that independent porous distributes gate structure
CN201485843U (en) Stream-guidance navigation pier structure
CN203958573U (en) A kind of manned exploration door under water that is exclusively used in cleaning power station steel gate gate slot
CN113463606A (en) Reconstruction and extension navigable building arrangement structure and construction method thereof
CN112832352A (en) Road rainwater drainage system
CN106437842A (en) Auxiliary transfer pump station of drainage tunnel in subway crossing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201218

Address after: Floor 22, block B, Taihong International Plaza, 69 Shangding Road, Zhengdong New District, Zhengzhou City, Henan Province

Patentee after: China power construction east China Survey and Design Institute (Zhengzhou) Co.,Ltd.

Address before: 310014 No. 22 Chao Wang Road, Xiacheng District, Zhejiang, Hangzhou

Patentee before: PowerChina Huadong Engineering Corp.,Ltd.

TR01 Transfer of patent right