Tailings Dam percolate pump drainage system and its construction method Download PDFInfo
- Publication number
- CN106193129B CN106193129B CN201610728848.5A CN201610728848A CN106193129B CN 106193129 B CN106193129 B CN 106193129B CN 201610728848 A CN201610728848 A CN 201610728848A CN 106193129 B CN106193129 B CN 106193129B
- Authority
- CN
- China
- Prior art keywords
- storage pool
- percolate
- tailings dam
- dam
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
- Sewage (AREA)
Abstract
The invention discloses a kind of Tailings Dam percolate pump drainage systems, belong to mine capital construction construction field.Tailings Dam percolate pump drainage system provided by the invention includes storage pool, the drainage pipe for being connected with storage pool and radially laying, the water pump being set in storage pool, percolate is collected by the drainage pipe, and it comes together in the storage pool, percolate is discharged by the water pump, the present invention has the advantages that easy for construction, stable structure, of low cost, and solves the problems, such as that percolate is not easy to discharge under Tailings Dam impervious barrier.The invention also discloses a kind of construction methods of Tailings Dam percolate pump drainage system.
Description
Technical field
The present invention relates to a kind of Tailings Dam percolate pump drainage system and its construction methods, belong to mine capital construction construction field.
Background technology
Tailings Dam is to store up metal or non-metal mine tailing or other works by building a dam or exclosure mode is formed
The place of industry waste residue.It is discharged into from ore dressing plant in the tailing of Tailings Dam often containing toxicant or heavy metal ion, contains to avoid
Poisonous and harmful substances polluted underground water must be laid with antiseepage film in Tailings Dam and do Anti-seeping technology.
In reality, the large area antiseepage film of laying in Tailings Dam, it is understood that there may be manufacturing defect, transport is damaged and welding is broken
Bad, cutting damage, ground puncture destruction etc. are a variety of to lead to the factor that antiseepage film leaks, moreover, the mine period of service is longer, oozes
It is more to leak position, percolate is spread from Tailings Dam bottom to deeper inside and Tailings Dam surrounding, inevitably polluted underground water
Body and surrounding enviroment.Therefore, it is necessary to the percolate under film is carried out to collect and outer row in time.Seepage tends to occur at tailing
After accumulation, antiseepage film stress, however, accumulating a large amount of tailing in Tailings Dam, difficulty is brought to percolate pump drainage.
At present, common leakage of leachate detection and pump drainage method are underground water detection method.Underground water detection method is in tail
Setting sump on the outside of the dam body in ore deposit library detects whether antiseepage film leaks simultaneously pump drainage percolate by extracting the water of sump.
However, underground water detection method has the disadvantage that:Due to being arranged on outside library, finding the time of leakage has longer lag;And it sets
The sump quantity put will not be too many, it is impossible to ensure that percolate is bound to flow into sump, and increase sump quantity, expense compared with
It is high.Therefore, it is necessary to the detection of existing effusion and pump drainage method are improved.
Invention content
The main object of the present invention is to provide a kind of Tailings Dam percolate pump drainage system, passes through the drainage pipe of radial setting
Percolate is collected, and is come together in storage pool, is discharged percolate by water pump, solves under Tailings Dam impervious barrier percolate not
The problem easily discharged, and have the advantages that of simple structure and low cost, safe and reliable.Meanwhile the present invention also provides a kind of tails
The construction method of ore deposit library percolate pump drainage system discloses the main points of process control in construction.
For solution more than technical problem, the present invention includes following technical solution:
A kind of Tailings Dam percolate pump drainage system, including,
Storage pool is set under the impervious barrier in the Tailings Dam at hypsography low-lying, is met water slope surface against dam body, to receive
Collect percolate;
Drainage pipe, under the Tailings Dam impervious barrier, one end is connected with the storage pool, and the other end is with the storage pool
Centered on radially lay, be arranged at intervals with inlet opening on the drainage pipe;
Water pump is set in the storage pool, is connect with one end of water pipe, and the water pipe is layed in meeting water for the dam body
In slope surface, the other end extends to dam crest.
Preferably, covered with gravel or rubble on the drainage pipe.
Further, the storage pool is reinforced concrete structure.
Further, the storage pool is pyramidal structure, and bottom is laid with impervious barrier, internal filler particles object.
Preferably, the particulate matter is gravel or rubble.
Preferably, the particulate matter is from bottom to top followed successively by middle sand, gravel or rubble, middle sand.
Further, the Tailings Dam percolate pump drainage system has further included conduit, and the conduit is fixedly installed on the dam
Body meets water in slope surface, and one end is stretched into the storage pool, and the other end extends to the dam crest, and the water pump, water pipe are placed in institute
It states in conduit, inlet opening is provided on the tube wall of the conduit in the storage pool.
Preferably, it is provided with into being enclosed with drainage layer on the tube wall of the conduit of water hole section.
Preferably, covered with impervious barrier on the conduit.
Correspondingly, the present invention also provides a kind of construction method of the Tailings Dam percolate pump drainage system, including such as
Lower step:
S1:Excavate the storage pool foundation pit and the groove needed for the drainage pipe;
S2:It lays the storage pool, be laid with the drainage pipe, and place the water pump, the fixed water pipe;
S3:Impervious barrier is laid with above the drainage pipe and the storage pool.
The present invention due to using the technology described above, is allowed to compared with prior art, have the following advantages that or actively imitate
Fruit:The present invention collects percolate, and come together in storage pool by the drainage pipe of radial setting, is arranged percolate by water pump
Go out, it is easy for construction, stable structure, easy to operate, of low cost, it solves percolate under Tailings Dam impervious barrier and is not easy the difficulty discharged
Topic.
Description of the drawings
Fig. 1 is the floor map of Tailings Dam percolate pump drainage system that first embodiment of the invention provides;
Fig. 2 is along A-A cross-section diagrams in Fig. 1;
Fig. 3 is the floor map of Tailings Dam percolate pump drainage system that second embodiment of the invention provides;
Fig. 4 is along B-B cross-section diagrams in Fig. 3;
Fig. 5 is along C-C cross-section diagrams in Fig. 3;
Fig. 6 is the flow chart of the construction method of Tailings Dam percolate pump drainage system that third embodiment of the invention provides.
Figure label is as follows:
Percolate pump drainage system 100;Storage pool 110;Particulate matter 111;Drainage pipe 120;Water pump 130;Water pipe 131;Antiseepage
Layer 140,141,142;Conduit 150;
Dam body 200;Dam body meets water slope surface 210;Dam crest 220.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to Tailings Dam percolate pump drainage system provided by the invention and its construction party
Method is described in further detail.With reference to following explanation and claims, advantages and features of the invention will become apparent from.It needs to illustrate
, attached drawing using very simplified form and using non-accurate ratio, only to it is convenient, lucidly aid in illustrating this
The purpose of inventive embodiments.
Embodiment one
It please refers to Fig.1 and the plane of Tailings Dam percolate pump drainage system 100 that Fig. 2, wherein Fig. 1 are provided by the present embodiment
Schematic diagram, Fig. 2 are along A-A cross-section diagrams in Fig. 1.The main points of the present invention are described further below in conjunction with Fig. 1, Fig. 2.
Tailings Dam is to intercept the mouth of a valley or exclosure by building a dam and form, after ore selects valuable concentrate through ore dressing plant
" waste residue " is discharged into Tailings Dam.With reference to shown in Fig. 1 and Fig. 2, Tailings Dam percolate pump drainage system 100 includes storage pool 110, row
Ooze pipe 120, water pump 130.Wherein, storage pool 110 is located under the impervious barrier 140 at the low-lying place in bottom of Tailings Dam, and close to dam body
200 bottoms meet water the outside of slope surface 210;Drainage pipe 120 is located under the impervious barrier 140 in Tailings Dam, one end and 110 phase of storage pool
Even, the other end is radially laid centered on storage pool 110, and inlet opening, and drainage pipe are arranged at intervals on drainage pipe 120
120 have certain slope, and storage pool 110 is imported convenient for percolate;Water pump 130 is set in storage pool 110, water pump 130 and water
One end connection of pipe 131, the other end of water pipe 131 extend to dam crest 220.As an example, storage pool 110 therein may be used
In order to increase the bearing capacity of 110 top plate of storage pool, support can also be arranged at intervals in storage pool 110 for reinforced concrete structure
Column or support plate, it might even be possible to which partition wall is set, and partition wall divides storage pool 110 for multiple interconnected pond bodies.In order to preferably
Percolate is collected, covered with gravel or rubble 121 on drainage pipe 120.
The working method of Tailings Dam percolate pump drainage system 100 is:When breakage occurs in the impervious barrier 140 being laid in Tailings Dam
When, the liquid in Tailings Dam is entered by breakage in the soil under impervious barrier 140, with increasing for percolate, percolate trickling
Into the drainage pipe 120 being radially laid with, then it is pooled in storage pool 110, it then will through water pipe 131 by water pump 130
Percolate is extracted out, and then detects the ingredient of percolate.The percolate pump drainage system structure is simple, of low cost, safe and reliable, and
It can be used for a long time.
Water pump 130 is in the long-term use, in fact it could happen that failure, it is therefore desirable to taking-up during pump maintenance be set to lead to
Road.Preferably, as shown in Fig. 2, Tailings Dam percolate pump drainage system 100 is additionally provided with HDPE conduits 150, preferred embodiment
The meeting water in slope surface 210 of dam body 200 is fixed on for, conduit 150, one end is stretched into storage pool 110, and the other end extends to dam crest
220, water pump 130, water pipe 131 may be contained in conduit 150.In repair, water pump 130 can be taken by rope from conduit 150
Go out.In addition, in order to which the percolate in storage pool 110 is made smoothly to enter in conduit 150, conduit 150 in storage pool 110
Inlet opening is provided on tube wall.
Embodiment two
Fig. 3, Fig. 4 and Fig. 5 are please referred to, the plane of Tailings Dam percolate pump drainage system 100 that Fig. 3 the present embodiment is provided is shown
It is intended to, Fig. 4 is Fig. 3 along B-B cross-section diagrams, and Fig. 5 is Fig. 3 along C-C cross-section diagrams.The present embodiment is done below in conjunction with Fig. 3 to Fig. 5 into
One step illustrates.
With reference to Fig. 3 to Fig. 5, and referring to Figures 1 and 2, Tailings Dam percolate pump drainage system 100 is similar with previous embodiment,
Include storage pool 110, drainage pipe 120, water pump 130.And in the set-up mode of conduit 150 and impervious barrier 142 and embodiment one
It is identical.Difference part is:Storage pool 110 is centrum shape, and up big and down small, 110 bottom of storage pool is equipped with impervious barrier 141, is prevented
The junction sealed set of infiltration layer 141 and the impervious barrier 140 of Tailings Dam bottom, central filler particulate matter 111, particulate matter 111 was both
It can play a supporting role to the impervious barrier 140 and tailing on top, while the gap between particulate matter 111 can accommodate diafiltration again
Liquid.
Storage pool 110 is formed by being laid with impervious barrier 141 and filler particles object 111 in the present embodiment, easy for construction, cost
It is cheap;Conduit 150 is set, so as to which water pump 130 is taken out by rope, facilitates pump maintenance, while water pump can also be protected
130 and water pipe 131.
Particulate matter 111 is rubble or gravel.In order not to pierce through impervious barrier 140,141, preferred embodiment is particulate matter
111 are from bottom to top followed successively by middle sand, gravel or rubble, middle sand.I.e. between impervious barrier 140,141 and rubble or gravel, it is all provided with
Middle sand is equipped with, so as to play the role of protecting impervious barrier 140,141.
Impervious barrier 140 and 150 junction of conduit, need to carry out seal approach, can use gluing knot.Preferred embodiment
To cover impervious barrier 142 on conduit 150 up to the junction sealed set between dam crest 220, impervious barrier 140,142.In this way may be used
Entered in storage pool 110 with the outer surface of liquid along conduit 150 effectivelying prevent in Tailings Dam.
It, can be to water pump 130 after if the middle sand or rubble in storage pool 110 enter conduit 150 by the inlet opening on conduit 150
It damages, accordingly, it is preferred that embodiment is, is provided with into drainage layer is covered on the conduit 150 of water hole section, drainage layer can be
The tiny braided fabric of geotextiles or gap, filters the percolate in storage pool 110, prevents particulate matter 111 from entering conduit 150, from
And protect water pump 130.
Embodiment three
Referring to Fig. 6, Fig. 6 is the flow chart of the construction method of Tailings Dam percolate pump drainage system provided in this embodiment.
With reference to Fig. 1 to Fig. 6, the construction method of 6 pairs of Tailings Dam percolate pump drainage systems is described further.The construction method includes as follows
Step:
S1:Groove needed for the excavation foundation pit of storage pool 110 and drainage pipe 120.At the low-lying place in the bottom of Tailings Dam, and
The foundation pit of storage pool 110 is excavated in the outside for the slope surface 210 that meets water close to 200 bottom of dam body.120 one end of drainage pipe and storage pool 110
It is connected, the other end is radially laid centered on storage pool 110, and therefore, the groove of drainage pipe 120 is also with storage pool 110
Center is radially laid, and is connected with storage pool Ji110Keng.
S2:Storage pool 110 and drainage pipe 120 are set, and place water pump 130, water pipe 131.
When storage pool 110 is reinforced concrete structure, after excavation pit, it can pour and deposit by formwork erection, cast-in-place mode
Prefabricated storage pool 110 can be also directly placed into foundation pit by reservoir 110.Then drainage pipe 110 is laid with, water pump 130 is placed, is fixed
Water pipe 131, and drainage pipe 120 is laid, rubble or gravel are filled in 120 groove of drainage pipe.When being provided with conduit 150, also
Lay conduit 150.
When storage pool 110 is made of impervious barrier 141 and particulate matter 111, leveling first is carried out to foundation pit, is then laid with
Bottom impervious barrier 141, setting water pump 110, fixed water pipe 131, filler particles object 111, and drainage pipe 120 is laid, in drainage pipe
Rubble or gravel are filled in 120 grooves.
S3:Impervious barrier 140 is laid with above drainage pipe 120 and storage pool 110.Impervious barrier 142 is set outside conduit 150
When, and it is laid with impervious barrier 142 together.In the present invention, the raw material of impervious barrier 140,141,142 can be:Concrete-polymer, drip
Blueness-polymer, synthetic rubber and thermoplastic plastic's film etc..Wherein, thermoplastic plastic's film can be:Polyvinyl chloride (PVC), chlorine sulphonyl
Change polyethylene (Hypalon), haloflex (CPE), plasticized polyolefin (EP) and high density polyethylene (HDPE) (HDPE) etc..Thermoplasticity
The laying of plastic film bed course should extend from bottom to a high position, not easy-to-draw too tight, should there are 1%~2% remaining width, in case part
Sink to stretching, adjacent two width should overlap more than 1m.
In conclusion in technical solution disclosed by the invention, drainage pipe 120 is radially laid in Tailings Dam, it can be with
The percolate leaked out to by the impervious barrier 140 of Tailings Dam in soil is effectively collected, and percolate is collected to connected storage pool
In 110, by 130 pump drainage of water pump to the scheduled region of dam crest, so as to fulfill the detection to percolate and pump drainage, simple in structure,
It is of low cost, safe and reliable.The invention also discloses the storage pools 110 of multiple structural forms, and it is prefabricated that armored concrete can be used
Part reduces site operation amount;The form of setting impervious barrier 141, filler particles object 111 can also be used, gather materials on the spot, is at low cost
It is honest and clean.In the present invention, by setting conduit 150, protection water pump 130, water pipe 131, at the same can also when water pump 130 needs repairing,
As the channel for taking out water pump 130.The invention also discloses the construction method of Tailings Dam percolate pump drainage system, construction is succinct,
Main points are apparent.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair
Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims
Range.
Claims (4)
1. a kind of Tailings Dam percolate pump drainage system, which is characterized in that including,
Storage pool is set under the impervious barrier in the Tailings Dam at hypsography low-lying, is met water slope surface against dam body, is oozed to collect
Filtrate;The storage pool is reinforced concrete structure;Partition wall is set in the storage pool, and the storage pool is divided by the partition wall
Multiple interconnected pond bodies;
Drainage pipe, under the Tailings Dam impervious barrier, one end is connected with the storage pool, and the other end is using the storage pool in
The heart is radially laid, and inlet opening is arranged at intervals on the drainage pipe;
Water pump is set in the storage pool, is connect with one end of water pipe, and the water pipe is layed in the slope surface that meets water of the dam body
On, the other end extends to dam crest;
Wherein, the Tailings Dam percolate pump drainage system has further included conduit, and the conduit is fixedly installed on the dam body and meets water
In slope surface, one end is stretched into the storage pool, and the other end extends to the dam crest, and the water pump, water pipe are placed in the conduit,
Inlet opening is provided on the tube wall of the conduit in the storage pool;It is provided with the tube wall into the conduit of water hole section
On be enclosed with drainage layer.
2. Tailings Dam percolate pump drainage system as described in claim 1, which is characterized in that covered with gravel on the drainage pipe
Or rubble.
3. Tailings Dam percolate pump drainage system as described in claim 1, which is characterized in that covered with antiseepage on the conduit
Layer.
4. the construction method of the Tailings Dam percolate pump drainage system as described in claims 1 to 3 is any, which is characterized in that including
Following steps:
S1:The storage pool foundation pit and the groove needed for the drainage pipe are excavated, the groove is centered on the storage pool
Radially lay;
S2:It lays the storage pool, be laid with the drainage pipe, fixed catheter, and the water pump, fixation are placed in the conduit
The water pipe;
S3:Impervious barrier is laid with above the drainage pipe and the storage pool.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610728848.5A CN106193129B (en) | 2016-08-26 | 2016-08-26 | Tailings Dam percolate pump drainage system and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610728848.5A CN106193129B (en) | 2016-08-26 | 2016-08-26 | Tailings Dam percolate pump drainage system and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106193129A CN106193129A (en) | 2016-12-07 |
CN106193129B true CN106193129B (en) | 2018-06-19 |
Family
ID=57525061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610728848.5A Active CN106193129B (en) | 2016-08-26 | 2016-08-26 | Tailings Dam percolate pump drainage system and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106193129B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114451092A (en) * | 2022-02-24 | 2022-05-10 | 昆明理工大学 | Method for constructing and greening copper tailing pond in arid region |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08333793A (en) * | 1995-06-08 | 1996-12-17 | Ohbayashi Corp | Alarm type drainage construction method |
CN202099865U (en) * | 2010-12-24 | 2012-01-04 | 天津合佳威立雅环境服务有限公司 | Leachate drainage system for hazardous waste safety landfill |
CN103266633A (en) * | 2013-06-04 | 2013-08-28 | 贵州遵义汇兴铁合金有限责任公司 | Seepage-proof sewage discharging and floodwater draining method for tailing reservoir in wet metallurgy |
CN104831758A (en) * | 2015-05-06 | 2015-08-12 | 河海大学 | Tailing piling and storing system and method for reducing environment pollution |
CN205100358U (en) * | 2015-11-20 | 2016-03-23 | 中国电建集团贵阳勘测设计研究院有限公司 | Tailing storehouse ditch structure of drainning off floodwaters of closing |
CN206090641U (en) * | 2016-08-26 | 2017-04-12 | 上海外经集团控股有限公司 | Tailing storehouse filtration liquid extraction system |
-
2016
- 2016-08-26 CN CN201610728848.5A patent/CN106193129B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08333793A (en) * | 1995-06-08 | 1996-12-17 | Ohbayashi Corp | Alarm type drainage construction method |
CN202099865U (en) * | 2010-12-24 | 2012-01-04 | 天津合佳威立雅环境服务有限公司 | Leachate drainage system for hazardous waste safety landfill |
CN103266633A (en) * | 2013-06-04 | 2013-08-28 | 贵州遵义汇兴铁合金有限责任公司 | Seepage-proof sewage discharging and floodwater draining method for tailing reservoir in wet metallurgy |
CN104831758A (en) * | 2015-05-06 | 2015-08-12 | 河海大学 | Tailing piling and storing system and method for reducing environment pollution |
CN205100358U (en) * | 2015-11-20 | 2016-03-23 | 中国电建集团贵阳勘测设计研究院有限公司 | Tailing storehouse ditch structure of drainning off floodwaters of closing |
CN206090641U (en) * | 2016-08-26 | 2017-04-12 | 上海外经集团控股有限公司 | Tailing storehouse filtration liquid extraction system |
Also Published As
Publication number | Publication date |
---|---|
CN106193129A (en) | 2016-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109441535A (en) | A kind of tunnel waterproof and water drainage system and its construction method | |
US8337121B2 (en) | Process for in-ground water collection | |
BG63951B1 (en) | Embankment dam and hydroinsulation method | |
DE3706869A1 (en) | METHOD FOR MONITORING AND, IF REQUIRED, REPAIRING LEAKAGE AT LANDFILLS | |
CN106703085B (en) | A kind of aqueous vapor collection system and its working method in Polluted Soil isolation | |
CN110029690B (en) | Percolate leakage detection and collection structure and construction method thereof | |
CN206346233U (en) | A kind of contaminated site vertical isolation repair system | |
CN109488371B (en) | Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method | |
US11560686B2 (en) | Membrane-lined wall | |
CN109848167A (en) | Hazardous waste rigidity landfill system and hazardous waste have bad luck system | |
US5480260A (en) | Ground water collection method and apparatus | |
KR20000016216A (en) | System and method for blocking leachate by using diving back flow tank | |
CN112681395A (en) | Refuse landfill with seepage-proofing function | |
CN206090641U (en) | Tailing storehouse filtration liquid extraction system | |
CN106193129B (en) | Tailings Dam percolate pump drainage system and its construction method | |
CN109235505A (en) | Three-dimensional environmental protection complex ecological closing structure | |
CN110029632A (en) | A kind of storage of general industrial solid waste, disposition field structure and its construction method | |
RU2539456C2 (en) | Multi-layer hydraulic insulation of underground structure (device by p.b. yurkevich) | |
CN112523264A (en) | High and steep slope seepage prevention system and laying method thereof | |
CN114733890B (en) | Underground water restoration and monitoring channel structure in landfill area | |
CN216965781U (en) | Landfill area groundwater is restoreed and is monitored access structure | |
CN202969419U (en) | Efficient anti-seepage structure system for liquid chemical storage tank area | |
KR100641069B1 (en) | Apparatus for Channelling Groundwater and The Method Therefor | |
CN210086317U (en) | Leachate leakage detection collection structure | |
CN209935492U (en) | Dangerous waste rigid landfill system and dangerous waste transportation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |