CN106201797A - The method that fatigue tester collocation 4U tool realizes multinode AC test - Google Patents

The method that fatigue tester collocation 4U tool realizes multinode AC test Download PDF

Info

Publication number
CN106201797A
CN106201797A CN201610553969.0A CN201610553969A CN106201797A CN 106201797 A CN106201797 A CN 106201797A CN 201610553969 A CN201610553969 A CN 201610553969A CN 106201797 A CN106201797 A CN 106201797A
Authority
CN
China
Prior art keywords
test
fatigue tester
node
test node
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610553969.0A
Other languages
Chinese (zh)
Inventor
刘智刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inspur Electronic Information Industry Co Ltd
Original Assignee
Inspur Electronic Information Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur Electronic Information Industry Co Ltd filed Critical Inspur Electronic Information Industry Co Ltd
Priority to CN201610553969.0A priority Critical patent/CN106201797A/en
Publication of CN106201797A publication Critical patent/CN106201797A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/22Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
    • G06F11/2284Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing by power-on test, e.g. power-on self test [POST]

Abstract

The invention discloses the method that a kind of fatigue tester collocation 4U tool realizes multinode AC test, belong to server test technical field.The method that the fatigue tester collocation 4U tool of the present invention realizes multinode AC test, performs test script on main test node, and when the on-off state secondary test node being detected is on, main test node execution etc. is to be operated;When the on-off state secondary test node being detected is off, the most main test node performs power-off operation;Fatigue tester is provided with power cut off delay, after fatigue tester detects the shutdown of main test node, carries out AC power-off and enters power cut off delay and clock, after fatigue tester reaches power cut off delay timing, again powering up to test node.The fatigue tester collocation 4U tool of this invention realizes the method for multinode AC test scientific and reasonable can utilize test resource, and improves testing efficiency, has good application value.

Description

The method that fatigue tester collocation 4U tool realizes multinode AC test
Technical field
The present invention relates to server test technical field, concrete offer a kind of fatigue tester collocation 4U tool realizes more piece The method of some AC test.
Background technology
The method carrying out AC test currently for RACK node divides two kinds, and one is mono-to RACK by AC fatigue tester Node carries out AC test;Another way is to carry out AC test by control RACK whole machine cabinet node.Both the above mode at present All there are some drawbacks, when using first kind of way to test, RACK single node can only be carried out AC test, test sample is very Few;When using the second way to test, needing to take the resource of RACK whole machine cabinet, whole machine cabinet is required for powering on and lower electricity behaviour Make, if so the node on same rack has test to arrange, just cannot proceed, it is impossible to test same stepping with AC OK, it is impossible to enough carrying out test flexibly the most effectively arranges to utilize, and wastes test resource, reduces testing efficiency.
Summary of the invention
The technical assignment of the present invention is the problem for above-mentioned existence, it is provided that a kind of method of testing is easy, can be scientific and reasonable Utilize test resource, and the method that the fatigue tester collocation 4U tool improving testing efficiency realizes multinode AC test.
For achieving the above object, the technical scheme is that
The method that a kind of fatigue tester collocation 4U tool realizes multinode AC test, performs test foot on main test node This, when the on-off state secondary test node being detected is on, main test node execution etc. is to be operated;When secondary test being detected When the on-off state of node is off, the most main test node performs power-off operation;Fatigue tester is provided with power cut off delay, After fatigue tester detects the shutdown of main test node, carrying out AC power-off and enter power cut off delay and clock, fatigue tester reaches After power cut off delay timing, again powering up to test node, test node is set to BIOS and powers up self-starting, when test node just After often entering OS, enter next test process.
The testing appliance of described method of testing has the secondary test of fatigue tester, 4U tool, a main test node and three Node.Described main test node and secondary test node are inserted respectively in 4U tool.The power supply of fatigue tester offer 220V is defeated Entering, the input of 4U tool exports with the power supply of fatigue tester and is connected, and fatigue tester holding wire is connected to main test joint On point, main test node and three secondary test nodes cascade one by one.
The time intervals to be operated such as described main test node execution every time are 30s.
Before test, in main test node and secondary test node, install operating system, the present invention preferably installs RHEL6.7 operating system.
Being copied to by test script in main test node, main test node uses netting twine one one-level with each secondary test node Connection, or all test nodes are all connected under a switch, main test node performs test script, starts to test Journey.
Described fatigue tester is AC fatigue tester, and the holding wire of AC fatigue tester is connected to main test node mainboard Pw_button position.
As preferably, fatigue tester is additionally provided with warning time delay, when there is delaying machine situation in secondary test node, and main test Node enters in the off-mode waiting secondary test node, when fatigue tester reaches warning delay time, and fatigue tester Alert, carry out abnormal DEBUG for abnormality test node.
As preferably, the described power cut off delay time is 20s, and warning delay time is 34min.
Compared with prior art, the present invention has beneficial effect highlighted below: method of testing of the present invention overcomes In prior art, AC fatigue tester can only carry out the drawback of AC test to single node, can realize controlling AC test node flexibly Quantity, scientific and reasonable utilizes test resource, improves testing efficiency, and testing appliance is simple, it is easy to operation, practical.
Accompanying drawing explanation
Fig. 1 is the method testing principle stream that fatigue tester of the present invention collocation 4U tool realizes multinode AC test Cheng Tu.
Detailed description of the invention
Below in conjunction with drawings and Examples, the fatigue tester collocation 4U tool of the present invention is realized multinode AC test Method be described in further detail.
Embodiment
The method testing apparatus that the fatigue tester collocation 4U tool of the present invention realizes multinode AC test is tired by AC Test machine, 4U tool, a main test node and three secondary test nodes are constituted.The power supply of 220V is provided for AC fatigue tester Input, the power output end of AC fatigue tester is connected with 4U tool, powers for whole 4U tool.One main test node and Three secondary test nodes are inserted respectively in 4U tool, and main test node and three secondary test nodes cascade one by one, main test joint Point is disposed as BIOS with secondary test node and powers up self-starting.The holding wire of AC fatigue tester is connected to main test node mainboard Pw_button position.AC fatigue tester is provided with power cut off delay and warning time delay is arranged, and the power cut off delay time is 20s, reports to the police Delay time is 34min.
Before test, in main test node and secondary test node, install operating system, the present invention operates with RHEL6.7 As a example by system, test script is copied on main test node simultaneously.
As it is shown in figure 1, in test process, monitor other secondary test nodes by main test node.On main test node Perform test script, the on-off state of the secondary test node of monitoring.When the on-off state of secondary test node is on, main test Node entrance etc. are to be operated, and waiting the time to be operated is 30s;When the on-off state of secondary test node is off, main test Node performs power-off operation.After AC fatigue tester detects the shutdown of main test node, the pw_button of main test node mainboard Voltage is 0V, and after detecting this signal, AC fatigue tester carries out AC power-off and enters power cut off delay and clock, when power cut off delay meter Time reach 20s after, AC fatigue tester powers up to test node again.Self-starting is powered up owing to test node is set to BIOS, After test node powers up and normally enters OS, enter next test process.In actual test process, all test nodes are all After having performed shutdown command, AC fatigue tester just can normal power down.If there is machine situation of delaying, the most main test joint in test node Point enters in the off-mode waiting secondary test node, and when AC fatigue tester reaches the warning delay time of 35min, AC is tired Labor test machine alerts, for occurring that abnormal test node carries out abnormal DEBUG.
Test process code is as follows:
Test script is put into/etc/rc.local under:
Main controlled node execution Scripts-1.sh:
#!/bin/bash
The BMC IP address of # pair test node: 192.168.1.101-103
for i in {101..103}
do
The power status state of node is caught and preserves by #
ipmitool -I lanplus -H 192.168.1.$i -U admin -P admin chassis power status > /root/pwStatus.tmp
# takes out status keyword symbol
pwStatus=`cat pwStatus.tmp|awk '{print $4}'`
Node Power status state is judged by #
if [ $pwStatus == "off" ]; then
The node having been switched off state is lighted positioning light by #
ipmitool -I lanplus -H 192.168.1.$i -U admin -P admin chassis identify force
else
# enters while circulation, it is judged that node state
while [[ $pwStatus == "on" ]]
do
If # node state one is On, then sleep 30, then record current time.During until state is off, jumps out and work as Front circulation.
sleep 30
date "+%Y-%m-%d %H:%M:%S" >> /root/dcTimeRecd.txt
echo "Node BMC IP: 192.168.1.$i should be check,power off times was too long." >> /root/dcTimeRecd.txt
done
fi
done
After # judges that all node states are all as Off, main test node self performs shutdown action.
poweroff
Secondary test node execution Scripts-2.sh:
#!/bin/bash
The # pair test node laggard line delay that has only to start shooting shuts down.
Sleep 30
Power off
Embodiment described above, the simply present invention more preferably detailed description of the invention, those skilled in the art is in the present invention The usual variations and alternatives carried out in the range of technical scheme all should comprise within the scope of the present invention.

Claims (3)

1. the method that fatigue tester collocation 4U tool realizes multinode AC test, it is characterised in that: hold on main test node Row test script, when the on-off state secondary test node being detected is on, main test node execution etc. is to be operated;Work as detection When on-off state to secondary test node is off, the most main test node performs power-off operation;Fatigue tester is provided with disconnected Electricity time delay, after fatigue tester detects the shutdown of main test node, carries out AC power-off and enters power cut off delay and clock, and tired surveys After test-run a machine reaches power cut off delay timing, again powering up to test node, test node is set to BIOS and powers up self-starting, works as test After node normally enters OS, enter next test process.
The method that fatigue tester the most according to claim 1 collocation 4U tool realizes multinode AC test, its feature exists In: fatigue tester is additionally provided with warning time delay, and when machine situation occurs delaying in secondary test node, main test node enters and waits pair In the off-mode of test node, when fatigue tester reaches warning delay time, fatigue tester alerts, for different Often test node carries out abnormal DEBUG.
The method that fatigue tester the most according to claim 1 and 2 collocation 4U tool realizes multinode AC test, its feature Being: the described power cut off delay time is 20s, warning delay time is 34min.
CN201610553969.0A 2016-07-14 2016-07-14 The method that fatigue tester collocation 4U tool realizes multinode AC test Pending CN106201797A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610553969.0A CN106201797A (en) 2016-07-14 2016-07-14 The method that fatigue tester collocation 4U tool realizes multinode AC test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610553969.0A CN106201797A (en) 2016-07-14 2016-07-14 The method that fatigue tester collocation 4U tool realizes multinode AC test

Publications (1)

Publication Number Publication Date
CN106201797A true CN106201797A (en) 2016-12-07

Family

ID=57475063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610553969.0A Pending CN106201797A (en) 2016-07-14 2016-07-14 The method that fatigue tester collocation 4U tool realizes multinode AC test

Country Status (1)

Country Link
CN (1) CN106201797A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106649016A (en) * 2016-12-29 2017-05-10 郑州云海信息技术有限公司 Period testing method for alternating-current power supply of 1U2 rack-mounted server
CN107168838A (en) * 2017-05-16 2017-09-15 郑州云海信息技术有限公司 A kind of RAID card Auto-Test System
CN108509304A (en) * 2018-04-08 2018-09-07 郑州云海信息技术有限公司 A kind of server A C, DC testing results system and method
CN109240865A (en) * 2018-09-06 2019-01-18 郑州云海信息技术有限公司 A kind of AC test method, device, terminal and the storage medium of AEP memory
CN109739127A (en) * 2018-12-28 2019-05-10 广东九联科技股份有限公司 A kind of intelligent programming information arrests method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104536875A (en) * 2015-01-16 2015-04-22 浪潮电子信息产业股份有限公司 Automatic server restart testing method based on IPMI
CN105138437A (en) * 2015-08-25 2015-12-09 浪潮电子信息产业股份有限公司 SmartRack multi-node parallel reboot testing method based on fatigue testing machine and 4U fixture

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104536875A (en) * 2015-01-16 2015-04-22 浪潮电子信息产业股份有限公司 Automatic server restart testing method based on IPMI
CN105138437A (en) * 2015-08-25 2015-12-09 浪潮电子信息产业股份有限公司 SmartRack multi-node parallel reboot testing method based on fatigue testing machine and 4U fixture

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106649016A (en) * 2016-12-29 2017-05-10 郑州云海信息技术有限公司 Period testing method for alternating-current power supply of 1U2 rack-mounted server
CN107168838A (en) * 2017-05-16 2017-09-15 郑州云海信息技术有限公司 A kind of RAID card Auto-Test System
CN108509304A (en) * 2018-04-08 2018-09-07 郑州云海信息技术有限公司 A kind of server A C, DC testing results system and method
CN109240865A (en) * 2018-09-06 2019-01-18 郑州云海信息技术有限公司 A kind of AC test method, device, terminal and the storage medium of AEP memory
CN109739127A (en) * 2018-12-28 2019-05-10 广东九联科技股份有限公司 A kind of intelligent programming information arrests method

Similar Documents

Publication Publication Date Title
CN106201797A (en) The method that fatigue tester collocation 4U tool realizes multinode AC test
CN104062967B (en) The method for diagnosing faults of start stop system and device
CN102255774A (en) Test system and test method for switch-on and switch-off of communication device as well as fault location method
CN105067928A (en) Automobile electronic product dark current automatic test method and device
CN103970630A (en) Method for testing overall stability of server
CN104391780A (en) Method for automatically testing stability of redundancy function of power supply of server
CN102341789A (en) Apparatus and method for monitoring a computer system
CN111831498B (en) Power-off test method, device and equipment
CN112198865A (en) Testing method, device and system for MCU low-power mode switching
CN104461664B (en) MCU start-up mode selection circuits
CN103309791A (en) Display device with fault diagnosis function
CN104407950A (en) Novel power-off switching-on and switching-off test method based on program control variable-frequency power supply
US20140122913A1 (en) Debugging device
CN106027171B (en) The test device of wireless communication module
CN104615520A (en) Test method for evaluating startup and shutdown life of server
US9859813B2 (en) Power converter and method for setting the operation and the start-up of a power converter
CN104898070A (en) Power supply test method and device
CN108228373B (en) Chip fault injection detection equipment and method
CN100464192C (en) Method for detecting resetting chip for air conditioner
CN107391324B (en) Test control device and method of storage system
CN206038845U (en) Domestic appliance dry combustion method circuit detection device
CN207908604U (en) A kind of electrical appliance kit detecting system
CN105068021A (en) Switching mode power supply offline fault detection device and system
CN102193609A (en) Setting method for power supply locking and electronic device thereof
CN104749517A (en) Method and device for detecting operation result of relay contact

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207