CN106192724A CN201610572752.4A CN201610572752A CN106192724A CN 106192724 A CN106192724 A CN 106192724A CN 201610572752 A CN201610572752 A CN 201610572752A CN 106192724 A CN106192724 A CN 106192724A
Authority
CN
China
Prior art keywords
earthfill
roadbed
geonet
attachment structure
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610572752.4A
Other languages
Chinese (zh)
Other versions
CN106192724B (en
Inventor
肖桂元
李子农
陈学军
叶子明
李知翰
白汉营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guilin University of Technology
Original Assignee
Guilin University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guilin University of Technology filed Critical Guilin University of Technology
Priority to CN201610572752.4A priority Critical patent/CN106192724B/en
Publication of CN106192724A publication Critical patent/CN106192724A/en
Application granted granted Critical
Publication of CN106192724B publication Critical patent/CN106192724B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses the attachment structure of a kind of abutment Yu roadbed for processing problem of bumping at bridge-head.This attachment structure is between abutment and original roadbed, including CFG stake, earthfill structure, soil cement grouting treatment district and geonet;CFG stake is positioned at orlop, and it effectively reinforces original roadbed, for reducing the sedimentation of original roadbed;Earthfill structure is positioned on CFG stake, earthfill structure is separated by geonet and parallel layering is filled by filler, every layer of geonet layer each with earthfill structure filler is locked in together, form stability plane, for effectively reducing and control the deformation of this attachment structure, and each layer of earthfill structure is compacted after filling, it is possible to reduce the sedimentation of this attachment structure;Soil cement grouting treatment district is positioned at the top of earthfill structure, and wedge shaped, one end is connected with the Bridge-Culvert Platform Back after abutment, and the other end is connected with original roadbed.The attachment structure of the present invention promotes pavement life, reduces maintenance cost, promotes degree of safety and comfort level that vehicle travels.

Description

A kind of attachment structure of the abutment Yu roadbed for processing problem of bumping at bridge-head
Technical field
The invention belongs to road-bridge transition section processing technology field, particularly to a kind of bridge for processing problem of bumping at bridge-head Platform and the attachment structure of roadbed.
Background technology
The most both at home and abroad for problem of bumping at bridge-head, often hazard to bridge's pier is set at road-bridge transition section, or carries out foundation stabilization Process, such as methods such as sand compaction pile, CFG stake and pile tubes.From engineering practice effect, use hazard to bridge's pier, at attachment strap The road surface of end and roadbed intersection easily produce relative settlement and transverse crack, easily produce " secondary jumping car " problem;Adopt During with other single foundation reinforcement methods, filled height is excessive, or roadbed is different from the abutment sedimentation time, therefore can not be very Solve well abutment and settlement of subgrade problem.Therefore, the demand for new technique is extremely urgent.
Summary of the invention
It is an object of the invention to overcome deficiency of the prior art, it is provided that a kind of abutment for processing problem of bumping at bridge-head Attachment structure with roadbed.
The thinking of the present invention: with the pending region of soil cement grouting treatment, it is possible to largely improve the intensity banketed, And specially processing region is extended at original roadbed from Bridge-Culvert Platform Back, reach to reduce Bridge-Culvert Platform Back with original roadbed even Connect the purpose of place's sedimentation, and reduce the differential settlement of processing region and unprocessed region;Simultaneously without soil cement grouting treatment Region point multilamellar of banketing is filled, and arranges geonet between every layer, and banket intensity can be greatly improved, and reduces settling amount;Through processing Earthfill structure below ground all use CFG stake bracing reinforcement, at utmost reduce the sedimentation of recent fill, thus at utmost The problem solving bumping at bridge-head.
The present invention is achieved in that the attachment structure of a kind of abutment Yu roadbed for processing problem of bumping at bridge-head, should Attachment structure is between abutment and original roadbed;This attachment structure includes CFG stake, earthfill structure, soil cement grouting treatment district And geonet;CFG stake is positioned at orlop, and it effectively strengthens original roadbed, for reducing the sedimentation of original roadbed;Earthfill structure Being positioned on CFG stake, earthfill structure is separated by geonet and parallel layering is filled by filler, and every layer of geonet is each with earthfill structure Layer filler is locked in together, and forms stable plane, for effectively reducing and control the deformation of this attachment structure, and earthfill structure Each layer is compacted after filling, it is possible to reduce the sedimentation of this attachment structure;Soil cement grouting treatment district is positioned at the upper of earthfill structure Portion, wedge shaped, one end is connected with the Bridge-Culvert Platform Back after abutment, and the other end is connected with original roadbed, soil cement grouting treatment district By treated length is Bridge-Culvert Platform Back length the 1/2 ~ 2/3 of Bridge-Culvert Platform Back side, go deep into a length of 10 ~ 20m of original roadbed.
It is 9 ~ 13% that the soil water mud in described soil cement grouting treatment district mixes mass ratio.
Described geonet specification is material thickness 1.25mm, highly 10cm or 15cm, and geonet welds away from 40cm or 47cm, geonet Intensity index: hot strength >=25MPa, stretch modulus >=650MPa, weld seam room temperature peel strength >=100Ncm, low temperature brittleness temperature Spend≤50 DEG C.
The method have the advantages that
(1) remarkable in economical benefits.Every year problem of bumping at bridge-head is repaired for highway construction department and a large amount of money need to be put into Gold, significantly reduces the maintenance costs that annual end of the bridge processes, and promotes the service life on road surface.
(2) social benefit highlights.Problems of Bump at Highway Bridge Head be can effectively reduce, comfortableness and the safety of driving improved Property, produce preferable social benefit.
(3) various piece complements each other, and works in coordination, and effectively distributes top lotus by soil cement grouting treatment and geonet Carry so that the differential settlement between abutment and original roadbed is reduced significantly, it is achieved rigidity abutment and flexible road basic mode The smooth transition of amount.
Accompanying drawing explanation
Fig. 1 is that in the embodiment of the present invention, structure for the attachment structure of the abutment with roadbed that process problem of bumping at bridge-head is shown It is intended to.
The original roadbed of labelling in figure: 1-;2-CFG stake;3-Bridge-Culvert Platform Back;4-earthfill structure;5-soil cement grouting treatment District;6-geonet;7-abutment.
Detailed description of the invention
Embodiment:
The attachment structure of a kind of abutment Yu roadbed for processing problem of bumping at bridge-head, as it is shown in figure 1, this attachment structure is positioned at bridge Between platform 7 and original roadbed 1;This attachment structure includes CFG stake 2, earthfill structure 4, soil cement grouting treatment district 5 and geonet 6; CFG stake 2 is positioned at orlop, and it effectively strengthens original roadbed 1, for reducing the sedimentation of original roadbed 1;Earthfill structure 4 is positioned at On CFG stake 2, earthfill structure 4 is separated by geonet 6 and parallel layering is filled by filler, every layer of geonet 6 and earthfill structure 4 Each layer filler is locked in together, and forms stable plane, for effectively reducing and control the deformation of this attachment structure, and the knot that bankets The each layer of structure 4 is compacted after filling, it is possible to reduce the sedimentation of this attachment structure;Soil cement grouting treatment district 5 is positioned at earthfill structure 4 Top, wedge shaped, one end is connected with the Bridge-Culvert Platform Back 3 after abutment 7, and the other end is connected with original roadbed 1, soil cement be in the milk Treatment region 5, by treated length is Bridge-Culvert Platform Back 3 length the 2/3 of Bridge-Culvert Platform Back 3 side, gos deep into a length of of original roadbed 1 15m。
It is 11% that the soil water mud in described soil cement grouting treatment district 5 mixes mass ratio.
Described geonet 6 specification is material thickness 1.25mm, highly 15cm, and geonet 6 welds away from 47cm, geonet 6 intensity index: Hot strength is 25MPa, and stretch modulus is 650MPa, and weld seam room temperature peel strength is 100Ncm, and brittle temperature is 50 DEG C.
In the present embodiment, the attachment structure for the abutment and roadbed that process problem of bumping at bridge-head follows the steps below Construction:
1. original roadbed 1 pressure of shaking are flattened
Between transitional region to Bridge-Culvert Platform Back 3 and original roadbed 1, the original roadbed 1 below earthfill structure 4, carry out leveling and shake Pressure.
2. CFG stake 2 pile
CFG stake 2 is laid below earthfill structure 4.
3. earthfill structure 4 and geonet 6 are laid
Starting the most first to lay one layer of geonet 6 from bottom, earthfill structure 4 one end, geonet 6 top is fixed to bridges and culverts platform The back of the body 3, the other end is fixed to original roadbed 1, the artificial and mechanical mode combined of stone employing, first fills out thickness with machinery filling to void Degree, then use hand-stuff dead angle, then flatten and be compacted, laying complete one layer.
Repeating step 3. the most from the bottom to top, until laying to soil cement grouting treatment district 5, carrying out soil cement grouting solidification, I.e. complete the construction of attachment structure.

Claims (1)

1. one kind is used for processing the abutment of problem of bumping at bridge-head and the attachment structure of roadbed, it is characterised in that this attachment structure is positioned at Between abutment (7) and original roadbed (1);This attachment structure includes CFG stake (2), earthfill structure (4), soil cement grouting treatment district And geonet (6) (5);CFG stake (2) is positioned at orlop, and it effectively strengthens original roadbed (1), is used for reducing original roadbed (1) Sedimentation;Earthfill structure (4) is positioned on CFG stake (2), and earthfill structure (4) is separated by geonet (6) and parallel layering is by filler Filling, every layer of geonet (6) is locked in together with earthfill structure (4) each layer filler, forms stable plane, for effectively reducing With control the deformation of this attachment structure, and earthfill structure (4) each layer is compacted after filling, it is possible to reduce the heavy of this attachment structure Fall;Soil cement grouting treatment district (5) is positioned at the top of earthfill structure (4), wedge shaped, one end and abutment (7) bridges and culverts platform below The back of the body (3) connects, and the other end is connected with original roadbed (1), and soil cement grouting treatment district (5) is by the process of Bridge-Culvert Platform Back (3) side The 1/2 ~ 2/3 of a length of Bridge-Culvert Platform Back (3) length, gos deep into a length of 10 ~ 20m of original roadbed (1);
It is 9 ~ 13% that the soil water mud of described soil cement grouting treatment district (5) mixes mass ratio;
Described geonet (6) specification is material thickness 1.25mm, highly 10cm or 15cm, and geonet (6) weldering is away from 40cm or 47cm, geotechnique Net (6) intensity index: hot strength >=25MPa, stretch modulus >=650MPa, weld seam room temperature peel strength >=100Ncm, low temperature Brittle temperature≤50 DEG C.
CN201610572752.4A 2016-07-21 2016-07-21 A kind of attachment structure for being used to handle the abutment and roadbed of problem of bumping at bridge-head Active CN106192724B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610572752.4A CN106192724B (en) 2016-07-21 2016-07-21 A kind of attachment structure for being used to handle the abutment and roadbed of problem of bumping at bridge-head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610572752.4A CN106192724B (en) 2016-07-21 2016-07-21 A kind of attachment structure for being used to handle the abutment and roadbed of problem of bumping at bridge-head

Publications (2)

Publication Number Publication Date
CN106192724A true CN106192724A (en) 2016-12-07
CN106192724B CN106192724B (en) 2018-01-12

Family

ID=57493689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610572752.4A Active CN106192724B (en) 2016-07-21 2016-07-21 A kind of attachment structure for being used to handle the abutment and roadbed of problem of bumping at bridge-head

Country Status (1)

Country Link
CN (1) CN106192724B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820715A (en) * 2019-10-18 2020-02-21 桂林理工大学 Device and method for reducing problem of vehicle jumping at road and bridge transition section
CN115262586A (en) * 2022-07-29 2022-11-01 中国二十冶集团有限公司 Construction method for box culvert back backfilling

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005113467A (en) * 2003-10-07 2005-04-28 Railway Technical Res Inst Method of constructing reinforced soil abutment and pier, and structures of the same
US20080172808A1 (en) * 2005-04-18 2008-07-24 George Leslie England Bridge Structures
CN102041759A (en) * 2010-11-26 2011-05-04 合肥工业大学科教开发部 Transition roadway for managing bumping at bridge-head
CN103628376A (en) * 2013-11-20 2014-03-12 长安大学 Bridgehead vehicle bumping prevention structure based on concrete composite pavement and laying method thereof
CN204780566U (en) * 2015-05-18 2015-11-18 上海市政工程设计研究总院(集团)有限公司 Eliminate either end of a bridge and jump bridge ground connection segment structure of car
CN105220620A (en) * 2015-10-20 2016-01-06 合肥市市政设计院有限公司 The bumping at bridge-head processing method of darker mud soft soil foundation after platform
CN205188819U (en) * 2015-12-08 2016-04-27 郑州大学 Support arrangement for prevent either end of a bridge jump car

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005113467A (en) * 2003-10-07 2005-04-28 Railway Technical Res Inst Method of constructing reinforced soil abutment and pier, and structures of the same
US20080172808A1 (en) * 2005-04-18 2008-07-24 George Leslie England Bridge Structures
CN102041759A (en) * 2010-11-26 2011-05-04 合肥工业大学科教开发部 Transition roadway for managing bumping at bridge-head
CN103628376A (en) * 2013-11-20 2014-03-12 长安大学 Bridgehead vehicle bumping prevention structure based on concrete composite pavement and laying method thereof
CN204780566U (en) * 2015-05-18 2015-11-18 上海市政工程设计研究总院(集团)有限公司 Eliminate either end of a bridge and jump bridge ground connection segment structure of car
CN105220620A (en) * 2015-10-20 2016-01-06 合肥市市政设计院有限公司 The bumping at bridge-head processing method of darker mud soft soil foundation after platform
CN205188819U (en) * 2015-12-08 2016-04-27 郑州大学 Support arrangement for prevent either end of a bridge jump car

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820715A (en) * 2019-10-18 2020-02-21 桂林理工大学 Device and method for reducing problem of vehicle jumping at road and bridge transition section
CN115262586A (en) * 2022-07-29 2022-11-01 中国二十冶集团有限公司 Construction method for box culvert back backfilling
CN115262586B (en) * 2022-07-29 2023-07-21 中国二十冶集团有限公司 Construction method for backfilling box culvert back

Also Published As

Publication number Publication date
CN106192724B (en) 2018-01-12

Similar Documents

Publication Publication Date Title
CN103321118B (en) Bridge road transition section roadbed structure of deep layer yielding ground regions
CN204401447U (en) A kind of structure preventing bumping at bridge-head
CN103276639B (en) Roadbed structure for deep soft soil region
CN204418003U (en) A kind of bridge platform post processing combined system
CN108999045A (en) A kind of subgrade strengthening structure and its construction method preventing and treating bumping at bridge-head
CN103614961B (en) Stepped reinforced concrete slab capable of preventing abutment vehicle skips and construction method
CN204940030U (en) Reconstruction and extension project new-old concrete bond Pavement mosaic structure
CN106087758A (en) A kind of construction method of the road and bridge attachment structure for slowing down bumping at bridge-head
CN105113386A (en) Stage back suitable for preventing bridgehead bump on high filling subgrade
CN109853381A (en) A kind of transition structure and its construction method preventing and treating bumping at bridge-head
CN102979020A (en) Method and structure used for handling highway bridgehead bumping problem
CN104631251A (en) Geogrid chamber lightweight mixed soil reinforced structure for bridge head treatment
CN106192724A (en) A kind of attachment structure of the abutment Yu roadbed for processing problem of bumping at bridge-head
CN208869894U (en) The reinforced structure for preventing and treating old widening of subgrade position sedimentation and deformation
CN102635104A (en) Wedge-shaped Geocell cement reinforced soil structure for road-bridge connection and construction method thereof
CN207017093U (en) New-old concrete bond widens seam-line removal structure
CN104047213B (en) A kind of method for repairing road surface that can solve hard stratum and Soft Soil Layer sinking speed difference
CN105735151B (en) A kind of method for repairing road surface
CN106283966B (en) Medium-and low-speed maglev single line embankment location independence pier stud type support rail beam transition section structure
CN106283950B (en) Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure
CN106192649A (en) A kind of construction method processing problem of bumping at bridge-head
CN106638280A (en) Integrated bridge abutment structure for controlling earth pressure behind abutment and filled earth settlement and construction method
CN106284053A (en) A kind of road and bridge attachment structure effectively slowing down bumping at bridge-head
CN204898452U (en) Platform back of body structure of road bed either end of a bridge
CN206298822U (en) The seamless pavement structure that optimization CRCP is connected with floorings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20161207

Assignee: Guangxi Keming Engineering Survey and Design Co.,Ltd.

Assignor: GUILIN University OF TECHNOLOGY

Contract record no.: X2022450000078

Denomination of invention: A Connection Structure between Abutment and Subgrade for Dealing with Vehicle Bumping at Bridge Head

Granted publication date: 20180112

License type: Common License

Record date: 20221118

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20161207

Assignee: Guilin Science and Engineering Architectural Planning and Design Co.,Ltd.

Assignor: GUILIN University OF TECHNOLOGY

Contract record no.: X2022450000240

Denomination of invention: A Connection Structure between Abutment and Subgrade for Dealing with Vehicle Bumping at Bridge Head

Granted publication date: 20180112

License type: Common License

Record date: 20221206

EE01 Entry into force of recordation of patent licensing contract