CN206346233U - A kind of contaminated site vertical isolation repair system - Google Patents

A kind of contaminated site vertical isolation repair system Download PDF

Info

Publication number
CN206346233U
CN206346233U CN201621414741.5U CN201621414741U CN206346233U CN 206346233 U CN206346233 U CN 206346233U CN 201621414741 U CN201621414741 U CN 201621414741U CN 206346233 U CN206346233 U CN 206346233U
Authority
CN
China
Prior art keywords
isolation barrier
vertical isolation
vertical
barrier
repair system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621414741.5U
Other languages
Chinese (zh)
Inventor
李韬
沈超
沈婷婷
冯凯
陈展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Survey Design And Research Institute Group Co ltd
Original Assignee
Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Geotechnical Investigations and Design Institute Co Ltd filed Critical Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority to CN201621414741.5U priority Critical patent/CN206346233U/en
Application granted granted Critical
Publication of CN206346233U publication Critical patent/CN206346233U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a kind of contaminated site vertical isolation repair system, it includes vertical isolation barrier and groundwater monitoring well;The vertical isolation barrier is circumferentially positioned inside the soil layer on the outside of Polluted area;Soil layer on the outside of the vertical isolation barrier is internally provided with reinforcement isolation barrier;The groundwater monitoring well is arranged on inside the region that the reinforcement isolation barrier is surrounded with the vertical isolation barrier.The utility model has the advantages that, the pollutant that vertical isolation barrier can effectively isolate inside Polluted area;The reliability of vertical isolation barrier can be further enhanced by strengthening isolation barrier combination groundwater monitoring well;Groundwater monitoring well can effectively monitor the whether contaminated thing of vertical isolation barrier and puncture, and carry out repairing and treating to puncture place.

Description

A kind of contaminated site vertical isolation repair system
Technical field
The utility model is related to environmental geotechnical technical field, and in particular to a kind of contaminated site vertical isolation reparation system System.
Background technology
Isolation sealing technique mainly uses engineering measure to seal pollutant in situ up for safekeeping, cuts off route of exposure, and limitation is dirty Contaminate thing migration, reduction or the exposure for eliminating pollutant, protection acceptor safety.As a kind of ripe pollution control technology, The technology is at home and abroad widely used, to it is different types of pollution all have preferable risk control effect, with into This is low, short construction period the advantages of.According to domestic and international existing engineering experience, isolation closing measure construction process requirement is high, and one Denier starts a leak, then whole isolation closed system failure, and pollutant easily spreads, therefore need to be to vertical isolation screen effect, top layer Coverage effect sets up risk management and control measure, carries out related prediction scheme, and set up effective monitoring system, it is ensured that isolation closing measure Long-term effectiveness.
The content of the invention
The purpose of this utility model is according to there is provided a kind of contaminated site vertical isolation in place of above-mentioned the deficiencies in the prior art Repair system, the system is using groundwater monitoring well and is strengthening isolation barrier, to reach that increase vertical isolation barrier is reliable The purpose of property.
The utility model purpose is realized and completed by following technical scheme:
A kind of contaminated site vertical isolation repair system, it includes vertical isolation barrier and groundwater monitoring well;It is described Vertical isolation barrier is circumferentially positioned inside the soil layer on the outside of Polluted area;Inside the soil layer on the outside of the vertical isolation barrier It is provided with reinforcement isolation barrier;The groundwater monitoring well is arranged on the reinforcement isolation barrier and enclosed with the vertical isolation barrier Into region inside.
The vertical isolation barrier is any in cement mixing method, steel sheet-pile wall, high-pressure rotary-spray piling wall or flexible membrane It is a kind of;The bottom buried depth of the vertical isolation barrier is more than the distributed depth of the Polluted area internal contamination thing.
The reinforcement isolation barrier is any in cement mixing method, steel sheet-pile wall, high-pressure rotary-spray piling wall or flexible membrane It is a kind of;The bottom buried depth for strengthening isolation barrier is more than the distributed depth of the Polluted area internal contamination thing.
The groundwater monitoring well is connected with aspirator and injection device.
The groundwater monitoring well includes well casing and the screen pipe installed in the well casing bottom.
The utility model has the advantages that, the pollutant that vertical isolation barrier can effectively isolate inside Polluted area;Plus Strong isolation barrier combination groundwater monitoring well can further enhance the reliability of vertical isolation barrier;Groundwater monitoring well can be with The effectively whether contaminated thing of monitoring vertical isolation barrier punctures, and carries out repairing and treating to puncture place.
Brief description of the drawings
Fig. 1 is vertical isolation barrier and the top view of reinforcement isolation barrier in the utility model;
Fig. 2 is groundwater monitoring well sectional view in the utility model.
Embodiment
Feature of the present utility model and other correlated characteristics are made further specifically by embodiment below in conjunction with accompanying drawing It is bright, in order to the understanding of technical staff of the same trade:
Mark 1-6 is respectively in such as Fig. 1-2, figure:Vertical isolation barrier 1, groundwater monitoring well 2, Polluted area 3, reinforcement Isolation barrier 4, well casing 5, screen pipe 6.
Embodiment:As shown in Figure 1-2, the present embodiment is specifically related to a kind of contaminated site vertical isolation repair system, and it is wrapped Include vertical isolation barrier 1 and groundwater monitoring well 2;Vertical isolation barrier 1 is circumferentially positioned in the soil layer in the outside of Polluted area 3 Portion;Major pollutants inside Polluted area 3 are insecticide, bactericide, herbicide, toluene, anhydrous isopropyl alcohol, dichloromethane, Methanol, mixed ester etc..Found by Investigation on Pollution, the pollutant distribution depth inside Polluted area 3 is maximum in 8m or so Depth of investigation is in 14m-18m or so.
As shown in figure 1, vertical isolation barrier 1 can be cement mixing method, steel sheet-pile wall, high-pressure rotary-spray piling wall or flexibility Any one in film, the bottom buried depth of vertical isolation barrier 1 is more than the distributed depth of the internal contamination thing of Polluted area 3;At this In embodiment, the use dual spindle soil-cement mixing pile of vertical isolation barrier 1, stake footpath φ 700 mm, adjacent studs lap of splice 200mm, Cement mixed weight 15%, cement preferably uses strength grade P.0 42.5 grades of Portland cement, the depth of vertical isolation barrier 1 For 15m.
As shown in figure 1, when the periphery of Polluted area 3 has important Architectural Equipment or during i.e. by building constructions, can hang down The outside of the straight relevant position of isolation barrier 1, which is set, strengthens isolation barrier 4;Strengthen isolation barrier 4 to be arranged on inside soil layer;Underground water Monitoring well 2 is arranged on vertical isolation barrier 1 with strengthening inside the region that isolation barrier 4 is surrounded;In the present embodiment, Polluted area 3 east side is river, and river east side is proposed to set primary school, to prevent the construction of the large area earthing of Polluted area 3 to place east side river Adversely affect and the effective hydraulic connection in barrier Polluted area 3 and river course, vertical isolation barrier 1 close to river course side Side, which is set, strengthens isolation barrier 4, and vertical isolation barrier 1 and the spacing strengthened between isolation barrier 4 are 2m, and remaining parameter is ibid. Vertical isolation barrier 1 is laid with groundwater monitoring well 2 with strengthening in the region that encloses of isolation barrier 4, well spacing 40m, well depth and The greatest contamination depth that filtering pipeline section depth is put according to well location is determined.
As shown in figure 1, the segment boundary of Polluted area 3 is provided with vertical isolation barrier 1 with strengthening isolation barrier 4, vertically Isolation barrier 1 can combine bearing load with the function of antiseepage dash with strengthening isolation barrier 4, make while having The divider wall of stress and impervious two kinds of functions;Vertical isolation barrier 1 can be not only used for riverbank with strengthening isolation barrier 4 in this engineering Slope retaining, can play a part of pollutant isolation again.
As shown in Fig. 2 in the present embodiment, groundwater monitoring well 2 includes the well casing 5 vertically set and is arranged on The screen pipe 6 of the bottom of well casing 5.Groundwater monitoring well 2 is also associated with aspirator and injection device.
As shown in figure 1, in routine maintenance procedure, being periodically monitored to groundwater monitoring well 2;If close to Polluted area Vertical isolation barrier 1 be damaged, pollutant to vertical isolation barrier 1 and strengthen isolation barrier 4 between region seepage, profit With groundwater monitoring well 2 using extracting underground water and the timely repair process of method of injection, and to being contaminated what thing punctured Vertical isolation barrier 1 is repaired.In monitoring and repair process, each groundwater monitoring well 2 can be independent in suction or injection Operation also can many wells pass through conduit attended operation.
The present embodiment has the beneficial effect that:The pollutant that vertical isolation barrier can effectively isolate inside Polluted area; The reliability of vertical isolation barrier can be further enhanced by strengthening isolation barrier combination groundwater monitoring well;Groundwater monitoring well can Punctured with effectively monitoring the whether contaminated thing of vertical isolation barrier, and repairing and treating is carried out to puncture place.

Claims (5)

1. a kind of contaminated site vertical isolation repair system, it is characterised in that:Including vertical isolation barrier and groundwater monitoring Well;The vertical isolation barrier is circumferentially positioned inside the soil layer on the outside of Polluted area;On the outside of the vertical isolation barrier Soil layer is internally provided with reinforcement isolation barrier;The groundwater monitoring well be arranged on it is described reinforcement isolation barrier with it is described it is vertical every Inside the region that off screen barrier is surrounded.
2. a kind of contaminated site vertical isolation repair system according to claim 1, it is characterised in that:The vertical isolation Barrier is any one in cement mixing method, steel sheet-pile wall, high-pressure rotary-spray piling wall or flexible membrane;The vertical isolation barrier Bottom buried depth be more than the Polluted area internal contamination thing distributed depth.
3. a kind of contaminated site vertical isolation repair system according to claim 1, it is characterised in that:It is described to strengthen isolation Barrier is any one in cement mixing method, steel sheet-pile wall, high-pressure rotary-spray piling wall or flexible membrane;The reinforcement isolation barrier Bottom buried depth be more than the Polluted area internal contamination thing distributed depth.
4. a kind of contaminated site vertical isolation repair system according to claim 1, it is characterised in that:The underground water prison Well logging is connected with aspirator and injection device.
5. a kind of contaminated site vertical isolation repair system according to claim 1, it is characterised in that:The underground water prison Well logging includes well casing and the screen pipe installed in the well casing bottom.
CN201621414741.5U 2016-12-22 2016-12-22 A kind of contaminated site vertical isolation repair system Active CN206346233U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621414741.5U CN206346233U (en) 2016-12-22 2016-12-22 A kind of contaminated site vertical isolation repair system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621414741.5U CN206346233U (en) 2016-12-22 2016-12-22 A kind of contaminated site vertical isolation repair system

Publications (1)

Publication Number Publication Date
CN206346233U true CN206346233U (en) 2017-07-21

Family

ID=59322002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621414741.5U Active CN206346233U (en) 2016-12-22 2016-12-22 A kind of contaminated site vertical isolation repair system

Country Status (1)

Country Link
CN (1) CN206346233U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107653915A (en) * 2017-09-27 2018-02-02 上海岩土工程勘察设计研究院有限公司 Suitable for the vertical isolation barrier design method of soft clay area
CN107687175A (en) * 2017-09-27 2018-02-13 浙江大学 The vertical antifouling isolation wall construction of both sides ground local stiffening type and method
CN108480373A (en) * 2018-03-27 2018-09-04 中交天航环保工程有限公司 A kind of contaminated sites source blocking method
CN110374143A (en) * 2019-05-24 2019-10-25 中节能大地环境修复有限公司 A kind of antiseepage barrier wall and its construction method
CN110397089A (en) * 2019-06-10 2019-11-01 上海勘察设计研究院(集团)有限公司 A kind of setting method of the multiple vertical isolation barrier of contaminated site
CN112302057A (en) * 2020-09-30 2021-02-02 南京格洛特环境工程股份有限公司 Construction method for integral separation of polluted land
CN116770901A (en) * 2023-08-14 2023-09-19 水利部交通运输部国家能源局南京水利科学研究院 Double-layer vertical partition wall structure of polluted site and active regulation and control method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107653915A (en) * 2017-09-27 2018-02-02 上海岩土工程勘察设计研究院有限公司 Suitable for the vertical isolation barrier design method of soft clay area
CN107687175A (en) * 2017-09-27 2018-02-13 浙江大学 The vertical antifouling isolation wall construction of both sides ground local stiffening type and method
CN107653915B (en) * 2017-09-27 2020-01-14 上海勘察设计研究院(集团)有限公司 Vertical isolation barrier design method suitable for soft soil area
CN108480373A (en) * 2018-03-27 2018-09-04 中交天航环保工程有限公司 A kind of contaminated sites source blocking method
CN110374143A (en) * 2019-05-24 2019-10-25 中节能大地环境修复有限公司 A kind of antiseepage barrier wall and its construction method
CN110397089A (en) * 2019-06-10 2019-11-01 上海勘察设计研究院(集团)有限公司 A kind of setting method of the multiple vertical isolation barrier of contaminated site
CN110397089B (en) * 2019-06-10 2020-12-08 上海勘察设计研究院(集团)有限公司 Method for setting multiple vertical isolation barriers in polluted site
CN112302057A (en) * 2020-09-30 2021-02-02 南京格洛特环境工程股份有限公司 Construction method for integral separation of polluted land
CN116770901A (en) * 2023-08-14 2023-09-19 水利部交通运输部国家能源局南京水利科学研究院 Double-layer vertical partition wall structure of polluted site and active regulation and control method

Similar Documents

Publication Publication Date Title
CN206346233U (en) A kind of contaminated site vertical isolation repair system
US9732590B2 (en) Detection and collection system for fugitive gases and effluent liquids leaking from around drilled wellheads
US9777881B2 (en) Polymer composite grouting method for blocking leaking and sand inrush of underground pipelines
CN106703085B (en) A kind of aqueous vapor collection system and its working method in Polluted Soil isolation
CN106284314A (en) Karst landform spiral-digging pore cast-in-place pile construction method
CN106734178A (en) Comprehensive restoration system and method for polluted site
CN111156006A (en) Construction method for shield underpass of dangerous pipeline
CN102433886A (en) Construction method for adding water lowering well in water collecting well
CN110586606A (en) Dangerous waste rigid landfill pool
CN117626947A (en) Construction method of rotary drilling bored concrete pile
CN109577337A (en) The construction method of deep foundation ditch of flowing line
CN206477365U (en) A kind of intensive aqueous vapor collection system in the isolation for Polluted Soil
CN202108045U (en) Sleeve pipe with anchor rod penetrating through underground continuous wall
CN110159866B (en) Construction method for reinforcing and reinforcing buried steel pipe
CN216965781U (en) Landfill area groundwater is restoreed and is monitored access structure
CN102296618A (en) Sleeve with anchor rod penetrating through diaphragm wall
CN114733890A (en) Underground water restoration and monitoring channel structure for landfill area
CN114855822A (en) Construction method for deep foundation pit of rain sewage pipeline on highway
CN209353360U (en) The anti-floating drainage arrangement of basement structure
CN110756570A (en) Subsurface excavation remediation method for deep polluted soil
CN206346231U (en) A kind of well formula aqueous vapor collection system in the isolation for Polluted Soil
CN206346232U (en) Monitoring well and film attachment structure in a kind of isolation for Polluted Soil
CN112302057A (en) Construction method for integral separation of polluted land
CN206346230U (en) A kind of periphery laying type aqueous vapor collection system in the isolation for Polluted Soil
CN210010292U (en) Isolation structure for preventing transverse migration of landfill gas in simple refuse landfill

Legal Events

Date Code Title Description
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 200032 18, building 681, Xiao Mu Qiao Road, Xuhui District, Shanghai.

Patentee after: Shanghai Survey, Design and Research Institute (Group) Co.,Ltd.

Country or region after: China

Address before: 200032, 18th Floor, No. 681 Xiaomuqiao Road, Xuhui District, Shanghai

Patentee before: SHANGHAI GEOTECHNICAL INVESTIGATIONS & DESIGN INSTITUTE Co.,Ltd.

Country or region before: China