CN110029690B - Percolate leakage detection and collection structure and construction method thereof - Google Patents
Percolate leakage detection and collection structure and construction method thereof Download PDFInfo
- Publication number
- CN110029690B CN110029690B CN201910313732.9A CN201910313732A CN110029690B CN 110029690 B CN110029690 B CN 110029690B CN 201910313732 A CN201910313732 A CN 201910313732A CN 110029690 B CN110029690 B CN 110029690B
- Authority
- CN
- China
- Prior art keywords
- ditch
- anchoring
- hdpe
- leakage detection
- hdpe geomembrane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000001514 detection method Methods 0.000 title claims abstract description 72
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 238000004873 anchoring Methods 0.000 claims abstract description 72
- 229920001903 high density polyethylene Polymers 0.000 claims abstract description 67
- 239000004700 high-density polyethylene Substances 0.000 claims abstract description 67
- 239000004744 fabric Substances 0.000 claims abstract description 19
- 239000004698 Polyethylene Substances 0.000 claims description 27
- 238000001914 filtration Methods 0.000 claims description 24
- 229920006262 high density polyethylene film Polymers 0.000 claims description 23
- 239000002131 composite material Substances 0.000 claims description 21
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 20
- 239000004927 clay Substances 0.000 claims description 19
- 239000004746 geotextile Substances 0.000 claims description 17
- 229940080314 sodium bentonite Drugs 0.000 claims description 9
- 229910000280 sodium bentonite Inorganic materials 0.000 claims description 9
- 238000011144 upstream manufacturing Methods 0.000 claims description 9
- 238000003466 welding Methods 0.000 claims description 9
- ONCZQWJXONKSMM-UHFFFAOYSA-N dialuminum;disodium;oxygen(2-);silicon(4+);hydrate Chemical compound O.[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[Na+].[Na+].[Al+3].[Al+3].[Si+4].[Si+4].[Si+4].[Si+4] ONCZQWJXONKSMM-UHFFFAOYSA-N 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 6
- 239000002689 soil Substances 0.000 claims description 6
- 239000012528 membrane Substances 0.000 claims description 5
- 238000003825 pressing Methods 0.000 claims description 5
- 239000004575 stone Substances 0.000 claims description 4
- 238000009412 basement excavation Methods 0.000 claims description 3
- 239000007788 liquid Substances 0.000 abstract description 7
- 239000003673 groundwater Substances 0.000 abstract description 3
- 230000035699 permeability Effects 0.000 abstract description 3
- 238000000638 solvent extraction Methods 0.000 abstract description 3
- 239000002910 solid waste Substances 0.000 abstract description 2
- 230000008595 infiltration Effects 0.000 abstract 1
- 238000001764 infiltration Methods 0.000 abstract 1
- 230000000149 penetrating effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000001223 reverse osmosis Methods 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/002—Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/006—Sealing of existing landfills, e.g. using mining techniques
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/04—Pipes or fittings specially adapted to sewers
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Hydrology & Water Resources (AREA)
- General Engineering & Computer Science (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Structural Engineering (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sewage (AREA)
- Processing Of Solid Wastes (AREA)
- Revetment (AREA)
Abstract
The invention relates to a percolate leakage detection and collection structure and a construction method thereof, which are suitable for solid waste storage and disposal sites which are provided with multistage anchoring platforms and are paved with double impermeable films. This infiltration liquid leak hunting collection structure includes anchor platform, anchor platform is last from supreme bottom geotechnique cloth, bottom HDPE geomembrane, top layer HDPE geomembrane and the top layer geotechnique cloth of having laid in proper order down, be equipped with leak hunting system and anchor system on the anchor platform between bottom HDPE geomembrane and top layer HDPE geomembrane, the anchor system is located leak hunting system's inboard. The invention designs a leak detection blind ditch with permeability and drainage property in the middle of the double-layer artificial lining layer, and the integrity of the impermeable layers is checked on the anchorage platforms at different heights in a partitioning way, so that whether the impermeable layers on the anchorage platforms are intact can be clearly judged, the countermeasure can be timely taken, the effective control of the side slope leakage liquid is ensured, and the safety of the surrounding environment and the groundwater of a storage and disposal field is ensured.
Description
Technical Field
The invention relates to a percolate leakage detection and collection structure and a construction method thereof, which are suitable for solid waste storage and disposal sites which are provided with multistage anchoring platforms and are paved with double impermeable films.
Background
GB 18598-2001 specifies that a landfill site lined with a double synthetic material should be provided with an auxiliary drainage system sump for leak monitoring of the upper synthetic layer. A composite geotechnical drainage network is preferably used in the percolate detection layer between the primary and secondary impermeable layers as specified in DB 52/865-2013. In the prior art, a composite geotechnical drainage net is adopted in a seepage detection layer between a main impermeable layer and a secondary impermeable layer for detection. However, the method is only suitable for a storage and disposal field with only one-stage anchoring platform in the basin, and leakage liquid above the first-stage anchoring platform is difficult to inspect and collect for the storage and disposal field with multiple-stage anchoring platforms.
Disclosure of Invention
In order to solve the technical problems, the invention provides a percolate leakage detection and collection structure and a construction method thereof.
The invention is realized by the following technical scheme:
the utility model provides a percolate leak hunting collection structure, includes the anchor platform, anchor platform is last from supreme bottom geotechnique cloth, bottom HDPE geomembrane, top layer HDPE geomembrane and the top layer geotechnique cloth of having laid in proper order down, anchor platform is last to be equipped with leak hunting system and anchor system between bottom HDPE geomembrane and top layer HDPE geomembrane, anchor system is located leak hunting system's inboard.
The leakage detection system comprises a leakage detection blind ditch, a water filtering pipe is longitudinally arranged at the bottom of the leakage detection blind ditch, graded pebbles are filled on the upper side of the water filtering pipe in the leakage detection blind ditch, a composite geotechnical drainage net is paved on the leakage detection blind ditch, and the composite geotechnical drainage net extends to one side far away from the anchoring system.
The graded pebbles are wrapped in a reverse-filtering geotextile.
And a blind drain plug is arranged at the end part of the leak detection blind drain.
The blind drain plug comprises a drainage PE pipe and plug concrete poured around the drainage PE pipe, wherein a bottom geotextile is arranged on the lower side of the plug concrete, and the drainage PE pipe is connected with the water filtering pipe.
The lower part of the plug concrete is embedded with a bottom HDPE film embedded connecting lock, and the upper part is embedded with a top HDPE film embedded connecting lock; the bottom HDPE film embedded connecting lock is welded with the bottom HDPE geomembrane, and the top HDPE film embedded connecting lock is welded with the top HDPE geomembrane.
The anchoring system comprises an anchoring ditch and backfill clay filled in the anchoring ditch, wherein a composite geotechnical drainage net and a top HDPE geomembrane are sequentially laid on the lower side of the backfill clay in the anchoring ditch from bottom to top, the composite geotechnical drainage net and the top HDPE geomembrane extend to one side far away from the leakage detection system, and the top HDPE geomembrane is welded with the top HDPE geomembrane on the upper side of the backfill clay.
And a sodium bentonite waterproof blanket is laid on the backfill clay and between the leakage detection blind ditch and the anchoring ditch.
The construction method of the percolate leakage detection and collection structure mainly comprises the following construction steps:
(1) Determining the positions of a leakage detection blind ditch and an anchor ditch on a flat anchor platform, and excavating the leakage detection blind ditch and the anchor ditch in earth and stone directions;
(2) After the leak detection blind ditch and the anchoring ditch are excavated, paving a bottom geotechnical cloth on the anchoring platform, and paving a bottom HDPE geomembrane on the upstream section of the anchoring ditch;
(3) Blind drain plug construction: pouring plug concrete to the elevation of the bottom HDPE film embedded connecting lock on the bottom geotextile at the end part of the leak detection blind ditch, embedding the bottom HDPE film embedded connecting lock, continuously pouring the plug concrete to the elevation of the drainage PE pipe, completing the installation of the drainage PE pipe, and pouring the plug concrete to the top elevation and embedding the top HDPE film embedded connecting lock;
(4) Welding a bottom HDPE geomembrane in a leak detection blind ditch and a bottom HDPE membrane embedded connection lock in a blind ditch plug to finish the installation work of a water filtering pipe, connecting the water filtering pipe with a drainage PE pipe, paving reverse filtering geotextile, and backfilling graded pebbles;
(5) Sequentially finishing the paving of the composite geotechnical drainage net at the upstream section of the anchoring ditch and the HDPE geomembrane at the top layer;
(6) Paving the HDPE geomembrane on the bottom layers of the anchoring ditch and the downstream section, and then welding the HDPE geomembrane on the bottom layers of the upstream section of the anchoring ditch;
(7) Paving the anchoring ditch, the composite geotechnical drainage net at the downstream section and the HDPE geomembrane at the top layer, compacting and backfilling clay after paving, paving a sodium bentonite waterproof blanket, and then finishing welding the HDPE geomembrane at the top layer and the bottom layer of the backfilled clay;
(8) Laying a top geotechnical cloth, and arranging a bagged soil pressing wall on the top geotechnical cloth for stacking and pressing.
And (3) in the step (1), the distance between the anchoring groove and the leakage detection blind groove is not smaller than 1m.
The invention has the beneficial effects that: the design concept of 'anchor platform leak detection blind ditch' is provided for a storage and disposal site which is provided with a plurality of stages of anchor platforms and a double-layer artificial lining layer. A leak detection blind ditch with permeability and drainage performance is designed in the middle of a double-layer artificial lining layer, the integrity of an impermeable layer is checked on the anchorage platforms at different heights in a partitioning way, whether the impermeable layer on each anchorage platform is intact can be clearly judged, countermeasures can be timely taken, leakage liquid penetrating through an impermeable membrane is collected and discharged, the leakage liquid of a side slope is effectively controlled, and the safety of the surrounding environment and groundwater of a storage and disposal site is ensured.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is an enlarged schematic cross-sectional view of a percolate leak detection collection structure according to the present invention;
FIG. 3 is an enlarged cross-sectional view of the blind drain plug of the present invention;
fig. 4 is an enlarged longitudinal section of the blind drain plug of the present invention.
In the figure: 1-anchoring platform, 2-leak detection blind drain, 3-bottom geotechnical cloth, 4-bottom HDPE geotechnical film, 5-composite geotechnical drainage net, 6-top HDPE geotechnical film, 7-top geotechnical cloth, 8-drainage pipe, 9-graded broken stone, 10-reverse filtering geotechnical cloth, 11-anchoring drain, 12-backfill clay, 13-sodium bentonite waterproof blanket, 14-bagged soil press wall, 15-bottom HDPE film embedded connection lock, 16-drainage PE pipe, 17-plug concrete and 18-top HDPE film embedded connection lock.
Detailed Description
The technical solution of the present invention is further described below, but the scope of the claimed invention is not limited to the above.
As shown in fig. 1 to 4, the leakage detection and collection structure for percolate comprises an anchoring platform 1, wherein a bottom geotextile 3, a bottom HDPE geomembrane 4, a top HDPE geomembrane 6 and a top geotextile 7 are sequentially paved on the anchoring platform 1 from bottom to top, a leakage detection system and an anchoring system are arranged between the bottom HDPE geomembrane 4 and the top HDPE geomembrane 6 on the anchoring platform 1, and the anchoring system is positioned at the inner side of the leakage detection system. When the device is used, a multi-stage anchoring platform 1 is excavated on a reservoir basin of a landfill, each stage of anchoring platform 1 is provided with a percolate leakage detection collection structure, the reservoir basin is used as a reference, and an anchoring system is positioned at the inner side of a leakage detection system.
The leakage detection system comprises a leakage detection blind ditch 2, a water filtering pipe 8 is longitudinally arranged at the bottom of the leakage detection blind ditch 2, graded pebbles 9 are filled on the upper side of the water filtering pipe 8 in the leakage detection blind ditch 2, a composite geotechnical drainage net 5 is paved on the leakage detection blind ditch 2, and the composite geotechnical drainage net 5 extends to one side far away from the anchoring system. And leakage detection, collection and drainage are carried out on the percolate through a leakage detection system, so that whether the HDPE geomembrane on each stage of anchoring platform 1 leaks or not is detected.
The graded pebbles 9 are wrapped in a reverse-filtering geotextile 10. Reverse osmosis of the percolate immersed in the water filtering pipe 8 to the outside of the blind drain 2 is avoided.
And a blind drain plug is arranged at the end part of the leak detection blind drain 2.
The blind drain plug comprises a drainage PE pipe 16 and plug concrete 17 poured around the drainage PE pipe 16, the lower side of the plug concrete 17 is provided with a bottom geotechnical cloth 3, and the drainage PE pipe 16 is connected with a drainage pipe 8. In use, the water filter tube 8 is a PE tube, the dimensions of which match those of the drainage PE tube 16.
The lower part of the plug concrete 17 is embedded with a bottom HDPE film embedded connecting lock 15, and the upper part is embedded with a top HDPE film embedded connecting lock 18; the bottom HDPE film embedded connecting lock 15 is welded with the bottom HDPE geomembrane 4, and the top HDPE film embedded connecting lock 18 is welded with the top HDPE geomembrane 6.
The anchoring system comprises an anchoring ditch 11 and backfill clay 12 filled in the anchoring ditch 11, wherein a composite geotechnical drainage net 5 and a top-layer HDPE geomembrane 6 are sequentially paved on the lower side of the backfill clay 12 in the anchoring ditch 11 from bottom to top, the composite geotechnical drainage net 5 and the top-layer HDPE geomembrane 6 extend to one side far away from the leakage detection system, and the top-layer HDPE geomembrane 6 is welded with the top-layer HDPE geomembrane 6 on the upper side of the backfill clay 12.
And a sodium bentonite waterproof blanket 13 is paved on the backfill clay 12 and between the leakage detection blind ditch 2 and the anchoring ditch 11. In use, the sodium bentonite waterproof blanket 13 is also located between the bottom HDPE geomembrane 4 and the top HDPE geomembrane 6.
The construction method of the percolate leakage detection and collection structure mainly comprises the following construction steps:
(1) Determining the positions of a leakage detection blind ditch 2 and an anchoring ditch 11 on a flat excavation anchoring platform 1, and excavating earth and stone sides of the leakage detection blind ditch 2 and the anchoring ditch 11;
(2) After the drain-detecting blind ditch 2 and the anchoring ditch 11 are excavated, paving a bottom geotechnical cloth 3 on the anchoring platform 1, and paving a bottom HDPE geomembrane 4 on the upstream section of the anchoring ditch 11;
(3) Blind drain plug construction: pouring plug concrete 17 to the elevation of a bottom HDPE film embedded connecting lock 15 on a bottom geotextile 3 at the end part of a leak detection blind ditch 2, embedding the bottom HDPE film embedded connecting lock 15, continuously pouring the plug concrete 17 to the elevation of a drainage PE pipe 16, completing the installation of the drainage PE pipe 16, and then pouring the plug concrete 17 to the top elevation and embedding a top HDPE film embedded connecting lock 18;
(4) Welding a bottom HDPE geomembrane 4 in a leak detection blind ditch 2 with a bottom HDPE membrane embedded connecting lock 15 in a blind ditch plug, completing the installation work of a water filtering pipe 8, connecting the water filtering pipe with a drainage PE pipe 16, paving a reverse filtering geotextile 10, and backfilling graded pebbles 9;
(5) Sequentially finishing the paving of the composite geotechnical drainage net 5 and the top HDPE geomembrane 6 at the upstream section of the anchoring ditch 11;
(6) Paving the anchoring ditch 11 and the bottom HDPE geomembrane 4 of the downstream section, and then welding the anchoring ditch 11 and the bottom HDPE geomembrane 4 of the upstream section of the anchoring ditch;
(7) Paving the anchoring ditch 11, the composite geotechnical drainage net 5 at the downstream section and the top HDPE geomembrane 6, compacting and backfilling the backfilling clay 12 after paving, paving a sodium bentonite waterproof blanket 13, and then finishing welding the top HDPE geomembrane 6 on the upper side and the lower side of the backfilling clay 12;
(8) The top geotechnical cloth 7 is paved, and the bagged soil compacting wall 14 is arranged on the top geotechnical cloth 7 for piling and compacting. When in use, each level of the catwalk needs to pile and press the bagged soil pressing wall 14 according to the design.
In the step (1), the distance between the anchoring groove 11 and the leakage detection blind groove 2 is not smaller than 1m.
In summary, the invention provides the design concept of 'blind ditch for detecting leakage of the anchoring platform' for the storage and disposal field with the multi-stage anchoring platform 1 and the double-layer artificial lining. A leak detection blind ditch 2 with permeability and drainage is designed in the middle of a double-layer artificial lining layer, the integrity of an impermeable layer is checked in a partitioning way on the anchoring platforms 1 with different heights, whether the impermeable layers on the anchoring platforms 1 are intact can be clearly judged, countermeasures can be timely taken, leakage liquid penetrating through an impermeable membrane is collected and discharged, the leakage liquid of a side slope is effectively controlled, and the safety of the surrounding environment and groundwater of a storage and disposal site is ensured.
Examples:
the specification of the bottom geotextile 3 is 600g/m2, and a sodium bentonite blanket with the specification of 4800g/m2 can be used for replacing the bottom geotextile 3. The pipe diameters of the drainage PE pipe 16 and the PE water filtering pipe 8 are DN200. The specification of the top geotextile 7 is 600g/m2. The end cap concrete 17 is C20 concrete, the end part of the blind drain end cap is coated with an anti-corrosion material, and the length of the blind drain end cap is not less than 1m. The length of the PE pipe 16 exposed out of the plug concrete 17 is not smaller than the lap joint length of the PE pipe joint. The depth h of the leak detection blind ditch 2 is more than or equal to 30cm, the bottom width b is more than or equal to 20cm, 3 rows of water inlet holes are staggered on the upper side of the PE water filtering pipe 8, and the hole pitch is 12cm. The leak detection blind ditch 2 should set up to be not less than 1% longitudinal slope along the axis direction, and its profile angle should satisfy HDPE geomembrane's requirement of buckling when the excavation, avoids breaking HDPE geomembrane. The thickness of the bottom HDPE geomembrane 4 is not less than 1mm, and the thickness of the top HDPE geomembrane 6 is not less than 2mm. The height of the bagged soil press wall 14 on the top geotextile 7 is not less than 60cm, and the width is not less than 70cm. The backfilled aggregate in the leak detection blind ditch 2 is preferably graded pebbles 9, and can also be graded gravels, such as backfilled graded gravels, so that the PE water filter pipe 8 is prevented from being damaged by sharp contours.
Claims (2)
1. A construction method of a percolate leakage detection and collection structure is characterized by comprising the following steps: the percolate leakage detection and collection structure comprises an anchoring platform (1), wherein a bottom geotextile (3), a bottom HDPE geomembrane (4), a top HDPE geomembrane (6) and a top geotextile (7) are sequentially paved on the anchoring platform (1) from bottom to top, a leakage detection system and an anchoring system are arranged between the bottom HDPE geomembrane (4) and the top HDPE geomembrane (6) on the anchoring platform (1), and the anchoring system is positioned at the inner side of the leakage detection system;
the leakage detection system comprises a leakage detection blind ditch (2), wherein a water filtering pipe (8) is longitudinally arranged at the bottom of the leakage detection blind ditch (2), graded pebbles (9) are filled on the upper side of the water filtering pipe (8) in the leakage detection blind ditch (2), a composite geotechnical drainage net (5) is paved on the leakage detection blind ditch (2), and the composite geotechnical drainage net (5) extends to one side far away from the anchoring system;
the graded pebbles (9) are wrapped in a reverse-filtering geotextile (10);
a blind drain plug is arranged at the end part of the leak detection blind drain (2);
the blind drain plug comprises a drainage PE pipe (16) and plug concrete (17) poured around the drainage PE pipe (16), a bottom geotechnical cloth (3) is arranged on the lower side of the plug concrete (17), and the drainage PE pipe (16) is connected with the water filtering pipe (8);
the lower part of the plug concrete (17) is embedded with a bottom HDPE film embedded connecting lock (15), and the upper part is embedded with a top HDPE film embedded connecting lock (18); the bottom HDPE film embedded connecting lock (15) is welded with the bottom HDPE geomembrane (4), and the top HDPE film embedded connecting lock (18) is connected with the top HDPE geomembrane (6);
the anchoring system comprises an anchoring ditch (11) and backfill clay (12) filled in the anchoring ditch (11), wherein a composite geotechnical drainage net (5) and a top-layer HDPE geomembrane (6) are sequentially paved on the lower side of the backfill clay (12) in the anchoring ditch (11) from bottom to top, the composite geotechnical drainage net (5) and the top-layer HDPE geomembrane (6) extend to one side far away from the leakage detection system, and the top-layer HDPE geomembrane (6) is welded with the top-layer HDPE geomembrane (6) on the upper side of the backfill clay (12);
a sodium bentonite waterproof blanket (13) is paved between the backfill clay (12) and the leak detection blind ditch (2) and the anchoring ditch (11);
the construction method of the percolate leakage detection and collection structure comprises the following construction steps:
(1) Determining the positions of a leakage detection blind ditch (2) and an anchor ditch (11) on a flat excavation anchor platform (1), and excavating the earth and stone sides of the leakage detection blind ditch (2) and the anchor ditch (11);
(2) After the drain-detecting blind ditch (2) and the anchoring ditch (11) are excavated, paving a bottom geotechnical cloth (3) on the anchoring platform (1), and paving a bottom HDPE geomembrane (4) on the upstream section of the anchoring ditch (11);
(3) Blind drain plug construction: pouring plug concrete (17) to the elevation of a bottom HDPE film embedded connecting lock (15) on a bottom geotextile (3) at the end part of a leak detection blind ditch (2), embedding the bottom HDPE film embedded connecting lock (15), continuously pouring the plug concrete (17) to the elevation of a drainage PE pipe (16), finishing the installation of the drainage PE pipe (16), and then pouring the plug concrete (17) to the top elevation and embedding a top HDPE film embedded connecting lock (18);
(4) Welding a bottom HDPE geomembrane (4) in a leak detection blind ditch (2) with a bottom HDPE membrane embedded connection lock (15) in a blind ditch plug, completing the installation work of a water filtering pipe (8), connecting the water filtering pipe with a drainage PE pipe (16), paving a reverse filtering geotechnical cloth (10), and backfilling graded pebbles (9);
(5) Sequentially finishing the laying of the composite geotechnical drainage net (5) at the upstream section of the anchoring ditch (11) and the top HDPE geomembrane (6);
(6) Paving the anchoring ditch (11) and the HDPE geomembrane (4) at the bottom layer of the downstream section, and then welding the anchoring ditch and the HDPE geomembrane (4) at the bottom layer of the upstream section of the anchoring ditch (11);
(7) Paving an anchoring ditch (11) and a downstream section composite geotechnical drainage net (5) and a top HDPE geomembrane (6), compacting and backfilling clay (12) after paving, paving a sodium bentonite waterproof blanket (13), and then finishing welding the top and bottom top HDPE geomembranes (6) of the backfilling clay (12);
(8) Paving a top geotechnical cloth (7), wherein a bagged soil pressing wall (14) is arranged on the top geotechnical cloth (7) for stacking and pressing.
2. The construction method of the percolate leakage detection and collection structure according to claim 1, wherein: and (3) in the step (1), the distance between the anchoring groove (11) and the leakage detection blind groove (2) is not smaller than 1m.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910313732.9A CN110029690B (en) | 2019-04-18 | 2019-04-18 | Percolate leakage detection and collection structure and construction method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910313732.9A CN110029690B (en) | 2019-04-18 | 2019-04-18 | Percolate leakage detection and collection structure and construction method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110029690A CN110029690A (en) | 2019-07-19 |
| CN110029690B true CN110029690B (en) | 2024-03-19 |
Family
ID=67239105
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910313732.9A Active CN110029690B (en) | 2019-04-18 | 2019-04-18 | Percolate leakage detection and collection structure and construction method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110029690B (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110644585A (en) * | 2019-09-06 | 2020-01-03 | 中国一冶集团有限公司 | Construction method of leachate adjusting system |
| CN110804694A (en) * | 2019-11-15 | 2020-02-18 | 万宝矿产有限公司 | Biological heap leaching W solution ditch protection and leakage monitoring system |
| CN111424726B (en) * | 2020-04-22 | 2025-04-29 | 武汉环投城市废弃物运营管理有限公司 | Landfill covering film partition sealing system and partition sealing method |
| CN111502280B (en) * | 2020-05-11 | 2021-06-11 | 中铁城建集团第三工程有限公司 | Construction method for detecting water leakage area by tool |
| CN113043511B (en) * | 2021-03-26 | 2025-03-11 | 中船第九设计研究院工程有限公司 | A lock-type lubricant dosing device |
| CN116146018B (en) * | 2023-04-20 | 2023-06-27 | 山西建筑工程集团有限公司 | Percolate collecting tank structure and construction method thereof |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201554044U (en) * | 2009-10-22 | 2010-08-18 | 北京高能时代环境技术股份有限公司 | An anti-seepage structure used in hazardous waste disposal engineering |
| CN201785778U (en) * | 2010-09-07 | 2011-04-06 | 中国市政工程西北设计研究院有限公司 | Middle impermeable membrane anchorage of steep hard-rocky side slope in side slope single-layer impermeable structure |
| CN104652581A (en) * | 2015-01-27 | 2015-05-27 | 北京锄禾环保技术有限公司 | Multi-stage slope anchoring structure for realizing rainwater and sewage separation |
| CN210086317U (en) * | 2019-04-18 | 2020-02-18 | 中国电建集团贵阳勘测设计研究院有限公司 | Leachate leakage detection collection structure |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104863184B (en) * | 2015-06-16 | 2016-09-21 | 河海大学 | A kind of refuse landfill seepage control system extending Leachate site breakdown time and preparation method thereof |
-
2019
- 2019-04-18 CN CN201910313732.9A patent/CN110029690B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201554044U (en) * | 2009-10-22 | 2010-08-18 | 北京高能时代环境技术股份有限公司 | An anti-seepage structure used in hazardous waste disposal engineering |
| CN201785778U (en) * | 2010-09-07 | 2011-04-06 | 中国市政工程西北设计研究院有限公司 | Middle impermeable membrane anchorage of steep hard-rocky side slope in side slope single-layer impermeable structure |
| CN104652581A (en) * | 2015-01-27 | 2015-05-27 | 北京锄禾环保技术有限公司 | Multi-stage slope anchoring structure for realizing rainwater and sewage separation |
| CN210086317U (en) * | 2019-04-18 | 2020-02-18 | 中国电建集团贵阳勘测设计研究院有限公司 | Leachate leakage detection collection structure |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110029690A (en) | 2019-07-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110541436B (en) | Double-layer HDPE (high-density polyethylene) film vertical antifouling barrier structure containing leakage detection layer and method | |
| CN110029690A (en) | Leachate leakage detection collection structure and construction method thereof | |
| CN110886327B (en) | Basement structure decompression anti-floating system based on slope area and construction method thereof | |
| CN111778793B (en) | A cavity collapse prevention structure and construction method | |
| CN102383413A (en) | Method for constructing strengthened saturated-flow plastic silt soft soil foundation | |
| CN101148885B (en) | Three-dimensional drainage system structure of groundwater in landfill | |
| CN106284434A (en) | The anti-float method of a kind of underground structure and every oozing device | |
| CN211228563U (en) | Assembled groundwater drainage blind ditch drainage system that oozes | |
| CN111719593A (en) | Prefabricated bentonite vertical barrier structure and method for underground pollution control | |
| CN112523264A (en) | High and steep slope seepage prevention system and laying method thereof | |
| CN108487331B (en) | An underground structure anti-floating system integrating corridor drainage and fertilizer tank anti-seepage | |
| CN210140850U (en) | Leachate collection and drainage guide structure | |
| CN116078778B (en) | Vertical partition structure of domestic waste landfill and construction method thereof | |
| CN110029632B (en) | General industrial solid waste storage and disposal site structure and construction method thereof | |
| CN109469042A (en) | Seepage-proofing karst cave processing structure for storage yard field area | |
| CN209353360U (en) | Anti-floating drainage for basement structures | |
| CN110453699A (en) | A drainage anti-sliding pile structure with a "meter"-shaped pile core and its construction method | |
| CN214657275U (en) | Self-flowing drainage pressure-limiting anti-floating structure | |
| CN110029689B (en) | Percolate collecting and guiding and draining structure and construction method thereof | |
| CN214245855U (en) | Water-proof pressure-control anti-floating structure | |
| CN114703805A (en) | Combined seepage-proofing and sewage-intercepting system and method for adjusting plain reservoir | |
| CN210086317U (en) | Leachate leakage detection collection structure | |
| CN116516898B (en) | High-groundwater excavation channel side slope drainage system and construction method | |
| CN119411543A (en) | A half-dig and half-fill full reservoir basin anti-seepage drainage type | |
| CN220058012U (en) | Fertilizer groove backfilling and anti-floating pressure relief observation matching system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |