CN106192888A - One has the flood control of monitoring alarm Functional City and assembles wall and method of work thereof - Google Patents

One has the flood control of monitoring alarm Functional City and assembles wall and method of work thereof Download PDF

Info

Publication number
CN106192888A
CN106192888A CN201610650169.0A CN201610650169A CN106192888A CN 106192888 A CN106192888 A CN 106192888A CN 201610650169 A CN201610650169 A CN 201610650169A CN 106192888 A CN106192888 A CN 106192888A
Authority
CN
China
Prior art keywords
flood control
control board
parts
flood
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610650169.0A
Other languages
Chinese (zh)
Other versions
CN106192888B (en
Inventor
梁峙
梁骁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou University of Technology
Original Assignee
Xuzhou University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou University of Technology filed Critical Xuzhou University of Technology
Priority to CN201610650169.0A priority Critical patent/CN106192888B/en
Publication of CN106192888A publication Critical patent/CN106192888A/en
Application granted granted Critical
Publication of CN106192888B publication Critical patent/CN106192888B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/106Temporary dykes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Emergency Alarm Devices (AREA)
  • Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)

Abstract

The invention discloses one and have monitoring alarm Functional City flood control assembling wall and method of work thereof, by support column, flood control board, main support rod, auxiliary supports angled seat, main support angled seat forms;Described support column is vertically fixed on ground, is provided with flood control board between two of which support column;Described main support rod one end is placed in the middle part of support column, and the other end is placed in main support angled seat, and the most main support angled seat is threaded connection and is fixed on ground;Described auxiliary strut angle seat is positioned at bottom support column, and wherein auxiliary support angled seat end face is fixed with support column bolt, and other end is fixed with ground bolt.The present invention can dismantle use, it is simple to constructs, keep in repair and carries.This apparatus structure is safe and reliable, it is provided that the movable flood protection device in a kind of easy-to-use and use cycle length city, this device flushes with ground in addition, the most attractive in appearance, and is beneficial to maintain the orthobiosis in city, does not results in the inconvenience of people's life.

Description

One has the flood control of monitoring alarm Functional City and assembles wall and method of work thereof
Technical field
The invention belongs to safety control equipment field, be specifically related to one and there is monitoring alarm Functional City flood control assembling wall.
Background technology
In recent years, storm flood takes place frequently, and life and property safety to people bring heavy losses, also normal to people Produce and life constitutes a serious threat.Especially at City Section, densely populated, the threat that flood causes is bigger.State has been concentrated in city Family more than 60% wealth, be once inundated with flood, loss then considerably beyond area be its several times even vast agriculture of tens times Village, therefore the importance of urban flood defence is the most prominent.All the time, we resist the method for extraodinary flood and are: a side is in distress, eight Fang Zhiyuan, indomitable, rehabilitate one's homeland.Although this tactics of human sea can with Emergency use, but put into human and material resources and wealth Power is huge, and the life security being in the first-line staff that fights flood and relieve victims is constituted threat greatly.For realize people and flood and Humorous coexistence, comes at flood interim, flood can be allowed to have enough spaces temporarily to store, can ensure again the people and vast flood fighting The life security of officers and men of speedily carrying out rescue work and property safety, it is necessary to have the most powerful flood defense system.
It addition, the flood control system of Urban House system is built not perfect by China at present, existing flood control board uses many Individual flood control board lateral connection, flood control board material mostly is steel, and steel are heavier and relatively costly, controls flood for house, without enough Manually, difficult is bigger, and cost performance is relatively low, it addition, flood control board and column be connected defective tightness.
Summary of the invention
In order to solve above-mentioned technical problem, the present invention provides one to have the flood control of monitoring alarm Functional City and assembles wall, bag Including: support column 1, flood control board 2, main support rod 3, auxiliary supports angled seat 4, main support angled seat 5;Described support column 1 is vertically fixed on Ground, is provided with flood control board 2 between two of which support column 1, flood control board 2 two ends are embedded in support column 1;Described main support rod 3 One end is placed in the middle part of support column 1, and the other end is placed in main support angled seat 5, and the most main support angled seat 5 is threaded connection and is fixed on On ground, support column 1 and main support angled seat 5 all with main support rod 3 chain connection;Described auxiliary supports angled seat 4 and is positioned at support column 1 Bottom, auxiliary supports angled seat 4 and is made up of equal leg angle, and wherein auxiliary support angled seat 4 end face is fixed, separately with support column 1 bolt End face is fixed with ground bolt.
Further, described support column 1 includes: flood control board hold down gag 1-1, flood control board sealing device 1-2, level sensor Device 1-3, supports seat 1-4, fixed panel 1-5, hydraulic inductor 1-6, middle control instrument 1-7;Described fixed panel 1-5 is rectangle knot Structure, fixed panel 1-5 has two, and two fixed panel 1-5 are symmetrical;Described support seat 1-4 is located in one of fixing Panel 1-5 is manganese steel material-structure, supports seat 1-4 and is welded and fixed with fixed panel 1-5;Described fixed panel 1-5 both ends are equal Being disposed with level sensor 1-3, level sensor 1-3 and have four, it is connected with middle control instrument 1-7 wire;Described flood control board is close Seal apparatus 1-2 is positioned at center, support column 1 top, and wherein flood control board sealing device 1-2 is through to support column 1 inside center;Described Flood control board hold down gag 1-1 is positioned at fixed panel 1-5 top inner side, and flood control board hold down gag 1-1 and fixed panel 1-5 is fixing even Connect;Described hydraulic inductor 1-6 is fixed on fixed panel 1-5 surface, and hydraulic inductor 1-6 is connected with middle control instrument 1-7 wire.
Further, described flood control board hold down gag 1-1 includes: compress column spinner 1-1-1, fixing tapped through hole 1-1-2, Super warning line alarm 1-1-3, a bracer 1-1-4, compress Rubber end 1-1-5, dynamic torque sensor 1-1-6;Described Bracer 1-1-4 is rectangular configuration, wherein props up bracer 1-1-4 upper surface center and is provided with super warning line alarm 1-1-3, super warning Water level alarm 1-1-3 is connected with middle control instrument 1-7 wire;Described bracer 1-1-4 front surface is provided with fixing tapped through hole 1-1- 2, fixing tapped through hole 1-1-2 has two;Described compression column spinner 1-1-1, through a bracer 1-1-4 two ends, wherein compresses Column spinner 1-1-1 has two, compresses column spinner 1-1-1 and threadeds with a bracer 1-1-4;Described compression Rubber end 1-1-5 It is positioned at compression column spinner 1-1-1 bottom, compresses column spinner 1-1-1 and be embedded in inside compression Rubber end 1-1-5;Described dynamic torque passes Sensor 1-1-6 is positioned at the top compressing Rubber end 1-1-5, and dynamic torque sensor 1-1-6 is connected with middle control instrument 1-7 wire, institute Stating dynamic torque sensor 1-1-6 is commercially available conventional instrument.
Further, described flood control board sealing device 1-2 includes: sealing plate 1-2-1, rotates push shaft 1-2-2, fixing screw thread Pipe 1-2-3, connecting shaft 1-2-4;Run through inside described fixing corrugated tubing 1-2-3 and have rotation push shaft 1-2-2, rotate push shaft 1-2-2 It is connected with fixing corrugated tubing 1-2-3 screw thread rotation, and is threaded connection realization and pumps;Described rotation push shaft 1-2- 2 bottoms are provided with connecting shaft 1-2-4, and wherein connecting shaft 1-2-4 has two, and connecting shaft 1-2-4 is about rotating push shaft 1-2-2 axis Line is symmetrical;Said two connecting shaft 1-2-4 one end is equipped with sealing plate 1-2-1;
Described rotation push shaft 1-2-2 and sealing plate 1-2-1 all with connecting shaft 1-2-4 chain connection.
Further, described flood control board 2 includes: implant 2-1, is connected groove 2-2, top plate 2-3, bottom plate 2-4;Institute Stating bottom plate 2-4 is 1, and top plate 2-3 is 2~10, and wherein bottom plate 2-4 is positioned at flood control board 2 lowermost end, top plate 2-3 It is positioned at bottom plate 2-4 top;Described linking groove 2-2 is positioned at bottom top plate 2-3, and linking groove 2-2 structure is trapezoidal groove, Wherein top plate 2-3 top is provided with raised rubber, and raised rubber is embedded in linking groove 2-2;Described top plate 2-3 and bottom plate Being equipped with implant 2-1 inside 2-4, wherein implant 2-1 is rectangular strip, and implant 2-1 level runs through top plate 2-3 and the end Laminate 2-4.
Further, described implant 2-1 is by macromolecular material pressing mold molding, the constituent of implant 2-1 and manufacture Process is as follows:
One, implant 2-1 constituent:
Count by weight, 1,1,2, the 2-tetrahydrochysene perfluor tetradecane (alcohol) acrylate 30~65 parts, (S) alpha-cyano-phenoxy Benzyl (1R, 3R)-3-(2,2-dibromo vinyl)-2,2-dimethyl cyclopropane carboxylic acid's ester 88~145 parts, 3-(2,2-bis-chloroethenes Thiazolinyl)-2,2-dimethyl cyclopropane carboxylic acid 54~98 parts, pi-allyl-1,1,2,2-tetrafluoro ethylether 28~75 parts, methylene basic ring Propane-2,2-diethyl dicarboxylate 68~180 parts, (1R)-trans-2,2-dimethyl-3-(2-methyl-1-propylene base)-ring third Alkane carboxylic acid-3-phenoxy benzyl ester 22~86 parts, concentration be 45ppm~95ppm (S)-alpha-cyano group-3-benzyloxy phenoxy base- (+)-cis-3-(2,2, dibromo vinyl)-2,2-dimethyl cyclopropane carboxylic acid's ester 53~110 parts, 3-(2,2-dichloroethylene)- 2,2-dimethyl cyclopropane carboxylic acids 56~132 parts, alpha-cyano phenoxy benzyl (1R, 3R)-3-(2,2-dibromo vinyl)-2,2 Diyl first cyclopropanecarboxylcompound 90~145 parts, cross-linking agent 85~146 parts, 2-cyano group-3-phenoxy benzyl-2,2,3,3-tetramethyls Basic ring cyclopropanecarboxylic acid ester 24~72 parts, methacrylic acid 2,2,3,3-tetrafluoro propyl ester 67~162 parts, cis-2,2-dimethyl-3- (2,2-dichloroethylene) cyclopropane-carboxylic acid 38~92 parts, cis-3-(2-chloro-3,3,3 ,-trifluoropropene base)-2,2-diformazan basic ring Propanecarboxylic acid 75~185 parts;
Described cross-linking agent is chlorinated polyethylene, acetic acid 2-(1,1-dimethyl ethyl) cyclohexyl, 4-cyclohexenyl group-1,2-dioctyl phthalate Any one in double (2-ethylhexyl) ester;
Two, the manufacture process of implant 2-1, comprises the steps of
1st step: add ultra-pure water 3650~4780 parts that electrical conductivity is 3.65 μ S/cm~8.75 μ S/cm in a kettle., start Agitator in reactor, rotating speed is 95rpm~170rpm, starts heat pump, makes reactor temperature rise to 80 DEG C~110 ℃;It is sequentially added into the 1,1,2,2-tetrahydrochysene perfluor tetradecane (alcohol) acrylate, (S) alpha-cyano-phenoxy benzyl (1R, 3R)-3- (2,2-dibromo vinyl)-2,2-dimethyl cyclopropane carboxylic acid's ester, 3-(2,2-dichloroethylene)-2,2-dimethylcyclopropane carboxylic Acid, stirring is to being completely dissolved, and regulation pH value is 6.5~8.5, and agitator speed is adjusted to 150rpm~280rpm, and temperature is 140 DEG C~180 DEG C, esterification 10~25 hours;
2nd step: take pi-allyl-1,1,2,2-tetrafluoro ethylether, methene cyclopropane-2,2-diethyl dicarboxylate pulverizes, Powder diameter is 700~1000 mesh;Add (1R)-trans-2,2-dimethyl-3-(2-methyl-1-propylene base)-cyclopropane carboxylic acid Acid-3-phenoxy benzyl ester mix homogeneously, is laid in pallet, and tiling thickness is 20mm~50mm, and employing dosage is 7.5kGy ~alpha ray irradiation 200 that 12.5kGy, energy are 8.0MeV~13.0MeV~350 minutes, and the β ray spoke of Isodose According to 250~400 minutes;
3rd step: through the 2nd step process mixed-powder be dissolved in (S)-alpha-cyano group-3-benzyloxy phenoxy base-(+)-cis-3-(2,2, two Bromo vinyl)-2, in 2-dimethyl cyclopropane carboxylic acid's ester, add reactor, agitator speed is 120rpm~190rpm, temperature It is 85 DEG C~140 DEG C, starts vacuum pump and make the vacuum of reactor reach-0.20MPa~2.25MPa, keep this state response 20~40 hours;Pressure release is also passed through radon gas, and making reacting kettle inner pressure is 0.75MPa~1.35MPa, and it is little that insulation stands 15~30 Time;Agitator speed is promoted to 250rpm~320rpm, simultaneous reactions still pressure release to 0MPa;It is sequentially added into 3-(2,2-bis-chloroethene Thiazolinyl)-2,2-dimethyl cyclopropane carboxylic acid, alpha-cyano phenoxy benzyl (1R, 3R)-3-(2,2-dibromo vinyl)-2,2 diyls After first cyclopropanecarboxylcompound is completely dissolved, add cross-linking agent stirring mixing so that the hydrophile-lipophile balance value of reactor solution is 6.5~8.4, insulation stands 25~50 hours;
4th step: when agitator speed is 260rpm~350rpm, is sequentially added into 2-cyano group-3-phenoxy benzyl-2, and 2,3,3- Tetramethyl-ring cyclopropanecarboxylic acid ester, methacrylic acid 2,2,3,3-tetrafluoro propyl ester, cis-2,2-dimethyl-3-(2,2-dichloroethylene Base) cyclopropane-carboxylic acid and cis-3-(2-chloro-3,3,3 ,-trifluoropropene base)-2,2-dimethyl cyclopropane carboxylic acid, promote reactor Pressure so that it is reach 1.55MPa~4.75MPa, temperature is 270 DEG C~350 DEG C, polyreaction 30~45 hours;Reaction completes After reacting kettle inner pressure is down to 0MPa, be cooled to 25 DEG C~35 DEG C, discharging, enter molding press and can be prepared by implant 2-1.
Further, the invention also discloses a kind of method of work with monitoring alarm Functional City flood control assembling wall, The method includes following step:
1st step: staff carries out the assembly working of this device.First, flood control board sealing device 1-2 is placed in fixed panel 1- In 5 internally installed grooves, fix carrying out bolt bottom fixed panel 1-5 subsequently;Secondly, by the bottom plate 2-4 bottom flood control board 2 Embed in the internally installed groove of support column 1 in advance, embed some top plate 2-3 the most again, subsequently that flood control board hold down gag 1-1 is solid It is scheduled on fixed panel 1-5 top;Finally, auxiliary is supported angled seat 4 and main support angled seat 5 and fixes with ground, by main support rod 3 and Fixed panel 1-5 and main support angled seat 5 chain connection;
2nd step: after this device has been fixed, now rotates the compression column spinner 1-1-1 of flood control board hold down gag 1-1, makes compression Rubber end 1-1-4 tightly suppresses top plate 2-3, promotes the linking groove 2-2 in flood control board 2 tight with the raised rubber of top plate 2-3 Close combination, meanwhile flood control board hold down gag 1-1 internal dynamic torque sensor 1-1-6 starts working, and produces telecommunications in real time Number and transmit to middle control instrument 1-7, when dynamic torque sensor 1-1-6 detected value reaches middle control instrument 1-7 setting value 330N.m, in Control instrument 1-7 sends information, represents that flood control board hold down gag 1-1 completes to compress flood control board 2;
3rd step: this device, during stopping flood, is positioned at the level sensor 1-3 on support column (1), hydraulic inductor 1-6 and super warning line alarm 1-1-3 monitors hydrologic(al) regime in real time, and produces the signal of telecommunication and be sent to middle control instrument 1-7, middle control instrument 1-7 shows level sensor 1-3 and hydraulic inductor 1-6 monitor value in real time;When water pressure monitoring value reaches warning value 1.100MPa Time, middle control instrument 1-7 sends hydraulic pressure warning message, when water level reaches super warning line alarm 1-1-3 position, and middle control instrument 1-7 sends water-level alarm information.
One disclosed by the invention has the flood control of monitoring alarm Functional City and assembles wall, has an advantage in that:
(1) design of this device is ingenious, and for dismountable, flood control board is the most detachable with support column and other parts, it is simple to construction, Maintenance and carrying;
(2) this device flood control board is embedded in inside support column, is connected by T-shaped groove, and is provided with flood control board sealing device so that It is tightr that flood control board is connected with column;
(3) this device flood control board uses light material, and inside stuffing is macromolecular material, improves the energy bearing water pressure Power, decreases the use of steel, reduces the weight of flood control board.
One of the present invention has the flood control of monitoring alarm Functional City and assembles wall, and this device can dismantle use, just In construction, keep in repair and carry.This apparatus structure is safe and reliable, it is provided that a kind of easy-to-use and use cycle length city is movable Flood protection device, this device flushes with ground in addition, the most attractive in appearance, and is beneficial to maintain the orthobiosis in city, does not results in people The inconvenience of life.
Accompanying drawing explanation
The one that Fig. 1 is heretofore described has the flood control of monitoring alarm Functional City and assembles wall construction schematic diagram.
Fig. 2 is heretofore described support column arrangement schematic diagram.
Fig. 3 is heretofore described flood control board hold down gag structural representation.
Fig. 4 is heretofore described flood control board schematic diagram of sealing device.
Fig. 5 is heretofore described flood control board structural representation.
The implant fatigue strength that Fig. 6 is heretofore described changes over figure.
In figure 1 above~Fig. 5, support column 1, flood control board hold down gag 1-1, compress column spinner 1-1-1, fixing tapped through hole 1-1-2, a bracer 1-1-3, compress Rubber end 1-1-4, flood control board sealing device 1-2, sealing plate 1-2-1, rotate push shaft 1-2- 2, fixing corrugated tubing 1-2-3, connecting shaft 1-2-4, level sensor 1-3, support seat 1-4, fixed panel 1-5, hydraulic inductor 1-6, middle control instrument 1-7, flood control board 2, implant 2-1, linking groove 2-2, top plate 2-3, bottom plate 2-4, main support rod 3, auxiliary Help support angled seat 4, main support angled seat 5.
Detailed description of the invention
With embodiment, the one that the present invention provides is had the flood control of monitoring alarm Functional City below in conjunction with the accompanying drawings and assemble wall It is further described.
As it is shown in figure 1, the one being heretofore described has the flood control of monitoring alarm Functional City assembles wall construction signal Figure.It is seen in fig. 1, that include: support column 1, flood control board 2, main support rod 3, auxiliary supports angled seat 4, main support angled seat 5;Described Support column 1 is vertically fixed on ground, is provided with flood control board 2 between two of which support column 1, and flood control board 2 two ends are embedded in support column 1 In;Described main support rod 3 one end is placed in the middle part of support column 1, and the other end is placed in main support angled seat 5, and the most main support angled seat 5 is led to Cross threaded being fixed on ground, support column 1 and main support angled seat 5 all with main support rod 3 chain connection;Described auxiliary supports Angled seat 4 is positioned at bottom support column 1, assists support angled seat 4 to be made up of equal leg angle, and wherein auxiliary supports angled seat 4 end face and props up Dagger 1 bolt is fixed, and other end is fixed with ground bolt.
As in figure 2 it is shown, be heretofore described support column arrangement schematic diagram.As seen from Figure 2, support column 1 includes: anti- Flood plate hold down gag 1-1, flood control board sealing device 1-2, level sensor 1-3, support seat 1-4, fixed panel 1-5, hydraulic pressure sense Answer device 1-6, middle control instrument 1-7;Described fixed panel 1-5 is rectangular configuration, and fixed panel 1-5 has two, two fixed panels 1-5 is symmetrical;It is manganese steel material-structure that described support seat 1-4 is located in one of fixed panel 1-5, supports seat 1-4 with solid Determine panel 1-5 to be welded and fixed;Described fixed panel 1-5 both ends are all disposed with level sensor 1-3, level sensor 1-3 altogether Having four, it is connected with middle control instrument 1-7 wire;Described flood control board sealing device 1-2 is positioned at center, support column 1 top, Qi Zhongfang Flood plate sealing device 1-2 is through to support column 1 inside center;Described flood control board hold down gag 1-1 is positioned at fixed panel 1-5 top Inner side, flood control board hold down gag 1-1 and fixed panel 1-5 is fixing to be connected;Described hydraulic inductor 1-6 is fixed on fixed panel 1- 5 surfaces, hydraulic inductor 1-6 is connected with middle control instrument 1-7 wire.
As it is shown on figure 3, be heretofore described flood control board hold down gag structural representation.Find out from Fig. 3 or Fig. 2, Flood control board hold down gag 1-1 includes: compress column spinner 1-1-1, fixing tapped through hole 1-1-2, super warning line alarm 1-1- 3, a bracer 1-1-4, compress Rubber end 1-1-5, dynamic torque sensor 1-1-6;Described bracer 1-1-4 is rectangular configuration, Wherein prop up bracer 1-1-4 upper surface center be provided with super warning line alarm 1-1-3, super warning line alarm 1-1-3 with in Control instrument 1-7 wire connects;Described bracer 1-1-4 front surface is provided with fixing tapped through hole 1-1-2, fixing tapped through hole 1-1-2 Have two;Described compression column spinner 1-1-1, through a bracer 1-1-4 two ends, wherein compresses column spinner 1-1-1 and has two Individual, compress column spinner 1-1-1 and threaded with a bracer 1-1-4;Described compression Rubber end 1-1-5 is positioned at compression column spinner 1-1- 1 bottom, compresses column spinner 1-1-1 and is embedded in inside compression Rubber end 1-1-5;Described dynamic torque sensor 1-1-6 is positioned at compression The top of Rubber end 1-1-5, dynamic torque sensor 1-1-6 is connected with middle control instrument 1-7 wire, described dynamic torque sensor 1- 1-6 is commercially available conventional instrument.
As shown in Figure 4, it is heretofore described flood control board schematic diagram of sealing device.As seen from Figure 4, flood control board Sealing device 1-2 includes: sealing plate 1-2-1, rotates push shaft 1-2-2, fixing corrugated tubing 1-2-3, connecting shaft 1-2-4;Described solid Determining to run through inside corrugated tubing 1-2-3 has rotation push shaft 1-2-2, rotates push shaft 1-2-2 with fixing corrugated tubing 1-2-3 screw thread rotation even Connect, and be threaded connection realization and pump;Described rotation push shaft 1-2-2 bottom is provided with connecting shaft 1-2-4, Qi Zhonglian Spindle 1-2-4 has two, and connecting shaft 1-2-4 is symmetrical about rotating push shaft 1-2-2 axis;Said two connecting shaft 1- 2-4 one end is equipped with sealing plate 1-2-1;
Described rotation push shaft 1-2-2 and sealing plate 1-2-1 all with connecting shaft 1-2-4 chain connection.
As it is shown in figure 5, be heretofore described flood control board structural representation.As seen from Figure 5, flood control board 2 includes: fill out Fill thing 2-1, be connected groove 2-2, top plate 2-3, bottom plate 2-4;Described bottom plate 2-4 is 1, and top plate 2-3 is 2~10 Individual, wherein bottom plate 2-4 is positioned at flood control board 2 lowermost end, and top plate 2-3 is positioned at bottom plate 2-4 top;Described linking groove 2-2 Being positioned at bottom top plate 2-3, linking groove 2-2 structure is trapezoidal groove, and wherein top plate 2-3 top is provided with raised rubber, convex Play rubber to be embedded in linking groove 2-2;It is equipped with implant 2-1 inside described top plate 2-3 and bottom plate 2-4, wherein fills Thing 2-1 is rectangular strip, and implant 2-1 level runs through top plate 2-3 and bottom plate 2-4.
Of the present invention a kind of have monitoring alarm Functional City flood control assemble wall work process be:
1st step: staff carries out the assembly working of this device.First, flood control board sealing device 1-2 is placed in fixed panel 1- In 5 internally installed grooves, fix carrying out bolt bottom fixed panel 1-5 subsequently;Secondly, by the bottom plate 2-4 bottom flood control board 2 Embed in the internally installed groove of support column 1 in advance, embed some top plate 2-3 the most again, subsequently that flood control board hold down gag 1-1 is solid It is scheduled on fixed panel 1-5 top;Finally, auxiliary is supported angled seat 4 and main support angled seat 5 and fixes with ground, by main support rod 3 and Fixed panel 1-5 and main support angled seat 5 chain connection;
2nd step: after this device has been fixed, now rotates the compression column spinner 1-1-1 of flood control board hold down gag 1-1, makes compression Rubber end 1-1-4 tightly suppresses top plate 2-3, promotes the linking groove 2-2 in flood control board 2 tight with the raised rubber of top plate 2-3 Close combination, meanwhile flood control board hold down gag 1-1 internal dynamic torque sensor 1-1-6 starts working, and produces telecommunications in real time Number and transmit to middle control instrument 1-7, when dynamic torque sensor 1-1-6 detected value reaches middle control instrument 1-7 setting value 330N.m, in Control instrument 1-7 sends information, represents that flood control board hold down gag 1-1 completes to compress flood control board 2;
3rd step: this device, during stopping flood, is positioned at the level sensor 1-3 on support column (1), hydraulic inductor 1-6 and super warning line alarm 1-1-3 monitors hydrologic(al) regime in real time, and produces the signal of telecommunication and be sent to middle control instrument 1-7, middle control instrument 1-7 shows level sensor 1-3 and hydraulic inductor 1-6 monitor value in real time;When water pressure monitoring value reaches warning value 1.100MPa Time, middle control instrument 1-7 sends hydraulic pressure warning message, when water level reaches super warning line alarm 1-1-3 position, and middle control instrument 1-7 sends water-level alarm information.
One of the present invention has the flood control of monitoring alarm Functional City and assembles wall, and this device can dismantle use, just In construction, keep in repair and carry.This apparatus structure is safe and reliable, it is provided that a kind of easy-to-use and use cycle length city is movable Flood protection device, this device flushes with ground in addition, the most attractive in appearance, and is beneficial to maintain the orthobiosis in city, does not results in people The inconvenience of life.
The following is the embodiment of the manufacture process of implant 2-1 of the present invention, embodiment is to further illustrate this The content of invention, but should not be construed as limitation of the present invention.Without departing from the spirit and substance of the case in the present invention, to this Amendment that bright method, step or condition are made and replacement, belong to the scope of the present invention.
If not specializing, the conventional means that technological means used in embodiment is well known to those skilled in the art.
Embodiment 1
Manufacture implant 2-1 of the present invention according to following steps, and count by weight:
1st step: add the ultra-pure water 3650 parts that electrical conductivity is 3.65 μ S/cm in a kettle., start agitator in reactor, turn Speed is 95rpm, starts heat pump, makes reactor temperature rise to 80 DEG C;It is sequentially added into the 1,1,2,2-tetrahydrochysene perfluor tetradecane (alcohol) acrylate 52 parts, (S) alpha-cyano-phenoxy benzyl (1R, 3R)-3-(2,2-dibromo vinyl)-2,2-diformazan basic ring Carboxylate 120 parts, 3-(2,2-dichloroethylene)-2,2-dimethyl cyclopropane carboxylic acid 150 parts, stir to being completely dissolved, Regulation pH value is 6.5, and agitator speed is adjusted to 150rpm, and temperature is 140 DEG C, esterification 10 hours;
2nd step: take pi-allyl-1,1,2,2-tetrafluoro ethylether 35 parts, methene cyclopropane-2,2-diethyl dicarboxylate 96 parts enters Row is pulverized, and powder diameter is 700 mesh;Add (1R)-trans-2,2-dimethyl-3-(2-methyl-1-propylene base)-cyclopropane carboxylic acid Acid 63 parts of mix homogeneously of-3-phenoxy benzyl ester, are laid in pallet, and tiling thickness is 20mm, and employing dosage is 7.5kGy, energy The alpha ray irradiation 200 minutes that amount is 8.0MeV, and the β x ray irradiation x of Isodose 250 minutes;
3rd step: the mixed-powder processed through the 2nd step be dissolved in (S)-alpha-cyano group-3-benzyloxy phenoxy base that concentration is 55ppm- (+)-cis-3-(2,2, dibromo vinyl)-2, in 2-dimethyl cyclopropane carboxylic acid's ester 73 parts, adds reactor, agitator speed For 120rpm, temperature is 85 DEG C, starts vacuum pump and makes the vacuum of reactor reach-0.20MPa, keeps this state response 20 little Time;Pressure release is also passed through radon gas, and making reacting kettle inner pressure is 0.75MPa, and insulation stands 15 hours;Agitator speed is promoted to 250rpm, simultaneous reactions still pressure release to 0MPa;It is sequentially added into 3-(2,2-dichloroethylene)-2,2-dimethyl cyclopropane carboxylic acid 66 Part, alpha-cyano phenoxy benzyl (1R, 3R)-3-(2,2-dibromo vinyl)-2,2 diyl first cyclopropanecarboxylcompound 45 parts complete molten Xie Hou, adds cross-linking agent 110 parts stirring mixing so that the hydrophile-lipophile balance value of reactor solution is 6.5, and it is little that insulation stands 25 Time;
4th step: when agitator speed is 260rpm, is sequentially added into 2-cyano group-3-phenoxy benzyl-2,2,3,3-tetramethyl-rings Cyclopropanecarboxylic acid ester 180 parts, methacrylic acid 2,2,3,3-tetrafluoro propyl ester 78 parts, cis-2,2-dimethyl-3-(2,2-dichloroethylene Base) cyclopropane-carboxylic acid 210 parts and cis-3-(2-chloro-3,3,3 ,-trifluoropropene base)-2,2-dimethyl cyclopropane carboxylic acid 184 parts, Promote reactor pressure so that it is reaching 1.55MPa, temperature is 270 DEG C, polyreaction 30 hours;By reactor after having reacted Interior pressure is down to 0MPa, is cooled to 30 DEG C, and discharging enters molding press and can be prepared by implant 2-1.
Described cross-linking agent is chlorinated polyethylene.
Embodiment 2
Manufacture implant 2-1 of the present invention according to following steps, and count by weight:
1st step: add the ultra-pure water 4200 parts that electrical conductivity is 6.25 μ S/cm in a kettle., start agitator in reactor, turn Speed is 135rpm, starts heat pump, makes reactor temperature rise to 105 DEG C;It is sequentially added into 1,1,2,2-tetrahydrochysene perfluor 14 Alkane (alcohol) acrylate 72 parts, (S) alpha-cyano-phenoxy benzyl (1R, 3R)-3-(2,2-dibromo vinyl)-2,2-dimethyl Cyclopropanecarboxylcompound 180 parts, 3-(2,2-dichloroethylene)-2,2-dimethyl cyclopropane carboxylic acid 215 parts, stirring is to the most molten Solving, regulation pH value is 7.5, and agitator speed is adjusted to 215rpm, and temperature is 160 DEG C, esterification 18 hours;
2nd step: take pi-allyl-1,1,2,2-tetrafluoro ethylether 65 parts, methene cyclopropane-2,2-diethyl dicarboxylate 170 parts Pulverizing, powder diameter is 850 mesh;Add (1R)-trans-2,2-dimethyl-3-(2-methyl-1-propylene base)-cyclopropane Carboxylic acid 95 parts of mix homogeneously of-3-phenoxy benzyl ester, are laid in pallet, and tiling thickness is 35mm, and employing dosage is 10.0kGy, energy are the alpha ray irradiation 275 minutes of 11.0MeV, and the β x ray irradiation x of Isodose 325 minutes;
3rd step: the mixed-powder processed through the 2nd step be dissolved in (S)-alpha-cyano group-3-benzyloxy phenoxy base that concentration is 68ppm- (+)-cis-3-(2,2, dibromo vinyl)-2, in 2-dimethyl cyclopropane carboxylic acid's ester 103 parts, adds reactor, agitator speed For 155rpm, temperature is 115 DEG C, starts vacuum pump and makes the vacuum of reactor reach 1.15MPa, keeps this state response 30 little Time;Pressure release is also passed through radon gas, and making reacting kettle inner pressure is 1.05MPa, and insulation stands 23 hours;Agitator speed is promoted to 285rpm, simultaneous reactions still pressure release to 0MPa;It is sequentially added into 3-(2,2-dichloroethylene)-2,2-dimethyl cyclopropane carboxylic acid 110 parts, alpha-cyano phenoxy benzyl (1R, 3R)-3-(2,2-dibromo vinyl)-2,2 diyl first cyclopropanecarboxylcompound 70 parts complete After CL, add cross-linking agent 148 parts stirring mixing so that the hydrophile-lipophile balance value of reactor solution is 7.5, and insulation stands 38 hours;
4th step: when agitator speed is 310rpm, is sequentially added into 2-cyano group-3-phenoxy benzyl-2,2,3,3-tetramethyl-rings Cyclopropanecarboxylic acid ester 220 parts, methacrylic acid 2,2,3,3-tetrafluoro propyl ester 113 parts, cis-2,2-dimethyl-3-(2,2-dichloroethylene Base) cyclopropane-carboxylic acid 248 parts and cis-3-(2-chloro-3,3,3 ,-trifluoropropene base)-2,2-dimethyl cyclopropane carboxylic acid 205 parts, Promote reactor pressure so that it is reaching 3.25MPa, temperature is 310 DEG C, polyreaction 38 hours;By reactor after having reacted Interior pressure is down to 0MPa, is cooled to 30 DEG C, and discharging enters molding press and can be prepared by implant 2-1.
Described cross-linking agent is acetic acid 2-(1,1-dimethyl ethyl) cyclohexyl.
Embodiment 3
Manufacture implant 2-1 of the present invention according to following steps, and count by weight:
1st step: add the ultra-pure water 4780 parts that electrical conductivity is 8.75 μ S/cm in a kettle., start agitator in reactor, turn Speed is 170rpm, starts heat pump, makes reactor temperature rise to 110 DEG C;It is sequentially added into 1,1,2,2-tetrahydrochysene perfluor 14 Alkane (alcohol) acrylate 85 parts, (S) alpha-cyano-phenoxy benzyl (1R, 3R)-3-(2,2-dibromo vinyl)-2,2-dimethyl Cyclopropanecarboxylcompound 240 parts, 3-(2,2-dichloroethylene)-2,2-dimethyl cyclopropane carboxylic acid 280 parts, stirring is to the most molten Solving, regulation pH value is 8.5, and agitator speed is adjusted to 280rpm, and temperature is 180 DEG C, esterification 25 hours;
2nd step: take pi-allyl-1,1,2,2-tetrafluoro ethylether 95 parts, methene cyclopropane-2,2-diethyl dicarboxylate 250 parts Pulverizing, powder diameter is 1000 mesh;Add (1R)-trans-2,2-dimethyl-3-(2-methyl-1-propylene base)-cyclopropane Carboxylic acid 112 parts of mix homogeneously of-3-phenoxy benzyl ester, are laid in pallet, and tiling thickness is 50mm, and employing dosage is 12.5kGy, energy are the alpha ray irradiation 350 minutes of 13.0MeV, and the β x ray irradiation x of Isodose 400 minutes;
3rd step: the mixed-powder processed through the 2nd step be dissolved in (S)-alpha-cyano group-3-benzyloxy phenoxy base that concentration is 82ppm- (+)-cis-3-(2,2, dibromo vinyl)-2, in 2-dimethyl cyclopropane carboxylic acid's ester 135 parts, adds reactor, agitator speed For 190rpm, temperature is 140 DEG C, starts vacuum pump and makes the vacuum of reactor reach 2.25MPa, keeps this state response 40 little Time;Pressure release is also passed through radon gas, and making reacting kettle inner pressure is 1.35MPa, and insulation stands 30 hours;Agitator speed is promoted to 320rpm, simultaneous reactions still pressure release to 0MPa;It is sequentially added into 3-(2,2-dichloroethylene)-2,2-dimethyl cyclopropane carboxylic acid 156 parts, alpha-cyano phenoxy benzyl (1R, 3R)-3-(2,2-dibromo vinyl)-2,2 diyl first cyclopropanecarboxylcompound 115 parts complete After CL, add cross-linking agent 187 parts stirring mixing so that the hydrophile-lipophile balance value of reactor solution is 8.4, and insulation stands 50 hours;
4th step: when agitator speed is 350rpm, is sequentially added into 2-cyano group-3-phenoxy benzyl-2,2,3,3-tetramethyl-rings Cyclopropanecarboxylic acid ester 265 parts, methacrylic acid 2,2,3,3-tetrafluoro propyl ester 152 parts, cis-2,2-dimethyl-3-(2,2-dichloroethylene Base) cyclopropane-carboxylic acid 286 parts and cis-3-(2-chloro-3,3,3 ,-trifluoropropene base)-2,2-dimethyl cyclopropane carboxylic acid 236 parts, Promote reactor pressure so that it is reaching 4.75MPa, temperature is 350 DEG C, polyreaction 45 hours;By reactor after having reacted Interior pressure is down to 0MPa, is cooled to 30 DEG C, and discharging enters molding press and can be prepared by implant 2-1.
Described cross-linking agent is double (2-ethylhexyl) ester of 4-cyclohexenyl group-1,2-dioctyl phthalate.
Reference examples
Reference examples is the implant of certain brand commercially available.
Embodiment 4
Implant described in implant 2-1 embodiment 1~3 prepared and reference examples carries out using effect contrast.To two Person's unit mass, yield strength, corrosion rate, tensile strength adds up, and result is as shown in table 1.
As seen from Table 1, implant 2-1 of the present invention, its unit mass, yield strength, corrosion rate, tension force is strong
The indexs such as degree are superior to the product that prior art produces.
Additionally, as shown in Figure 6, it it is the system that changes with the use time of implant 2-1 fatigue of materials intensity of the present invention Meter.Finding out in figure, implant 2-1 used by embodiment 1~3, its fatigue of materials intensity is significantly better than with use time intensity of variation Existing product.

Claims (7)

1. there is the flood control of monitoring alarm Functional City and assemble a wall, including: support column (1), flood control board (2), main support rod (3), auxiliary supports angled seat (4), main support angled seat (5);It is characterized in that, described support column (1) is vertically fixed on ground, wherein Being provided with flood control board (2) between two support columns (1), flood control board (2) two ends are embedded in support column (1);Described main support rod (3) One end is placed in support column (1) middle part, and the other end is placed on main support angled seat (5), and the most main support angled seat (5) is threaded connection Be fixed on ground, support column (1) and main support angled seat (5) all with main support rod (3) chain connection;Described auxiliary supports angled seat (4) being positioned at support column (1) bottom, auxiliary supports angled seat (4) and is made up of equal leg angle, and wherein auxiliary supports angled seat (4) end face Fixing with support column (1) bolt, other end is fixed with ground bolt.
One the most according to claim 1 has the flood control of monitoring alarm Functional City and assembles wall, it is characterised in that described Dagger (1) including: flood control board hold down gag (1-1), flood control board sealing device (1-2), level sensor (1-3), supports seat (1- 4), fixed panel (1-5), hydraulic inductor (1-6), middle control instrument (1-7);Described fixed panel (1-5) is rectangular configuration, fixing Panel (1-5) is manganese steel material-structure, supports seat (1-4) and is welded and fixed with fixed panel (1-5);Described fixed panel (1-5) Both ends are all disposed with level sensor (1-3), and level sensor (1-3) has four, and it is with middle control instrument (1-7) wire even Connect;Described flood control board sealing device (1-2) is positioned at support column (1) center, top, and wherein flood control board sealing device (1-2) is through to Support column (1) inside center;Described flood control board hold down gag (1-1) is positioned at fixed panel (1-5) top inner side, and flood control board compresses Device (1-1) is fixing with fixed panel (1-5) to be connected;Described hydraulic inductor (1-6) is fixed on fixed panel (1-5) surface, Hydraulic inductor (1-6) is connected with middle control instrument (1-7) wire.
One the most according to claim 2 has the flood control of monitoring alarm Functional City and assembles wall, it is characterised in that described anti- Flood plate hold down gag (1-1) including: compresses column spinner (1-1-1), fixing tapped through hole (1-1-2), super warning line alarm (1-1-3), a bracer (1-1-4), compress Rubber end (1-1-5), dynamic torque sensor (1-1-6);Described bracer (1-1- 4) it is rectangular configuration, wherein props up bracer (1-1-4) upper surface center and be provided with super warning line alarm (1-1-3), super warning water Level alarm (1-1-3) is connected with middle control instrument (1-7) wire;Described bracer (1-1-4) front surface is provided with fixing tapped through hole (1-1-2), fixing tapped through hole (1-1-2) has two;Described compression column spinner (1-1-1) is through a bracer (1-1-4) Two ends, wherein compress column spinner (1-1-1) and have two, compress column spinner (1-1-1) and threaded with a bracer (1-1-4); Described compression Rubber end (1-1-5) is positioned at compression column spinner (1-1-1) bottom, compresses column spinner (1-1-1) and is embedded in compression rubber Head (1-1-5) is internal;Described dynamic torque sensor (1-1-6) is positioned at the top compressing Rubber end (1-1-5), and dynamic torque passes Sensor (1-1-6) is connected with middle control instrument (1-7) wire, and described dynamic torque sensor (1-1-6) is commercially available conventional instrument.
One the most according to claim 2 has the flood control of monitoring alarm Functional City and assembles wall, it is characterised in that described anti- Flood plate sealing device (1-2) including: sealing plate (1-2-1), rotates push shaft (1-2-2), fixing corrugated tubing (1-2-3), connecting shaft (1-2-4);There is rotation push shaft (1-2-2) described fixing corrugated tubing (1-2-3) internal running through, rotates push shaft (1-2-2) with fixing Corrugated tubing (1-2-3) screw thread rotation connects;Described rotation push shaft (1-2-2) bottom is provided with connecting shaft (1-2-4), wherein connecting shaft (1-2-4) having two, connecting shaft (1-2-4) is symmetrical about rotating push shaft (1-2-2) axis;Said two connecting shaft (1-2-4) one end is equipped with sealing plate (1-2-1);
Described rotation push shaft (1-2-2) and sealing plate (1-2-1) all with connecting shaft (1-2-4) chain connection.
One the most according to claim 1 has the flood control of monitoring alarm Functional City and assembles wall, it is characterised in that described anti- Flood plate (2) including: implant (2-1), linking groove (2-2), top plate (2-3), bottom plate (2-4);Described bottom plate (2-4) Being 1, top plate (2-3) is 2~10, and wherein bottom plate (2-4) is positioned at flood control board (2) lowermost end, and top plate (2-3) is positioned at Bottom plate (2-4) top;Described linking groove (2-2) is positioned at top plate (2-3) bottom, and linking groove (2-2) structure is trapezoidal Groove, wherein top plate (2-3) top is provided with raised rubber, and raised rubber is embedded in linking groove (2-2);Described top plate (2-3) being equipped with implant (2-1) with bottom plate (2-4) inside, wherein implant (2-1) is rectangular strip, implant (2-1) Level runs through top plate (2-3) and bottom plate (2-4).
One the most according to claim 5 have monitoring alarm Functional City flood control assemble wall, it is characterised in that described in fill out Filling thing (2-1) by macromolecular material pressing mold molding, constituent and the manufacture process of implant (2-1) are as follows:
One, implant (2-1) constituent:
Count by weight, 1,1,2, the 2-tetrahydrochysene perfluor tetradecane (alcohol) acrylate 52~85 parts, (S) alpha-cyano-phenoxy Benzyl (1R, 3R)-3-(2,2-dibromo vinyl)-2,2-dimethyl cyclopropane carboxylic acid's ester 120~240 parts, 3-(2,2-bis-chloroethenes Thiazolinyl)-2,2-dimethyl cyclopropane carboxylic acid 150~280 parts, pi-allyl-1,1,2,2-tetrafluoro ethylether 35~95 parts, methene Cyclopropane-2,2-diethyl dicarboxylate 96~250 parts, (1R)-trans-2,2-dimethyl-3-(2-methyl-1-propylene base)-ring Propanecarboxylic acid's-3-phenoxy benzyl ester 63~112 parts, concentration is (S)-alpha-cyano group-3-benzyloxy phenoxy of 55ppm~82ppm Base-(+)-cis-3-(2,2, dibromo vinyl)-2,2-dimethyl cyclopropane carboxylic acid's ester 73~135 parts, 3-(2,2-dichloroethylene Base)-2,2-dimethyl cyclopropane carboxylic acid 66~156 parts, alpha-cyano phenoxy benzyl (1R, 3R)-3-(2,2-dibromo vinyl)- 2,2 diyl first cyclopropanecarboxylcompounds 45~115 parts, cross-linking agent 110~187 parts, 2-cyano group-3-phenoxy benzyl-2,2,3,3- Tetramethyl-ring cyclopropanecarboxylic acid ester 180~265 parts, methacrylic acid 2,2,3,3-tetrafluoro propyl ester 78~152 parts, cis-2,2-diformazan Base-3-(2,2-dichloroethylene) cyclopropane-carboxylic acid 210~286 parts, cis-3-(2-chloro-3,3,3 ,-trifluoropropene base)-2,2- Dimethyl cyclopropane carboxylic acid 184~236 parts;
Described cross-linking agent is chlorinated polyethylene, acetic acid 2-(1,1-dimethyl ethyl) cyclohexyl, 4-cyclohexenyl group-1,2-dioctyl phthalate Any one in double (2-ethylhexyl) ester;
Two, the manufacture process of implant (2-1), comprises the steps of
1st step: add ultra-pure water 3650~4780 parts that electrical conductivity is 3.65 μ S/cm~8.75 μ S/cm in a kettle., start Agitator in reactor, rotating speed is 95rpm~170rpm, starts heat pump, makes reactor temperature rise to 80 DEG C~110 ℃;It is sequentially added into the 1,1,2,2-tetrahydrochysene perfluor tetradecane (alcohol) acrylate, (S) alpha-cyano-phenoxy benzyl (1R, 3R)-3- (2,2-dibromo vinyl)-2,2-dimethyl cyclopropane carboxylic acid's ester, 3-(2,2-dichloroethylene)-2,2-dimethylcyclopropane carboxylic Acid, stirring is to being completely dissolved, and regulation pH value is 6.5~8.5, and agitator speed is adjusted to 150rpm~280rpm, and temperature is 140 DEG C~180 DEG C, esterification 10~25 hours;
2nd step: take pi-allyl-1,1,2,2-tetrafluoro ethylether, methene cyclopropane-2,2-diethyl dicarboxylate pulverizes, Powder diameter is 700~1000 mesh;Add (1R)-trans-2,2-dimethyl-3-(2-methyl-1-propylene base)-cyclopropane carboxylic acid Acid-3-phenoxy benzyl ester mix homogeneously, is laid in pallet, and tiling thickness is 20mm~50mm, and employing dosage is 7.5kGy ~alpha ray irradiation 200 that 12.5kGy, energy are 8.0MeV~13.0MeV~350 minutes, and the β ray spoke of Isodose According to 250~400 minutes;
3rd step: through the 2nd step process mixed-powder be dissolved in (S)-alpha-cyano group-3-benzyloxy phenoxy base-(+)-cis-3-(2,2, two Bromo vinyl)-2, in 2-dimethyl cyclopropane carboxylic acid's ester, add reactor, agitator speed is 120rpm~190rpm, temperature It is 85 DEG C~140 DEG C, starts vacuum pump and make the vacuum of reactor reach-0.20MPa~2.25MPa, keep this state response 20~40 hours;Pressure release is also passed through radon gas, and making reacting kettle inner pressure is 0.75MPa~1.35MPa, and it is little that insulation stands 15~30 Time;Agitator speed is promoted to 250rpm~320rpm, simultaneous reactions still pressure release to 0MPa;It is sequentially added into 3-(2,2-bis-chloroethene Thiazolinyl)-2,2-dimethyl cyclopropane carboxylic acid, alpha-cyano phenoxy benzyl (1R, 3R)-3-(2,2-dibromo vinyl)-2,2 diyls After first cyclopropanecarboxylcompound is completely dissolved, add cross-linking agent stirring mixing so that the hydrophile-lipophile balance value of reactor solution is 6.5~8.4, insulation stands 25~50 hours;
4th step: when agitator speed is 260rpm~350rpm, is sequentially added into 2-cyano group-3-phenoxy benzyl-2, and 2,3,3- Tetramethyl-ring cyclopropanecarboxylic acid ester, methacrylic acid 2,2,3,3-tetrafluoro propyl ester, cis-2,2-dimethyl-3-(2,2-dichloroethylene Base) cyclopropane-carboxylic acid and cis-3-(2-chloro-3,3,3 ,-trifluoropropene base)-2,2-dimethyl cyclopropane carboxylic acid, promote reactor Pressure so that it is reach 1.55MPa~4.75MPa, temperature is 270 DEG C~350 DEG C, polyreaction 30~45 hours;Reaction completes After reacting kettle inner pressure is down to 0MPa, be cooled to 25 DEG C~35 DEG C, discharging, enter molding press and can be prepared by implant (2-1).
7. a method of work with monitoring alarm Functional City flood control assembling wall, it is characterised in that the method includes following Several steps:
1st step: staff carries out the assembly working of this device, first, is placed in fixed panel by flood control board sealing device (1-2) (1-5), in internally installed groove, subsequently fixed panel (1-5) bottom is carried out bolt and fix;Secondly, by flood control board (2) bottom Bottom plate (2-4) embeds in support column (1) internally installed groove in advance, embeds some top plates (2-3) the most again, subsequently will flood control Plate hold down gag (1-1) is fixed on fixed panel (1-5) top;Finally, auxiliary is supported angled seat (4) and main support angled seat (5) Fix with ground, by main support rod (3) and fixed panel (1-5) and main support angled seat (5) chain connection;
2nd step: after this device has been fixed, now rotates the compression column spinner (1-1-1) of flood control board hold down gag (1-1), makes Compress Rubber end (1-1-4) and tightly suppress top plate (2-3), promote the linking groove (2-2) in flood control board (2) and top plate (2- 3) raised rubber is combined closely, and meanwhile flood control board hold down gag (1-1) internal dynamic torque sensor (1-1-6) starts Work, produces the signal of telecommunication in real time and transmits to middle control instrument (1-7), when dynamic torque sensor (1-1-6) detected value reaches middle control During instrument (1-7) setting value 330N.m, middle control instrument (1-7) sends information, represents that flood control board hold down gag (1-1) completes anti- Flood plate (2) compresses;
3rd step: this device is stopping during flood, the level sensor (1-3) being positioned on support column (1), water pressure sensing Hydrologic(al) regime monitored in real time by device (1-6) and super warning line alarm (1-1-3), and produces the signal of telecommunication and be sent to middle control instrument (1- 7), middle control instrument (1-7) shows level sensor (1-3) and hydraulic inductor (1-6) monitor value in real time;When water pressure monitoring value reaches During warning value 1.100MPa, middle control instrument (1-7) sends hydraulic pressure warning message, when water level reaches super warning line alarm (1-1- 3), during position, middle control instrument (1-7) sends water-level alarm information.
CN201610650169.0A 2016-08-08 2016-08-08 One kind has monitoring alarm Functional City flood control assembling wall and its method of work Expired - Fee Related CN106192888B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610650169.0A CN106192888B (en) 2016-08-08 2016-08-08 One kind has monitoring alarm Functional City flood control assembling wall and its method of work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610650169.0A CN106192888B (en) 2016-08-08 2016-08-08 One kind has monitoring alarm Functional City flood control assembling wall and its method of work

Publications (2)

Publication Number Publication Date
CN106192888A true CN106192888A (en) 2016-12-07
CN106192888B CN106192888B (en) 2018-02-02

Family

ID=57514019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610650169.0A Expired - Fee Related CN106192888B (en) 2016-08-08 2016-08-08 One kind has monitoring alarm Functional City flood control assembling wall and its method of work

Country Status (1)

Country Link
CN (1) CN106192888B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112227301A (en) * 2020-09-23 2021-01-15 李咸荣 Combined flood-fighting flood control plate based on hydraulic seal

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6840711B1 (en) * 2003-03-31 2005-01-11 Ross R. Martinez Flood control panel system
CN201952779U (en) * 2011-01-18 2011-08-31 黄顺仁 Flood prevention water retaining gate structure
CN105133542A (en) * 2015-08-25 2015-12-09 高瞻 Foldable plate-inserting type water stop door
CN105735862A (en) * 2016-04-01 2016-07-06 湖南力威泵阀设备有限公司 Flood prevention water-retaining door with rotating shaft structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6840711B1 (en) * 2003-03-31 2005-01-11 Ross R. Martinez Flood control panel system
CN201952779U (en) * 2011-01-18 2011-08-31 黄顺仁 Flood prevention water retaining gate structure
CN105133542A (en) * 2015-08-25 2015-12-09 高瞻 Foldable plate-inserting type water stop door
CN105735862A (en) * 2016-04-01 2016-07-06 湖南力威泵阀设备有限公司 Flood prevention water-retaining door with rotating shaft structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112227301A (en) * 2020-09-23 2021-01-15 李咸荣 Combined flood-fighting flood control plate based on hydraulic seal

Also Published As

Publication number Publication date
CN106192888B (en) 2018-02-02

Similar Documents

Publication Publication Date Title
CN106192888A (en) One has the flood control of monitoring alarm Functional City and assembles wall and method of work thereof
CN207048136U (en) A kind of drag-line termination connection system and its tensioning equipment
CN104314776B (en) Assembled prestressed tower drum for offshore and onshore wind turbine generators
CN112982430B (en) Artificial anchor eye grout-replenishing device for preventing leakage of sand grout and insufficient grouting
CN101994877A (en) Lining-type reinforced concrete anticorrosion compound pipeline
CN106320367B (en) The prestressed rock anchor rod foundation of replaceable anchor pole
CN108487340A (en) The anchor connection method anti-pulling device of unit for single-pile vertical anti-pulling static test
CN207194930U (en) A kind of mining pallet support apparatus
CN104612455B (en) Blower fan concrete tower and the integral structure on basis
CN105804098B (en) The pre-applied force anchor system and its construction method of slope protection device
CN103000003B (en) Bulb tubular water turbine generator set runner connecting bolt fracture warning device
CN206918422U (en) A kind of Novel civil air defense engineering tubular construction through walls
CN207193967U (en) A kind of prestressed concrete pipe pile end plate
CN206298875U (en) For the antiseepage film of Face Slab of Concrete of Rock-fill Dam lash-up recovering under water
CN106089592B (en) A kind of double blades wind power generating set with vertical shaft and its working method
CN207862921U (en) A kind of recyclable deep hole pile cages anti-floating and hanging apparatus
CN204959717U (en) Marine fixed platform uses from closed packer
CN107191685A (en) A kind of Novel civil air defense engineering tubular construction through walls
CN210767314U (en) Fireproof heat-preservation steel structure
CN214657052U (en) Manual anchor eye grout filling device
CN206581680U (en) A kind of flange form reinforced concrete electric pole
CN206640241U (en) A kind of rod-type no-welding borehole cable crane span structure
CN202577938U (en) Scaffold embedded assembled wall connecting device
CN221372278U (en) Waterproof component for connection of anti-floating anchor rod and bottom plate
CN218374391U (en) Fireproof steel structure for building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180202