CN106203888A - The apparatus and method of power grid regulation intelligent error preventing operation - Google Patents

The apparatus and method of power grid regulation intelligent error preventing operation Download PDF

Info

Publication number
CN106203888A
CN106203888A CN201610597958.2A CN201610597958A CN106203888A CN 106203888 A CN106203888 A CN 106203888A CN 201610597958 A CN201610597958 A CN 201610597958A CN 106203888 A CN106203888 A CN 106203888A
Authority
CN
China
Prior art keywords
error
adjusting system
ticket
server
database server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610597958.2A
Other languages
Chinese (zh)
Inventor
陈宏胜
帅红
周宁
刘欣宇
杨帆
樊启俊
许懿
胡润滋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Chongqing Electric Power Co Ltd
Original Assignee
State Grid Chongqing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Chongqing Electric Power Co Ltd filed Critical State Grid Chongqing Electric Power Co Ltd
Priority to CN201610597958.2A priority Critical patent/CN106203888A/en
Publication of CN106203888A publication Critical patent/CN106203888A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The present invention relates to a kind of power grid regulation intelligent anti-error operation system, including city's adjusting system, county's adjusting system and Wide Area Network, city's adjusting system includes that being positioned at production controls first database server of great Qu, the first apps server, the first data exchange and file server and the first switch, is positioned at the second database server of management information great Qu, the second apps server, the second data exchange and file server, the second switch and the first disk array;Ground county adjusting system includes being positioned at the 3rd database server of management information great Qu, the 3rd apps server, the 3rd data exchange and file server, the 3rd switch and second disk array;City's adjusting system is positioned at the hardware unit that the hardware unit of management information great Qu is positioned at management information great Qu with ground county adjusting system and is connected by wide area network.The arrangement achieves accurately generating and accurate delivery of operation order, and realize the self-cleaning function of component, improve detection plant running reliability.

Description

The apparatus and method of power grid regulation intelligent error preventing operation
Technical field
The invention belongs to dispatch technical field, particularly relate to a kind of power grid regulation intelligent error preventing operation device and Method.
Background technology
The historical origin of Dispatching for a long time, is with rich experience by dispatcher the earliest, and to relevant scheduling Operating standard is held accurately, outputs correct operation order, and therefore, operation order is write and required that nominal value is clean and tidy, has neat handwriting and easily distinguish Recognize, must not alter and content unambiguously.This manually draft, the method for hand filling not only wastes time and energy, and to dispatcher Require the highest.In order to improve the accuracy of operation order, shorten invoicing time, allow dispatcher and plant stand operations staff from heavy The duplication of labour in free, get rid of the mistake that causes of anthropic factor, reduce the tremendous economic loss that maloperation causes, exploitation Intelligent error preventing operation ticket system becomes inexorable trend.Additionally, although prior art there is also certain operations ticket management system, but It is that the hardware server systems that these operation ticket management systems are based on needs to process mass data, lacks maintenance and often lead to clothes In business device system, dust stratification is too much, thus tend to cause the other system wild effect in addition to maloperation, such as: dust is too much The short circuit of initiation, open circuit, or the heat radiation that dust stratification too much causes is insufficient so that server frequently switches on machine.This is in power train The reliability requirement of system is the most unallowable, too increases manual maintenance cost simultaneously.
Summary of the invention
The present invention provides power grid regulation intelligent anti-error operation system for overcoming technical problem present in prior art, should Device not only can achieve accurately generating and accurate delivery of operation order, moreover it is possible to realizes the self-cleaning function of component, carries Height detection device reliability of operation.
A kind of power grid regulation intelligent anti-error operation system, including city's adjusting system, county's adjusting system and Wide Area Network.
Preferably technical scheme, its supplementary features are: city's adjusting system includes: be positioned at and produce the first data controlling great Qu Storehouse server, the first apps server, the first data exchange and file server and the first switch, be positioned at management information Second database server of great Qu, the second apps server, the second data exchange and file server, the second switch With the first disk array;
Ground county adjusting system includes: be positioned at the 3rd database server of management information great Qu, the 3rd apps server, the 3rd Data exchange and file server, the 3rd switch and second disk array;
City's adjusting system is positioned at the hardware unit of management information great Qu and ground county adjusting system and is positioned at the hardware unit of management information great Qu Connected by wide area network;
By by database server store digital information, apps server obtaining data letter from database server Breath, and send to each work station, it is achieved thereby that accurately generating and accurate delivery of operation order, not only increase the effect of operation Operator are also emancipated from hard work by rate and accuracy simultaneously.
Further preferred technical scheme, its supplementary features are: the first apps server, the second application program clothes Business device, the 3rd apps server have been used for judgement and the process of anti-misoperation rule, and send behaviour to each work station Make warning information, to remind dispatcher to prevent mistuning degree, the first database server, the second database server, the 3rd Database server stores history and real time data, it is achieved the synchronization of each station data;
Each work station obtains required by the first database server, the second database server, the 3rd database server Data message, to complete the drafting of Dispatching, to audit, simulate preview, operation order management and information inquiry, figure dimension Protect.
Further preferred technical scheme, its supplementary features are: city's adjusting system is for control manipulation simulation preview, safety Anti-error, regulation and control person's electric grid operating behavior restraint is worked in coordination with in anti-error application, Multi-regulation;
City's adjusting system previews for control manipulation simulation in management information great Qu, safe related function is applied, electric grid operating association of the superior and the subordinate Same and anti-error, control manipulation simulation preview becomes ticket and flow process mould with safe related function for regulation and control integral intelligent operating platform operation order Block provides the simulation preview of Real-Time Scheduling grid switching operation and anti-error service;
City's adjusting system is producing control great Qu for providing specially for the regulation and control integral intelligent anti-error application of operating platform Remote Door simulates preview application for the control manipulation of policer operation business, with before remote manipulation, automatically carries out anti-misoperation preview, The anti-false alert of active push lock operation, specification monitor's remote manipulation flow process, it is achieved monitor's remote manipulation behavior restraint.
Further preferred technical scheme, its supplementary features are: ground county adjusting system is for transferring in row regulation and control behaviour for ground county Work simulation preview, monitoring pattern intelligence become ticket, policer operation ticket workflow management, safe related function application, Remote operation to prevent Application, Multi-regulation work in coordination with anti-error, regulation and control person's electric grid operating behavior restraint by mistake;
Ground county adjusting system becomes ticket, policer operation in management information great Qu for control manipulation simulation preview, monitoring pattern intelligence Ticket workflow management, safe related function, the superior and the subordinate's electric grid operating are worked in coordination with and anti-error, and policer operation becomes ticket and policer operation ticket workflow management There is provided by monitoring intend ticket to examination & verification, far control executions, file overall process intelligence assist into ticket and standardized stream thread management service;Regulation and control Simulation preview realizes merging with safe related function application, becomes ticket and workflow management thereof to provide real for dispatch command ticket and policer operation ticket Time control manipulation simulation preview and anti-misoperation locking service;
It is pre-for disposing the anti-error application of Remote and the simulation of supporting control manipulation thereof that ground county adjusting system controls great Qu in production Drill application, before remote manipulation, automatically start simulation preview, real-time simulation demonstration policer operation content, the anti-false alert of active push and Locking maloperation, specification monitor's remote manipulation flow process, it is achieved monitor's remote manipulation behavior restraint.
Further preferred technical scheme, its additional technical feature is: the first apps server, the second application journey Sequence server, the 3rd apps server and the first database server, the second database server, the 3rd database service Device also include housing and dust cleaning system, dust cleaning system include first dust stratification detection device, second dust stratification detection device, Dust blow device and the exhaust outlet being arranged on housing, be provided with circuit board in housing,
Dust sweeping device includes being swept into device of air, is swept at the air inlet of device of air and arranges defecator, cleans air inlet Device is arranged on detection pedestal with cleaning pipeline connection, the gas outlet cleaning pipeline,
It is additionally provided with measurement metallic plate in the side installing component of circuit board, measures metallic plate and electricity on circuit boards is set By circuit component, measure metallic plate and there is the measurement stitch through circuit board, measure stitch independent of the circuit on circuit board;
First dust stratification detection device includes capacitometer and capacitance comparator, and capacitometer includes being arranged on detection pedestal On upper electric capacity measurement terminal and the lower capacitance measurement terminal that is arranged on lower detection pedestal, upper detection pedestal is arranged at circuit board Top, lower detection pedestal is arranged on the lower section of circuit board, lower capacitance measurement terminal in use with measure stitch contact, power on Hold measurement terminal to be positioned in use and the first distance of the top measuring metallic plate, when comparator is judged to measure capacitance During less than threshold value electric capacity, start and be swept into device of air, through filtered air via the gas outlet blowout cleaned on pipeline, to electricity Circuit component cleans;
Second dust stratification detection device includes Light-Echo detection device and light intensity comparator, and Light-Echo detection device is arranged on detection On pedestal, Light-Echo detection device is used for launching optical signal to the upper surface of component and accepting the optical signal being reflected back, when The when that the light intensity of optical signal being less than the threshold value light intensity of each component, start and be swept into device of air, through filtered air Via the gas outlet blowout cleaned on pipeline, component is cleaned;
Upper detection pedestal is arranged on top base installing plate, and top base installing plate is arranged on the upper cylinder piston rod of upper cylinder, Upper cylinder is arranged on Y-axis mobile platform, and upper Y-axis mobile platform is slidably mounted on Y-axis guide rail, and Y-axis guide rail is by upper Y-axis Guide rail installation frame is arranged on X-axis mobile platform, and upper X-axis mobile platform is slidably arranged on X-axis guide rail, upper X-axis guide rail Being arranged on housing by upper X-axis guide rail installation frame, upper Y-axis mobile platform is driven by upper Y-axis ball screw framework, and upper Y-axis is rolled Screw mechanism is driven by upper y-axis motor, and upper X-axis mobile platform is driven by upper X-axis ball screw framework, upper X-axis ball-screw Mechanism is driven by upper X-axis motor,
Lower detection pedestal is arranged on bottom base installing plate, and bottom base installing plate is arranged on the lower cylinder piston rod of lower cylinder, Lower cylinder is arranged on lower Y-axis mobile platform, and lower Y-axis mobile platform is slidably mounted on Y-axis guide rail, and Y-axis guide rail is by lower Y-axis Guide rail installation frame is arranged on lower X-axis mobile platform, and lower X-axis mobile platform is slidably arranged on lower X-axis guide rail, lower X-axis guide rail Platform is arranged on housing by lower X-axis guide rail installation frame, and lower Y-axis mobile platform is driven by lower Y-axis ball screw framework, lower Y Axle ball screw framework is driven by lower y-axis motor, and lower X-axis mobile platform is driven by lower X-axis ball screw framework, lower X-axis ball Screw mechanism is driven by lower X-axis motor,
When any one startup in this first dust stratification detection device and the second dust stratification detection device is swept into device of air, this cleaning Air intake installation starts, and after the scheduled time, this is swept into device of air and is automatically switched off.
It is arranged on by the component of easy dust stratification owing to measuring metallic plate, so the dust stratification situation measuring metallic plate is permissible Represent the dust stratification situation on component surface.By the both sides at circuit board, capacitometer is set, can be to any one portion Capacitance measurement between certain fixed range above the stitch measuring metallic plate that part is other and parts, when the upper surface measuring metallic plate Constantly the when of accumulation dust, the measurement capacitance between both can gradually decrease, so being reduced to one when measuring capacitance The when of determining stage, i.e. it is believed that dust accumulation is more, it should dust is cleared up.
When circuit board and component dust stratification are more when, the dust measured on metallic plate can produce obvious diffuse-reflectance Effect, weakens the reflection effect of component upper surface greatly, and Light-Echo detection device can be caused cannot to receive enough The light intensity of intensity is to be triggered.The automatic monitoring for element surface dust stratification degree is also achieved by another mode, from And significantly improve that element surface dust stratification is more and the short circuit that causes or heat radiation are smooth and the element burnout problems that causes.
And, the gas outlet cleaning pipeline is arranged to one with the first dust stratification detection device and the second dust stratification detection device Rising, can clear up each component respectively, for the component of easy dust stratification, the frequency of cleaning can be high by one A bit, for being not easy dust stratification, the cleaning frequency can be lower, it is achieved thereby that the cleaning of efficient dust stratification, it is to avoid to housing Interior component carries out waste during overall blowing cleaning.
A kind of power grid regulation intelligent error preventing operational approach applying any of the above-described power grid regulation intelligent anti-error operation system,
First apps server, the second apps server, the 3rd apps server complete anti-misoperation rule Judgement and process, and send operation warning information to each work station, to remind dispatcher to prevent mistuning degree, the first number According to storehouse server, the second database server, the 3rd database server store history and real time data, it is achieved each work The synchronization of data of standing;
Each work station obtains required by the first database server, the second database server, the 3rd database server Data message, to complete the drafting of Dispatching, to audit, simulate preview, operation order management and information inquiry, figure dimension Protect.
By by database server store digital information, apps server obtaining number from database server It is believed that breath, and send to each work station, it is achieved thereby that accurately generating and accurate delivery of operation order, not only increase operation Efficiency and accuracy, also operator are emancipated from hard work simultaneously.
Preferably technical scheme, its supplementary features are: adjusting system He Di county of city adjusting system also performs nominal value check and operates:
During user's manual edit, amendment operation order, system provides operation order term and facility information verifying function, when with Family input word content does not meets relevant normalized written, or input equipment information is inquired about the most then in equipment library, and system will Send relevant anti-false alert.
While realizing normalized written verification, it is anti-error with operation item relatedness that system also provides for operation order operation task Verifying function, i.e. system can the contents of intelligently parsing contrast operation's task and operating procedure, it is judged that whether the two content exists electricity Gas logic association, if operation item content exists the equipment operation unrelated with operation task, system will send the very first time Anti-false alert.
Preferably technical scheme, its supplementary features are: adjusting system He Di county of city adjusting system also performs topology anti-misoperation:
Chopper, disconnecting switch, by electric five anti-rule knowledges, are encoded, are passed through equipment by the anti-error application of security of system Combine formation Rule of judgment with rule, is stored in data base;During judgement, mate rule by the mode of connection with device type Then, forward reasoning mechanism is used to realize reasoning process;When certain operation item do not meet in rule base regular time, system can be given Corresponding anti-false alert.
System convention storehouse contain basic five anti-, circuits and main transformer has a power failure, non-synchronous close unlink, electromagnetic looped network, list anti-error Deng rule.The anti-error function realized is as follows:
The topological anti-error function of basic proofing rules, such as: disconnecting link prompting, band are closed in cutter combination switch with ground prompting, cutter with ground Electricity deciliter disconnecting link prompting, charged co-grounding switch prompting, conjunction grounding switch prompting with voltage etc..
Circuit and main transformer stop the topological anti-error function of power transmission, such as: cyclization prompting, prompting of unlinking, load dead electricity are pointed out, born The switching manipulation prompting of lotus charge prompting, transformator each side, the cutter prompting of transformer neutral point ground, 3/2 pull-switch operation order carry Show.
Non-synchronous closes the topological anti-error function unlinked, and such as: certain breaker closing, system automatically analyzes chopper both sides electricity Whether Force system operational factor meets quasi-synchronization paralleling service condition, is unsatisfactory for then locking Loop Closing Operation.
The topological anti-error function of electromagnetic looped network, such as: during certain breaker closing, whether reasoning operation can cause across electricity Multiple transformators are formed loop-net operation by pressure grade side by side, if "Yes", locking Loop Closing Operation, and would eject anti-false alert.
Maintenance, protect the board such as electricity, quiescing and list anti-error check function, such as: certain equipment hangs protects electricity bridge queen, has a power failure and grasps When making, system can analyze in dead electricity load whether there is " protecting electricity " equipment, "Yes" then locking power failure operation or offer optimum turn For mode.
Preferably technical scheme, its supplementary features are: adjusting system He Di county of city adjusting system also performs equipment state and checks Operation,
When intending ticket, equipment that system selects according to user and operation, whether comparative apparatus real-time status conflict with dbjective state, as There is conflict, then lock operation eject prompting in fruit;Meanwhile, ground county adjusting system checks and accepts the electric grid operating letter that city's adjusting system is issued Breath, auxiliarily county's system carries out intending ticket;
After operation order has operated, when dispatcher backfills report information, the mode of operation for equipment is checked by system;Shape On the one hand equipment real-time status is checked by the anti-school of state, on the other hand makes information check to monitoring back, and the two is checked all Errorless, allow dispatcher to fill in relevant report information.
Preferably technical scheme, its supplementary features are: ground county adjusting system also performs Remote operation anti-misoperation:
When policer operation ticket stubs row link formally starts Remote operation, system will be monitored ticket by managing great Qu process module Information is sent to be deployed in and produces the Remote anti-error application of operation controlling great Qu;This application is deployed in EMS in plug-in mode In system remote operation application;During user progressively performs operation item, the anti-error application of remote manipulation is long-range operating process Anti-error service is provided.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment of the present invention 1;
Fig. 2 is the structural representation of the server internal in the embodiment of the present invention 2;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is that dispatch command ticket is issued an order the logic diagram of inherent rule of operation.
Detailed description of the invention
For the summary of the invention of the present invention, feature and effect can be further appreciated that, hereby enumerate following example, and describe in detail As follows:
Embodiment 1:
Fig. 1 is the structural representation of the embodiment of the present invention 1;
A kind of power grid regulation intelligent anti-error operation system, including city's adjusting system, county's adjusting system and Wide Area Network;
City's adjusting system includes: is positioned at production and controls first database server of great Qu, the first apps server, the first number According to exchange and file server and the first switch, it is positioned at the second database server of management information great Qu, the second application journey Sequence server, the second data exchange and file server, the second switch and the first disk array;
Ground county adjusting system includes: be positioned at the 3rd database server of management information great Qu, the 3rd apps server, the 3rd Data exchange and file server, the 3rd switch and second disk array;
City's adjusting system is positioned at the hardware unit of management information great Qu and ground county adjusting system and is positioned at the hardware unit of management information great Qu Connected by wide area network;
First apps server, the second apps server, the 3rd apps server have been used for anti-misoperation The judgement of rule and process, and send operation warning information to each work station, to remind dispatcher to prevent mistuning degree, the One database server, the second database server, the 3rd database server store history and real time data, it is achieved each The synchronization of station data;
Each work station obtains required by the first database server, the second database server, the 3rd database server Data message, to complete the drafting of Dispatching, to audit, simulate preview, operation order management and information inquiry, figure dimension Protect.
By by database server store digital information, apps server obtaining number from database server It is believed that breath, and send to each work station, it is achieved thereby that accurately generating and accurate delivery of operation order, not only increase operation Efficiency and accuracy, also operator are emancipated from hard work simultaneously.
It is further preferred that city's adjusting system is worked in coordination with anti-for control manipulation simulation preview, safe related function application, Multi-regulation By mistake;
City's adjusting system is applied for control manipulation simulation preview, safe related function in management information great Qu, control manipulation simulation preview Ticket and process module is become to provide Real-Time Scheduling grid switching operation mould with safe related function for regulation and control integral intelligent operating platform operation order Intend preview and anti-error service;
City's adjusting system is producing control great Qu for providing specially for the regulation and control integral intelligent anti-error application of operating platform Remote Door simulates preview application for the control manipulation of policer operation business, with before remote manipulation, automatically carries out anti-misoperation preview, The anti-false alert of active push lock operation, specification monitor's remote manipulation flow process.
It is further preferred that ground county adjusting system is for transferring in the simulation preview of row control manipulation, monitoring pattern intelligence for ground county Can become ticket, policer operation ticket workflow management, safe related function application, Remote operates anti-error application, Multi-regulation is worked in coordination with anti-error;
Ground county adjusting system becomes ticket, policer operation in management information great Qu for control manipulation simulation preview, monitoring pattern intelligence Ticket workflow management, safe related function, policer operation becomes ticket and policer operation ticket workflow management to provide by monitoring plan ticket to auditing, far controlling Perform, filing overall process intelligence assists into ticket and standardized stream thread management service;Regulation and control simulation preview is real with safe related function application Now merge, become ticket and workflow management thereof to provide real-time monitoring operation simulation to preview and anti-error for dispatch command ticket and policer operation ticket Locking services;
It is pre-for disposing the anti-error application of Remote and the simulation of supporting control manipulation thereof that ground county adjusting system controls great Qu in production Drill application, before remote manipulation, automatically start simulation preview, real-time simulation demonstration policer operation content, the anti-false alert of active push and Locking maloperation.
Embodiment 2:
Fig. 2 is the structural representation of the embodiment of the present invention 2;Fig. 3 is the top view of Fig. 2;
In figure, the implication that each reference represents is as follows;1, housing;2, circuit board;
11, it is swept into device of air;12, defecator;13, horizontal-extending pipeline;14, pipeline is vertically extended;15, in pipeline Between seat;16, upper detection pedestal;17, upper electric capacity measurement terminal;18, Light-Echo detection device;19, component;20, row Air port;21, top base installing plate;22, upper cylinder piston rod;23, upper cylinder;24, upper Y-axis mobile platform;25, Y-axis is led Rail;26, upper X-axis mobile platform;27, upper X-axis guide rail;28, upper Y-axis guide rail installation frame;29, upper X-axis guide rail installation frame; 30, upper Y-axis ball screw framework;31, lower detection pedestal;32, bottom base installing plate;33, lower cylinder piston rod;34, under Cylinder;35, lower Y-axis mobile platform;36, Y-axis guide rail;37, lower Y-axis guide rail installation frame;38, lower X-axis mobile platform; 39、 Lower X-axis guide rail;40, lower X-axis guide rail installation frame;41, lower Y-axis ball screw framework;42, upper y-axis motor;43, upper X-axis electricity Machine;44, lower capacitance measurement terminal;45, stitch is measured;50, metallic plate is measured.
First apps server, the second apps server, the 3rd apps server and the first data base Server, the second database server, the 3rd database server also include housing and dust cleaning system, dust cleaning system Including the first dust stratification detection device, the second dust stratification detection device, dust blow device and the exhaust outlet 20 being arranged on housing,
Dust sweeping device includes being swept into device of air 11, is swept at the air inlet of device of air 11 and arranges defecator 12, clearly Sweeping into device of air 11 and clean pipeline connection, the gas outlet cleaning pipeline is arranged on detection pedestal 16,
It is additionally provided with measurement metallic plate 50 in the side installing component of circuit board, measures metallic plate 50 and be arranged on circuit board 2 On component 19 other, measure metallic plate and there is the measurement stitch 45 through circuit board, measure stitch 45 independent of circuit board Circuit on 20;In order to avoid the measurement to electric capacity interferes with the properly functioning of circuit.
First dust stratification detection device includes capacitometer and capacitance comparator, and capacitometer includes being arranged on detection Upper electric capacity measurement terminal 17 on 16, base and the lower capacitance measurement terminal 44 being arranged on lower detection pedestal 31, upper detection pedestal 16 tops being arranged at circuit board, lower detection pedestal 31 is arranged on the lower section of circuit board, and lower capacitance measurement terminal 44 is in use Contacting with measuring stitch 45, upper electric capacity measurement terminal 17 is positioned at and the first distance of the top measuring metallic plate 50 in use Place, when comparator judge measure capacitance less than threshold value electric capacity time, start be swept into device of air, through filtered air via Clean the gas outlet blowout on pipeline, component 19 is cleaned;
Second dust stratification detection device includes Light-Echo detection device 18 and light intensity comparator, and Light-Echo detection device 18 is arranged on On detection pedestal 16, Light-Echo detection device 18 is for launching optical signal to the upper surface of component 19 and acceptance is reflected back Optical signal, when the light intensity of optical signal is less than the threshold value light intensity of each component 19 when, starts and is swept into device of air 11, warp Cross filtered air to blow out via the gas outlet cleaned on pipeline, component 19 is cleaned;
Upper detection pedestal 16 is arranged on top base installing plate 21, and top base installing plate 21 is arranged on the upper cylinder 23 of upper cylinder 23 On piston rod 22, upper cylinder 23 is arranged on Y-axis mobile platform 24, and upper Y-axis mobile platform 24 is slidably mounted on Y-axis guide rail On, Y-axis guide rail is arranged on upper X-axis mobile platform 26 by upper Y-axis guide rail 25 installing rack 28, and upper X-axis mobile platform 26 slides Being arranged on X-axis guide rail 27, upper X-axis guide rail 27 is arranged on housing by upper X-axis guide rail 27 installing rack, and upper Y-axis moves flat Platform 24 is driven by upper Y-axis ball screw framework 30, and upper Y-axis ball screw framework 30 is driven by upper y-axis motor 42, and upper X-axis moves Platform 26 is driven by upper X-axis ball screw framework, and upper X-axis ball screw framework is driven by upper X-axis motor 43,
Lower detection pedestal 31 is arranged on bottom base installing plate 32, and bottom base installing plate 32 is arranged on the lower cylinder 34 of lower cylinder 34 On piston rod 33, lower cylinder 34 is arranged on lower Y-axis mobile platform 35, and lower Y-axis mobile platform 35 is slidably mounted on Y-axis guide rail On, Y-axis guide rail is arranged on lower X-axis mobile platform 38 by lower Y-axis guide rail 36 installing rack 37, and lower X-axis mobile platform 38 slides Being arranged on lower X-axis guide rail 39, lower X-axis guide rail 39 platform is arranged on housing by lower X-axis guide rail 39 installing rack 40, lower Y-axis Mobile platform 35 is driven by lower Y-axis ball screw framework 41, and lower Y-axis ball screw framework 41 is driven by lower y-axis motor, lower X-axis Mobile platform 38 is driven by lower X-axis ball screw framework, and lower X-axis ball screw framework is driven by lower X-axis motor,
When any one startup in this first dust stratification detection device and the second dust stratification detection device is swept into device of air 11, this is clear Sweeping into device of air 11 to start, after the scheduled time, this is swept into device of air 11 and is automatically switched off.
Component 19 side of easy dust stratification it is arranged on, so measuring the dust stratification shape of metallic plate 50 owing to measuring metallic plate 50 Condition can represent the dust stratification situation on component 19 surface.By the both sides at circuit board, capacitometer is set, can be to appointing The electric capacity measuring above stitch 45 and parts between certain fixed range measuring metallic plate 50 on the side of what component 19 Measure, when the upper surface of component 19 constantly accumulates dust when, upper electric capacity measurement terminal and lower capacitance measurement terminal it Between measurement capacitance can gradually decrease, so when measure capacitance be reduced to certain stage when, i.e. it is believed that dust amass Tired more, it should dust is cleared up.And gas outlet is also disposed on detection pedestal just, and towards component 19, The upper surface of component 19 can be cleared up.
When circuit board and component 19 dust stratification are more when, dust can produce obvious diffuse-reflectance effect, greatly Weaken the reflection effect of component 19 upper surface, Light-Echo detection device 18 can be caused cannot to receive the light of sufficient intensity Strong to be triggered.Also achieved by another mode and the automatic of element surface dust stratification degree is monitored, thus significantly Improve that element surface dust stratification is more and the short circuit that causes or heat radiation are smooth and the element burnout problems that causes.
And, the gas outlet cleaning pipeline is arranged to one with the first dust stratification detection device and the second dust stratification detection device Rising, can clear up each component 19 respectively, for the component 19 of easy dust stratification, the frequency of cleaning can be high Some, for being not easy dust stratification, the cleaning frequency can be lower, it is achieved thereby that the cleaning of efficient dust stratification, it is to avoid to shell Internal component 19 carries out waste during overall blowing cleaning.
The most particularly, the afterbody of upper cylinder 23 uses footing to install, and the rear portion of upper cylinder 23 is pacified by middle part radial type The mode of dress is arranged on Y-axis mobile platform 24.
Use this mounting means, longer cylinder can be formed with installing on shorter upper Y-axis mobile platform 24, thus Make to keep between Y-axis mobile platform, X-axis guide rail, Y-axis guide rail and circuit board, component 19 longer distance, it is to avoid Upper cylinder 23 piston rod 22 being recovered to upper cylinder 23 interferes with component 19 when horizontal movement, can also keep away simultaneously Exempt to clean pipeline and hang down other and cause upper Y-axis mobile platform 24 to hang on component 19 when moving to component 19, Y in impact The motion of axle mobile platform 24.
The most particularly, clean pipeline include horizontal-extending pipeline 13 and vertically extend pipeline 14, horizontal-extending pipeline 13 It is connected to be swept between device of air 11 and pipeline middle base 15 and in the shape of a spiral.
By horizontal-extending pipeline 13 is arranged to helical form, so that horizontal-extending pipeline 13 is when packing up, volume It is unlikely to excessive, it is to avoid horizontal-extending pipeline 13 touches circuit board or electronic component and causes the damage of horizontal-extending pipeline 13 Bad.
More specifically, pipeline middle base 15 is arranged on X-axis mobile platform 26, for pipeline middle base 15 and upper X Shaft platform carries out the movement in X-direction together.
By allowing pipeline middle base 15 move together with X-axis platform, the movable model of horizontal-extending pipeline 13 can be limited Enclose, and coordinate the spiral-shaped of horizontal extension road 13 so that horizontal-extending pipeline 13 when regaining can away from circuit board and Component 19.
The most particularly, exhaust outlet 20 be arranged on housing farthest away from the position being swept into device of air 11.
By the distance that exhaust outlet 20 is arranged on housing being swept at device of air 11 highest distance position, can by all from Adapt to the gas outlet dust that cleaned of blowing to discharge, it is to avoid the dust after cleaning is fallen on component 19 once more.
The most particularly, on the basis of threshold value light intensity 0.5 times of light intensity, this benchmark light intensity is that each component 19 is not accumulated Reflective light intensity during dust.
When 0.5 times that light intensity is threshold value light intensity when, the dust on electric elements is the most more, if the most clear Reason, it will cause element radiating not smooth, thus reduce the serviceability of detection device.
The most particularly, on the basis of threshold value electric capacity 0.9 times of capacitance, this reference capacitance value be each component 19 not Capacitance during accumulation dust, between upper electric capacity measurement terminal 17 and lower capacitance measurement terminal 44.
On the basis of capacitance when of 0.9 times of capacitance, the dust on electric elements is the most more, if not in time Cleaning, it will cause element radiating not smooth, thus reduce the serviceability of detection device.
The operating principle of the present embodiment is:
Just come into operation at server, during the not yet dust stratification of component 19 surface, by lower capacitance measurement terminal 44 contact measurement Stitch 45, upper electric capacity measurement terminal 17 is positioned at certain segment distance measuring metallic plate 50 upper surface, measures this measurement metallic plate 50 Reference capacitance value, can also utilize Light-Echo detection device 18 to confirm the reflective light intensity on this measurement metallic plate 50 surface simultaneously.
When on component 19, dust stratification is more when, when upper electric capacity measurement terminal 17 still moves to apart from this measurement metal The above-mentioned distance of plate 50, lower capacitance measurement terminal 44 contacts the measurement stitch 45 of this measurement metallic plate 50, owing to measuring metallic plate The superficial dust of 50 is more, so the distance between upper electric capacity measurement terminal 17 and this measurement metallic plate 50 substantially reduces , and, dust itself also can reduce the actual measurement capacitance of measurement.When the low lower limit to threshold value of capacitance, startup is swept into Device of air 11.
In addition to this detection mode, it is also provided with the mode of light detection, when dust accumulates on component 19 The when of more, can reduce the reflectance measuring metallic plate 50 surface, reducing reflecting light electro-detection device can receive Intensity of illumination, when reflecting the intensity of illumination received by photoelectric detection system less than threshold value light intensity, automatically start and be swept into Device of air 11.
It is swept into after device of air 11 starts and absorbs the most filtered cleaned air from the external world, send into and clean in pipeline.By Then each element is blown cleaning respectively, can efficiently, concentrate clear up each component 19 surface dust.Right In the component 19 of easy dust stratification, the frequency of cleaning can be higher, and for being not easy dust stratification, the cleaning frequency can be low by one A bit, it is achieved thereby that the cleaning of efficient dust stratification, it is to avoid the component 19 in housing to be carried out wave during overall blowing cleaning Take.Can allow be swept into after device of air 11 first blows the very first time and be automatically switched off, the such as very first time can be half a minute.Then etc. Second time for the treatment of allows and is suspended in the ash fall in enclosure interior space, because while the giving vent to anger components and parts table of self adaptation gas outlet The dust in face blows afloat, and constantly to enclosure interior space make-up air, says from main trend, and the air being mixed with dust can be from row Air port 20 is discharged, but cannot guarantee that after some time, and the air being mixed with dust will be all from enclosure interior space Discharge.So after blowing over a period of time, the air in space in housing, is still the air being mixed with a small amount of dust in fact, so Needs wait for a period of time, and allow dust in air settle.Such as second time can be 3 minutes or 2 minutes.Dust in housing After sedimentation, then detect electric capacity, if remaining less than threshold value, then continue to clean, the most repeatedly, So that the dust on element and circuit board is cleaned up.
After the cleaning for certain component 19 completes, upper Y-axis mobile platform and lower Y-axis mobile platform can move to Other electronic component both sides, utilize the first dust stratification detection device and the second dust stratification detection device to detect other elements, And choose whether according to specific circumstances to clear up.
Embodiment 3:
A kind of power grid regulation intelligent error preventing operational approach of the power grid regulation intelligent anti-error operation system applying any of the above-described,
First apps server, the second apps server, the 3rd apps server complete anti-misoperation rule Judgement and process, and send operation warning information to each work station, to remind dispatcher to prevent mistuning degree, the first number According to store historical data and real time data in storehouse server, the second database server, the 3rd database server, it is achieved each The synchronization of station data;
Each work station obtains required by the first database server, the second database server, the 3rd database server Data message, to complete the drafting of Dispatching, to audit, simulate preview, operation order management and information inquiry, figure dimension Protect.
By by database server store digital information, apps server obtaining number from database server It is believed that breath, and send to each work station, it is achieved thereby that accurately generating and accurate delivery of operation order, not only increase operation Efficiency and accuracy, also operator are emancipated from hard work simultaneously.
Preferably, city's adjusting system He Di county adjusting system also perform nominal value check operation:
During user's manual edit, amendment operation order, system provides operation order term and facility information verifying function, when with Family input word content does not meets relevant normalized written, or input equipment information is inquired about the most then in equipment library, and system will Send relevant anti-false alert.
While realizing normalized written verification, it is anti-error with operation item relatedness that system also provides for operation order operation task Verifying function, i.e. system can the contents of intelligently parsing contrast operation's task and operating procedure, it is judged that whether the two content exists electricity Gas logic association, if operation item content exists the equipment operation unrelated with operation task, system will send the very first time Anti-false alert.
Preferably, city's adjusting system He Di county adjusting system also perform topology anti-misoperation:
Chopper, disconnecting switch, by electric five anti-rule knowledges, are encoded, are passed through equipment by the anti-error application of security of system Combine formation Rule of judgment with rule, is stored in data base;During judgement, mate rule by the mode of connection with device type Then, forward reasoning mechanism is used to realize reasoning process;When certain operation item do not meet in rule base regular time, system can be given Corresponding anti-false alert.
System convention storehouse contain basic five anti-, circuits and main transformer has a power failure, non-synchronous close unlink, electromagnetic looped network, list anti-error Deng rule.The anti-error function realized is as follows:
The topological anti-error function of basic proofing rules, such as: disconnecting link prompting, band are closed in cutter combination switch with ground prompting, cutter with ground Electricity deciliter disconnecting link prompting, charged co-grounding switch prompting, conjunction grounding switch prompting with voltage etc..
Circuit and main transformer stop the topological anti-error function of power transmission, such as: cyclization prompting, prompting of unlinking, load dead electricity are pointed out, born The switching manipulation prompting of lotus charge prompting, transformator each side, the cutter prompting of transformer neutral point ground, 3/2 pull-switch operation order carry Show.
Non-synchronous closes the topological anti-error function unlinked, and such as: certain breaker closing, system automatically analyzes chopper both sides electricity Whether Force system operational factor meets quasi-synchronization paralleling service condition, is unsatisfactory for then locking Loop Closing Operation.
The topological anti-error function of electromagnetic looped network, such as: during certain breaker closing, whether reasoning operation can cause across electricity Multiple transformators are formed loop-net operation by pressure grade side by side, if "Yes", locking Loop Closing Operation, and would eject anti-false alert.
Maintenance, protect the board such as electricity, quiescing and list anti-error check function, such as: certain equipment hangs protects electricity bridge queen, has a power failure and grasps When making, system can analyze in dead electricity load whether there is " protecting electricity " equipment, "Yes" then locking power failure operation or offer optimum turn For mode.
Preferably, adjusting system He Di county of city adjusting system also performs safety on line and checks,
EMS security of system is checked class application and is provided and include that safety analysis, static security analysis, transient stability analysis, voltage are steady The Security Checking functions such as setting analysis, Small signal stability analysis, Analysis of Short-Circuit Current, the safe related function being deployed in IIIth district can be by connecing Mouthful the Security Checking function that provides of the integrated corresponding EMS system of mode, impact on electrical network after being scheduled to ticket is carried out safety Anti-error verification.
Preferably, adjusting system He Di county of city adjusting system also performs equipment state and checks operation,
When intending ticket, equipment that system selects according to user and operation, whether comparative apparatus real-time status conflict with dbjective state, as There is conflict, then lock operation eject prompting in fruit;
After operation order has operated, when dispatcher backfills report information, the mode of operation for equipment is checked by system;Shape On the one hand equipment real-time status is checked by the anti-school of state, on the other hand makes information check to monitoring back, and the two is checked all Errorless, allow dispatcher to fill in relevant report information.
Preferably, it is anti-error that adjusting system He Di county of city adjusting system also carries out operation order,
Operation order is anti-error includes that dispatch command ticket operation order is anti-error and policer operation ticket operation order is anti-error,
Wherein, dispatch command ticket operation order is anti-is mistaken for:
Dispatch command ticket is issued an order in operating process, and system provides monitoring execution sequence locking, the orders such as locking of issuing an order across sport anti- Function by mistake.System is by arranging relevant anit-misoperation rules to the button such as " ordering ", " being finished ", it is achieved the order to process of issuing an order Locking.As a example by " issuing an order ", in it in rule as shown in Figure 4:
After user chooses operation item, after clicking " ordering ", system starts check service the most automatically, first analyzes judgement and chooses Whether project exists project of having ordered, if some projects order to perform, ejects locking and reminds.First step is checked by rear, continues Across sport operation judges, project monitoring-information, continuous carrying out successively confirms that judgement, project topology anti-false judgment etc. are checked.
All checks are by rear, and dispatcher can complete the operation of issuing an order of relevant operational item.
Wherein, policer operation ticket operation order is anti-is mistaken for:
System realizes the safe related function during monitoring Remote operation performs, and possesses prompting operation equipment and has the most carried out mould Whether plan operates, has guarded, whether there is remote operation ticket corresponding to this equipment, is the equipment of current operation, equipment Dead electricity, whether violate the Security Checking functions such as equipment regulation.
Preferably, ground county adjusting system also perform Remote operation anti-misoperation:
When policer operation ticket stubs row link formally starts Remote operation, system will be monitored ticket by managing great Qu process module Information is sent to be deployed in and produces the Remote anti-error application of operation controlling great Qu;This application is deployed in EMS in plug-in mode In system remote operation application;During user progressively performs operation item, the anti-error application of remote manipulation is long-range operating process Anti-error service is provided.
As a example by pulling open certain switch, after user starts the operation application of EMS system remote, take charge of system remote remote control by me and prevent After by mistake application chooses operation item to click execution, system is simulated preview automatically to operation, and by rule base to operate into The anti-error check of row, checks errorless i.e. by the relevant interface unblock long-range operating right of starting device.User must be in limiting time Inside completing operation, otherwise system cancels operating right, lock operation automatically.After remotely having operated, user's edit operation record Time, system automatic Check equipment real-time status, confirm that remote-control operation puts in place.It is big that relevant remote-control operation information passes back to management automatically District's policer operation ticket process module.
Although the preferred embodiments of the present invention being described above in conjunction with accompanying drawing, but the invention is not limited in above-mentioned Detailed description of the invention, above-mentioned detailed description of the invention is only schematically, is not restrictive, the ordinary skill of this area Personnel are under the enlightenment of the present invention, in the case of without departing from present inventive concept and scope of the claimed protection, it is also possible to make Go out a lot of form, such as:Pipeline middle base is arranged on upper X-axis mobile platform by embodiment 2, vertical extension and pipeline Middle base connects, and actually can also pipeline middle base be installed on upper Y-axis mobile platform.These belong to the guarantor of the present invention Within the scope of protecting.

Claims (10)

1. a power grid regulation intelligent anti-error operation system, it is characterised in that: include city's adjusting system, county's adjusting system and wide area network Network.
Power grid regulation intelligent anti-error operation system the most according to claim 1, it is characterised in that:
City's adjusting system includes: is positioned at production and controls first database server of great Qu, the first apps server, the first number According to exchange and file server and the first switch, it is positioned at the second database server of management information great Qu, the second application journey Sequence server, the second data exchange and file server, the second switch and the first disk array;
Ground county adjusting system includes: be positioned at the 3rd database server of management information great Qu, the 3rd apps server, the 3rd Data exchange and file server, the 3rd switch and second disk array;
City's adjusting system is positioned at the hardware unit of management information great Qu and ground county adjusting system and is positioned at the hardware unit of management information great Qu Connected by wide area network.
Power grid regulation intelligent anti-error operation system the most according to claim 1, it is characterised in that:
Described first apps server, described second apps server, described 3rd apps server are used for Complete judgement and the process of anti-misoperation rule, and send operation warning information to each work station, to remind dispatcher to prevent There is mistuning degree, described first database server, described second database server, described 3rd database server are deposited Storage history and real time data, it is achieved the synchronization of each station data;
Each work station is taken by described first database server, described second database server, described 3rd data base Business device obtain needed for data message, to complete the drafting of Dispatching, to audit, simulate preview, operation order management and believe Breath inquiry, figure are safeguarded.
Power grid regulation intelligent anti-error operation system the most according to claim 2, it is characterised in that:
Described city adjusting system works in coordination with anti-error, regulation and control person's electrical network for control manipulation simulation preview, safe related function application, Multi-regulation Operation behavior retrains;
Described city adjusting system previews for control manipulation simulation in management information great Qu, safe related function is applied, the superior and the subordinate electrical network behaviour Making collaborative and anti-error, the simulation preview of described control manipulation and described safe related function are regulation and control integral intelligent operating platform operation order Ticket and process module is become to provide the simulation preview of Real-Time Scheduling grid switching operation and anti-error service;
Described city adjusting system is producing control great Qu for carrying for the regulation and control integral intelligent anti-error application of operating platform Remote For being specifically designed for the control manipulation simulation preview application of policer operation business, with before remote manipulation, automatically carry out anti-misoperation Preview, the anti-false alert of active push lock operation, specification monitor's remote manipulation flow process, it is achieved monitor's remote manipulation behavior Constraint.
Power grid regulation intelligent anti-error operation system the most according to claim 2, it is characterised in that:
For transferring in for ground county, the simulation of row control manipulation previews described ground county adjusting system, monitoring pattern intelligence becomes ticket, monitoring behaviour Make ticket workflow management, safe related function application, Remote operates anti-error application, Multi-regulation works in coordination with anti-error, regulation and control person's electrical network behaviour Make behavior restraint;
Described ground county adjusting system becomes ticket, monitoring in management information great Qu for control manipulation simulation preview, monitoring pattern intelligence Operation order workflow management, safe related function, the superior and the subordinate's electric grid operating are worked in coordination with and anti-error, and described policer operation becomes ticket and described monitoring behaviour Make ticket workflow management provide by monitoring intend ticket to examination & verification, far control executions, file overall process intelligence assist into ticket and standardization flow process Management service;Described regulation and control simulation preview realizes merging, for dispatch command ticket and policer operation ticket with the application of described safe related function Ticket and workflow management thereof is become to provide the preview of real-time monitoring operation simulation and anti-misoperation locking service;
Described ground county adjusting system is producing control great Qu for disposing the anti-error application of Remote and supporting control manipulation mould thereof Intending preview application, automatically start simulation preview before remote manipulation, real-time simulation demonstration policer operation content, active push is anti-error to be carried Wake up and locking maloperation, specification monitor's remote manipulation flow process, it is achieved monitor's remote manipulation behavior restraint.
6. apply the power grid regulation according to the power grid regulation intelligent anti-error operation system according to any one of claim 1-5 for one kind Intelligent error preventing operational approach, it is characterised in that:
Described first apps server, described second apps server, described 3rd apps server complete The judgement of anti-misoperation rule and process, and send operation warning information to each work station, to remind dispatcher to prevent Mistuning degree, stores in described first database server, described second database server, described 3rd database server and goes through History and real time data, it is achieved the synchronization of each station data;
Each work station is taken by described first database server, described second database server, described 3rd data base Business device obtain needed for data message, to complete the drafting of Dispatching, to audit, simulate preview, operation order management and believe Breath inquiry, figure are safeguarded.
Power grid regulation intelligent error preventing operational approach the most according to claim 6, it is characterised in that: described city adjusting system and institute Shu Di county adjusting system also performs nominal value check and operates:
During user's manual edit, amendment operation order, system provides operation order term and facility information verifying function, when with Family input word content does not meets relevant normalized written, or input equipment information is inquired about the most then in equipment library, and system will Send relevant anti-false alert.
Power grid regulation intelligent error preventing operational approach the most according to claim 6, it is characterised in that: described city adjusting system and institute Shu Di county adjusting system also perform topology anti-misoperation:
Chopper, disconnecting switch, by electric five anti-rule knowledges, are encoded, are passed through equipment by the anti-error application of security of system Combine formation Rule of judgment with rule, is stored in data base;During judgement, mate rule by the mode of connection with device type Then, forward reasoning mechanism is used to realize reasoning process;When certain operation item do not meet in rule base regular time, system can be given Corresponding anti-false alert.
Power grid regulation intelligent error preventing operational approach the most according to claim 6, it is characterised in that: described city adjusting system and institute Shu Di county adjusting system also performs equipment state and checks operation,
When intending ticket, equipment that system selects according to user and operation, whether comparative apparatus real-time status conflict with dbjective state, as There is conflict, then lock operation eject prompting in fruit;Meanwhile, ground county adjusting system checks and accepts the electric grid operating letter that city's adjusting system is issued Breath, auxiliarily county's system carries out intending ticket;
After operation order has operated, when dispatcher backfills report information, the mode of operation for equipment is checked by system;Shape On the one hand equipment real-time status is checked by the anti-school of state, on the other hand makes information check to monitoring back, and the two is checked all Errorless, allow dispatcher to fill in relevant report information.
Power grid regulation intelligent error preventing operational approach the most according to claim 6, it is characterised in that: described ground county adjusting system Also execution Remote operation anti-misoperation:
When policer operation ticket stubs row link formally starts Remote operation, system will be monitored ticket by managing great Qu process module Information is sent to be deployed in and produces the Remote anti-error application of operation controlling great Qu;This application is deployed in EMS in plug-in mode In system remote operation application;During user progressively performs operation item, the anti-error application of remote manipulation is long-range operating process Anti-error service is provided.
CN201610597958.2A 2016-07-27 2016-07-27 The apparatus and method of power grid regulation intelligent error preventing operation Pending CN106203888A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610597958.2A CN106203888A (en) 2016-07-27 2016-07-27 The apparatus and method of power grid regulation intelligent error preventing operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610597958.2A CN106203888A (en) 2016-07-27 2016-07-27 The apparatus and method of power grid regulation intelligent error preventing operation

Publications (1)

Publication Number Publication Date
CN106203888A true CN106203888A (en) 2016-12-07

Family

ID=57495510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610597958.2A Pending CN106203888A (en) 2016-07-27 2016-07-27 The apparatus and method of power grid regulation intelligent error preventing operation

Country Status (1)

Country Link
CN (1) CN106203888A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108985468A (en) * 2018-06-27 2018-12-11 中国南方电网有限责任公司 A method of the single intelligence of association maintenance generates operation order
CN112769068A (en) * 2021-01-05 2021-05-07 国网安徽省电力有限公司 Device and method for intelligently preventing misoperation in power grid regulation and control
CN113537921A (en) * 2021-05-29 2021-10-22 中国南方电网有限责任公司 Intelligent safety anti-error check system and anti-error check system thereof
CN116995671A (en) * 2023-09-25 2023-11-03 广东电网有限责任公司梅州供电局 Quick power failure maintenance method, device and equipment for power grid and storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202856455U (en) * 2012-07-31 2013-04-03 长园共创电力安全技术股份有限公司 Five-prevention system adopting wireless network
CN104201775A (en) * 2014-08-19 2014-12-10 江苏省电力设计院 Distribution automation system configuration method based on city and county level integration
CN104678960A (en) * 2015-01-29 2015-06-03 国网浙江省电力公司嘉兴供电公司 Offline type dispatching operation ticket system and method based on field error prevention and simulated ticket training
CN104821662A (en) * 2015-05-19 2015-08-05 国家电网公司 Multidimensional intelligent anti-misoperation system and method
CN104966150A (en) * 2015-05-26 2015-10-07 国网山东省电力公司青岛供电公司 Intelligent anti-error analysis method and system
CN104979900A (en) * 2014-04-09 2015-10-14 珠海优特电力科技股份有限公司 Substation programmed operation anti-misoperation system and method
CN105790202A (en) * 2016-05-04 2016-07-20 杭州飞翔电力电器有限公司 Overvoltage protector used for power transmission tower

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202856455U (en) * 2012-07-31 2013-04-03 长园共创电力安全技术股份有限公司 Five-prevention system adopting wireless network
CN104979900A (en) * 2014-04-09 2015-10-14 珠海优特电力科技股份有限公司 Substation programmed operation anti-misoperation system and method
CN104201775A (en) * 2014-08-19 2014-12-10 江苏省电力设计院 Distribution automation system configuration method based on city and county level integration
CN104678960A (en) * 2015-01-29 2015-06-03 国网浙江省电力公司嘉兴供电公司 Offline type dispatching operation ticket system and method based on field error prevention and simulated ticket training
CN104821662A (en) * 2015-05-19 2015-08-05 国家电网公司 Multidimensional intelligent anti-misoperation system and method
CN104966150A (en) * 2015-05-26 2015-10-07 国网山东省电力公司青岛供电公司 Intelligent anti-error analysis method and system
CN105790202A (en) * 2016-05-04 2016-07-20 杭州飞翔电力电器有限公司 Overvoltage protector used for power transmission tower

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108985468A (en) * 2018-06-27 2018-12-11 中国南方电网有限责任公司 A method of the single intelligence of association maintenance generates operation order
CN112769068A (en) * 2021-01-05 2021-05-07 国网安徽省电力有限公司 Device and method for intelligently preventing misoperation in power grid regulation and control
CN113537921A (en) * 2021-05-29 2021-10-22 中国南方电网有限责任公司 Intelligent safety anti-error check system and anti-error check system thereof
CN116995671A (en) * 2023-09-25 2023-11-03 广东电网有限责任公司梅州供电局 Quick power failure maintenance method, device and equipment for power grid and storage medium
CN116995671B (en) * 2023-09-25 2024-01-09 广东电网有限责任公司梅州供电局 Quick power failure maintenance method, device and equipment for power grid and storage medium

Similar Documents

Publication Publication Date Title
CN106203888A (en) The apparatus and method of power grid regulation intelligent error preventing operation
CN103578039B (en) A kind of power networks risk prewarning analysis system
CN107219837B (en) Be used for subway shield door fault monitoring and early warning intelligent system
CN104331042B (en) State evaluation method of hydropower plant computer monitoring system
CN102355060B (en) Intelligent interlocking system of transformer substation
CN102005736B (en) On-line monitoring method of state of relay protection equipment
CN105045179A (en) Airport boarding bridge, ground air conditioning and power supply crew scheduling monitoring and management system
CN203630608U (en) Operation anti-misoperation system of remote visualized transformer station
CN103576650A (en) Operation security monitoring and managing system for airport ground equipment
CN103078382A (en) Battery charging management cabinet
CN110705829A (en) Ground wire management method and system based on two-dimensional code and intelligent lock technology
CN105487006B (en) A kind of panel switches mechanical property on-line monitoring system and monitoring method
CN110428533A (en) One kind realizing the anti-error integrated intelligent lock management system of lock control based on Internet of Things
CN109521751A (en) A kind of nuclear power plant's key work center method failure mitigation method
CN107069966A (en) A kind of transformer station's remote online monitoring and status assessing system
CN110209163A (en) A kind of robot, area Gui Hang automatic tour inspection system
CN105788084B (en) The public charging pile of full-automatic roof induction type
CN202475014U (en) Regional electrical network integrated five-preventing system
CN109237710A (en) Anti-fraud consumable smart media management system and air cleaning system
CN105843125A (en) Transformer station sequence operation system and method based on state identification technology
CN101609972A (en) Be used to guarantee the system and the control method of operating personnel's personal safety and proper operation
CN201307233Y (en) Power car servicing safety monitoring system
CN202309220U (en) Failure alarming wireless transmission monitoring device for railway low-voltage distribution box
CN110310016A (en) A kind of power distribution network Multi-source Information Fusion intelligent alarm method based on evented identification
CN107871176A (en) The safety-optimized method and system of secondary device applied to IEC61850 information modelings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207

RJ01 Rejection of invention patent application after publication