CN106193083B - 一种多导洞隧道下穿桥桩的沉降控制方法 - Google Patents
一种多导洞隧道下穿桥桩的沉降控制方法 Download PDFInfo
- Publication number
- CN106193083B CN106193083B CN201610619898.XA CN201610619898A CN106193083B CN 106193083 B CN106193083 B CN 106193083B CN 201610619898 A CN201610619898 A CN 201610619898A CN 106193083 B CN106193083 B CN 106193083B
- Authority
- CN
- China
- Prior art keywords
- region
- excavation
- tunnel
- different
- stage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610619898.XA CN106193083B (zh) | 2016-08-01 | 2016-08-01 | 一种多导洞隧道下穿桥桩的沉降控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610619898.XA CN106193083B (zh) | 2016-08-01 | 2016-08-01 | 一种多导洞隧道下穿桥桩的沉降控制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106193083A CN106193083A (zh) | 2016-12-07 |
CN106193083B true CN106193083B (zh) | 2018-07-17 |
Family
ID=57497384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610619898.XA Active CN106193083B (zh) | 2016-08-01 | 2016-08-01 | 一种多导洞隧道下穿桥桩的沉降控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106193083B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106874576A (zh) * | 2017-01-19 | 2017-06-20 | 中铁开发投资有限公司 | 一种隧道下穿地下构筑物的柱结构变形预测控制方法 |
CN106909715A (zh) * | 2017-01-19 | 2017-06-30 | 中铁开发投资有限公司 | 一种隧道下穿地下构筑物的梁结构变形预测控制方法 |
CN106988750B (zh) * | 2017-05-26 | 2023-07-14 | 中铁四局集团有限公司 | 一种大跨度区间隧道超近距离下穿既有站的实施方式 |
CN108265764A (zh) * | 2018-02-02 | 2018-07-10 | 北京市政建设集团有限责任公司 | 一种测量和监控量测准备的方法 |
CN110374610A (zh) * | 2019-07-16 | 2019-10-25 | 安徽省交通航务工程有限公司 | 一种盾构机侧穿立交桥桥桩形成盾构隧道的方法 |
CN110735641B (zh) * | 2019-11-05 | 2021-10-15 | 中建八局轨道交通建设有限公司 | 下穿管线的换乘通道的施工方法 |
CN111060022B (zh) * | 2019-11-11 | 2021-10-08 | 北京住总集团有限责任公司 | 一种盾构下穿结构物形变的激光自动化分析系统及方法 |
CN113309527B (zh) * | 2021-06-11 | 2022-03-08 | 北京科技大学 | 一种双层导洞的上导洞预拱度施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101691764A (zh) * | 2009-10-26 | 2010-04-07 | 西南交通大学 | 一种桩基沉降现场监测评价方法 |
KR101057167B1 (ko) * | 2011-03-28 | 2011-08-17 | (주)동명기술공단종합건축사사무소 | 말뚝 두부 보강 장치 및 이를 이용한 확대 기초 시공 공법 |
CN102733816A (zh) * | 2012-07-10 | 2012-10-17 | 河海大学 | 一种盾构近距离穿越建筑物时的变形控制方法 |
CN104035142A (zh) * | 2014-06-05 | 2014-09-10 | 同济大学 | 一种海底隧道突涌水险情早期预警方法 |
CN104778291A (zh) * | 2014-01-14 | 2015-07-15 | 国家电网公司 | 一种基于监测基础变形的采动区输电铁塔承载力评估方法 |
CN105484752A (zh) * | 2015-12-08 | 2016-04-13 | 中国水利水电第八工程局有限公司 | 一种用于地铁运营隧道的地面纠偏回调方法 |
-
2016
- 2016-08-01 CN CN201610619898.XA patent/CN106193083B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101691764A (zh) * | 2009-10-26 | 2010-04-07 | 西南交通大学 | 一种桩基沉降现场监测评价方法 |
KR101057167B1 (ko) * | 2011-03-28 | 2011-08-17 | (주)동명기술공단종합건축사사무소 | 말뚝 두부 보강 장치 및 이를 이용한 확대 기초 시공 공법 |
CN102733816A (zh) * | 2012-07-10 | 2012-10-17 | 河海大学 | 一种盾构近距离穿越建筑物时的变形控制方法 |
CN104778291A (zh) * | 2014-01-14 | 2015-07-15 | 国家电网公司 | 一种基于监测基础变形的采动区输电铁塔承载力评估方法 |
CN104035142A (zh) * | 2014-06-05 | 2014-09-10 | 同济大学 | 一种海底隧道突涌水险情早期预警方法 |
CN105484752A (zh) * | 2015-12-08 | 2016-04-13 | 中国水利水电第八工程局有限公司 | 一种用于地铁运营隧道的地面纠偏回调方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106193083A (zh) | 2016-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106193083B (zh) | 一种多导洞隧道下穿桥桩的沉降控制方法 | |
CN104102525B (zh) | 一种穿越城市轨道交通工程的风险分级控制方法 | |
CN113153335A (zh) | 用于盾构下穿的安全管理系统 | |
CN108266193A (zh) | Ⅳ、ⅴ级软弱围岩全断面隧道的施工方法 | |
CN105443132A (zh) | 浅埋暗挖十字横撑隧道施工方法 | |
CN104481546B (zh) | 一种软岩隧道斜井进入正洞的双曲拱的施工方法 | |
CN105507908B (zh) | 一种大断面隧道渡线段三联拱施工工艺 | |
CN106949877A (zh) | 一种多维度盾构隧道上方地表沉降的监测方法 | |
CN103510959A (zh) | 一种浅埋大跨小净距黄土隧道开挖技术 | |
CN106050243A (zh) | 超浅埋小间距大断面的多隧道并行施工方法 | |
CN111119902B (zh) | 一种基于bp神经网络的隧道动态施工方法 | |
Han et al. | Construction technologies and mechanical effects of the pipe-jacking crossing anchor-cable group in soft stratum | |
CN105971611A (zh) | 地铁隧道近距离下穿既有铁路干线路基沉降控制方法 | |
CN110259458A (zh) | 小净距隧道浅埋段双侧壁导坑开挖的施工方法 | |
CN103993885A (zh) | 一种暗挖隧道侧向开洞支撑体系构建方法 | |
CN110242305A (zh) | 一种斜井进单侧壁导坑法施作主洞的施工工艺方法 | |
CN107489433A (zh) | 一种隧道crd工法防渗漏结构及防渗漏方法 | |
CN111594190A (zh) | 一种盾构穿越不同风险源时的盾构掘进参数控制方法 | |
CN110489926A (zh) | 一种基于地层变形的海底隧道施工过程控制方法及系统 | |
CN109538219A (zh) | 破碎硬质岩隧道的原位扩建超大断面及分部开挖方法 | |
CN102733812A (zh) | 城市江底分岔段小净距隧道侧壁扩挖的隧道施工方法 | |
CN106121662A (zh) | 盾构掘削局部超挖区域同步注浆动态补偿填充控制方法 | |
CN112257154B (zh) | 一种城市隧道透明施工监测方法及系统 | |
Farhadian et al. | Groundwater seepage estimation into Amirkabir tunnel using analytical methods and DEM and SGR method | |
CN110005440A (zh) | 横向管棚支护下双侧壁导洞式施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Lian Xinzeng Inventor after: Pan Zheng Inventor after: Bo Zhiqiang Inventor after: Guo Shui Inventor after: Wang Haitao Inventor after: Wang Hongbin Inventor after: Huang Mingli Inventor after: Li Jianhua Inventor after: Xie Weidong Inventor after: Wang Jianshe Inventor after: Wang Wei Inventor after: Zhang Xu Inventor before: Lian Xinzeng Inventor before: Bo Zhiqiang Inventor before: Guo Shui Inventor before: Wang Haitao Inventor before: Huang Mingli Inventor before: Li Jianhua Inventor before: Xie Weidong Inventor before: Wang Jianshe Inventor before: Wang Wei Inventor before: Zhang Xu Inventor before: Pan Zheng |
|
GR01 | Patent grant | ||
GR01 | Patent grant |