CN105386464B - Inlet and outlet part for maintenance of intelligent urban underground comprehensive pipe gallery - Google Patents

Inlet and outlet part for maintenance of intelligent urban underground comprehensive pipe gallery Download PDF

Info

Publication number
CN105386464B
CN105386464B CN201510950887.5A CN201510950887A CN105386464B CN 105386464 B CN105386464 B CN 105386464B CN 201510950887 A CN201510950887 A CN 201510950887A CN 105386464 B CN105386464 B CN 105386464B
Authority
CN
China
Prior art keywords
maintenance
well
water channel
urban underground
rain water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510950887.5A
Other languages
Chinese (zh)
Other versions
CN105386464A (en
Inventor
田翰文
赵学坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Universe Pipe Network Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510950887.5A priority Critical patent/CN105386464B/en
Publication of CN105386464A publication Critical patent/CN105386464A/en
Application granted granted Critical
Publication of CN105386464B publication Critical patent/CN105386464B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air
    • E04H1/1211Waiting shelters for bus stops

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Public Health (AREA)
  • Hydrology & Water Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Health & Medical Sciences (AREA)
  • Sewage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention relates to the field of public facilities and particularly discloses an inlet and outlet part for maintenance of an intelligent urban underground comprehensive pipe gallery. The inlet and outlet part comprises overhauling wells which are arranged at a public traffic bus shelter; the upstream and downstream parts of the overhauling wells are respectively reinforced concrete pipes; the upper openings of the overhauling wells are tightly covered by prefabricated reinforced concrete floors; a rectangular rain passage is connected with the upstream and downstream reinforced concrete pipes; supporting upright posts are arranged below the rectangular rain passage; a handrail stair is arranged in each overhauling well; the rectangular rain passage is provided with a sealing bin gate. The invention provides a safe and convenient proposal for conveniently checking, monitoring, overhauling and replacing parts and pipelines for a urban underground comprehensive pipe gallery and provides convenience for robots and mud clearing machineries to enter or exit to clear mud; accidents of injuries, caused by well covers, of people, can be completely avoided; meanwhile, the material construction cost is lowered, and the surface building space is reduced as well, so reliable guarantee is provided for safe running of a hundred-year underground pipe network.

Description

A kind of Urban Underground intelligent comprehensive piping lane maintenance is imported and exported
(One)Technical field
The present invention relates to urban operating mechanism field, more particularly to a kind of Urban Underground intelligent comprehensive piping lane maintenance import and export.
(Two)Background technology
Disclose a kind of intelligent in the notification number that on April 2nd, 2014 announces is for the patent application of CN103696483A Multifunctional comprehensive sewer pipe, it is by gas pipeline, water supply pipe, sewage conduct heating tube and feed pipe and five electric power Circuit is embedded in concrete reinforced pipe body, and is provided with gutter, and gutter both sides are provided with maintenance platform, solve city City's waterlogging, rain, the problem of foul water fraction, also solve various pipe networks confusions and power circuit is subject to the infringement of thunder and lightning sleety weather Problem, but its maintenance is imported and exported or common maintenance is imported and exported, and this fine import and export is exactly typically that internal diameter is smaller Circular inspection well, to the turnover inspection and maintenance of maintenance mans many inconvenience are brought, and the replacing of various pipelines cannot be carried out at all, is hung Dress and keep in repair, not to mention machines for mud clearage carries out desilting into inside, therefore easily cause sewer and silt up seriously, lose down Water channel drains flooded fields the ability of flood discharge, and the waterlogging that virtually increased city drains off floodwaters risk, reduces prevention of the city to Rainfall Disaster Ability, to the life security and national wealth of city dweller serious threat is brought.
(Three)The content of the invention
Defect in order to make up prior art of the invention, there is provided a kind of inspection for being easy to sewer, detection, machines for mud clearage Desilting easy access, the Urban Underground intelligent comprehensive piping lane maintenance of maintenance personal's easy access are imported and exported.
The present invention is achieved through the following technical solutions:
A kind of Urban Underground intelligent comprehensive piping lane maintenance is imported and exported, and be it is characterized in that, including public transport waiting booth, public Maintenance well is excavated in traffic waiting booth, four angles of maintenance well pour with four support columns of public transport waiting booth and are integrated, The upstream and downstream of maintenance well is respectively armored concrete body, and the length of the maintenance well is more than automatic development machine, push-bench and The length sum of individual armored concrete body three, the suitable for reading of the maintenance well covers tightly reality with prefabricated reinforced concrete floor;Dimension The armored concrete body that rectangle rain water channel connects upstream and downstream, the rectangle rain water channel and armored concrete are built in well workover Tubular body channel shape is identical, is down convex, and the rectangle rain water channel upper end is open, and builds to maintenance well head, under End is hanging and is supported with support post;Four support columns of the public transport waiting booth, the metope, rectangle rain in pipe gallery Aquaporin, the support post of rectangle rain water channel are poured with the steel reinforcement cage and concrete mortar tied up and are integrated, and do antiseepage Water process.
It it is at least 3 meters from armored concrete body top to the distance of ground level.
The width of the maintenance well adds the space of rectangle rain water channel both sides, both sides for the width of rectangle rain water channel Gap length it is equal, per side width be 2~3 meters.
Hand steered stair are provided with the maintenance well, the rectangle rain water channel at hand steered stair is provided with sealing door, Rectangle or circular import and export are left on prefabricated reinforced concrete floor above hand steered stair, in the import and export cast iron is provided with Cover plate, is provided with finger print safety identifying system on the cover plate.
The surrounding of the maintenance well and bottom surface are formed by steel bar concrete water, and do antiseepage water process.
The upstream of the maintenance well is automatic storing emptying gate, the automatic storing emptying gate and armored concrete body and The metope of maintenance well is poured and is integrated.
The rectangle rain water channel is 1.8~2 meters with a distance from the bottom surface of maintenance well.
The invention has the beneficial effects as follows:
The present invention for Urban Underground pipe gallery and sewer provide one kind be easy to check monitoring, maintenance change accessory with Pipeline, and robot and the safe and convenient scheme of machines for mud clearage turnover desilting.After the present invention, the road and people's row in city Manhole cover is no longer provided with road, the generation of well lid casualty accident is completely eliminated;Meanwhile, public waiting booth is set with the present invention One is calculated as, material construction cost had both been saved, surface structures space is saved again, be that the safe operation of century-old underground pipe network is carried Reliable guarantee is supplied.
(Four)Description of the drawings
Below in conjunction with the accompanying drawings the present invention is further illustrated:
Fig. 1 is the cross section structure diagram of the present invention;
Fig. 2 be Fig. 1 in A-A to cross section structure schematic diagram;
Fig. 3 is the overlooking the structure diagram of armored concrete body and the position relationship of rectangle rain water channel.
In figure, 1 armored concrete body, 2 public transport waiting booths, 3 rectangle storm sewers, 4 automatic storing emptying gates, 5 Prefabricated reinforced concrete floor, 6 cover plates, 7 hand steered stair, 8 spaces, 9 sealing doors, 10 support columns, 11 support posts, 12 maintenances Well.
(Five)Specific embodiment
Accompanying drawing is the specific embodiment of the present invention.As shown in Figure 1 to Figure 3, this kind of Urban Underground intelligent comprehensive piping lane maintenance Import and export, be the starting well and received well during pipe gallery tunnels jacking construction automatically(Two foundation ditches)On the basis of, Using mould, reinforcement cage skeleton, concrete mortar, and the building complex being cast as one with urban transit bus waiting booth Thing, it includes excavating the maintenance well 12 in public transport waiting booth 2, and public transport waiting booth 2 has four support columns 10, ties up Well workover 12 is built with public transport waiting booth 2 and is integrated, and to save urban ground space resources, keeps in repair the well head of well 12 with prefabricated Reinforced concrete floor 5 covers tightly reality, and prefabricated reinforced concrete floor 5 needs polishing to process above, every piece of prefabricated reinforced concrete building Plate 5 leaves lifting Crape ring at lifting equalization point, and to lift dredging machinery desilting, prefabricated reinforced concrete floor are carried out 5 ground for also serving as public transport waiting booth 2;Armored concrete body 1 is respectively in the upstream and downstream of maintenance well 12, in upstream Automatic storing emptying gate 4 is installed, automatic storing emptying gate 4 is arranged on public transport waiting booth 2 at armored concrete body 1 Between two support columns 10 of upstream, and pour and be integrated with the metope of armored concrete body 1 and maintenance well 12;Maintenance well Rectangle rain water channel 3, rectangle rain water channel 4 and armored concrete body 1 are built between the armored concrete body 1 of 12 upstream and downstream Inner passage shape is identical, is down convex, and the upper end of rectangle rain water channel 4 is open, and builds to the well head of maintenance well 12, lower end Supported vacantly and with support post 11, the lower end of rectangle rain water channel 4 is advisable from the bottom surface of maintenance well 12 at 1.8~2 meters, keep in repair well 12 bottom surface is that the waterproof bed course being integrated is poured with armored concrete, and the various pipelines in armored concrete body 1 are all from square Pass through outside shape storm sewer 3, the wall thickness on the both sides of rectangle rain water channel 3 is not to be exceeded 250 millimeters, too thick, can affect both sides The installation of pipeline rectilinear direction;The length of maintenance well 12 is more than automatic development machine, push-bench and an armored concrete body 1 three The length sum of person, the width for keeping in repair well 12 adds the space of the both sides of rectangle rain water channel 3 for the width of rectangle rain water channel 3 8, the width of space 8 of both sides is equal, at least two meters of the width per side, is advisable with 2~3 meters, in order to during maintenance and inspection, keep in repair people Member's turnover facility;It it is at least 3 meters from the top of armored concrete body 1 to the distance of ground level, with greenbelt on without prejudice to ground Arboreal growth be advisable;Four support columns 10 of public transport waiting booth 1, keep in repair metope, the rectangle rain water channel 3, square of well 12 The support post 11 of shape rain water channel 3 is poured with the steel reinforcement cage and concrete mortar tied up and is integrated, and does antiseepage water process.
Hand steered stair 7 are also equipped with maintenance well 12, the rectangle rain water channel 3 at hand steered stair 7 is provided with close Envelope door 9, in order to be keeped in repair in armored concrete body 1;Rectangle or diameter are left on the top of hand steered stair 7 not Circular import and export less than 80 centimetres, it is opened on prefabricated reinforced concrete floor 5, and in the import and export cast iron flat 6 is provided with, Secure identification system is installed, such as IC-card, fingerprint machine face recognition system on cover plate 6, can also install and public security department's networking Warning system, destroyed with preventing someone from making a forcible entry into;
The surrounding of maintenance well 12 and bottom surface are formed by steel bar concrete water, and do antiseepage water process.
In addition to technical characteristic described in specification, remaining technical characteristic is technology known to those skilled in the art.

Claims (7)

1. a kind of Urban Underground intelligent comprehensive piping lane maintenance is imported and exported, and be it is characterized in that, including public transport waiting booth(2), in public affairs Excavate maintenance well in traffic waiting booth altogether(12), keep in repair well(12)Four angles pour with four support columns of public transport waiting booth Build and be integrated, keep in repair well(12)Upstream and downstream be respectively armored concrete body(1), the maintenance well(12)Length more than from Dynamic development machine, push-bench and an armored concrete body(1)The length sum of three, the maintenance well(12)It is suitable for reading with pre- Reinforced concrete floor processed(5)Cover tightly reality;Maintenance well(12)Inside build rectangle rain water channel(3)The reinforced concrete of connection upstream and downstream Native body(1), the rectangle rain water channel(3)With armored concrete body(1)Inner passage shape is identical, is down convex, The rectangle rain water channel(3)Upper end is open, and builds to maintenance well(12)Mouthful, lower end is hanging and uses support post(11) Support;The public transport waiting booth(2)Four support columns(10), the metope, rectangle rain water channel in pipe gallery(3), square Shape rain water channel(3)Support post(11)Poured with the steel reinforcement cage and concrete mortar tied up and be integrated, and do water-impervious Process.
2. Urban Underground intelligent comprehensive piping lane maintenance according to claim 1 is imported and exported, and be it is characterized in that, from armored concrete Body(1)The distance of top to ground level is at least 3 meters.
3. Urban Underground intelligent comprehensive piping lane maintenance according to claim 1 is imported and exported, and be it is characterized in that, the maintenance well (12)Width be rectangle rain water channel(3)Width add rectangle rain water channel(3)The space of both sides(8), the sky of both sides Gap(8)Width is equal, and the width per side is 2~3 meters.
4. Urban Underground intelligent comprehensive piping lane maintenance according to claim 1 is imported and exported, and be it is characterized in that, the maintenance well (12)Inside it is provided with hand steered stair(7), near hand steered stair(7)The rectangle rain water channel at place(3)It is provided with sealing door(9), Hand steered stair(7)The prefabricated reinforced concrete floor of top(5)On leave rectangle or it is circular import and export, be provided with the import and export Cast iron flat(6), the cover plate(6)On finger print safety identifying system is installed.
5. the Urban Underground intelligent comprehensive piping lane maintenance according to any one of Claims 1-4 is imported and exported, and be it is characterized in that, institute State maintenance well(12)Surrounding and bottom surface formed by steel bar concrete water, and do antiseepage water process.
6. Urban Underground intelligent comprehensive piping lane maintenance according to claim 5 is imported and exported, and be it is characterized in that, the maintenance well (12)Upstream be automatic storing emptying gate(4), the automatic storing emptying gate(4)With armored concrete body and maintenance well (12)Metope pour and be integrated.
7. Urban Underground intelligent comprehensive piping lane maintenance according to claim 6 is imported and exported, and be it is characterized in that, the rectangle rainwater Passage(3)From maintenance well(12)Bottom surface distance be 1.8~2 meters.
CN201510950887.5A 2015-12-19 2015-12-19 Inlet and outlet part for maintenance of intelligent urban underground comprehensive pipe gallery Active CN105386464B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510950887.5A CN105386464B (en) 2015-12-19 2015-12-19 Inlet and outlet part for maintenance of intelligent urban underground comprehensive pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510950887.5A CN105386464B (en) 2015-12-19 2015-12-19 Inlet and outlet part for maintenance of intelligent urban underground comprehensive pipe gallery

Publications (2)

Publication Number Publication Date
CN105386464A CN105386464A (en) 2016-03-09
CN105386464B true CN105386464B (en) 2017-04-26

Family

ID=55419197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510950887.5A Active CN105386464B (en) 2015-12-19 2015-12-19 Inlet and outlet part for maintenance of intelligent urban underground comprehensive pipe gallery

Country Status (1)

Country Link
CN (1) CN105386464B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106251758A (en) * 2016-08-30 2016-12-21 江苏建筑职业技术学院 Drain well model and manufacture method
CN106592639B (en) * 2016-10-26 2018-08-28 周禹珺 A kind of underground pipe network inlet and outlet device of aperture in 400mm or more
CN108867698A (en) * 2018-09-03 2018-11-23 江苏金贸科技发展有限公司 A kind of double cabin piping lane import and export mixes in underground
CN109781174A (en) * 2018-12-11 2019-05-21 中冶(北京)交通科技发展有限公司 A kind of municipal administration synthesis pipe gallery detection system
CN109754562A (en) * 2018-12-11 2019-05-14 中冶(北京)交通科技发展有限公司 A kind of municipal administration synthesis pipe gallery alarm system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10325467A (en) * 1997-05-23 1998-12-08 Nok Corp Sealing device
CN201605599U (en) * 2010-01-08 2010-10-13 刘洪彬 Integrated prefabricated inspection well
JP5564676B1 (en) * 2014-02-17 2014-07-30 強化土株式会社 Liquefaction suppression device and liquefaction suppression method
CN204530765U (en) * 2015-02-06 2015-08-05 林毅 Possesses the manhole of rain collector
CN205242445U (en) * 2015-12-19 2016-05-18 赵学坤 Intelligent integrated piping lane maintenance of city underground is imported and exported

Also Published As

Publication number Publication date
CN105386464A (en) 2016-03-09

Similar Documents

Publication Publication Date Title
CN105386464B (en) Inlet and outlet part for maintenance of intelligent urban underground comprehensive pipe gallery
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN110578339B (en) Construction method of shaft type underground stereo garage
CN108385627B (en) Hydropower station diversion tunnel plugging construction method based on karst landform
CN105386460B (en) Intelligent urban underground comprehensive pipe gallery
CN205242445U (en) Intelligent integrated piping lane maintenance of city underground is imported and exported
CN202247920U (en) Construction structure for water drainage of blind ditch and water collecting wells in deep foundation pit
WO2023103651A1 (en) Drainage pressure relief anti-floating system for weakly permeable soft stratum
CN211228626U (en) Automatic pressure relief device for anti-floating of basement bottom plate
CN210068153U (en) Station access & exit open cut section construction structure who closes on city building and road
CN112343654A (en) Maintainable drainage system for extremely water-rich stratum tunnel and tunnel
KR100654632B1 (en) A water turning method of powerless drain pipe and apparatus thereof
CN206157701U (en) Navigation construction's water delivery and dissipation structure
CN207176737U (en) A kind of mechanical underground parking of inclined shaft
CN206477382U (en) Rainwater recycle comprehensively utilizes structure
CN106437842B (en) The auxiliary that subway crosses dewatering type tunnel between sea area simultaneous transfers drainage pumping plant
CN215055647U (en) Cover drainage system that covers on vehicle
CN101812846B (en) Drainage structure of upstream wall of shore type hydropower station workshop and construction method thereof
CN114737586A (en) Multi-well-point linkage precipitation construction method for large basement in water-rich sandy soil area
CN205296215U (en) City underground intelligent integrated piping lane
CN211368952U (en) Hidden rainwater collection device
CN106703157A (en) Construction method of rainwater recycling and comprehensive utilizing structure
CN106988400A (en) It is a kind of keep off it is damp, anti-blocking, maintenance it is convenient, can sand washing desilting hondo formula closure works system and method
CN109537471B (en) Dangerous chemical leakage emergency treatment system crossing sensitive water bridge and construction method
CN206419062U (en) The auxiliary that subway crosses dewatering type tunnel between sea area simultaneous transfers drainage pumping plant

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Tian Hanwen

Inventor after: Zhao Xuekun

Inventor before: Zhao Xuekun

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170629

Address after: 274300, Shandong, Shanxian County province Heze single town, North Ring Road, 105 National Road East head

Patentee after: Shandong universe pipe network technology Co., Ltd.