CN106192888B - One kind has monitoring alarm Functional City flood control assembling wall and its method of work - Google Patents

One kind has monitoring alarm Functional City flood control assembling wall and its method of work Download PDF

Info

Publication number
CN106192888B
CN106192888B CN201610650169.0A CN201610650169A CN106192888B CN 106192888 B CN106192888 B CN 106192888B CN 201610650169 A CN201610650169 A CN 201610650169A CN 106192888 B CN106192888 B CN 106192888B
Authority
CN
China
Prior art keywords
flood control
control board
fixed
parts
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610650169.0A
Other languages
Chinese (zh)
Other versions
CN106192888A (en
Inventor
梁峙
梁骁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou University of Technology
Original Assignee
Xuzhou University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou University of Technology filed Critical Xuzhou University of Technology
Priority to CN201610650169.0A priority Critical patent/CN106192888B/en
Publication of CN106192888A publication Critical patent/CN106192888A/en
Application granted granted Critical
Publication of CN106192888B publication Critical patent/CN106192888B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/106Temporary dykes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)
  • Emergency Alarm Devices (AREA)

Abstract

The invention discloses one kind to have monitoring alarm Functional City flood control assembling wall and its method of work, is made up of support column, flood control board, main support rod, Auxiliary support angled seat, main support angled seat;The support column is fixed on ground vertically, and flood control board is provided between two of which support column;Described main support rod one end is placed in the middle part of support column, and the other end is placed in main support angled seat, wherein main support angled seat is connected through a screw thread and is fixed on ground;The Auxiliary support angled seat is fixed positioned at support column bottom, wherein Auxiliary support angled seat end face with support column bolt, and other end is fixed with ground bolt.The present invention can dismantle use, be easy to construct, repair and carry.The apparatus structure is safe and reliable, there is provided the movable flood protection device in city of a kind of easy-to-use and service life length, in addition the device flushed with ground, it is not only attractive in appearance, and beneficial to the normal life in maintenance city, the inconvenience of people's life will not be caused.

Description

One kind has monitoring alarm Functional City flood control assembling wall and its method of work
Technical field
The invention belongs to safety control equipment field, and in particular to one kind has monitoring alarm Functional City flood control assembling wall.
Background technology
In recent years, storm flood takes place frequently, and the life and property safety to people bring heavy losses, also to the normal of people Production and life constitute a serious threat.It is densely populated especially in City Section, threatened caused by flood bigger.State is concentrated in city The wealth of family more than 60%, once being inundated with flood, loss is then its several times even tens times of vast agriculture considerably beyond area Village, therefore the importance of urban flood defence is more prominent.All the time, the method that we resist extraodinary flood is:One side is in distress, eight Fang Zhiyuan, it is indomitable, rehabilitate one's homeland.Although this tactics of human sea can be with Emergency use, the human and material resources and wealth that put into Power is huge, and the life security in the first-line staff that fights flood and relieve victims is formed and greatly threatened.For realize people and flood and Humorous coexistence, come temporarily, flood can be allowed there are enough spaces temporarily to store in flood, and can ensures the people and vast flood fighting Speedily carry out rescue work the life security and property safety of officers and men, it is necessary to have flood defense system powerful enough.
In addition, flood control system construction of the China to Urban House system at present is not perfect, existing flood control board uses more Individual flood control board lateral connection, flood control plate material is mostly steel, and steel are heavier and cost is higher, is controlled flood for house, without enough Manually, difficult is bigger, and cost performance is relatively low, in addition, flood control board and column are connected defective tightness.
The content of the invention
In order to solve the above-mentioned technical problem, the present invention provides a kind of with monitoring alarm Functional City flood control assembling wall, bag Include:Support column 1, flood control board 2, main support rod 3, Auxiliary support angled seat 4, main support angled seat 5;The support column 1 is fixed on vertically Ground, flood control board 2 is provided between two of which support column 1, the both ends of flood control board 2 are embedded in support column 1;The main support rod 3 One end is placed in the middle part of support column 1, and the other end is placed in main support angled seat 5, wherein main support angled seat 5 is connected through a screw thread and is fixed on On ground, support column 1 and it is main support angled seat 5 with the hinge connection of main support rod 3;The Auxiliary support angled seat 4 is located at support column 1 Bottom, Auxiliary support angled seat 4 are made up of equal leg angle, and wherein the end face of Auxiliary support angled seat 4 is fixed with the bolt of support column 1, separately End face is fixed with ground bolt.
Further, the support column 1 includes:Flood control board pressing device 1-1, flood control board sealing device 1-2, level sensor Device 1-3, support base 1-4, fixed panel 1-5, hydraulic inductor 1-6, middle control instrument 1-7;The fixed panel 1-5 is rectangle knot Structure, fixed panel 1-5 share two, and two fixed panel 1-5 are symmetrical;The support base 1-4 is located in one of fixing Panel 1-5 is manganese steel material-structure, and support base 1-4 is welded and fixed with fixed panel 1-5;The fixed panel 1-5 both ends are equal Level sensor 1-3 is disposed with, level sensor 1-3 shares four, and it is connected with middle control instrument 1-7 wires;The flood control board is close Seal apparatus 1-2 is located at the top center of support column 1, and wherein flood control board sealing device 1-2 is through to the inside center of support column 1;It is described Flood control board pressing device 1-1 is located at fixed panel 1-5 top inner sides, and flood control board pressing device 1-1 and fixed panel 1-5, which is fixed, to be connected Connect;The hydraulic inductor 1-6 is fixed on fixed panel 1-5 surfaces, and hydraulic inductor 1-6 is connected with middle control instrument 1-7 wires.
Further, the flood control board pressing device 1-1 includes:Column spinner 1-1-1, fixed thread through hole 1-1-2 are compressed, Super warning line alarm 1-1-3, support block 1-1-4, compress Rubber end 1-1-5, dynamic torque sensor 1-1-6;The branch Bracer 1-1-4 is rectangular configuration, and wherein support block 1-1-4 upper surfaces center is provided with super warning line alarm 1-1-3, surpasses warning Water level alarm 1-1-3 is connected with middle control instrument 1-7 wires;The preceding surfaces of support block 1-1-4 are provided with fixed thread through hole 1-1- 2, fixed thread through hole 1-1-2 shares two;The compression column spinner 1-1-1 is through support block 1-1-4 both ends, wherein compressing Column spinner 1-1-1 shares two, compresses column spinner 1-1-1 and is threadedly coupled with support block 1-1-4;The compression Rubber end 1-1-5 Positioned at column spinner 1-1-1 bottoms are compressed, column spinner 1-1-1 is compressed inside compression Rubber end 1-1-5;The dynamic torque passes Sensor 1-1-6 is connected positioned at the top for compressing Rubber end 1-1-5, dynamic torque sensor 1-1-6 with middle control instrument 1-7 wires, institute It is commercially available conventional instrument to state dynamic torque sensor 1-1-6.
Further, the flood control board sealing device 1-2 includes:Sealing plate 1-2-1, rotate push shaft 1-2-2, fixed thread Pipe 1-2-3, connecting shaft 1-2-4;Through there is rotation push shaft 1-2-2 inside the fixed thread pipe 1-2-3, push shaft 1-2-2 is rotated It is connected with fixed thread pipe 1-2-3 screw thread rotations, and is connected through a screw thread realization and pumps;The rotation push shaft 1-2- 2 bottoms are provided with connecting shaft 1-2-4, and wherein connecting shaft 1-2-4 shares two, and connecting shaft 1-2-4 is on rotating push shaft 1-2-2 axis Line is symmetrical;Described two connecting shaft 1-2-4 one end are equipped with sealing plate 1-2-1;
The rotation push shaft 1-2-2 and sealing plate 1-2-1 with connecting shaft 1-2-4 hinge connections.
Further, the flood control board 2 includes:Filler 2-1, it is connected groove 2-2, top plate 2-3, bottom plate 2-4;Institute Bottom plate 2-4 is stated as 1, top plate 2-3 is 2~10, and wherein bottom plate 2-4 is located at the lowermost end of flood control board 2, top plate 2-3 Positioned at bottom plate 2-4 tops;The linking groove 2-2 is located at top plate 2-3 bottoms, and linking groove 2-2 structures are trapezoidal groove, Raised rubber is provided with the top of wherein top plate 2-3, raised rubber is in linking groove 2-2;The top plate 2-3 and bottom plate Filler 2-1 is equipped with inside 2-4, wherein filler 2-1 is rectangular strip, and filler 2-1 levels run through top plate 2-3 and bottom Laminate 2-4.
Further, the filler 2-1 is molded by high polymer material pressing mold, filler 2-1 constituent and manufacture Process is as follows:
First, filler 2-1 constituents:
Count in parts by weight, 1,1,2,2- 30~65 parts of the tetrahydrochysene perfluor tetradecane (alcohol) acrylate, (S) alpha-cyano-benzene Oxy-benzyl (1R, 3R) -3- (2,2- dibromo vinyl) -88~145 parts of 2,2- dimethyl cyclopropane carboxylic acids ester, 3- (2,2- bis- Chlorovinyl) 54~98 parts of -2,2- dimethyl cyclopropane carboxylic acids, pi-allyl -1,1,2,2- 28~75 parts of tetrafluoro ethylethers, methylene 68~180 parts of basic ring propane -2,2- diethyl dicarboxylate, (1R)-trans -2,2- dimethyl -3- (2- methyl-1-propylenes base) - 22~86 parts of cyclopropane-carboxylic acid -3- phenoxy benzyls ester, concentration are 45ppm~95ppm (S)-alpha- cyano group -3- benzyloxy phenoxies Base-(+)-cis- 3- (2,2, dibromo vinyl) -53~110 parts of 2,2- dimethyl cyclopropane carboxylic acids ester, 3- (2,2- dichloroethylene Base) 56~132 parts of -2,2- dimethyl cyclopropane carboxylic acids, alpha-cyano phenoxy benzyl (1R, 3R) -3- (2,2- dibromo vinyl) - 2,2 90~145 parts of diyl first cyclopropanecarboxylcompounds, 85~146 parts of crosslinking agent, 2- cyano group -3- phenoxy benzyls -2,2,3,3- tetra- 24~72 parts of methyl cyclopropane acid esters, 67~162 parts of 2,2,3,3- tetrafluoro propyl ester of methacrylic acid, cis -2,2- dimethyl -3- 38~92 parts of (2,2- dichloroethylene) cyclopropane-carboxylic acid, cis-3- (2- chloro-3,3,3 ,-trifluoropropenes base) -2,2- diformazan basic rings 75~185 parts of propanecarboxylic acid;
The crosslinking agent is haloflex, acetic acid 2- (1,1- dimethyl ethyls) cyclohexyl, 4- cyclohexenyl groups -1,2- two Any one in double (2- ethylhexyls) esters of formic acid;
2nd, filler 2-1 manufacturing process, is comprised the steps of:
1st step:3650~4780 parts of the ultra-pure water that electrical conductivity is the μ S/cm of 3.65 μ S/cm~8.75 is added in a kettle, Start reactor in agitator, rotating speed be 95rpm~170rpm, startup heat pump, make reactor temperature rise to 80 DEG C~ 110℃;Sequentially add 1,1,2,2- the tetrahydrochysene perfluor tetradecane (alcohol) acrylate, (S) alpha-cyano-phenoxy benzyl (1R, 3R)- 3- (2,2- dibromo vinyls) -2,2- dimethyl cyclopropane carboxylic acids ester, 3- (2,2- dichloroethylenes) -2,2- dimethylcyclopropanes Carboxylic acid, to being completely dissolved, regulation pH value is 6.5~8.5, agitator speed is adjusted into 150rpm~280rpm, temperature is for stirring 140 DEG C~180 DEG C, esterification 10~25 hours;
2nd step:Pi-allyl -1,1,2,2- tetrafluoros ethylether, methene cyclopropane -2,2- diethyl dicarboxylates is taken to carry out powder Broken, powder diameter is 700~1000 mesh;Add (1R)-trans -2,2- dimethyl -3- (2- methyl-1-propylenes base)-cyclopropane Carboxylic acid -3- phenoxy benzyl esters are well mixed, and are laid in pallet, and tiling thickness is 20mm~50mm, use dosage for 7.5kGy~12.5kGy, the alpha ray that energy is 8.0MeV~13.0MeV irradiate 200~350 minutes, and the β of Isodose X ray irradiation x 250~400 minutes;
3rd step:Through the 2nd step handle mixed-powder be dissolved in (S)-alpha- cyano group -3- benzyloxy phenoxies base-(+)-cis- 3- (2, 2, dibromo vinyl) in -2,2- dimethyl cyclopropane carboxylic acid's esters, reactor is added, agitator speed is 120rpm~190rpm, Temperature is 85 DEG C~140 DEG C, and starting vavuum pump makes the vacuum of reactor reach -0.20MPa~2.25MPa, keeps this state Reaction 20~40 hours;Pressure release is simultaneously passed through radon gas, and it is 0.75MPa~1.35MPa to make reacting kettle inner pressure, and insulation stands 15~30 Hour;Agitator speed is promoted to 250rpm~320rpm, simultaneous reactions kettle pressure release to 0MPa;Sequentially add 3- (2,2- dichloros Vinyl) -2,2- dimethyl cyclopropane carboxylic acids, alpha-cyano phenoxy benzyl (1R, 3R) -3- (2,2- dibromo vinyls) -2,2 two After base first cyclopropanecarboxylcompound is completely dissolved, adds crosslinking agent and be stirred so that the hydrophilic lipophilic balance of reactor solution For 6.5~8.4, insulation stands 25~50 hours;
4th step:When agitator speed is 260rpm~350rpm, 2- cyano group -3- phenoxy benzyls -2,2 are sequentially added, 3,3- tetramethyl-rings cyclopropanecarboxylic acid ester, methacrylic acid 2,2,3,3- tetrafluoros propyl ester, the cis -2,2- dimethyl -3- (chloroethenes of 2,2- bis- Alkenyl) cyclopropane-carboxylic acid and cis-3- (2- chloro-3,3,3 ,-trifluoropropenes base) -2,2- dimethyl cyclopropane carboxylic acids, lifting reaction Kettle pressure, 1.55MPa~4.75MPa is reached, temperature is 270 DEG C~350 DEG C, polymerisation 30~45 hours;React Reacting kettle inner pressure is down to 0MPa after, 25 DEG C~35 DEG C is cooled to, discharging, enters molding press and can be prepared by filler 2-1.
Further, the invention also discloses a kind of controlled flood with monitoring alarm Functional City to assemble the method for work of wall, This method includes following steps:
1st step:Staff carries out the assembly working of the device.First, flood control board sealing device 1-2 is placed in stationary plane Inside plate 1-5 in mounting groove, bolt then is carried out to fixed panel 1-5 bottoms and fixed;Secondly, by the bottom of the bottom of flood control board 2 Plate 2-4 is embedded in the inside mounting groove of support column 1 in advance, some top plate 2-3 is then embedded in again, then by flood control board pressing device 1-1 is fixed on fixed panel 1-5 tops;Finally, Auxiliary support angled seat 4 and main support angled seat 5 are fixed with ground, by main support Bar 3 and fixed panel 1-5 and the main support hinge connection of angled seat 5;
2nd step:After the completion of the device is fixed, flood control board pressing device 1-1 compression column spinner 1-1-1 is now rotated, is made Compress Rubber end 1-1-4 and tightly suppress top plate 2-3, promote the raised rubber of the linking groove 2-2 and top plate 2-3 in flood control board 2 Glue is combined closely, and at the same time flood control board pressing device 1-1 internal dynamic torque sensors 1-1-6 starts working, and is produced in real time Electric signal is simultaneously transmitted to middle control instrument 1-7, when dynamic torque sensor 1-1-6 detected values reach middle control instrument 1-7 setting values 330N.m When, middle control instrument 1-7 sends prompt message, represents that flood control board pressing device 1-1 completes to compress flood control board 2;
3rd step:The device is during flood is stopped, level sensor 1-3, hydraulic pressure sense on support column (1) Answer device 1-6 and super warning line alarm 1-1-3 to monitor hydrologic(al) regime in real time, and produce electric signal and be sent to middle control instrument 1-7, in Control instrument 1-7 real-time display level sensor 1-3 and hydraulic inductor 1-6 monitor values;When water pressure monitoring value reaches warning value During 1.100MPa, middle control instrument 1-7 sends hydraulic pressure warning message, when water level reaches super warning line alarm 1-1-3 positions When, middle control instrument 1-7 sends water-level alarm information.
It is disclosed by the invention a kind of with monitoring alarm Functional City flood control assembling wall, it the advantage is that:
(1) device is ingenious in design, is detachable, flood control board and support column and other parts are detachable, are easy to Construction, maintenance and carrying;
(2) the device flood control board is embedded in inside support column, is connected by T-shaped groove, and is provided with flood control board sealing device, So that flood control board be connected with column it is closer;
(3) the device flood control board uses light material, and inside stuffing is high polymer material, improves and bears water pressure Ability, reduce the use of steel, reduce the weight of flood control board.
A kind of controlled flood with monitoring alarm Functional City of the present invention assembles wall, and the device can dismantle use, just In construction, maintenance and carry.The apparatus structure is safe and reliable, there is provided the city activity of a kind of easy-to-use and service life length Flood protection device, in addition the device flushed with ground, it is not only attractive in appearance, and beneficial to maintain city normal life, people will not be caused The inconvenience of life.
Brief description of the drawings
Fig. 1 is that heretofore described one kind has monitoring alarm Functional City flood control assembling wall construction schematic diagram.
Fig. 2 is heretofore described support column arrangement schematic diagram.
Fig. 3 is heretofore described flood control board pressing device structural representation.
Fig. 4 is heretofore described flood control board schematic diagram of sealing device.
Fig. 5 is heretofore described flood control plate structure schematic diagram.
Fig. 6 is that heretofore described filler fatigue strength changes over time figure.
In figure 1 above~Fig. 5, support column 1, flood control board pressing device 1-1, column spinner 1-1-1, fixed thread through hole are compressed 1-1-2, support block 1-1-3, compress Rubber end 1-1-4, flood control board sealing device 1-2, sealing plate 1-2-1, rotation push shaft 1-2- 2, fixed thread pipe 1-2-3, connecting shaft 1-2-4, level sensor 1-3, support base 1-4, fixed panel 1-5, hydraulic inductor 1-6, middle control instrument 1-7, flood control board 2, filler 2-1 are connected groove 2-2, top plate 2-3, bottom plate 2-4, and main support rod 3 is auxiliary Help support angled seat 4, main support angled seat 5.
Embodiment
With reference to the accompanying drawings and examples to provided by the invention a kind of with monitoring alarm Functional City flood control assembling wall It is further described.
As shown in figure 1, it is that heretofore described one kind has the flood control assembling wall construction signal of monitoring alarm Functional City Figure.It is seen in fig. 1, that including:Support column 1, flood control board 2, main support rod 3, Auxiliary support angled seat 4, main support angled seat 5;It is described Support column 1 is fixed on ground vertically, is provided with flood control board 2 between two of which support column 1, the both ends of flood control board 2 are embedded in support column 1 It is interior;Described one end of main support rod 3 is placed in the middle part of support column 1, and the other end is placed in main support angled seat 5, wherein main support angled seat 5 is logical Threaded connection is crossed to be fixed on ground, support column 1 and it is main support angled seat 5 with the hinge connection of main support rod 3;The Auxiliary support Angled seat 4 is located at the bottom of support column 1, and Auxiliary support angled seat 4 is made up of equal leg angle, wherein the end face of Auxiliary support angled seat 4 and branch The bolt of dagger 1 is fixed, and other end is fixed with ground bolt.
As shown in Fig. 2 it is heretofore described support column arrangement schematic diagram.As seen from Figure 2, support column 1 includes:It is anti- Big vast plate pressing device 1-1, flood control board sealing device 1-2, level sensor 1-3, support base 1-4, fixed panel 1-5, hydraulic pressure sense Answer device 1-6, middle control instrument 1-7;The fixed panel 1-5 is rectangular configuration, and fixed panel 1-5 shares two, two fixed panels 1-5 is symmetrical;It is manganese steel material-structure that the support base 1-4, which is located in one of fixed panel 1-5, and support base 1-4 is with consolidating Determine panel 1-5 to be welded and fixed;The fixed panel 1-5 both ends are arranged with level sensor 1-3, and level sensor 1-3 is total to There are four, it is connected with middle control instrument 1-7 wires;The flood control board sealing device 1-2 is located at the top center of support column 1, wherein anti- Big vast plate sealing device 1-2 is through to the inside center of support column 1;The flood control board pressing device 1-1 is located at fixed panel 1-5 tops Inner side, flood control board pressing device 1-1 are fixedly connected with fixed panel 1-5;The hydraulic inductor 1-6 is fixed on fixed panel 1- 5 surfaces, hydraulic inductor 1-6 are connected with middle control instrument 1-7 wires.
As shown in figure 3, it is heretofore described flood control board pressing device structural representation.Find out from Fig. 3 or Fig. 2, Flood control board pressing device 1-1 includes:Compress column spinner 1-1-1, fixed thread through hole 1-1-2, super warning line alarm 1-1- 3, support block 1-1-4, compress Rubber end 1-1-5, dynamic torque sensor 1-1-6;The support block 1-1-4 is rectangular configuration, Wherein support block 1-1-4 upper surfaces center is provided with super warning line alarm 1-1-3, and super warning line alarm 1-1-3 is with Control the connection of instrument 1-7 wires;The preceding surfaces of support block 1-1-4 are provided with fixed thread through hole 1-1-2, fixed thread through hole 1-1-2 Share two;The compression column spinner 1-1-1 is through support block 1-1-4 both ends, wherein compressing column spinner 1-1-1 shares two It is individual, compress column spinner 1-1-1 and be threadedly coupled with support block 1-1-4;The compression Rubber end 1-1-5 is positioned at compression column spinner 1-1- 1 bottom, column spinner 1-1-1 is compressed inside compression Rubber end 1-1-5;The dynamic torque sensor 1-1-6 is positioned at compression Rubber end 1-1-5 top, dynamic torque sensor 1-1-6 are connected with middle control instrument 1-7 wires, the dynamic torque sensor 1- 1-6 is commercially available conventional instrument.
As shown in figure 4, it is heretofore described flood control board schematic diagram of sealing device.As seen from Figure 4, flood control board Sealing device 1-2 includes:Sealing plate 1-2-1, rotate push shaft 1-2-2, fixed thread pipe 1-2-3, connecting shaft 1-2-4;It is described solid Determine to rotate push shaft 1-2-2 through there is rotation push shaft 1-2-2 inside screwed pipe 1-2-3 and with fixed thread pipe 1-2-3 screw thread rotations connect Connect, and be connected through a screw thread realization and pump;The rotation push shaft 1-2-2 bottoms are provided with connecting shaft 1-2-4, wherein connecting Spindle 1-2-4 shares two, and connecting shaft 1-2-4 is symmetrical on rotation push shaft 1-2-2 axis;Described two connecting shaft 1- 2-4 one end is equipped with sealing plate 1-2-1;
The rotation push shaft 1-2-2 and sealing plate 1-2-1 with connecting shaft 1-2-4 hinge connections.
As shown in figure 5, it is heretofore described flood control plate structure schematic diagram.As seen from Figure 5, flood control board 2 includes:Fill out Thing 2-1 is filled, is connected groove 2-2, top plate 2-3, bottom plate 2-4;The bottom plate 2-4 is 1, and top plate 2-3 is 2~10 Individual, wherein bottom plate 2-4 is located at the lowermost end of flood control board 2, and top plate 2-3 is located at bottom plate 2-4 tops;The linking groove 2-2 Positioned at top plate 2-3 bottoms, linking groove 2-2 structures are trapezoidal groove, and raised rubber is provided with the top of wherein top plate 2-3, convex Rubber is played in linking groove 2-2;Filler 2-1 is equipped with inside the top plate 2-3 and bottom plate 2-4, wherein filling Thing 2-1 is rectangular strip, and filler 2-1 levels run through top plate 2-3 and bottom plate 2-4.
It is of the present invention it is a kind of with monitoring alarm Functional City flood control assembling wall the course of work be:
1st step:Staff carries out the assembly working of the device.First, flood control board sealing device 1-2 is placed in stationary plane Inside plate 1-5 in mounting groove, bolt then is carried out to fixed panel 1-5 bottoms and fixed;Secondly, by the bottom of the bottom of flood control board 2 Plate 2-4 is embedded in the inside mounting groove of support column 1 in advance, some top plate 2-3 is then embedded in again, then by flood control board pressing device 1-1 is fixed on fixed panel 1-5 tops;Finally, Auxiliary support angled seat 4 and main support angled seat 5 are fixed with ground, by main support Bar 3 and fixed panel 1-5 and the main support hinge connection of angled seat 5;
2nd step:After the completion of the device is fixed, flood control board pressing device 1-1 compression column spinner 1-1-1 is now rotated, is made Compress Rubber end 1-1-4 and tightly suppress top plate 2-3, promote the raised rubber of the linking groove 2-2 and top plate 2-3 in flood control board 2 Glue is combined closely, and at the same time flood control board pressing device 1-1 internal dynamic torque sensors 1-1-6 starts working, and is produced in real time Electric signal is simultaneously transmitted to middle control instrument 1-7, when dynamic torque sensor 1-1-6 detected values reach middle control instrument 1-7 setting values 330N.m When, middle control instrument 1-7 sends prompt message, represents that flood control board pressing device 1-1 completes to compress flood control board 2;
3rd step:The device is during flood is stopped, level sensor 1-3, hydraulic pressure sense on support column (1) Answer device 1-6 and super warning line alarm 1-1-3 to monitor hydrologic(al) regime in real time, and produce electric signal and be sent to middle control instrument 1-7, in Control instrument 1-7 real-time display level sensor 1-3 and hydraulic inductor 1-6 monitor values;When water pressure monitoring value reaches warning value During 1.100MPa, middle control instrument 1-7 sends hydraulic pressure warning message, when water level reaches super warning line alarm 1-1-3 positions When, middle control instrument 1-7 sends water-level alarm information.
A kind of controlled flood with monitoring alarm Functional City of the present invention assembles wall, and the device can dismantle use, just In construction, maintenance and carry.The apparatus structure is safe and reliable, there is provided the city activity of a kind of easy-to-use and service life length Flood protection device, in addition the device flushed with ground, it is not only attractive in appearance, and beneficial to maintain city normal life, people will not be caused The inconvenience of life.
It is the embodiment of filler 2-1 of the present invention manufacturing process below, embodiment is to further illustrate this The content of invention, but should not be construed as limiting the invention.Without departing from the spirit and substance of the case in the present invention, to this hair The modification and replacement that bright method, step or condition are made, belong to the scope of the present invention.
Unless otherwise specified, the conventional meanses that technological means used in embodiment is well known to those skilled in the art.
Embodiment 1
Filler 2-1 of the present invention is manufactured according to following steps, and is counted in parts by weight:
1st step:3650 parts of the ultra-pure water that electrical conductivity is 3.65 μ S/cm is added in a kettle, is started in reactor and is stirred Device, rotating speed 95rpm, start heat pump, reactor temperature is risen to 80 DEG C;Sequentially add 1,1,2,2- tetrahydrochysenes perfluor ten 52 parts of four alkane (alcohol) acrylate, (S) alpha-cyano-phenoxy benzyl (1R, 3R) -3- (2,2- dibromo vinyls) -2,2- diformazans 120 parts of basic ring carboxylate, 3- (2,2- dichloroethylene) -150 parts of 2,2- dimethyl cyclopropane carboxylic acids, stir to completely molten Solution, regulation pH value are 6.5, agitator speed are adjusted into 150rpm, temperature is 140 DEG C, esterification 10 hours;
2nd step:Take 35 parts of pi-allyl -1,1,2,2- tetrafluoros ethylether, methene cyclopropane -2,2- diethyl dicarboxylates 96 Part is crushed, and powder diameter is 700 mesh;Add (1R)-trans -2,2- dimethyl -3- (2- methyl-1-propylenes base)-ring third 63 parts of alkane carboxylic acid -3- phenoxy benzyls ester is well mixed, is laid in pallet, and tiling thickness is 20mm, use dosage for 7.5kGy, the alpha ray that energy is 8.0MeV irradiate 200 minutes, and the β x ray irradiation xs 250 minutes of Isodose;
3rd step:The mixed-powder handled through the 2nd step is dissolved in (S)-alpha- cyano group -3- benzyloxy phenoxies that concentration is 55ppm In base-(+)-cis- 3- (2,2, dibromo vinyl) -73 parts of 2,2- dimethyl cyclopropane carboxylic acids ester, reactor is added, agitator turns Speed is 120rpm, and temperature is 85 DEG C, and starting vavuum pump makes the vacuum of reactor reach -0.20MPa, keeps this state response 20 Hour;Pressure release is simultaneously passed through radon gas, and it is 0.75MPa to make reacting kettle inner pressure, and insulation stands 15 hours;Agitator speed is promoted to 250rpm, simultaneous reactions kettle pressure release to 0MPa;Sequentially add 3- (2,2- dichloroethylenes) -2,2- dimethyl cyclopropane carboxylic acids 66 Part, 45 parts of -2,2 diyl first cyclopropanecarboxylcompounds of alpha-cyano phenoxy benzyl (1R, 3R) -3- (2,2- dibromo vinyls) are completely molten Xie Hou, add 110 parts of crosslinking agent and be stirred so that the hydrophilic lipophilic balance of reactor solution is 6.5, and it is small that insulation stands 25 When;
4th step:When agitator speed is 260rpm, 2- cyano group -3- phenoxy benzyls -2,2,3,3- tetramethyls are sequentially added 180 parts of basic ring cyclopropanecarboxylic acid ester, 78 parts of methacrylic acid 2,2,3,3- tetrafluoros propyl ester, cis -2,2- dimethyl -3- (2,2- dichloros Vinyl) 210 parts of cyclopropane-carboxylic acid and cis-3- (the chloro- 3,3,3- trifluoro-propenyls of 2-) -2,2- dimethyl cyclopropane carboxylic acids 184 Part, reactor pressure is lifted, reaches 1.55MPa, temperature is 270 DEG C, polymerisation 30 hours;Will reaction after the completion of reaction Pressure is down to 0MPa in kettle, is cooled to 30 DEG C, discharging, enters molding press and can be prepared by filler 2-1.
The crosslinking agent is haloflex.
Embodiment 2
Filler 2-1 of the present invention is manufactured according to following steps, and is counted in parts by weight:
1st step:4200 parts of the ultra-pure water that electrical conductivity is 6.25 μ S/cm is added in a kettle, is started in reactor and is stirred Device, rotating speed 135rpm, start heat pump, reactor temperature is risen to 105 DEG C;Sequentially add 1,1,2,2- tetrahydrochysene perfluors 72 parts of the tetradecane (alcohol) acrylate, (S) alpha-cyano-phenoxy benzyl (1R, 3R) -3- (2,2- dibromo vinyls) -2,2- two 180 parts of methylcyclopropanecarboxylic acid's ester, 3- (2,2- dichloroethylene) -215 parts of 2,2- dimethyl cyclopropane carboxylic acids, are stirred to complete Dissolving, regulation pH value are 7.5, agitator speed are adjusted into 215rpm, temperature is 160 DEG C, esterification 18 hours;
2nd step:Take 65 parts of pi-allyl -1,1,2,2- tetrafluoros ethylether, methene cyclopropane -2,2- diethyl dicarboxylates 170 parts are crushed, and powder diameter is 850 mesh;Add (1R)-trans -2,2- dimethyl -3- (2- methyl-1-propylenes base)-ring 95 parts of propanecarboxylic acid's -3- phenoxy benzyls ester is well mixed, is laid in pallet, and tiling thickness is 35mm, use dosage for 10.0kGy, the alpha ray that energy is 11.0MeV irradiate 275 minutes, and the β x ray irradiation xs 325 minutes of Isodose;
3rd step:The mixed-powder handled through the 2nd step is dissolved in (S)-alpha- cyano group -3- benzyloxy phenoxies that concentration is 68ppm In base-(+)-cis- 3- (2,2, dibromo vinyl) -103 parts of 2,2- dimethyl cyclopropane carboxylic acids ester, reactor, agitator are added Rotating speed is 155rpm, and temperature is 115 DEG C, and starting vavuum pump makes the vacuum of reactor reach 1.15MPa, keeps this state response 30 hours;Pressure release is simultaneously passed through radon gas, and it is 1.05MPa to make reacting kettle inner pressure, and insulation stands 23 hours;Agitator speed is promoted to 285rpm, simultaneous reactions kettle pressure release to 0MPa;Sequentially add 3- (2,2- dichloroethylenes) -2,2- dimethyl cyclopropane carboxylic acids 110 parts, 70 parts of the diyl first cyclopropanecarboxylcompounds of alpha-cyano phenoxy benzyl (1R, 3R) -3- (2,2- dibromo vinyls) -2,2 it is complete After fully dissolved, add 148 parts of crosslinking agent and be stirred so that the hydrophilic lipophilic balance of reactor solution is 7.5, and insulation is stood 38 hours;
4th step:When agitator speed is 310rpm, 2- cyano group -3- phenoxy benzyls -2,2,3,3- tetramethyls are sequentially added 220 parts of basic ring cyclopropanecarboxylic acid ester, 113 parts of methacrylic acid 2,2,3,3- tetrafluoros propyl ester, cis -2,2- dimethyl -3- (2,2- dichloros Vinyl) 248 parts of cyclopropane-carboxylic acid and cis-3- (the chloro- 3,3,3- trifluoro-propenyls of 2-) -2,2- dimethyl cyclopropane carboxylic acids 205 Part, reactor pressure is lifted, reaches 3.25MPa, temperature is 310 DEG C, polymerisation 38 hours;Will reaction after the completion of reaction Pressure is down to 0MPa in kettle, is cooled to 30 DEG C, discharging, enters molding press and can be prepared by filler 2-1.
The crosslinking agent is acetic acid 2- (1,1- dimethyl ethyls) cyclohexyl.
Embodiment 3
Filler 2-1 of the present invention is manufactured according to following steps, and is counted in parts by weight:
1st step:4780 parts of the ultra-pure water that electrical conductivity is 8.75 μ S/cm is added in a kettle, is started in reactor and is stirred Device, rotating speed 170rpm, start heat pump, reactor temperature is risen to 110 DEG C;Sequentially add 1,1,2,2- tetrahydrochysene perfluors 85 parts of the tetradecane (alcohol) acrylate, (S) alpha-cyano-phenoxy benzyl (1R, 3R) -3- (2,2- dibromo vinyls) -2,2- two 240 parts of methylcyclopropanecarboxylic acid's ester, 3- (2,2- dichloroethylene) -280 parts of 2,2- dimethyl cyclopropane carboxylic acids, are stirred to complete Dissolving, regulation pH value are 8.5, agitator speed are adjusted into 280rpm, temperature is 180 DEG C, esterification 25 hours;
2nd step:Take 95 parts of pi-allyl -1,1,2,2- tetrafluoros ethylether, methene cyclopropane -2,2- diethyl dicarboxylates 250 parts are crushed, and powder diameter is 1000 mesh;Addition (1R)-trans -2,2- dimethyl -3- (2- methyl-1-propylenes base) - 112 parts of cyclopropane-carboxylic acid -3- phenoxy benzyls ester is well mixed, is laid in pallet, and tiling thickness is 50mm, use dosage for 12.5kGy, the alpha ray that energy is 13.0MeV irradiate 350 minutes, and the β x ray irradiation xs 400 minutes of Isodose;
3rd step:The mixed-powder handled through the 2nd step is dissolved in (S)-alpha- cyano group -3- benzyloxy phenoxies that concentration is 82ppm In base-(+)-cis- 3- (2,2, dibromo vinyl) -135 parts of 2,2- dimethyl cyclopropane carboxylic acids ester, reactor, agitator are added Rotating speed is 190rpm, and temperature is 140 DEG C, and starting vavuum pump makes the vacuum of reactor reach 2.25MPa, keeps this state response 40 hours;Pressure release is simultaneously passed through radon gas, and it is 1.35MPa to make reacting kettle inner pressure, and insulation stands 30 hours;Agitator speed is promoted to 320rpm, simultaneous reactions kettle pressure release to 0MPa;Sequentially add 3- (2,2- dichloroethylenes) -2,2- dimethyl cyclopropane carboxylic acids 156 parts, 115 parts of the diyl first cyclopropanecarboxylcompounds of alpha-cyano phenoxy benzyl (1R, 3R) -3- (2,2- dibromo vinyls) -2,2 it is complete After fully dissolved, add 187 parts of crosslinking agent and be stirred so that the hydrophilic lipophilic balance of reactor solution is 8.4, and insulation is stood 50 hours;
4th step:When agitator speed is 350rpm, 2- cyano group -3- phenoxy benzyls -2,2,3,3- tetramethyls are sequentially added 265 parts of basic ring cyclopropanecarboxylic acid ester, 152 parts of methacrylic acid 2,2,3,3- tetrafluoros propyl ester, cis -2,2- dimethyl -3- (2,2- dichloros Vinyl) 286 parts of cyclopropane-carboxylic acid and cis-3- (the chloro- 3,3,3- trifluoro-propenyls of 2-) -2,2- dimethyl cyclopropane carboxylic acids 236 Part, reactor pressure is lifted, reaches 4.75MPa, temperature is 350 DEG C, polymerisation 45 hours;Will reaction after the completion of reaction Pressure is down to 0MPa in kettle, is cooled to 30 DEG C, discharging, enters molding press and can be prepared by filler 2-1.
The crosslinking agent is double (2- ethylhexyls) esters of 4- cyclohexenyl group -1,2- dioctyl phthalate.
Reference examples
Reference examples are the filler of certain commercially available brand.
Embodiment 4
Filler described in the filler 2-1 and reference examples that embodiment 1~3 is prepared carries out using effect contrast. To the two unit mass, yield strength, corrosion rate, tensile strength is counted, as a result as shown in table 1.
As seen from Table 1, filler 2-1 of the present invention, its unit mass, yield strength, corrosion rate, tension force are strong
The indexs such as degree are superior to the product of prior art production.
In addition, as shown in fig. 6, it is the system that filler 2-1 fatigues of materials intensity of the present invention changes with usage time Meter.Find out in figure, filler 2-1 used in embodiment 1~3, its fatigue of materials intensity is significantly better than with usage time intensity of variation Existing product.

Claims (6)

1. one kind has monitoring alarm Functional City flood control assembling wall, including:Support column(1), flood control board(2), main support rod (3), Auxiliary support angled seat(4), main support angled seat(5);Characterized in that, the support column(1)Ground is fixed on vertically, wherein Two support columns(1)Between be provided with flood control board(2), flood control board(2)Both ends are embedded in support column(1)It is interior;The main support rod(3) One end is placed in support column(1)Middle part, the other end are placed in main support angled seat(5)On, wherein main support angled seat(5)It is connected through a screw thread It is fixed on ground, support column(1)With main support angled seat(5)And main support rod(3)Hinge connection;The Auxiliary support angled seat (4)Positioned at support column(1)Bottom, Auxiliary support angled seat(4)It is made up of equal leg angle, wherein Auxiliary support angled seat(4)End face With support column(1)Bolt is fixed, and other end is fixed with ground bolt;
The support column(1)Including:Flood control board pressing device(1-1), flood control board sealing device(1-2), level sensor(1- 3), support base(1-4), fixed panel(1-5), hydraulic inductor(1-6), middle control instrument(1-7);The fixed panel(1-5)For Rectangular configuration, fixed panel(1-5)For manganese steel material-structure, support base(1-4)With fixed panel(1-5)It is welded and fixed;It is described Fixed panel(1-5)Both ends are arranged with level sensor(1-3), level sensor(1-3)Four are shared, itself and middle control instrument (1-7)Wire connects;The flood control board sealing device(1-2)Positioned at support column(1)Top center, wherein flood control board sealing device (1-2)It is through to support column(1)Inside center;The flood control board pressing device(1-1)Positioned at fixed panel(1-5)In top Side, flood control board pressing device(1-1)With fixed panel(1-5)It is fixedly connected;The hydraulic inductor(1-6)It is fixed on stationary plane Plate(1-5)Surface, hydraulic inductor(1-6)With middle control instrument(1-7)Wire connects.
It is 2. according to claim 1 a kind of with monitoring alarm Functional City flood control assembling wall, it is characterised in that described anti- Big vast plate pressing device(1-1)Including:Compress column spinner(1-1-1), fixed thread through hole(1-1-2), super warning line alarm (1-1-3), support block(1-1-4), compress Rubber end(1-1-5), dynamic torque sensor(1-1-6);The support block(1-1- 4)For rectangular configuration, wherein support block(1-1-4)Upper surface center is provided with super warning line alarm(1-1-3), surpass warning water Level alarm(1-1-3)With middle control instrument(1-7)Wire connects;The support block(1-1-4)Preceding surface is provided with fixed thread through hole (1-1-2), fixed thread through hole(1-1-2)Share two;The compression column spinner(1-1-1)Through support block(1-1-4) Both ends, wherein compressing column spinner(1-1-1)Two are shared, compresses column spinner(1-1-1)With support block(1-1-4)Threaded connection; The compression Rubber end(1-1-5)Positioned at compression column spinner(1-1-1)Bottom, compress column spinner(1-1-1)Embedded in compression rubber Head(1-1-5)It is internal;The dynamic torque sensor(1-1-6)Positioned at compression Rubber end(1-1-5)Top, dynamic torque pass Sensor(1-1-6)With middle control instrument(1-7)Wire connects, the dynamic torque sensor(1-1-6)For commercially available conventional instrument.
It is 3. according to claim 2 a kind of with monitoring alarm Functional City flood control assembling wall, it is characterised in that described anti- Big vast plate sealing device(1-2)Including:Sealing plate(1-2-1), rotate push shaft(1-2-2), fixed thread pipe(1-2-3), connecting shaft (1-2-4);The fixed thread pipe(1-2-3)Inside, which is run through, rotation push shaft(1-2-2), rotate push shaft(1-2-2)With fixation Screwed pipe(1-2-3)Screw thread rotation connects;The rotation push shaft(1-2-2)Bottom is provided with connecting shaft(1-2-4), wherein connecting shaft (1-2-4)Two are shared, connecting shaft(1-2-4)On rotating push shaft(1-2-2)Axis is symmetrical;Two connecting shafts (1-2-4)One end is equipped with sealing plate(1-2-1);
The rotation push shaft(1-2-2)And sealing plate(1-2-1)And connecting shaft(1-2-4)Hinge connection.
It is 4. according to claim 3 a kind of with monitoring alarm Functional City flood control assembling wall, it is characterised in that described anti- Big vast plate(2)Including:Filler(2-1), it is connected groove(2-2), top plate(2-3), bottom plate(2-4);The bottom plate(2-4) For 1, top plate(2-3)For 2~10, wherein bottom plate(2-4)Positioned at flood control board(2)Lowermost end, top plate(2-3)It is located at Bottom plate(2-4)Top;The linking groove(2-2)Positioned at top plate(2-3)Bottom, it is connected groove(2-2)Structure is trapezoidal Groove, wherein top plate(2-3)Top is provided with raised rubber, and raised rubber is embedded in linking groove(2-2)It is interior;The top plate (2-3)And bottom plate(2-4)Inside is equipped with filler(2-1), wherein filler(2-1)For rectangular strip, filler(2-1) Level runs through top plate(2-3)And bottom plate(2-4).
It is 5. according to claim 4 a kind of with monitoring alarm Functional City flood control assembling wall, it is characterised in that described to fill out Fill thing(2-1)It is molded by high polymer material pressing mold, filler(2-1)Constituent and manufacturing process it is as follows:
First, filler(2-1)Constituent:
Count in parts by weight, 1,1,2,2- 52~85 parts of the tetrahydrochysene perfluor tetradecane (alcohol) acrylate, (S) alpha-cyano-phenoxy Benzyl (1R, 3R) -3- (2,2- dibromo vinyl) -120~240 parts of 2,2- dimethyl cyclopropane carboxylic acids ester, 3- (2,2- bis- chloroethenes Alkenyl) 150~280 parts of -2,2- dimethyl cyclopropane carboxylic acids, pi-allyl -1,1,2,2- 35~95 parts of tetrafluoro ethylethers, methene 96~250 parts of cyclopropane -2,2- diethyl dicarboxylate, (1R)-trans -2,2- dimethyl -3- (2- methyl-1-propylenes base)-ring 63~112 parts of propanecarboxylic acid's -3- phenoxy benzyls ester, concentration are the ppm of 55 ppm~82 (S)-alpha- cyano group -3- benzene oxygen Benzyl-(+)-cis- 3- (2,2, dibromo vinyl) -73~135 parts of 2,2- dimethyl cyclopropane carboxylic acids ester, 3- (2,2- bis- chloroethenes Alkenyl) 66~156 parts of -2,2- dimethyl cyclopropane carboxylic acids, alpha-cyano phenoxy benzyl (1R, 3R) -3- (2,2- dibromoethylenes Base) -2,2 45~115 parts of diyl first cyclopropanecarboxylcompounds, 110~187 parts of crosslinking agent, 2- cyano group -3- phenoxy benzyls -2,2, 3,3- 180~265 parts of tetramethyl-ring cyclopropanecarboxylic acid esters, 78~152 parts of 2,2,3,3- tetrafluoro propyl ester of methacrylic acid, cis -2,2- 210~286 parts of dimethyl -3- (2,2- dichloroethylene) cyclopropane-carboxylic acid, cis-3- (2- chloro-3,3,3 ,-trifluoropropenes base) - 184~236 parts of 2,2- dimethyl cyclopropane carboxylic acids;
The crosslinking agent is haloflex, acetic acid 2- (1,1- dimethyl ethyls) cyclohexyl, 4- cyclohexenyl group -1,2- dioctyl phthalate Any one in double (2- ethylhexyls) esters;
2nd, filler(2-1)Manufacturing process, comprise the steps of:
1st step:3650~4780 parts of the ultra-pure water that electrical conductivity is the μ S/cm of 3.65 μ S/cm~8.75 is added in a kettle, is opened Agitator in dynamic reactor, rotating speed are the rpm of 95 rpm~170, start heat pump, make reactor temperature rise to 80 DEG C~ 110 ℃;Sequentially add 1,1,2,2- the tetrahydrochysene perfluor tetradecane (alcohol) acrylate, (S) alpha-cyano-phenoxy benzyl (1R, 3R) -3- (2,2- dibromo vinyls) -2,2- dimethyl cyclopropane carboxylic acids ester, 3- (2,2- dichloroethylenes) -2,2- diformazan basic rings Propanecarboxylic acid, to being completely dissolved, regulation pH value is 6.5~8.5 for stirring, and agitator speed is adjusted into the rpm of 150 rpm~280, Temperature is 140 DEG C~180 DEG C, esterification 10~25 hours;
2nd step:Pi-allyl -1,1 is taken, 2,2- tetrafluoro ethylethers, methene cyclopropane -2,2- diethyl dicarboxylate are crushed, Powder diameter is 700~1000 mesh;Add (1R)-trans -2,2- dimethyl -3- (2- methyl-1-propylenes base)-cyclopropane carboxylic acid Acid -3- phenoxy benzyl esters are well mixed, and are laid in pallet, and tiling thickness is the mm of 20 mm~50, uses dosage as 7.5 The kGy of kGy~12.5, energy are that the MeV of 8.0 MeV~13.0 alpha ray irradiates 200~350 minutes, and the β of Isodose X ray irradiation x 250~400 minutes;
3rd step:The mixed-powder handled through the 2nd step is dissolved in (S)-alpha- cyano group -3- benzyloxy phenoxies base-(+)-cis- 3- (2,2, two Bromo vinyl) in -2,2- dimethyl cyclopropane carboxylic acid's esters, add reactor, agitator speed is the rpm of 120 rpm~190, temperature Spend for 85 DEG C~140 DEG C, starting vavuum pump makes the vacuum of reactor reach the MPa of -0.20 MPa~2.25, keeps this state Reaction 20~40 hours;Pressure release is simultaneously passed through radon gas, makes reacting kettle inner pressure for the MPa of 0.75 MPa~1.35, and insulation stands 15~ 30 hours;Agitator speed is promoted to the rpm of 250 rpm~320, simultaneous reactions kettle pressure release to 0MPa;Sequentially add 3- (2,2- Dichloroethylene) -2,2- dimethyl cyclopropane carboxylic acids, alpha-cyano phenoxy benzyl (1R, 3R) -3- (2,2- dibromo vinyls) - After 2,2 diyl first cyclopropanecarboxylcompounds are completely dissolved, add crosslinking agent and be stirred so that the hydrophilic and oleophilic of reactor solution is put down Weighing apparatus value is 6.5~8.4, and insulation stands 25~50 hours;
4th step:When agitator speed is 260 rpm~350 rpm, 2- cyano group -3- phenoxy benzyls -2,2 are sequentially added, 3, 3- tetramethyl-rings cyclopropanecarboxylic acid ester, methacrylic acid 2,2,3,3- tetrafluoros propyl ester, cis -2,2- dimethyl -3- (2,2- dichloroethylene Base) cyclopropane-carboxylic acid and cis-3- (2- chloro-3,3,3 ,-trifluoropropenes base) -2,2- dimethyl cyclopropane carboxylic acids, lift reactor Pressure, the MPa of 1.55 MPa~4.75 is reached, temperature is 270 DEG C~350 DEG C, polymerisation 30~45 hours;React Reacting kettle inner pressure is down to 0 MPa after, 25 DEG C~35 DEG C is cooled to, discharging, enters molding press and can be prepared by filler(2- 1).
6. the method for work according to claim 1 with monitoring alarm Functional City flood control assembling wall, it is characterised in that The method of work includes following steps:
1st step:Staff carries out the assembly working of the device, first, by flood control board sealing device(1-2)It is placed in fixed panel (1-5)In internal mounting groove, then to fixed panel(1-5)Bottom carries out bolt and fixed;Secondly, by flood control board(2)Bottom Bottom plate(2-4)Embedded support column in advance(1)In internal mounting groove, some top plates are then embedded in again(2-3), then will flood control Plate pressing device(1-1)It is fixed on fixed panel(1-5)Top;Finally, by Auxiliary support angled seat(4)With main support angled seat(5) Fixed with ground, by main support rod(3)With fixed panel(1-5)With main support angled seat(5)Hinge connection;
2nd step:After the completion of the device is fixed, flood control board pressing device is now rotated(1-1)Compression column spinner(1-1-1), make Compress Rubber end(1-1-4)Tightly suppress top plate(2-3), promote flood control board(2)Interior linking groove(2-2)With top plate(2- 3)Raised rubber combine closely, at the same time flood control board pressing device(1-1)Internal dynamic torque sensor(1-1-6)Start Work, electric signal is produced in real time and is transmitted to middle control instrument(1-7), work as dynamic torque sensor(1-1-6)Detected value reaches middle control Instrument(1-7)During setting value 330N.m, middle control instrument(1-7)Prompt message is sent, represents flood control board pressing device(1-1)Complete to anti- Big vast plate(2)Compress;
3rd step:The device is during flood is stopped, positioned at support column(1)On level sensor(1-3), water pressure sensing Device(1-6)With super warning line alarm(1-1-3)Monitoring hydrologic(al) regime in real time, and produce electric signal and be sent to middle control instrument(1- 7), middle control instrument(1-7)Real-time display level sensor(1-3)And hydraulic inductor(1-6)Monitor value;When water pressure monitoring value reaches During 1.100 MPa of warning value, middle control instrument(1-7)Hydraulic pressure warning message is sent, when water level reaches super warning line alarm(1-1- 3)During position, middle control instrument(1-7)Send water-level alarm information.
CN201610650169.0A 2016-08-08 2016-08-08 One kind has monitoring alarm Functional City flood control assembling wall and its method of work Expired - Fee Related CN106192888B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610650169.0A CN106192888B (en) 2016-08-08 2016-08-08 One kind has monitoring alarm Functional City flood control assembling wall and its method of work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610650169.0A CN106192888B (en) 2016-08-08 2016-08-08 One kind has monitoring alarm Functional City flood control assembling wall and its method of work

Publications (2)

Publication Number Publication Date
CN106192888A CN106192888A (en) 2016-12-07
CN106192888B true CN106192888B (en) 2018-02-02

Family

ID=57514019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610650169.0A Expired - Fee Related CN106192888B (en) 2016-08-08 2016-08-08 One kind has monitoring alarm Functional City flood control assembling wall and its method of work

Country Status (1)

Country Link
CN (1) CN106192888B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112227301B (en) * 2020-09-23 2021-12-10 山东黄河勘测设计研究院有限公司 Combined flood-fighting flood control plate based on hydraulic seal

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6840711B1 (en) * 2003-03-31 2005-01-11 Ross R. Martinez Flood control panel system
CN201952779U (en) * 2011-01-18 2011-08-31 黄顺仁 Flood prevention water retaining gate structure
CN105133542B (en) * 2015-08-25 2017-03-29 高瞻 A kind of foldable board plug type blocks water door
CN105735862A (en) * 2016-04-01 2016-07-06 湖南力威泵阀设备有限公司 Flood prevention water-retaining door with rotating shaft structure

Also Published As

Publication number Publication date
CN106192888A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN106192888B (en) One kind has monitoring alarm Functional City flood control assembling wall and its method of work
CN207048136U (en) A kind of drag-line termination connection system and its tensioning equipment
CN106360885A (en) Rubber shoes surrounding strip press fit machine capable of improving press fit quality
CN112982430A (en) Artificial anchor eye grout-replenishing device for preventing leakage of sand grout and insufficient grouting
CN107707998A (en) A kind of large-scale audio amplifier fixed framing device for being used for outdoor liftable and fixing
CN104790383B (en) A kind of upright column pile for foundation pit
CN104863124B (en) A kind of utilize the device and method of soil bearing capacity between grout pile
CN207271889U (en) Metal thin-wall multiple tube impacts hydraulic bulging device
CN105819380B (en) A kind of yellow peach carrot compound fruit vinegar raw material apparatus for automatically lifting and its method of work
CN109706983B (en) Device and method for testing vertical bearing characteristic of single pile under unloading condition
CN106089592B (en) A kind of double blades wind power generating set with vertical shaft and its working method
CN206256461U (en) A kind of easy-to-mount column foot
CN206298875U (en) For the antiseepage film of Face Slab of Concrete of Rock-fill Dam lash-up recovering under water
CN105019353B (en) Method for arranging anti-buckling energy dissipation structures at root portion and circular steel tube pier
CN204898508U (en) Circular steel tube pier of bucking power consumption structure is prevented in root setting
CN106246461B (en) A kind of large construction cluster formula wind power generating set with vertical shaft and its working method
CN201924350U (en) Bolt-type mechanical connecting clamp for pulling-resistant pipe pile
WO2021184857A1 (en) Ultrahigh-pressure food processor
CN205205847U (en) Frame construction of stake cushion cap
CN204645071U (en) A kind of device utilizing soil bearing capacity between PHC pipe pile
CN114215044A (en) Pressure-bearing uplift pile with rear-inserted unbonded steel strand U-shaped pipe and construction method thereof
CN113529308A (en) Yarn dyeing device capable of uniformly dyeing
CN103883126B (en) Plate non-return streaming concrete lift-up pouring construction method
CN209323560U (en) Communication tower built-in type ground basket structure
CN105257016B (en) Frame column reinforcement structure and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180202

CF01 Termination of patent right due to non-payment of annual fee