CN206346233U - A kind of contaminated site vertical isolation repair system - Google Patents
A kind of contaminated site vertical isolation repair system Download PDFInfo
- Publication number
- CN206346233U CN206346233U CN201621414741.5U CN201621414741U CN206346233U CN 206346233 U CN206346233 U CN 206346233U CN 201621414741 U CN201621414741 U CN 201621414741U CN 206346233 U CN206346233 U CN 206346233U
- Authority
- CN
- China
- Prior art keywords
- isolation barrier
- vertical isolation
- vertical
- barrier
- repair system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000002955 isolation Methods 0.000 title claims abstract description 88
- 230000008439 repair process Effects 0.000 title claims abstract description 13
- 230000004888 barrier function Effects 0.000 claims abstract description 72
- 238000012544 monitoring process Methods 0.000 claims abstract description 29
- 239000003673 groundwater Substances 0.000 claims abstract description 24
- 230000002787 reinforcement Effects 0.000 claims abstract description 10
- 239000002689 soil Substances 0.000 claims abstract description 8
- 238000000034 method Methods 0.000 claims description 9
- 239000004568 cement Substances 0.000 claims description 8
- 238000011109 contamination Methods 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 238000002347 injection Methods 0.000 claims description 5
- 239000007924 injection Substances 0.000 claims description 5
- 239000007921 spray Substances 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 239000012528 membrane Substances 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 239000003344 environmental pollutant Substances 0.000 abstract description 10
- 231100000719 pollutant Toxicity 0.000 abstract description 10
- 238000005728 strengthening Methods 0.000 abstract description 9
- YMWUJEATGCHHMB-UHFFFAOYSA-N Dichloromethane Chemical compound ClCCl YMWUJEATGCHHMB-UHFFFAOYSA-N 0.000 description 3
- KFZMGEQAYNKOFK-UHFFFAOYSA-N Isopropanol Chemical compound CC(C)O KFZMGEQAYNKOFK-UHFFFAOYSA-N 0.000 description 3
- OKKJLVBELUTLKV-UHFFFAOYSA-N Methanol Chemical compound OC OKKJLVBELUTLKV-UHFFFAOYSA-N 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000011835 investigation Methods 0.000 description 2
- 239000011398 Portland cement Substances 0.000 description 1
- YXFVVABEGXRONW-UHFFFAOYSA-N Toluene Chemical compound CC1=CC=CC=C1 YXFVVABEGXRONW-UHFFFAOYSA-N 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000000844 anti-bacterial effect Effects 0.000 description 1
- 239000003899 bactericide agent Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 150000002148 esters Chemical class 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 230000002363 herbicidal effect Effects 0.000 description 1
- 239000004009 herbicide Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000002917 insecticide Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000012954 risk control Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Landscapes
- Processing Of Solid Wastes (AREA)
Abstract
The utility model discloses a kind of contaminated site vertical isolation repair system, it includes vertical isolation barrier and groundwater monitoring well;The vertical isolation barrier is circumferentially positioned inside the soil layer on the outside of Polluted area;Soil layer on the outside of the vertical isolation barrier is internally provided with reinforcement isolation barrier;The groundwater monitoring well is arranged on inside the region that the reinforcement isolation barrier is surrounded with the vertical isolation barrier.The utility model has the advantages that, the pollutant that vertical isolation barrier can effectively isolate inside Polluted area;The reliability of vertical isolation barrier can be further enhanced by strengthening isolation barrier combination groundwater monitoring well;Groundwater monitoring well can effectively monitor the whether contaminated thing of vertical isolation barrier and puncture, and carry out repairing and treating to puncture place.
Description
Technical field
The utility model is related to environmental geotechnical technical field, and in particular to a kind of contaminated site vertical isolation reparation system
System.
Background technology
Isolation sealing technique mainly uses engineering measure to seal pollutant in situ up for safekeeping, cuts off route of exposure, and limitation is dirty
Contaminate thing migration, reduction or the exposure for eliminating pollutant, protection acceptor safety.As a kind of ripe pollution control technology,
The technology is at home and abroad widely used, to it is different types of pollution all have preferable risk control effect, with into
This is low, short construction period the advantages of.According to domestic and international existing engineering experience, isolation closing measure construction process requirement is high, and one
Denier starts a leak, then whole isolation closed system failure, and pollutant easily spreads, therefore need to be to vertical isolation screen effect, top layer
Coverage effect sets up risk management and control measure, carries out related prediction scheme, and set up effective monitoring system, it is ensured that isolation closing measure
Long-term effectiveness.
The content of the invention
The purpose of this utility model is according to there is provided a kind of contaminated site vertical isolation in place of above-mentioned the deficiencies in the prior art
Repair system, the system is using groundwater monitoring well and is strengthening isolation barrier, to reach that increase vertical isolation barrier is reliable
The purpose of property.
The utility model purpose is realized and completed by following technical scheme:
A kind of contaminated site vertical isolation repair system, it includes vertical isolation barrier and groundwater monitoring well;It is described
Vertical isolation barrier is circumferentially positioned inside the soil layer on the outside of Polluted area;Inside the soil layer on the outside of the vertical isolation barrier
It is provided with reinforcement isolation barrier;The groundwater monitoring well is arranged on the reinforcement isolation barrier and enclosed with the vertical isolation barrier
Into region inside.
The vertical isolation barrier is any in cement mixing method, steel sheet-pile wall, high-pressure rotary-spray piling wall or flexible membrane
It is a kind of;The bottom buried depth of the vertical isolation barrier is more than the distributed depth of the Polluted area internal contamination thing.
The reinforcement isolation barrier is any in cement mixing method, steel sheet-pile wall, high-pressure rotary-spray piling wall or flexible membrane
It is a kind of;The bottom buried depth for strengthening isolation barrier is more than the distributed depth of the Polluted area internal contamination thing.
The groundwater monitoring well is connected with aspirator and injection device.
The groundwater monitoring well includes well casing and the screen pipe installed in the well casing bottom.
The utility model has the advantages that, the pollutant that vertical isolation barrier can effectively isolate inside Polluted area;Plus
Strong isolation barrier combination groundwater monitoring well can further enhance the reliability of vertical isolation barrier;Groundwater monitoring well can be with
The effectively whether contaminated thing of monitoring vertical isolation barrier punctures, and carries out repairing and treating to puncture place.
Brief description of the drawings
Fig. 1 is vertical isolation barrier and the top view of reinforcement isolation barrier in the utility model;
Fig. 2 is groundwater monitoring well sectional view in the utility model.
Embodiment
Feature of the present utility model and other correlated characteristics are made further specifically by embodiment below in conjunction with accompanying drawing
It is bright, in order to the understanding of technical staff of the same trade:
Mark 1-6 is respectively in such as Fig. 1-2, figure:Vertical isolation barrier 1, groundwater monitoring well 2, Polluted area 3, reinforcement
Isolation barrier 4, well casing 5, screen pipe 6.
Embodiment:As shown in Figure 1-2, the present embodiment is specifically related to a kind of contaminated site vertical isolation repair system, and it is wrapped
Include vertical isolation barrier 1 and groundwater monitoring well 2;Vertical isolation barrier 1 is circumferentially positioned in the soil layer in the outside of Polluted area 3
Portion;Major pollutants inside Polluted area 3 are insecticide, bactericide, herbicide, toluene, anhydrous isopropyl alcohol, dichloromethane,
Methanol, mixed ester etc..Found by Investigation on Pollution, the pollutant distribution depth inside Polluted area 3 is maximum in 8m or so
Depth of investigation is in 14m-18m or so.
As shown in figure 1, vertical isolation barrier 1 can be cement mixing method, steel sheet-pile wall, high-pressure rotary-spray piling wall or flexibility
Any one in film, the bottom buried depth of vertical isolation barrier 1 is more than the distributed depth of the internal contamination thing of Polluted area 3;At this
In embodiment, the use dual spindle soil-cement mixing pile of vertical isolation barrier 1, stake footpath φ 700 mm, adjacent studs lap of splice 200mm,
Cement mixed weight 15%, cement preferably uses strength grade P.0 42.5 grades of Portland cement, the depth of vertical isolation barrier 1
For 15m.
As shown in figure 1, when the periphery of Polluted area 3 has important Architectural Equipment or during i.e. by building constructions, can hang down
The outside of the straight relevant position of isolation barrier 1, which is set, strengthens isolation barrier 4;Strengthen isolation barrier 4 to be arranged on inside soil layer;Underground water
Monitoring well 2 is arranged on vertical isolation barrier 1 with strengthening inside the region that isolation barrier 4 is surrounded;In the present embodiment, Polluted area
3 east side is river, and river east side is proposed to set primary school, to prevent the construction of the large area earthing of Polluted area 3 to place east side river
Adversely affect and the effective hydraulic connection in barrier Polluted area 3 and river course, vertical isolation barrier 1 close to river course side
Side, which is set, strengthens isolation barrier 4, and vertical isolation barrier 1 and the spacing strengthened between isolation barrier 4 are 2m, and remaining parameter is ibid.
Vertical isolation barrier 1 is laid with groundwater monitoring well 2 with strengthening in the region that encloses of isolation barrier 4, well spacing 40m, well depth and
The greatest contamination depth that filtering pipeline section depth is put according to well location is determined.
As shown in figure 1, the segment boundary of Polluted area 3 is provided with vertical isolation barrier 1 with strengthening isolation barrier 4, vertically
Isolation barrier 1 can combine bearing load with the function of antiseepage dash with strengthening isolation barrier 4, make while having
The divider wall of stress and impervious two kinds of functions;Vertical isolation barrier 1 can be not only used for riverbank with strengthening isolation barrier 4 in this engineering
Slope retaining, can play a part of pollutant isolation again.
As shown in Fig. 2 in the present embodiment, groundwater monitoring well 2 includes the well casing 5 vertically set and is arranged on
The screen pipe 6 of the bottom of well casing 5.Groundwater monitoring well 2 is also associated with aspirator and injection device.
As shown in figure 1, in routine maintenance procedure, being periodically monitored to groundwater monitoring well 2;If close to Polluted area
Vertical isolation barrier 1 be damaged, pollutant to vertical isolation barrier 1 and strengthen isolation barrier 4 between region seepage, profit
With groundwater monitoring well 2 using extracting underground water and the timely repair process of method of injection, and to being contaminated what thing punctured
Vertical isolation barrier 1 is repaired.In monitoring and repair process, each groundwater monitoring well 2 can be independent in suction or injection
Operation also can many wells pass through conduit attended operation.
The present embodiment has the beneficial effect that:The pollutant that vertical isolation barrier can effectively isolate inside Polluted area;
The reliability of vertical isolation barrier can be further enhanced by strengthening isolation barrier combination groundwater monitoring well;Groundwater monitoring well can
Punctured with effectively monitoring the whether contaminated thing of vertical isolation barrier, and repairing and treating is carried out to puncture place.
Claims (5)
1. a kind of contaminated site vertical isolation repair system, it is characterised in that:Including vertical isolation barrier and groundwater monitoring
Well;The vertical isolation barrier is circumferentially positioned inside the soil layer on the outside of Polluted area;On the outside of the vertical isolation barrier
Soil layer is internally provided with reinforcement isolation barrier;The groundwater monitoring well be arranged on it is described reinforcement isolation barrier with it is described it is vertical every
Inside the region that off screen barrier is surrounded.
2. a kind of contaminated site vertical isolation repair system according to claim 1, it is characterised in that:The vertical isolation
Barrier is any one in cement mixing method, steel sheet-pile wall, high-pressure rotary-spray piling wall or flexible membrane;The vertical isolation barrier
Bottom buried depth be more than the Polluted area internal contamination thing distributed depth.
3. a kind of contaminated site vertical isolation repair system according to claim 1, it is characterised in that:It is described to strengthen isolation
Barrier is any one in cement mixing method, steel sheet-pile wall, high-pressure rotary-spray piling wall or flexible membrane;The reinforcement isolation barrier
Bottom buried depth be more than the Polluted area internal contamination thing distributed depth.
4. a kind of contaminated site vertical isolation repair system according to claim 1, it is characterised in that:The underground water prison
Well logging is connected with aspirator and injection device.
5. a kind of contaminated site vertical isolation repair system according to claim 1, it is characterised in that:The underground water prison
Well logging includes well casing and the screen pipe installed in the well casing bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621414741.5U CN206346233U (en) | 2016-12-22 | 2016-12-22 | A kind of contaminated site vertical isolation repair system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621414741.5U CN206346233U (en) | 2016-12-22 | 2016-12-22 | A kind of contaminated site vertical isolation repair system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206346233U true CN206346233U (en) | 2017-07-21 |
Family
ID=59322002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621414741.5U Active CN206346233U (en) | 2016-12-22 | 2016-12-22 | A kind of contaminated site vertical isolation repair system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206346233U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107653915A (en) * | 2017-09-27 | 2018-02-02 | 上海岩土工程勘察设计研究院有限公司 | Suitable for the vertical isolation barrier design method of soft clay area |
CN107687175A (en) * | 2017-09-27 | 2018-02-13 | 浙江大学 | The vertical antifouling isolation wall construction of both sides ground local stiffening type and method |
CN108480373A (en) * | 2018-03-27 | 2018-09-04 | 中交天航环保工程有限公司 | A kind of contaminated sites source blocking method |
CN110374143A (en) * | 2019-05-24 | 2019-10-25 | 中节能大地环境修复有限公司 | A kind of antiseepage barrier wall and its construction method |
CN110397089A (en) * | 2019-06-10 | 2019-11-01 | 上海勘察设计研究院(集团)有限公司 | A kind of setting method of the multiple vertical isolation barrier of contaminated site |
CN112302057A (en) * | 2020-09-30 | 2021-02-02 | 南京格洛特环境工程股份有限公司 | Construction method for integral separation of polluted land |
CN116770901A (en) * | 2023-08-14 | 2023-09-19 | 水利部交通运输部国家能源局南京水利科学研究院 | Double-layer vertical partition wall structure of polluted site and active regulation and control method |
-
2016
- 2016-12-22 CN CN201621414741.5U patent/CN206346233U/en active Active
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107653915A (en) * | 2017-09-27 | 2018-02-02 | 上海岩土工程勘察设计研究院有限公司 | Suitable for the vertical isolation barrier design method of soft clay area |
CN107687175A (en) * | 2017-09-27 | 2018-02-13 | 浙江大学 | The vertical antifouling isolation wall construction of both sides ground local stiffening type and method |
CN107653915B (en) * | 2017-09-27 | 2020-01-14 | 上海勘察设计研究院(集团)有限公司 | Vertical isolation barrier design method suitable for soft soil area |
CN108480373A (en) * | 2018-03-27 | 2018-09-04 | 中交天航环保工程有限公司 | A kind of contaminated sites source blocking method |
CN110374143A (en) * | 2019-05-24 | 2019-10-25 | 中节能大地环境修复有限公司 | A kind of antiseepage barrier wall and its construction method |
CN110397089A (en) * | 2019-06-10 | 2019-11-01 | 上海勘察设计研究院(集团)有限公司 | A kind of setting method of the multiple vertical isolation barrier of contaminated site |
CN110397089B (en) * | 2019-06-10 | 2020-12-08 | 上海勘察设计研究院(集团)有限公司 | Method for setting multiple vertical isolation barriers in polluted site |
CN112302057A (en) * | 2020-09-30 | 2021-02-02 | 南京格洛特环境工程股份有限公司 | Construction method for integral separation of polluted land |
CN116770901A (en) * | 2023-08-14 | 2023-09-19 | 水利部交通运输部国家能源局南京水利科学研究院 | Double-layer vertical partition wall structure of polluted site and active regulation and control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206346233U (en) | A kind of contaminated site vertical isolation repair system | |
US9732590B2 (en) | Detection and collection system for fugitive gases and effluent liquids leaking from around drilled wellheads | |
US9777881B2 (en) | Polymer composite grouting method for blocking leaking and sand inrush of underground pipelines | |
CN106703085B (en) | A kind of aqueous vapor collection system and its working method in Polluted Soil isolation | |
CN106284314A (en) | Karst landform spiral-digging pore cast-in-place pile construction method | |
CN106734178A (en) | Comprehensive restoration system and method for polluted site | |
CN111156006A (en) | Construction method for shield underpass of dangerous pipeline | |
CN102433886A (en) | Construction method for adding water lowering well in water collecting well | |
CN110586606A (en) | Dangerous waste rigid landfill pool | |
CN117626947A (en) | Construction method of rotary drilling bored concrete pile | |
CN109577337A (en) | The construction method of deep foundation ditch of flowing line | |
CN206477365U (en) | A kind of intensive aqueous vapor collection system in the isolation for Polluted Soil | |
CN202108045U (en) | Sleeve pipe with anchor rod penetrating through underground continuous wall | |
CN110159866B (en) | Construction method for reinforcing and reinforcing buried steel pipe | |
CN216965781U (en) | Landfill area groundwater is restoreed and is monitored access structure | |
CN102296618A (en) | Sleeve with anchor rod penetrating through diaphragm wall | |
CN114733890A (en) | Underground water restoration and monitoring channel structure for landfill area | |
CN114855822A (en) | Construction method for deep foundation pit of rain sewage pipeline on highway | |
CN209353360U (en) | The anti-floating drainage arrangement of basement structure | |
CN110756570A (en) | Subsurface excavation remediation method for deep polluted soil | |
CN206346231U (en) | A kind of well formula aqueous vapor collection system in the isolation for Polluted Soil | |
CN206346232U (en) | Monitoring well and film attachment structure in a kind of isolation for Polluted Soil | |
CN112302057A (en) | Construction method for integral separation of polluted land | |
CN206346230U (en) | A kind of periphery laying type aqueous vapor collection system in the isolation for Polluted Soil | |
CN210010292U (en) | Isolation structure for preventing transverse migration of landfill gas in simple refuse landfill |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 200032 18, building 681, Xiao Mu Qiao Road, Xuhui District, Shanghai. Patentee after: Shanghai Survey, Design and Research Institute (Group) Co.,Ltd. Country or region after: China Address before: 200032, 18th Floor, No. 681 Xiaomuqiao Road, Xuhui District, Shanghai Patentee before: SHANGHAI GEOTECHNICAL INVESTIGATIONS & DESIGN INSTITUTE Co.,Ltd. Country or region before: China |